CN113430898A CN202110758202.2A CN202110758202A CN113430898A CN 113430898 A CN113430898 A CN 113430898A CN 202110758202 A CN202110758202 A CN 202110758202A CN 113430898 A CN113430898 A CN 113430898A
Authority
CN
China
Prior art keywords
storage bin
construction equipment
bin
integrated construction
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202110758202.2A
Other languages
Chinese (zh)
Inventor
赵毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110758202.2A priority Critical patent/CN113430898A/en
Publication of CN113430898A publication Critical patent/CN113430898A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/46Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing and placing the materials, e.g. slurry seals
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/05Crushing, pulverising or disintegrating apparatus; Aggregate screening, cleaning, drying or heating apparatus; Dust-collecting arrangements specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1059Controlling the operations; Devices solely for supplying or proportioning the ingredients
    • E01C19/1068Supplying or proportioning the ingredients

Abstract

The invention discloses road integrated construction equipment which comprises a crusher, a screening machine, a storage bin, a stirring bin, a mixing storage bin, a cement storage bin, a water storage bin, a spreading machine, a control room, an energy supply room, a spraying dust-settling device and a dust cover. The invention provides a road integrated construction device, which can finish the production of paving materials on a construction site, and reduce the material transportation cost and the storage cost caused by the multiple transportation of bulk raw materials; meanwhile, various surplus raw materials under the field construction environment can be effectively utilized, and the utilization rate of the raw materials is improved; the invention can reduce the production of finished products and increase profits, and has obvious advantages in engineering bidding.

Description

Road integration construction equipment
Technical Field
The invention relates to the technical field of construction equipment, in particular to road integrated construction equipment.
Background
In daily road construction, in the use process of leveling foundation roadbed construction, paving a water-stable base layer, producing on-site commercial concrete and on-site mortar, raw materials are basically purchased by a supplier in a mineral resource company, transported to a unit raw material mixing station, mixed and stirred and then transported to a construction site again. Wherein, the transportation cost, the purchase cost and the storage cost of bulk raw materials are generated for many times, and the production cost is greatly increased; secondly, in the field roadbed construction, a plurality of raw materials can be utilized on the field, but the raw materials cannot be utilized due to the lack of equipment, so that a plurality of raw materials are wasted.
In order to solve the technical problem, a road integrated construction device is provided.
Disclosure of Invention
The technical problem to be solved by the invention is to overcome the defects of the technology, and the invention provides:
a road integrated construction equipment comprises
The crusher is used for crushing input materials and outputting the crushed materials through a discharge port;
the screening machine is connected with the crusher and receives crushed materials output by a discharge port of the crusher, and the screening machine screens and separates the crushed materials;
the storage bin is connected with the discharge port of the screening machine through a first conveying belt;
the stirring bin is connected with the discharge port of the storage bin through a second conveyor belt;
the mixing storage bin is connected with the discharge port of the stirring bin through a third conveyor belt, an external outlet is formed in the mixing storage bin, and the external outlet is used for being in butt joint with external transportation equipment;
the cement storage bin is connected with the feeding hole of the stirring bin through a fourth conveyor belt;
the water storage bin is connected with the feeding hole of the stirring bin through a fifth conveyor belt;
one end of the paver is connected with the discharge port of the stirring bin through a sixth conveying belt, and the other end of the paver is connected with the discharge port of the mixing storage bin through a seventh conveying belt;
the control room is a control center and is electrically connected with all parts in the integrated construction equipment, and is used for controlling the start and stop of each piece of equipment, and the conveying speed of each feeding hole, each discharging hole switch and the conveying belt;
an energy supply chamber, the energy supply chamber with all parts electric connection in the integration construction equipment just for its energy supply.
As an improvement, the storage bin is provided with a plurality of storage bins, and the type of the materials stored in each storage bin is different.
As an improvement, the energy supply chamber is driven by an electric energy or fuel oil generator.
As the improvement, be equipped with and spray dust fall equipment, it is portable to spray dust fall equipment and locate on the integration construction equipment.
As an improvement, the spraying dust-settling equipment is a fog gun or spraying equipment.
As an improvement, a dust cover is arranged, and the dust cover can cover all parts in the integrated construction equipment to play a role of dust prevention.
Compared with the prior art, the invention has the advantages that: the invention provides a road integrated construction device, which can finish the production of paving materials on a construction site, and reduce the material transportation cost and the storage cost caused by the multiple transportation of bulk raw materials; meanwhile, various surplus raw materials under the field construction environment can be effectively utilized, and the utilization rate of the raw materials is improved; the invention can reduce the production of finished products and increase profits, and has obvious advantages in engineering bidding.
Drawings
Fig. 1 is a block diagram of a road integrated construction equipment according to the present invention.
In the figure, 1, a crusher; 2. screening machine; 3. a storage bin; 4. a first conveyor belt; 5. a stirring bin; 6. a second conveyor belt; 7. a third conveyor belt; 8. a cement storage bin; 9. a fourth conveyor belt; 10. a water storage bin; 11. a fifth conveyor belt; 12. a paver; 13. a sixth conveyor belt; 14. a seventh conveyor belt; 15. a control room; 16. an energy supply chamber; 17. a mixing storage bin; 18. an external outlet; 19. spraying dust settling equipment; 20. a dust cover.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "inner", "outer", "vertical", "circumferential", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
In the description of the present invention, "the first feature" and "the second feature" may include one or more of the features. Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
The following describes a road integrated construction apparatus in further detail with reference to the accompanying drawings.
Referring to the drawings, FIG. 1 shows a road construction equipment, comprising
The crusher 1 is used for crushing input materials and outputting the crushed materials through a discharge port;
the screening machine 2 is connected with the crusher 1 and receives crushed materials output from a discharge port of the crusher 1, and the screening machine 2 screens and separates the crushed materials;
the storage bin 3 is connected with the discharge port of the sieving machine 2 through a first conveyor belt 4;
the stirring bin 5 is connected with the discharge hole of the storage bin 3 through a second conveyor belt 6;
the mixing storage bin 17 is connected with a discharge hole of the stirring bin 5 through a third conveyor belt 7, an external outlet 18 is formed in the mixing storage bin 17, and the external outlet 18 is used for being in butt joint with external transportation equipment;
the cement storage bin 8 is connected with a feeding hole of the stirring bin 5 through a fourth conveyor belt 9;
the water storage bin 10 is connected with a feed inlet of the stirring bin 5 through a fifth conveyor belt 11;
one end of the paver 12 is connected with a discharge hole of the stirring bin 5 through a sixth conveyor belt 13, and the other end of the paver 12 is connected with a discharge hole of a mixed storage bin 17 through a seventh conveyor belt 14;
the control room 15 is a control center and is electrically connected with all parts in the integrated construction equipment, and is used for controlling the start and stop of each piece of equipment, and the conveying speed of each feeding hole, each discharging hole switch and the conveying belt;
and the energy supply chamber 16 is electrically connected with all the components in the integrated construction equipment and supplies energy to the components.
In this embodiment, there are a plurality of storage bins 3, and the types of materials stored in each storage bin 3 are different.
In this embodiment, the energy supply chamber 16 is driven by an electric or fuel-powered generator.
In this embodiment, be equipped with and spray dust fall equipment 19, spray dust fall equipment 19 portable locate the integration construction equipment on.
In this embodiment, the spraying dust-settling device 19 is a fog gun or a spraying device.
In this embodiment, the dust cover 20 is provided, and the dust cover 20 can cover all the components in the integrated construction equipment, thereby playing a role of dust prevention.
The working principle of the invention is as follows: carry the raw materials to breaker 1 through machinery, in the material gets into screening machine 2 after the processing is smashed, the material classification conveys to the storage silo 3 that corresponds after the screening, and control room 15 controls storage silo 3 and throws the material according to the construction ratio demand, and the raw materials is put in to the raw materials stirring storehouse through second conveyer belt 6 in, adds water and cement in to stirring storehouse 5 through cement storage storehouse 8 and water storage storehouse 10 simultaneously. And (3) fully mixing and stirring, wherein the stirred materials can be directly conveyed into the spreading machine 12 for spreading through the sixth conveying belt 13, or conveyed into the mixing storage bin 17 for storage, and conveyed into the spreading machine 12 for spreading through the seventh conveying belt 14.
The road integrated construction equipment can be used in combination among control room control equipment according to the requirements of construction projects, can produce different materials for different project projects, and is specifically shown as the following embodiment:
example 1: the production process of the water stabilizing material comprises the following steps: the raw materials are conveyed into a crusher, processed and crushed, then enter a screening machine, and are respectively conveyed to corresponding storage bins after screening. The control room controls the storage bin according to construction proportioning requirements to put raw materials of various models onto a second conveyor belt to be mixed, then the raw materials are conveyed to the stirring bin, cement and water are put into the stirring bin, the raw materials are conveyed to the mixing storage bin after being mixed and stirred, and then the raw materials are conveyed to the spreading machine through the mixing storage bin to be spread for use.
Example 2: the production process of commercial concrete materials comprises the following steps: the raw materials are conveyed to a crusher, processed and crushed, then enter a sieving machine, and are respectively conveyed to corresponding storage bins after being screened. The control room controls the storage bin according to construction proportioning requirements to put the raw materials of various models onto the second conveyor belt to be mixed, then the raw materials are conveyed to the stirring bin, cement and water are put into the stirring bin, the raw materials are mixed and stirred, and then the raw materials are conveyed to the mixing storage bin. Then pouring the mixture into a commercial concrete transport vehicle through an external outlet of the mixing storage bin and delivering the mixture to a construction site for use.
Example 3: the foundation subgrade construction leveling process: the raw materials are conveyed to a crusher, processed and crushed, then enter a sieving machine, and are respectively conveyed to corresponding storage bins after being screened. And controlling the storage bin to throw the raw materials of various types onto a second conveyor belt according to the construction ratio requirement, mixing the raw materials, entering a paver through the stirring bin which stops running to level and pave, and leveling by a grader and a road roller.
Example 4: the production process of the on-site mortar comprises the following steps: the raw material clear water sand is conveyed into a storage bin and then conveyed to a stirring bin through a second conveyor belt, meanwhile, a control room controls a cement storage bin and a water storage bin to throw cement and water into the stirring bin for mixing according to construction proportioning requirements, the raw materials are conveyed to a mixing storage bin after being mixed and stirred, and then the raw materials are poured into a transport vehicle through an external outlet of the mixing storage bin and conveyed to a construction site for use.
The invention can use the screened finished product materials to directly put into the storage bin, and then the finished product materials are controlled by the control room to finish a plurality of production modes in the embodiment according to the construction proportion.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should appreciate that they can readily use the disclosed conception and specific embodiments as a basis for designing or modifying other structures for carrying out the same purposes of the present invention without departing from the spirit and scope of the invention as defined by the appended claims.

Claims (6)

1. The utility model provides a road integration construction equipment which characterized in that: comprises that
The crusher (1) is used for crushing input materials and outputting the crushed materials through a discharge port;
the screening machine (2) is connected with the crusher (1) and receives crushed materials output from a discharge port of the crusher (1), and the screening machine (2) screens and separates the crushed materials;
the storage bin (3) is connected with a discharge port of the screening machine (2) through a first conveying belt (4);
the stirring bin (5) is connected with the discharge hole of the storage bin (3) through a second conveyor belt (6);
the mixing storage bin (17) is connected with a discharge hole of the stirring bin (5) through a third conveyor belt (7), an external outlet (18) is formed in the mixing storage bin (17), and the external outlet (18) is used for being butted with external transportation equipment;
the cement storage bin (8) is connected with the feeding hole of the stirring bin (5) through a fourth conveyor belt (9);
the water storage bin (10) is connected with a feeding hole of the stirring bin (5) through a fifth conveyor belt (11);
one end of the paver (12) is connected with a discharge hole of the stirring bin (5) through a sixth conveying belt (13), and the other end of the paver (12) is connected with a discharge hole of the mixing storage bin (17) through a seventh conveying belt (14);
the control chamber (15) is a control center and is electrically connected with all parts in the integrated construction equipment, and is used for controlling the start and stop of each piece of equipment, and the conveying speed of each feeding hole, each discharging hole switch and each conveying belt;
an energy supply chamber (16), wherein the energy supply chamber (16) is electrically connected with all the components in the integrated construction equipment and supplies energy to the components.
2. The road integrated construction equipment according to claim 1, wherein: the storage bin (3) is provided with a plurality of storage bins, and the types of the materials stored in each storage bin (3) are different.
3. The road integrated construction equipment according to claim 1, wherein: the energy supply chamber (16) is driven by an electric energy or fuel oil generator.
4. The road integrated construction equipment according to claim 1, wherein: be equipped with and spray dust fall equipment (19), it is portable to locate to spray dust fall equipment (19) on the integration construction equipment.
5. The road integrated construction equipment according to claim 4, wherein: the spraying dust-settling equipment (19) is a fog gun or spraying equipment.
6. The road integrated construction equipment according to claim 5, wherein: the dustproof cover (20) is arranged, and all parts in the integrated construction equipment can be covered by the dustproof cover (20) to play a dustproof role.
CN202110758202.2A 2021-07-05 2021-07-05 Road integration construction equipment Withdrawn CN113430898A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110758202.2A CN113430898A (en) 2021-07-05 2021-07-05 Road integration construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110758202.2A CN113430898A (en) 2021-07-05 2021-07-05 Road integration construction equipment

Publications (1)

Publication Number Publication Date
CN113430898A true CN113430898A (en) 2021-09-24

Family

ID=77759001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110758202.2A Withdrawn CN113430898A (en) 2021-07-05 2021-07-05 Road integration construction equipment

Country Status (1)

Country Link
CN (1) CN113430898A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323872A (en) * 2022-08-16 2022-11-11 中震科建(广东)防灾减灾研究院有限公司 Construction vehicle for earth and stone mixed filling standardization and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115323872A (en) * 2022-08-16 2022-11-11 中震科建(广东)防灾减灾研究院有限公司 Construction vehicle for earth and stone mixed filling standardization and construction method

Similar Documents

Publication Publication Date Title
CN101879755B (en) Drying-free dry-mixed mortar complete equipment
CN105773845B (en) Intermittent water is steady-and concrete integrally stands
CN201720929U (en) Drying-free dry-mixed mortar complete equipment
CN106113279A (en) A kind of dry mortar production method and production line
CN103481375A (en) Production system of dry-mixed mortar
CN104975553B (en) A kind of cold-mix asphalt mixing material manufacturing technique and its mixing plant
CN106012760A (en) Cold in-plant recycling mixing device and method for asphalt mixtures
CN106182409A (en) A kind of joint use type dry-mixed mortar production line
CN113430898A (en) Road integration construction equipment
CN109176895A (en) A kind of dual-purpose mixing plant
CN209408951U (en) A kind of dual-purpose mixing plant
CN105803898A (en) Batch-type asphalt cold-recycling blending technology
CN203557538U (en) Dry-mixed mortar production system
CN205889523U (en) Concrete product additive colour syste
CN104552605B (en) Mixing pump truck for wet-mixed mortar
CN210552188U (en) Environment-friendly grit self-control concrete mixing plant
CN213563585U (en) Intensive stabilized soil stirring complete equipment
CN211285141U (en) Asphalt in-situ mixing and laying equipment
CN204450866U (en) Wet mixing mortar stirs pump truck
JP4781513B2 (en) Concrete manufacturing method and concrete manufacturing apparatus
CN220310337U (en) Production device of curing agent for mud treatment
KR0128101B1 (en) A mixing process selecting the ascon and the aspaly
CN108547200A (en) Bituminous paving materials recycling system and regeneration method
CN215482110U (en) Continuous and intermittent dual-purpose asphalt mixture stirring roller and asphalt stirring equipment
CN109849190B (en) Water-stable mixing station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination