CN108756196A - A kind of assembled architecture main body protective device and its construction method - Google Patents

A kind of assembled architecture main body protective device and its construction method Download PDF

Info

Publication number
CN108756196A
CN108756196A CN201810949360.4A CN201810949360A CN108756196A CN 108756196 A CN108756196 A CN 108756196A CN 201810949360 A CN201810949360 A CN 201810949360A CN 108756196 A CN108756196 A CN 108756196A
Authority
CN
China
Prior art keywords
protection
girder
operating platform
protective device
facade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810949360.4A
Other languages
Chinese (zh)
Inventor
尹家武
向俊志
宋梅香
张瑞
杨海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201810949360.4A priority Critical patent/CN108756196A/en
Publication of CN108756196A publication Critical patent/CN108756196A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/20Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开一种装配式建筑主体防护装置及其施工方法,该防护装置包括斜撑装置、操作平台和立面防护,所述立面防护垂直设置在操作平台上,操作平台固定设置在斜撑装置上,斜撑装置通过固定设置在预制墙板上,所述预制墙板在生产加工时预留有螺栓孔洞。本发明中装配式建筑防护装置为装配式建筑外墙施工提供了安全操作平台,解决了装配式建筑脚手架安装困难的问题,降低了装配式建筑外墙施工过程中工人发生安全事故的风险;同时该防护装置是一种标准化、拆装速度快、周转使用率高、施工便捷、安全稳固性能高,符合环保节能与绿色施工要求,推广应用前景广阔,具有显著经济和社会效益。

The invention discloses a prefabricated building body protection device and a construction method thereof. The protection device includes a diagonal brace device, an operating platform and a facade protection. The facade protection is vertically arranged on the operation platform, and the operation platform is fixedly arranged on the diagonal brace. On the device, the diagonal bracing device is fixedly arranged on the prefabricated wallboard, and the prefabricated wallboard is reserved with bolt holes during production and processing. The prefabricated building protection device in the present invention provides a safe operation platform for the construction of the prefabricated building exterior wall, solves the problem of difficult installation of prefabricated building scaffolding, and reduces the risk of safety accidents for workers during the construction of the prefabricated building exterior wall; at the same time The protective device is standardized, fast in disassembly and assembly, high in turnover rate, convenient in construction, high in safety and stability, meets the requirements of environmental protection, energy saving and green construction, has broad prospects for promotion and application, and has significant economic and social benefits.

Description

一种装配式建筑主体防护装置及其施工方法A prefabricated building main protective device and its construction method

技术领域technical field

本发明属于装配式建筑工程技术施工领域,具体的,涉及一种装配式建筑主体防护装置及其施工方法。The invention belongs to the technical construction field of prefabricated building engineering, and in particular relates to a protective device for a main body of a prefabricated building and a construction method thereof.

背景技术Background technique

装配式建筑是将成批生产的预制房屋构件运输到建筑现场后进行装配而成的建筑,按照预制构件的形式与施工方法分为砌砖建筑、板材建筑、盒式建筑、板材骨架建筑与升板升材建筑等五中类型,预制房屋构件是通过流水线进行机械化生产,因此生产速度更快、生产成本更低,装配式建筑相较于传统建筑更加节能环保,同时装配式建筑具有施工速度快、建设周期短、大量节约劳动力的有点,各省市对于装配式建筑的覆盖都有一定的要求,这些都促进了装配式建筑的发展,使装配式建筑逐渐成为建筑发展的趋势。The prefabricated building is a building assembled by transporting the prefabricated building components produced in batches to the construction site. According to the form and construction method of the prefabricated components, it is divided into brick building, plate building, box building, plate skeleton building and upgrade The prefabricated building components are mechanized through the assembly line, so the production speed is faster and the production cost is lower. Compared with the traditional building, the prefabricated building is more energy-saving and environmentally friendly. At the same time, the prefabricated building has a fast construction speed. , Short construction period, a lot of labor saving, all provinces and cities have certain requirements for the coverage of prefabricated buildings, these have promoted the development of prefabricated buildings, making prefabricated buildings gradually become the trend of construction development.

装配式建筑的外墙多为预制墙板,在装配过程中,为了避免影响预制墙板的结构安全,施工时不允许在预制墙板的外墙上重新开洞,这也知己导致了外脚手架无法进行搭设,工人只能在无操作平台的情况下进行外墙作业,易发生安全事故,造成人身和财产的损失,为了解决这一问题,提供一种装配拆卸方便、稳固安全的防护装置,本发明提供了以下技术方案。The outer walls of prefabricated buildings are mostly prefabricated wall panels. During the assembly process, in order to avoid affecting the structural safety of the prefabricated wall panels, it is not allowed to re-open holes on the outer walls of the prefabricated wall panels during construction, which also leads to external scaffolding. It cannot be erected, and workers can only work on the outer wall without an operating platform, which is prone to safety accidents, resulting in personal and property losses. In order to solve this problem, a protective device that is easy to assemble and disassemble, stable and safe is provided. The present invention provides the following technical solutions.

发明内容Contents of the invention

本发明的目的在于提供一种装配式建筑主体防护装置及其施工方法。The object of the present invention is to provide a prefabricated building body protection device and a construction method thereof.

本发明的目的可以通过以下技术方案实现:The purpose of the present invention can be achieved through the following technical solutions:

一种装配式建筑主体防护装置及其施工方法,该防护装置包括斜撑装置、操作平台和立面防护,所述立面防护垂直设置在操作平台上,操作平台固定设置在斜撑装置上,斜撑装置通过固定设置在预制墙板上,所述预制墙板在生产加工时预留有螺栓孔洞;A prefabricated building body protection device and its construction method, the protection device includes a diagonal brace device, an operating platform and a facade protection, the facade protection is vertically arranged on the operation platform, and the operation platform is fixedly arranged on the diagonal brace device, The diagonal bracing device is fixed on the prefabricated wallboard, and the prefabricated wallboard has bolt holes reserved during production and processing;

所述斜撑装置包括主横梁、竖梁和斜梁,主横梁的左右两端分别连接竖梁的一端与斜梁的一端,所述主横梁与竖梁垂直焊接连接,所述斜梁的另一端与竖梁的另一端焊接连接,所述竖梁上开有螺栓孔,竖梁通过固定螺栓固定在预制墙板上;The diagonal bracing device includes a main beam, a vertical beam and an oblique beam. The left and right ends of the main beam are respectively connected to one end of the vertical beam and one end of the oblique beam. The main beam and the vertical beam are vertically welded and connected. One end is welded to the other end of the vertical beam, and the vertical beam is provided with a bolt hole, and the vertical beam is fixed on the prefabricated wallboard by fixing bolts;

所述操作平台包括由主梁相互垂直组成的主梁框,两平行主梁之间设置有若干次梁,主梁与次梁装配形成操作平台框架,操作平台框架上铺设平台板,操作平台框架与平台板通过点焊的方式固定连接;The operating platform includes a main beam frame composed of main girders perpendicular to each other. Several secondary beams are arranged between two parallel main beams. It is fixedly connected with the platform plate by spot welding;

所述立面防护包括若干平行设置的防护主梁以及与防护主梁垂直设置的若干防护横梁,防护横梁等间距设置,所述防护主梁与防护横梁的一侧设置有方格铁网,立面防护与操作平台垂直设置,其中防护主梁与主梁垂直焊接连接。The facade protection includes several protective main beams arranged in parallel and several protective beams perpendicular to the protective main beams. The protective beams are arranged at equal intervals. The surface protection is set vertically to the operating platform, and the protective girder is vertically welded to the main girder.

作为本发明的进一步方案,每一个所述操作平台的底部对应设置有斜撑装置2~3组。As a further solution of the present invention, 2 to 3 groups of diagonal bracing devices are correspondingly provided at the bottom of each operation platform.

作为本发明的进一步方案,所述斜梁与所述竖梁之间的倾角为45°~60°,斜梁与竖梁之间设置次横梁,次横梁的两端分别与并与斜梁和竖梁焊接连接。As a further solution of the present invention, the inclination angle between the inclined beam and the vertical beam is 45° to 60°, and a secondary beam is arranged between the inclined beam and the vertical beam, and the two ends of the secondary beam are connected with the inclined beam and the vertical beam respectively. Vertical girder welded connection.

作为本发明的进一步方案,所述主梁与斜撑装置主横梁均开设有螺栓孔,主梁与主横梁通过连接螺栓固定连接,螺帽的内侧加设有垫片。As a further solution of the present invention, the main beam and the main beam of the diagonal bracing device are provided with bolt holes, the main beam and the main beam are fixedly connected by connecting bolts, and gaskets are added inside the nuts.

作为本发明的进一步方案,所述平台板为压花钢板。As a further solution of the present invention, the platform plate is an embossed steel plate.

作为本发明的进一步方案,该防护装置的施工方法包括以下步骤:As a further solution of the present invention, the construction method of the protective device comprises the following steps:

S1:将主梁和次梁采用焊接的方式固定连接,形成操作平台框架,操作平台框架上采用点焊的方式铺设固定有平台板形成操作平台;S1: The main beam and the secondary beam are fixedly connected by welding to form the operating platform frame, and the platform plate is laid and fixed on the operating platform frame by spot welding to form the operating platform;

S2:将立面防护的防护主梁垂直焊接在操作平台的主梁上,并在防护主梁之间嵌入防护横梁,并采用焊接的方式进行固定牢固形成立面防护;S2: Vertically weld the protective main beam of the facade protection to the main beam of the operation platform, and embed the protective beam between the protective main beams, and fix it firmly by welding to form the facade protection;

S3:将主横梁、竖梁与斜梁采用焊接的方式固定连接,并在竖梁和斜梁之间焊接次横梁,在主横梁两端打设螺栓孔洞,形成斜撑装置;S3: The main beam, vertical beam and inclined beam are fixedly connected by welding, and the secondary beam is welded between the vertical beam and the inclined beam, and bolt holes are drilled at both ends of the main beam to form a diagonal bracing device;

S4:将组装好的斜撑装置通过固定螺栓固定在预制墙板上,固定螺栓内外侧均加设垫片,并加固牢固;S4: Fix the assembled diagonal bracing device on the prefabricated wallboard through fixing bolts, add gaskets on the inside and outside of the fixing bolts, and reinforce them firmly;

S5:安装:将带有立面防护的操作平台缓缓吊运至斜撑装置上方,操作平台的主梁与斜撑装置的主横梁通过连接螺栓固定连接,螺帽内侧加设垫片,并加固牢固;S5: Installation: Slowly lift the operation platform with facade protection above the diagonal bracing device, the main beam of the operating platform and the main beam of the diagonal bracing device are fixedly connected by connecting bolts, and gaskets are added inside the nuts, and Reinforced firmly;

S6:施工层各个工序施工完成后,装配式建筑主体防护装置拆除、周转至下一楼层安装使用;S6: After the construction of each process of the construction layer is completed, the main protective device of the prefabricated building is removed and transferred to the next floor for installation and use;

S7:拆除:首先拆除连接螺栓,并将带有立面防护的操作平台缓缓吊运至指定材料中转场地,其次拆除固定螺栓,将斜撑装置亦转运至指定材料中转场地;S7: Dismantling: first remove the connecting bolts, and slowly lift the operation platform with facade protection to the designated material transfer site, then remove the fixing bolts, and transfer the diagonal bracing device to the designated material transfer site;

S8:周转:待下一层预制墙板安装并浇筑完成后,对装配式建筑主体防护装置进行安装;S8: Turnover: After the next layer of prefabricated wall panels is installed and poured, install the main protective device of the prefabricated building;

S9:回收:利用塔吊将防护装置吊运至中转场地备用。S9: Recovery: use the tower crane to lift the protective device to the transfer site for standby.

本发明的有益效果:Beneficial effects of the present invention:

1、本发明中装配式建筑防护装置为装配式建筑外墙施工提供了安全操作平台,解决了装配式建筑脚手架安装困难的问题,降低了装配式建筑外墙施工过程中工人发生安全事故的风险;1. The prefabricated building protection device in the present invention provides a safe operation platform for the construction of the prefabricated building exterior wall, solves the problem of difficult installation of prefabricated building scaffolding, and reduces the risk of safety accidents for workers during the construction of prefabricated building exterior walls ;

2、本发明中装配式建筑防护装置是提供一种标准化、拆装速度快、周转使用率高、施工便捷、安全稳固性能高,符合环保节能与绿色施工要求,推广应用前景广阔,具有显著经济和社会效益;2. The prefabricated building protective device in the present invention provides a standardization, fast disassembly and assembly, high turnover utilization rate, convenient construction, high safety and stability performance, meets the requirements of environmental protection, energy saving and green construction, has broad prospects for promotion and application, and has significant economic benefits. and social benefits;

3、本发明中装配式建筑防护装置安全可靠,安拆方便,结构灵活,提高施工效率的同时也降低了施工成本。3. The prefabricated building protective device in the present invention is safe and reliable, easy to install and disassemble, flexible in structure, improves construction efficiency and reduces construction cost.

附图说明Description of drawings

下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1是本发明装配式建筑防护装置剖面图;Fig. 1 is a cross-sectional view of a prefabricated building protective device of the present invention;

图2是本发明装配式建筑防护装置立面图;Fig. 2 is the elevation view of the prefabricated building protective device of the present invention;

图3是本发明装配式建筑防护装置平面图;Fig. 3 is a plan view of the prefabricated building protective device of the present invention;

图4是本发明的局部结构示意图。Fig. 4 is a schematic diagram of a partial structure of the present invention.

具体实施方式Detailed ways

下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The following clearly and completely describes the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

一种装配式建筑主体防护装置,如图1、图2所示,包括斜撑装置、操作平台和立面防护,所述立面防护垂直设置在操作平台上,操作平台固定设置在斜撑装置上,每一个操作平台的底部对应设置有斜撑装置2~3组,斜撑装置通过螺栓固定设置在预制墙板14上,所述预制墙板14在生产加工时预留有螺栓孔洞。A prefabricated building body protection device, as shown in Figure 1 and Figure 2, includes a diagonal brace device, an operating platform and a facade protection, the facade protection is vertically arranged on the operation platform, and the operation platform is fixedly arranged on the diagonal brace device Above, the bottom of each operating platform is provided with 2 to 3 groups of diagonal bracing devices. The diagonal bracing devices are fixed on the prefabricated wallboard 14 by bolts. The prefabricated wallboard 14 has bolt holes reserved during production and processing.

所述斜撑装置包括主横梁7、竖梁8和斜梁9,主横梁7的左右两端分别连接竖梁8的一端与斜梁9的一端,所述主横梁7与竖梁8垂直焊接连接,所述斜梁9的另一端与竖梁8的另一端焊接连接,斜梁9与竖梁8之间的倾角为45°~60°,所述的斜梁9与竖梁8之间设置次横梁10,次横梁10的两端分别与并与斜梁9和竖梁8焊接连接,能够有效加强斜撑装置的结构强度与稳定性,所述竖梁8上开有螺栓孔,竖梁8通过固定螺栓11固定在预制墙板14上;Described brace device comprises main crossbeam 7, vertical beam 8 and inclined beam 9, and the left and right ends of main crossbeam 7 connects one end of vertical beam 8 and one end of inclined beam 9 respectively, and described main crossbeam 7 and vertical beam 8 are welded vertically connection, the other end of the inclined beam 9 is welded to the other end of the vertical beam 8, the inclination angle between the inclined beam 9 and the vertical beam 8 is 45° to 60°, and the angle between the inclined beam 9 and the vertical beam 8 The secondary crossbeam 10 is set, and the two ends of the secondary crossbeam 10 are respectively connected with the inclined beam 9 and the vertical beam 8 by welding, which can effectively strengthen the structural strength and stability of the diagonal brace device. Bolt holes are provided on the vertical beam 8, and the vertical The beam 8 is fixed on the prefabricated wall panel 14 by fixing bolts 11;

如图3所示,所述操作平台包括由主梁1相互垂直组成的主梁框,两平行主梁1之间设置有若干次梁2,主梁1与次梁2装配形成操作平台框架,操作平台框架上铺设平台板3,操作平台框架与平台板3通过点焊的方式固定连接,在本发明的一个实施例中,平台板3为压花钢板,如图4所示,所述主梁1与斜撑装置主横梁7均开设有螺栓孔,主梁1与主横梁7通过连接螺栓16固定连接,螺帽17的内侧加设有垫片18,所述斜撑装置与操作平台之间通过螺栓活动连接,使防护装置的各零部件能够分拆进行运输,防护装置的结构更加灵活可靠;As shown in Figure 3, the operating platform includes a main beam frame composed of main beams 1 perpendicular to each other, several secondary beams 2 are arranged between two parallel main beams 1, and the main beams 1 and secondary beams 2 are assembled to form an operating platform frame. The platform board 3 is laid on the operating platform frame, and the operating platform frame is fixedly connected with the platform board 3 by spot welding. In one embodiment of the present invention, the platform board 3 is an embossed steel plate, as shown in Figure 4, the main Both the beam 1 and the main beam 7 of the diagonal brace device are provided with bolt holes, the main beam 1 and the main beam 7 are fixedly connected by connecting bolts 16, and the inside of the nut 17 is provided with a gasket 18, between the diagonal brace device and the operating platform The parts are connected by bolts, so that the parts of the protective device can be disassembled for transportation, and the structure of the protective device is more flexible and reliable;

所述立面防护包括若干平行设置的防护主梁4以及与防护主梁4垂直设置的若干防护横梁5,防护横梁5等间距设置,所述防护主梁4与防护横梁5的一侧设置有方格铁网6,所述立面防护与操作平台垂直设置,其中防护主梁4与主梁1垂直焊接连接。Described façade protection comprises some protective main beams 4 that are arranged in parallel and some protective beams 5 that are vertically arranged with protective main beams 4, and protective beams 5 are equidistantly arranged, and one side of described protective main beams 4 and protective beams 5 is provided with Grid iron net 6, the facade protection and the operation platform are arranged vertically, wherein the protective girder 4 and the girder 1 are vertically welded and connected.

一种装配式建筑主体防护装置的施工方法包括以下步骤:A construction method of a prefabricated building body protection device comprises the following steps:

S1:将主梁1和次梁2采用焊接的方式固定连接,形成操作平台框架,操作平台框架上采用点焊的方式铺设固定有平台板3形成操作平台;S1: The main beam 1 and the secondary beam 2 are fixedly connected by welding to form the operating platform frame, and the platform plate 3 is laid and fixed on the operating platform frame by spot welding to form an operating platform;

S2:将立面防护的防护主梁4垂直焊接在操作平台的主梁1上,并在防护主梁4之间嵌入防护横梁5,并采用焊接的方式进行固定牢固形成立面防护;S2: Vertically weld the protective main beam 4 of the facade protection on the main beam 1 of the operation platform, and embed the protective beam 5 between the protective main beams 4, and fix and firmly form the facade protection by welding;

S3:将主横梁7、竖梁8与斜梁9采用焊接的方式固定连接,并在竖梁8和斜梁9之间焊接次横梁10,在主横梁7两端打设螺栓孔洞,形成斜撑装置;S3: The main beam 7, the vertical beam 8 and the inclined beam 9 are fixedly connected by welding, and the secondary beam 10 is welded between the vertical beam 8 and the inclined beam 9, and bolt holes are drilled at both ends of the main beam 7 to form an inclined beam. support device;

S4:将组装好的斜撑装置通过固定螺栓11固定在预制墙板14上,固定螺栓11内外侧均加设垫片,并加固牢固;S4: Fix the assembled diagonal bracing device on the prefabricated wall panel 14 through the fixing bolt 11, add gaskets on the inner and outer sides of the fixing bolt 11, and reinforce it firmly;

S5:安装:将带有立面防护的操作平台缓缓吊运至斜撑装置上方,操作平台的主梁1与斜撑装置的主横梁7通过连接螺栓16固定连接,螺帽17内侧加设垫片18,并加固牢固;S5: Installation: Slowly lift the operation platform with facade protection above the diagonal bracing device, the main beam 1 of the operating platform and the main beam 7 of the diagonal bracing device are fixedly connected by connecting bolts 16, and the inner side of the nut 17 is installed Gasket 18, and reinforced firmly;

S6:施工层各个工序施工完成后,装配式建筑主体防护装置拆除、周转至下一楼层安装使用;S6: After the construction of each process of the construction layer is completed, the main protective device of the prefabricated building is removed and transferred to the next floor for installation and use;

S7:拆除:首先拆除连接螺栓16,并将带有立面防护的操作平台缓缓吊运至指定材料中转场地,其次拆除固定螺栓11,将斜撑装置亦转运至指定材料中转场地;S7: Dismantling: first remove the connecting bolts 16, and slowly lift the operation platform with facade protection to the designated material transfer site, then remove the fixing bolts 11, and transfer the diagonal bracing device to the designated material transfer site;

S8:周转:待下一层预制墙板安装并浇筑完成后,对装配式建筑主体防护装置进行安装;S8: Turnover: After the next layer of prefabricated wall panels is installed and poured, install the main protective device of the prefabricated building;

S9:回收:利用塔吊将防护框架吊运至中转场地备用;S9: Recycling: use the tower crane to lift the protective frame to the transfer site for standby;

本发明实施例所述防护装置在加工、制作时,可根据建筑物的造型进行单片设计,但单片防护装置至少设计2组斜撑装置,且防护装置在吊运安装时,防护装置可以多楼层连续设置、安装并使用。The protection device described in the embodiment of the present invention can be designed in a single piece according to the shape of the building during processing and production, but at least two sets of diagonal braces are designed for the single protection device, and the protection device can Multi-floor continuous setting, installation and use.

以上内容仅仅是对本发明结构所作的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。The above content is only an example and description of the structure of the present invention. Those skilled in the art make various modifications or supplements to the described specific embodiments or replace them in similar ways, as long as they do not deviate from the structure of the invention or Anything beyond the scope defined in the claims shall belong to the protection scope of the present invention.

Claims (6)

1. a kind of assembled architecture main body protective device and its construction method, which is characterized in that the protective device includes diagonal brace dress It sets, the protection of operating platform and facade, the facade protection is vertically arranged on the operational platform, and operating platform is fixed at diagonal brace On device, for bracing device by being fixed on prefabricated panel (14), the prefabricated panel (14) is reserved in production and processing There is bolt hole;
The bracing device includes main beam (7), vertical beam (8) and cant beam (9), and the left and right ends of main beam (7) are separately connected perpendicular One end of one end and cant beam (9) of beam (8), the main beam (7) connect with vertical beam (8) vertical welding, the cant beam (9) it is another The other end of one end and vertical beam (8) is welded to connect, and bolt hole is provided on the vertical beam (8), and vertical beam (8) passes through fixing bolt (11) It is fixed on prefabricated panel (14);
The operating platform includes the girder frame for being mutually perpendicular to form by girder (1), is provided between two parallel spines (1) several Secondary beam (2), girder (1) are assembled to form operating platform frame with secondary beam (2), landing slab (3), operation are laid on operating platform frame Platform framework is fixedly connected with landing slab (3) by way of spot welding;
Facade protection include several protection girders (4) disposed in parallel and with protect girder (4) vertically disposed several Crossbeam (5) is protected, crossbeam (5) spaced set, the side side of being provided with of the protection girder (4) and protection crossbeam (5) are protected Lattice iron net (6), facade protection is vertically arranged with operating platform, wherein protection girder (4) is connect with girder (1) vertical welding.
2. a kind of assembled architecture main body protective device according to claim 1 and its construction method, which is characterized in that every The bottom of one operating platform is correspondingly arranged on 2~3 groups of bracing device.
3. a kind of assembled architecture main body protective device according to claim 1 and its construction method, which is characterized in that institute The inclination angle stated between cant beam (9) and the vertical beam (8) is 45 °~60 °, and time crossbeam is arranged between cant beam (9) and vertical beam (8) (10), the both ends of secondary crossbeam (10) are welded to connect with and with cant beam (9) and vertical beam (8) respectively.
4. a kind of assembled architecture main body protective device according to claim 1 and its construction method, which is characterized in that institute It states girder (1) and offers bolt hole with bracing device main beam (7), girder (1) is with main beam (7) by connecting bolt (16) It is fixedly connected, gasket (18) is equipped on the inside of nut (17).
5. a kind of assembled architecture main body protective device according to claim 1 and its construction method, which is characterized in that institute It is embossed steel plates to state landing slab (3).
6. a kind of assembled architecture main body protective device according to claim 1 and its construction method, which is characterized in that should The construction method of protective device includes the following steps:
S1:Girder (1) is fixedly connected with secondary beam (2) by the way of welding, formation operation platform framework, operating platform frame On be laid with by the way of spot welding and be fixed with landing slab (3) formation operation platform;
S2:By facade protect protection girder (4) be vertically welded on the girder (1) of operating platform, and protection girder (4) it Between embedded protection crossbeam (5), and securely form facade using being fixed by the way of welding and protect;
S3:Main beam (7), vertical beam (8) are fixedly connected with cant beam (9) by the way of welding, and in vertical beam (8) and cant beam (9) time crossbeam (10) is welded between, is set bolt hole at main beam (7) both ends, is formed bracing device;
S4:Assembled bracing device is fixed on by fixing bolt (11) on prefabricated panel (14), in fixing bolt (11) Outside adds gasket, and reinforces secured;
S5:Installation:The operating platform protected with facade is slowly hoisted to above bracing device, the girder (1) of operating platform It is fixedly connected with the main beam (7) of bracing device by connecting bolt (16), adds gasket (18) on the inside of nut (17), and reinforce Securely;
S6:After the completion of each process construction of construction layer, assembled architecture main body protective device is removed, goes to next floor installation week It uses;
S7:It removes:Connection bolt (16) is removed first, and will slowly be hoisted to specified material with the operating platform that facade protects Secondly transfer place removes fixing bolt (11), bracing device is also transported to specified material transfer place;
S8:Turnover:After the completion of waiting for that next layer of prefabricated panel is installed and poured, assembled architecture main body protective device is pacified Dress;
S9:Recycling:It is spare that protective device is hoisted to transfer place using tower crane.
CN201810949360.4A 2018-08-20 2018-08-20 A kind of assembled architecture main body protective device and its construction method Pending CN108756196A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810949360.4A CN108756196A (en) 2018-08-20 2018-08-20 A kind of assembled architecture main body protective device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810949360.4A CN108756196A (en) 2018-08-20 2018-08-20 A kind of assembled architecture main body protective device and its construction method

Publications (1)

Publication Number Publication Date
CN108756196A true CN108756196A (en) 2018-11-06

Family

ID=63967269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810949360.4A Pending CN108756196A (en) 2018-08-20 2018-08-20 A kind of assembled architecture main body protective device and its construction method

Country Status (1)

Country Link
CN (1) CN108756196A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518981A (en) * 2018-11-21 2019-03-26 中国建筑第四工程局有限公司 Protective device with shaped and its construction method at a kind of assembled architecture work layer stair transformation platform
CN110965761A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Scaffold suitable for multilayer assembled shear wall and construction method thereof
CN111844426A (en) * 2020-07-14 2020-10-30 中天建设集团有限公司 Prefabricated outer wall embedded with triangular cantilever mounting structure and manufacturing and mounting method thereof
CN114809659A (en) * 2022-05-16 2022-07-29 北京城建北方集团有限公司 Unloading platform for construction engineering and construction method thereof
CN116378226A (en) * 2023-05-08 2023-07-04 中建八局(海南)建设有限公司 Wall facility fixing device of assembled building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130091452A (en) * 2012-02-08 2013-08-19 현대알루미늄(주) Structure for safety working foothold having form fixing means
CN204001652U (en) * 2014-08-04 2014-12-10 江苏省苏中建设集团股份有限公司沈阳分公司 The portable exterior wall operating platform of fabricated shear wall structure
CN205012627U (en) * 2015-07-02 2016-02-03 中天建设集团有限公司 Assembly type structure outer wall protects stores pylon outward
CN106677509A (en) * 2017-02-14 2017-05-17 中天建设集团有限公司 Design finalization external protective frame system used for assembly type building construction
CN107524284A (en) * 2017-09-18 2017-12-29 山东天齐置业集团股份有限公司 A kind of regularization pylon protection system and installation method
CN208950275U (en) * 2018-08-20 2019-06-07 中建四局第六建筑工程有限公司 A kind of assembled architecture main body protective device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130091452A (en) * 2012-02-08 2013-08-19 현대알루미늄(주) Structure for safety working foothold having form fixing means
CN204001652U (en) * 2014-08-04 2014-12-10 江苏省苏中建设集团股份有限公司沈阳分公司 The portable exterior wall operating platform of fabricated shear wall structure
CN205012627U (en) * 2015-07-02 2016-02-03 中天建设集团有限公司 Assembly type structure outer wall protects stores pylon outward
CN106677509A (en) * 2017-02-14 2017-05-17 中天建设集团有限公司 Design finalization external protective frame system used for assembly type building construction
CN107524284A (en) * 2017-09-18 2017-12-29 山东天齐置业集团股份有限公司 A kind of regularization pylon protection system and installation method
CN208950275U (en) * 2018-08-20 2019-06-07 中建四局第六建筑工程有限公司 A kind of assembled architecture main body protective device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518981A (en) * 2018-11-21 2019-03-26 中国建筑第四工程局有限公司 Protective device with shaped and its construction method at a kind of assembled architecture work layer stair transformation platform
CN109518981B (en) * 2018-11-21 2024-04-02 中国建筑第四工程局有限公司 Shaping protection device at building ladder conversion platform of fabricated building operation and construction method thereof
CN110965761A (en) * 2019-12-31 2020-04-07 广西建工集团第五建筑工程有限责任公司 Scaffold suitable for multilayer assembled shear wall and construction method thereof
CN111844426A (en) * 2020-07-14 2020-10-30 中天建设集团有限公司 Prefabricated outer wall embedded with triangular cantilever mounting structure and manufacturing and mounting method thereof
CN114809659A (en) * 2022-05-16 2022-07-29 北京城建北方集团有限公司 Unloading platform for construction engineering and construction method thereof
CN116378226A (en) * 2023-05-08 2023-07-04 中建八局(海南)建设有限公司 Wall facility fixing device of assembled building

Similar Documents

Publication Publication Date Title
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN108756196A (en) A kind of assembled architecture main body protective device and its construction method
CN103821276B (en) A kind of assembled, modular architectural system
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN206859479U (en) A kind of steel bar girder laminated floor slab
CN207260319U (en) Integrated module assembled arthitecutral structure
CN102661019A (en) Heat preservation and decoration integrated construction method for outer wall of building
CN107191000A (en) The temporary support of telescopic in height regulation reinforces combination steel construction
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN105952044A (en) A fully prefabricated prestressed concrete floor structure and prestressed assembly method
CN110409492A (en) A multi-structure combined assembled pipe gallery with superimposed components and its construction method
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
CN204983173U (en) Steel construction beam -column connection node
CN105133767A (en) Manufacturing method for regular hexagonal honeycomb latticed steel hollow floor frame box type structure
CN104652661A (en) Semirigid frame-external recycled concrete wall panel and fabrication method
CN207794298U (en) A kind of standard cell mode building site bar that can be recycled
CN208950275U (en) A kind of assembled architecture main body protective device
CN205223857U (en) Edge of a wing broach template of prefabricated T roof beam or case roof beam
CN108412231A (en) Assembled is bolted reinforcing steel processing shed and its assemble method entirely
CN207905389U (en) Assembled is bolted reinforcing steel processing shed entirely
CN106006301A (en) High-altitude switching assisting device and construction method of super-high-rise construction elevator
CN206942191U (en) A kind of temporary support of telescopic in height regulation reinforces combination steel construction
CN206495497U (en) Build aluminum alloy mould plate crossbeam and floor combining structure
CN206397129U (en) Build aluminum alloy mould plate corner upright and wall panel assemblies structure
CN213774466U (en) Back-hang connecting floor bearing plate structure with steel adding structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106

RJ01 Rejection of invention patent application after publication