CN107301305B - 一种实现管片三维受载的结构力学性能的建模方法 - Google Patents
一种实现管片三维受载的结构力学性能的建模方法 Download PDFInfo
- Publication number
- CN107301305B CN107301305B CN201710638191.8A CN201710638191A CN107301305B CN 107301305 B CN107301305 B CN 107301305B CN 201710638191 A CN201710638191 A CN 201710638191A CN 107301305 B CN107301305 B CN 107301305B
- Authority
- CN
- China
- Prior art keywords
- segment
- duct piece
- stratum
- piece
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710638191.8A CN107301305B (zh) | 2017-07-31 | 2017-07-31 | 一种实现管片三维受载的结构力学性能的建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710638191.8A CN107301305B (zh) | 2017-07-31 | 2017-07-31 | 一种实现管片三维受载的结构力学性能的建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107301305A CN107301305A (zh) | 2017-10-27 |
CN107301305B true CN107301305B (zh) | 2021-03-09 |
Family
ID=60133123
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710638191.8A Active CN107301305B (zh) | 2017-07-31 | 2017-07-31 | 一种实现管片三维受载的结构力学性能的建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107301305B (zh) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108571328B (zh) * | 2018-06-29 | 2023-08-04 | 西南交通大学 | 一种地层交界段盾构隧道管片衬砌结构及设计方法 |
CN109359412B (zh) * | 2018-11-01 | 2021-04-16 | 山东大学 | 预测隧道盾构开挖过程全变形的计算方法及系统 |
CN109471357B (zh) * | 2018-11-06 | 2022-02-08 | 宁波华液机器制造有限公司 | 一种模拟隧道与土体相互作用的管片位移控制系统 |
CN109540666B (zh) * | 2018-11-06 | 2021-04-30 | 宁波用躬科技有限公司 | 一种土层对管片实际荷载特性的模拟加载系统及加载方法 |
CN109655346B (zh) * | 2018-11-06 | 2021-05-04 | 无锡地铁集团有限公司 | 一种隧道管片纵向力模拟施加装置及其方法 |
CN109406182B (zh) * | 2018-11-06 | 2020-10-23 | 宁波大学 | 一种模拟隧道与土体相互作用的管片荷载控制系统 |
CN109556561A (zh) * | 2018-12-12 | 2019-04-02 | 中铁十八局集团有限公司 | 盾构隧道管片径向受力变形的检测方法 |
CN110737960B (zh) * | 2019-11-14 | 2022-06-10 | 西南交通大学 | 一种盾构隧道管片设计参数优化方法 |
CN113420482B (zh) * | 2021-06-24 | 2022-07-05 | 北京安捷工程咨询有限公司 | 一种基于结构内力监测值的管片荷载正交数值反演方法 |
CN116361947B (zh) * | 2023-03-20 | 2023-12-22 | 西北核技术研究所 | 一种侵彻大尺寸钢筋混凝土内外部三维建模的方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001032692A (ja) * | 1999-07-16 | 2001-02-06 | Taisei Corp | セグメントの形状 |
CN103593553B (zh) * | 2013-11-01 | 2017-01-25 | 中南大学 | 一种盾构隧道管片非均质等效梁单元模型结构计算方法 |
CN104634646A (zh) * | 2015-01-13 | 2015-05-20 | 哈尔滨工业大学 | 一种模拟盾构隧道施工周围地下管线力学行为的试验方法 |
CN104615870B (zh) * | 2015-01-25 | 2017-05-17 | 上海市隧道工程轨道交通设计研究院 | 一种反演计算超大直径盾构隧道管片接头参数的方法 |
-
2017
- 2017-07-31 CN CN201710638191.8A patent/CN107301305B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107301305A (zh) | 2017-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107301305B (zh) | 一种实现管片三维受载的结构力学性能的建模方法 | |
CN109459311B (zh) | 一种模拟不同受力条件下隧道管环受力变形的实验装置 | |
CN109359412B (zh) | 预测隧道盾构开挖过程全变形的计算方法及系统 | |
CN114659492B (zh) | 一种隧道掘进用监测平台及监测方法 | |
Katzenbach et al. | Assessing settlement of high‐rise structures by 3D simulations | |
Huang et al. | Exploring the three-dimensional response of a water storage and sewage tunnel based on full-scale loading tests | |
Pan et al. | Stability analysis and full-scale test of a new recyclable supporting structure for underground ecological granaries | |
CN113153334A (zh) | 一种盾构下穿施工对结构物影响的风险管控系统 | |
CN213875269U (zh) | 一种多功能隧道模型试验装置 | |
Zhu et al. | Failure and stability analysis of deep soft rock roadways based on true triaxial geomechanical model tests | |
CN110909429A (zh) | 基于隧道衬砌病害检测的波纹钢板内衬加固参数优化设计方法及结构 | |
CN111206932A (zh) | 一种盾构施工对场地扰动的模拟装置与方法 | |
Kunecki | Field Test and Three-Dimensional Numerical Analysis of Soil–Steel Tunnel during Backfilling | |
CN112948952A (zh) | 一种盾构隧道衬砌背后空洞的演化预测方法 | |
CN110245426B (zh) | 一种用于管廊结构顶管施工的有限元精细化模拟方法 | |
CN114419982A (zh) | 软岩地层留煤柱采空区巷道变形破坏的模型试验系统及方法 | |
CN109826633A (zh) | 一种盾构机下穿已有盾构隧道模拟装置及模拟方法 | |
CN104330297B (zh) | 深立井马头门三维物理模型实验装置与方法 | |
CN204165819U (zh) | 深立井马头门三维物理模型实验装置 | |
Xiao et al. | Prefabricated urban underground utility tunnels: a case study on mechanical behaviour with strain monitoring and numerical simulation | |
Peng et al. | Studies on support techniques for roadway bearing structure features under different geo-pressures | |
Liu et al. | Performance assessment of arch-shaped primary lining during construction in weak rock shallow-buried tunnel | |
Chen | On the influence of pile foundation settlement of existing high-rise buildings on the surrounding buildings | |
Anatol'Evich et al. | Forecast of the stress-strain state of the prefabricated lining of underground tunnels of curvilinear cross-section | |
Gu et al. | Computational model of outer circle and inner ellipse shield tunnel lining structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 510000 Guangzhou Nansha District, Guangdong Province, Mingzhuwan Starting Area, West Side of Industrial Fourth Road, self-compiled No. 2 (for office use only) (self-declaration) (MZ) Applicant after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd. Applicant after: STATE KEY LABORATORY OF SHIELD MACHINE AND BORING TECHNOLOGY Address before: 471000 Luoyang, Henan, the old city of Zhuang Yuan Red Road Applicant before: CHINA RAILWAY TUNNELS GROUP Co.,Ltd. Applicant before: STATE KEY LABORATORY OF SHIELD MACHINE AND BORING TECHNOLOGY |
|
GR01 | Patent grant | ||
GR01 | Patent grant |