CN113553641B - 桥墩周围进行基坑开挖的安全距离的获取方法及装置 - Google Patents
桥墩周围进行基坑开挖的安全距离的获取方法及装置 Download PDFInfo
- Publication number
- CN113553641B CN113553641B CN202110745743.1A CN202110745743A CN113553641B CN 113553641 B CN113553641 B CN 113553641B CN 202110745743 A CN202110745743 A CN 202110745743A CN 113553641 B CN113553641 B CN 113553641B
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- pier
- distance
- safety
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/14—Force analysis or force optimisation, e.g. static or dynamic forces
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- General Physics & Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110745743.1A CN113553641B (zh) | 2021-07-01 | 2021-07-01 | 桥墩周围进行基坑开挖的安全距离的获取方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110745743.1A CN113553641B (zh) | 2021-07-01 | 2021-07-01 | 桥墩周围进行基坑开挖的安全距离的获取方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113553641A CN113553641A (zh) | 2021-10-26 |
CN113553641B true CN113553641B (zh) | 2022-04-22 |
Family
ID=78131232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110745743.1A Active CN113553641B (zh) | 2021-07-01 | 2021-07-01 | 桥墩周围进行基坑开挖的安全距离的获取方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113553641B (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070256034A1 (en) * | 2006-05-01 | 2007-11-01 | Sony Ericsson Mobile Communications Japan, Inc. | Information processing apparatus, information processing method, information processing program, and mobile terminal device |
CN111046460A (zh) * | 2019-11-23 | 2020-04-21 | 中国水利水电第七工程局有限公司 | 一种基于bim的基坑监测系统及监测方法 |
-
2021
- 2021-07-01 CN CN202110745743.1A patent/CN113553641B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070256034A1 (en) * | 2006-05-01 | 2007-11-01 | Sony Ericsson Mobile Communications Japan, Inc. | Information processing apparatus, information processing method, information processing program, and mobile terminal device |
CN111046460A (zh) * | 2019-11-23 | 2020-04-21 | 中国水利水电第七工程局有限公司 | 一种基于bim的基坑监测系统及监测方法 |
Non-Patent Citations (1)
Title |
---|
Subsidence Displacement Analysis of Bridge Pier under Approaching Excavation Load;Shuai Huang等;《IOP Conference Series:Earth and Environmental Science》;20181231;第1-6页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113553641A (zh) | 2021-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691294B (zh) | 一种地下连续墙的施工方法 | |
JP6589224B2 (ja) | 管の評価方法、測定装置および管の評価システム | |
CN107301305B (zh) | 一种实现管片三维受载的结构力学性能的建模方法 | |
CN105178288A (zh) | 高架桥下地下连续墙施工方法 | |
CN103643668B (zh) | 一种建筑工程基坑监测的方法 | |
CN112836270B (zh) | 一种应用于预测潜水降水对建筑物沉降影响的方法 | |
CN102561406A (zh) | 控制沉井后背土体变形的施工方法 | |
Memar et al. | Effect of pile cross-section shape on pile group behaviour under lateral loading in sand | |
CN113553641B (zh) | 桥墩周围进行基坑开挖的安全距离的获取方法及装置 | |
CN112177061A (zh) | 复杂地质构造下的微观水平变形监测系统与方法 | |
Moore | Large-scale laboratory experiments to advance the design and performance of buried pipe infrastructure | |
CN116484471A (zh) | 一种圆形地连墙墙体等效模型的等效参数确定方法 | |
CN104631486A (zh) | 狭窄环境下的独立柱基施工方法 | |
CN201933516U (zh) | 钻孔桩静载荷试验双层钢套管 | |
Regier | Investigation of the failure mechanisms of intact and deteriorated culverts | |
CN112344983B (zh) | 软土基环境下的沉降施工水平监测方法与系统 | |
CN111928817B (zh) | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 | |
CN211948464U (zh) | 地下连续墙与基础底板的预埋钢板连接构造 | |
Fantaziu et al. | Study Achievement of Deep Excavations from the Point of View of Their Effects on Surrounding Existing Buildings | |
CN109086505B (zh) | 筑坝围堰钢管桩受力分析方法及系统 | |
CN107894721B (zh) | 拱坝横缝张开时机的控制系统及方法 | |
CN112343098B (zh) | 用于围护结构顶部的水平监测系统与方法 | |
Zhang et al. | Design of Deep Braced Excavation and Earth Retaining Systems Under Complex Built Environment: Theories and Case Studies | |
CN219178574U (zh) | 一种提高监测点观测数据精度的装置 | |
CN109972679A (zh) | 超深地下连续墙成槽施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100013 No. 5 Youth ditch East Road, Hepingli, Beijing, Chaoyang District Applicant after: General Coal Research Institute Co.,Ltd. Applicant after: National natural disaster prevention and Control Research Institute Ministry of emergency management Applicant after: Institute of Disaster Prevention Applicant after: CHINA HARBOUR ENGINEERING Co.,Ltd. Applicant after: BEIJING METEOROLOGICAL INFORMATION CENTER Address before: 100013 No. 5 Youth ditch East Road, Hepingli, Beijing, Chaoyang District Applicant before: CHINA COAL Research Institute Applicant before: National natural disaster prevention and Control Research Institute Ministry of emergency management Applicant before: Institute of Disaster Prevention Applicant before: CHINA HARBOUR ENGINEERING Co.,Ltd. Applicant before: BEIJING METEOROLOGICAL INFORMATION CENTER |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |