CN113407182A - 一种工程建设管理数据分析决策系统平台 - Google Patents
一种工程建设管理数据分析决策系统平台 Download PDFInfo
- Publication number
- CN113407182A CN113407182A CN202110658283.9A CN202110658283A CN113407182A CN 113407182 A CN113407182 A CN 113407182A CN 202110658283 A CN202110658283 A CN 202110658283A CN 113407182 A CN113407182 A CN 113407182A
- Authority
- CN
- China
- Prior art keywords
- data
- module
- analysis
- decision
- construction management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007405 data analysis Methods 0.000 title claims abstract description 37
- 238000009430 construction management Methods 0.000 title claims abstract description 20
- 238000004458 analytical method Methods 0.000 claims abstract description 27
- 238000012545 processing Methods 0.000 claims abstract description 18
- 230000000007 visual effect Effects 0.000 claims abstract description 14
- 238000013480 data collection Methods 0.000 claims abstract description 12
- 238000010276 construction Methods 0.000 claims description 14
- 238000000034 method Methods 0.000 description 14
- 230000008569 process Effects 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 3
- 230000003213 activating effect Effects 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 238000007630 basic procedure Methods 0.000 description 1
- 238000011217 control strategy Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
- G06F8/38—Creation or generation of source code for implementing user interfaces
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
- G06F8/34—Graphical or visual programming
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Human Computer Interaction (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种工程建设管理数据分析决策系统平台,包括原始数据收集模块、数据处理模块、数据分析模块、绘图模块、决策模块,原始数据收集模块用于接收人工录入的数据;数据处理模块与原始数据收集模块连接,用于将专用数组中的时间和各类进度数据进行分类整理;数据分析模块与数据处理模块相连,从数据处理模块中调用相应数据,用于将数据按照制定分析规则进行排列;绘图模块与数据分析模块相连,从分析方法的数组中取得数据绘制可视化图形;决策模块与绘图模块连接,编辑分析方法对应的决策规则,在数据触发规则后弹出对应决策。本发明通过建立工程建设管理数据分析决策平台,将数据分析产生的决策指令自动展示给决策者,提升了决策效率。
Description
技术领域
本发明涉及计算机编程技术领域,具体来说,涉及一种工程建设管理数据分析决策系统平台。
背景技术
在工程建设领域,工程建设的进度往往是建设管理者和各施工单位最为关心的内容之一。但是,建设进度的统计往往局限于文字和数字统计,或以百分比的形式展示,这种统计方式大大限制了工程管理者对进度控制点的掌握,不利于采取相应的控制策略。当前的进度统计多局限于某一方面,例如某区域内的进度统计、某种类型的分项工程统计等,并未采用前锋线、进度曲线等方法进行可视化分析,也未明确工程建设的关键时间节点、需要重点关注的区域进度控制敏感点。因此,当前的进度分析方法不利于建设管理者快速掌握工程建设进度的薄弱点和关键控制点,且无法适应当前工程建设管理进度高效化、可视化、精细化的要求。
发明内容
针对相关技术中的上述技术问题,本发明提出一种工程建设管理数据分析决策系统平台,能够克服现有技术方法的上述不足。
为实现上述技术目的,本发明的技术方案是这样实现的:
一种工程建设管理数据分析决策系统平台,包括原始数据收集模块、数据处理模块、数据分析模块、绘图模块、决策模块,其中,
所述原始数据收集模块,用于接收人工录入的数据;
所述数据处理模块,前端与所述原始数据收集模块连接,用于将专用数组中的时间和各类进度数据进行分类整理;
所述数据分析模块,前端与所述数据处理模块相连,从数据处理模块中调用相应数据,用于将数据按照制定分析规则进行排列,并将每种分析方法存入相应的专用数组;
所述绘图模块,前端与所述数据分析模块相连,从对应分析方法的专用数组中取得数据,来绘制相应的可视化图形;
所述决策模块,前端与所述绘图模块相连接,编辑不同的分析方法对应的决策规则,在数据触发规则后,自动弹出对应决策。
进一步地,所述接收人工录入的数据通过在可视化界面,将数据录入并储存在专用数组中。
进一步地,所述数据进行分类整理是按照时间的前后顺序进行排序,并按照日、周、月、年的时间周期、建设地区来进行动态分组。
进一步地,所述分析规则包括前锋线、S曲线和横道图。
进一步地,人工录入的数据包括工程进度数据和对应时间序列。
本发明的有益效果:通过建立一种工程建设管理数据分析决策平台,实现建设数据的分类整理,并将各类分析方法通过可视化的方法展现给决策者,优化了管理流程;通过建立一种工程建设管理数据分析决策平台,将数据分析产生的决策指令自动展示给决策者,提升了决策效率。
附图说明
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1是根据本发明实施例所述的工程建设管理数据分析决策系统平台的模块连接示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。
本发明设计一种工程建设管理数据分析决策系统平台,通过原始数据收集模块、数据处理模块、数据分析模块、绘图模块、决策模块,可实现数据收集整理、分析绘图、制定决策等功能,区别于现有技术手段,可通过人机交互行为,为管理决策者提供更多维度、更多分析方法的可视化数据,便于快速掌握工程建设的薄弱点和关键点,制定决策的效率得到提高。
如图1所示,根据本发明实施例所述的工程建设管理数据分析决策系统平台,包括:原始数据收集模块、数据处理模块、数据分析模块、绘图模块、决策模块。此顺序即为数据流动和模块连接的先后顺序。
原始数据收集模块用于接收人工录入的数据,通过可视化界面,将数据录入储存在包含日期与各类进度的专用数组中。
数据处理模块的前端与原始数据收集模块连接,用于将专用数组中的时间、各类进度数据进行分类整理。按照时间前后排序,并按照日、周、月、年的时间周期、建设地区进行动态分组。
数据分析模块的前端与数据处理模块相连,从数据处理模块中调用相应数据,用于将数据按照制定分析规则(前锋线、S曲线、横道图等)排列,每种分析方法存入相应的专用数组。
绘图模块的前端与数据分析模块相连,从对应分析方法的专用数组中取得数据,绘制相应可视化图形。
决策模块的前端连接绘图模块,决策模块中编辑不同分析方法对应的决策规则,在数据触发规则后,自动弹出对应决策。也可根据可视化图形进行人工决策分析。上述分析决策均会被记录在决策历史中,方便后续查看。
为了方便理解本发明的上述技术方案,以下通过具体使用方式上对本发明的上述技术方案进行详细说明。
在收集原始数据时是通过在可视化界面,人工录入工程进度数据和对应时间序列。全部数据进入原始数据收集模块,数据存入至数组1。例如:通过原始数据收集模块,人工录入A工程5月每日的基础工序施工进度,数据存入数组1。
在整理数据时,将数组1中的数据在数据处理模块中进行处理。将日期、各工序当日完成进度等数据记录在数组2所在的不同列中,并在每周的最后一日、每月最后一日设置分隔符,便于统计不同周期的进度数据。例如:通过程序将数组1中的数据录入数组2,数组2分为N列,第1列为日期,第2列为工序一完成百分比,第3列为工序二完成百分比,第N列为工序N-1完成的百分比;在每周日的下一行录入“#”,每月最后一日的下一行录入“*”,实现周、月的划分。
在分析数据时,把数组2中的数据在数据分析模块中进行处理,按照分析方法的规则,将数组2中的数据进行整理,形成数组3,数组3中同时存放多种分析方法所形成的数据格式。例如:数组3采用“前锋线”法进行数据分析,数组3分为N列,第1列为时间,第2列为工序一按照计划完成的百分比,第3列为工序一实际完成百分比(数据取自数组2”),第4列为工序二按照计划完成的百分比,第5列为工序二实际完成百分比,依次类推。
然后分析好数据后,进行绘图。将数组3中的数据转入绘图模块,在该模块中绘制相应的可视化图形,供决策者进行分析。例如:按照“前锋线”法的绘图规则,利用绘图程序绘制图像,并输出至显示器。
最后进入决策模块,根据各类分析方法的具体规则,为将数组3中的数据设置边界条件,当数据触发边界条件后,将信息传递到绘图模块,在可视化图形中显示决策建议;决策建议形成后,将决策建议及此刻数据记录在数组4中,最终形成决策建议表。例如,在数组3中的N+1列为工序一的进度情况设置边界条件为:实际完成进度百分比小于计划完成进度百分比;当出现实际完成进度百分比小于计划完成进度百分比时,通过程序向绘图模块发出指令,激活决策建议,并在显示器中显示该建议;数组4中记录决策建议的内容和激活原因。
综上所述,借助于本发明的上述技术方案,通过建立一种工程建设管理数据分析决策平台,实现建设数据的分类整理,并将各类分析方法通过可视化的方法展现给决策者,优化了管理流程;通过建立一种工程建设管理数据分析决策平台,将数据分析产生的决策指令自动展示给决策者,提升了决策效率。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种工程建设管理数据分析决策系统平台,其特征在于,包括原始数据收集模块、数据处理模块、数据分析模块、绘图模块、决策模块,其中,
所述原始数据收集模块,用于接收人工录入的数据;
所述数据处理模块,前端与所述原始数据收集模块连接,用于将专用数组中的时间和各类进度数据进行分类整理;
所述数据分析模块,前端与所述数据处理模块相连,从数据处理模块中调用相应数据,用于将数据按照制定分析规则进行排列,并将每种分析方法存入相应的专用数组;
所述绘图模块,前端与所述数据分析模块相连,从对应分析方法的专用数组中取得数据,来绘制相应的可视化图形;
所述决策模块,前端与所述绘图模块相连接,编辑不同的分析方法对应的决策规则,在数据触发规则后,自动弹出对应决策。
2. 根据权利要求1所述的工程建设管理数据分析决策系统平台,其特征在于, 所述接收人工录入的数据通过在可视化界面,将数据录入并储存在专用数组中。
3. 根据权利要求1所述的工程建设管理数据分析决策系统平台,其特征在于, 所述数据进行分类整理是按照时间的前后顺序进行排序,并按照日、周、月、年的时间周期、建设地区来进行动态分组。
4. 根据权利要求1所述的工程建设管理数据分析决策系统平台,其特征在于, 所述分析规则包括前锋线、S曲线和横道图。
5.根据权利要求2所述的工程建设管理数据分析决策系统平台,其特征在于,人工录入的数据包括工程进度数据和对应时间序列。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110658283.9A CN113407182B (zh) | 2021-06-15 | 2021-06-15 | 一种工程建设管理数据分析决策系统平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110658283.9A CN113407182B (zh) | 2021-06-15 | 2021-06-15 | 一种工程建设管理数据分析决策系统平台 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113407182A true CN113407182A (zh) | 2021-09-17 |
CN113407182B CN113407182B (zh) | 2024-04-12 |
Family
ID=77683751
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110658283.9A Active CN113407182B (zh) | 2021-06-15 | 2021-06-15 | 一种工程建设管理数据分析决策系统平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113407182B (zh) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5065338A (en) * | 1986-05-23 | 1991-11-12 | Active English Information Systems, Inc. | Expert information system and method for decision record generation |
US6301579B1 (en) * | 1998-10-20 | 2001-10-09 | Silicon Graphics, Inc. | Method, system, and computer program product for visualizing a data structure |
US20110082819A1 (en) * | 2009-10-02 | 2011-04-07 | International Business Machines Corporation | Systems and Methods for Decision Pattern Identification and Application |
US20140149582A1 (en) * | 2012-11-23 | 2014-05-29 | Mediatek Inc. | Methods for automatically managing installed applications and determining application recommendation result based on auxiliary information and related computer readable media |
CN106022477A (zh) * | 2016-05-18 | 2016-10-12 | 国网信通亿力科技有限责任公司 | 智能分析决策系统及方法 |
CN106447584A (zh) * | 2016-09-22 | 2017-02-22 | 东南大学 | 一种面向高速公路网络运营的决策支持系统及其使用方法 |
CN106600103A (zh) * | 2016-11-04 | 2017-04-26 | 国网江苏省电力公司 | 面向规划计划决策的统计数据模型构建方法 |
CN107829452A (zh) * | 2017-11-12 | 2018-03-23 | 湖南科技大学 | 一种融合多传感器及地基sar的深基坑施工监测预警技术 |
EP3407217A1 (en) * | 2017-05-24 | 2018-11-28 | Mphasis Limited | System and method for optimizing aggregation and analysis of data across multiple data sources |
CN109784736A (zh) * | 2019-01-21 | 2019-05-21 | 成都乐超人科技有限公司 | 一种基于大数据的分析决策系统 |
CN111598419A (zh) * | 2020-04-30 | 2020-08-28 | 国网浙江省电力有限公司台州供电公司 | 一种基于互联网的电网建设管控方法和智慧基建平台系统 |
CA3063018A1 (en) * | 2018-11-21 | 2020-10-17 | Beijing Yutian Technology Co. Ltd | An intelligent emergency decision support system for emergency communication |
CN111830924A (zh) * | 2020-08-04 | 2020-10-27 | 郑州信大先进技术研究院 | 建筑工程内部设施的统一管理与联动控制系统及方法 |
WO2021028788A1 (es) * | 2019-08-09 | 2021-02-18 | Arce Rojas Consultores & Cia. S.A. | Metodo para consulta territorial |
-
2021
- 2021-06-15 CN CN202110658283.9A patent/CN113407182B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5065338A (en) * | 1986-05-23 | 1991-11-12 | Active English Information Systems, Inc. | Expert information system and method for decision record generation |
US6301579B1 (en) * | 1998-10-20 | 2001-10-09 | Silicon Graphics, Inc. | Method, system, and computer program product for visualizing a data structure |
US20110082819A1 (en) * | 2009-10-02 | 2011-04-07 | International Business Machines Corporation | Systems and Methods for Decision Pattern Identification and Application |
US20140149582A1 (en) * | 2012-11-23 | 2014-05-29 | Mediatek Inc. | Methods for automatically managing installed applications and determining application recommendation result based on auxiliary information and related computer readable media |
CN106022477A (zh) * | 2016-05-18 | 2016-10-12 | 国网信通亿力科技有限责任公司 | 智能分析决策系统及方法 |
CN106447584A (zh) * | 2016-09-22 | 2017-02-22 | 东南大学 | 一种面向高速公路网络运营的决策支持系统及其使用方法 |
CN106600103A (zh) * | 2016-11-04 | 2017-04-26 | 国网江苏省电力公司 | 面向规划计划决策的统计数据模型构建方法 |
EP3407217A1 (en) * | 2017-05-24 | 2018-11-28 | Mphasis Limited | System and method for optimizing aggregation and analysis of data across multiple data sources |
CN107829452A (zh) * | 2017-11-12 | 2018-03-23 | 湖南科技大学 | 一种融合多传感器及地基sar的深基坑施工监测预警技术 |
CA3063018A1 (en) * | 2018-11-21 | 2020-10-17 | Beijing Yutian Technology Co. Ltd | An intelligent emergency decision support system for emergency communication |
CN109784736A (zh) * | 2019-01-21 | 2019-05-21 | 成都乐超人科技有限公司 | 一种基于大数据的分析决策系统 |
WO2021028788A1 (es) * | 2019-08-09 | 2021-02-18 | Arce Rojas Consultores & Cia. S.A. | Metodo para consulta territorial |
CN111598419A (zh) * | 2020-04-30 | 2020-08-28 | 国网浙江省电力有限公司台州供电公司 | 一种基于互联网的电网建设管控方法和智慧基建平台系统 |
CN111830924A (zh) * | 2020-08-04 | 2020-10-27 | 郑州信大先进技术研究院 | 建筑工程内部设施的统一管理与联动控制系统及方法 |
Non-Patent Citations (8)
Title |
---|
OKUMA, H.等: "An overview of decision making in Rough Non-deterministic Information Analysis", 《2010 SECOND WORLD CONGRESS ON NATURE AND BIOLOGICALLY INSPIRED COMPUTING (NABIC)》, 17 February 2011 (2011-02-17), pages 345 - 350 * |
SUBSIR: ""决策树"——数据挖掘、数据分析", pages 1 - 7, Retrieved from the Internet <URL:https://www.cnblogs.com/subsir/articles/2782970.html> * |
刘念: "发动机加工设备故障诊断和维修决策研究", 《中国优秀硕士学位论文全文数据库(工程科技Ⅱ辑)》, no. 06, 15 June 2014 (2014-06-15), pages 039 - 216 * |
文超等: "高速铁路智能调度辅助决策系统功能分析", 《中国铁路》, no. 07, 31 July 2020 (2020-07-31), pages 9 - 14 * |
王文东等: "基于虚拟数据库的综合决策支持系统", 《微机发展》, no. 04, 30 April 2005 (2005-04-30), pages 63 - 65 * |
蔡胜胜: "突发事件应急决策与处置平台设计与实现", 《中国优秀硕士学位论文全文数据库(社会科学Ⅰ辑)》, no. 12, 15 December 2020 (2020-12-15), pages 110 - 4 * |
赵家庆等: "基于时标量测的电网实时预警关键技术方案", 《电力自动化设备》, 31 October 2014 (2014-10-31), pages 157 - 163 * |
高健博: "自动驾驶车辆决策控制方法研究", 《中国优秀硕士学位论文全文数据库(工程科技Ⅱ辑)》, no. 06, 15 June 2020 (2020-06-15), pages 035 - 165 * |
Also Published As
Publication number | Publication date |
---|---|
CN113407182B (zh) | 2024-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110377524B (zh) | 报表系统的测试方法、装置、系统及介质 | |
TW583567B (en) | Automatic intelligent system for performing yield rate improvement and multivariate analysis of production process parameters and method thereof | |
CN113094288B (zh) | 一种基于Xmind思维导图转测试用例的方法 | |
US7933910B2 (en) | Retrieving apparatus, retrieving method, and retrieving program of hierarchical structure data | |
CN113407182A (zh) | 一种工程建设管理数据分析决策系统平台 | |
CN108279013A (zh) | 电子地图增量数据的检查纠错方法和装置、以及导航系统 | |
CN104484375A (zh) | 在项目分析流程中自动建立数据库的方法及系统 | |
CN108205576A (zh) | 一种基于数据仓库工具hive分区存储使用和分析数据的方法及系统 | |
CN102855288A (zh) | 差异数据的处理方法和装置 | |
CN113919761A (zh) | 一种诉讼案件管理方法、系统及装置 | |
CN113918588A (zh) | 一种基于知识点的错题动态智能管理系统 | |
CN104484581B (zh) | 生物信息项目的自动化分析方法及系统 | |
Nagy et al. | Using process mining in real-time to reduce the number of faulty products | |
CN107451283A (zh) | 数据的分析方法及装置 | |
CN111752991A (zh) | 一种表计数据统计方法、装置和获取表计统计数据方法 | |
CN111400421A (zh) | 基于云端服务器的高精地图制作方法及其制作系统 | |
AU2021106903A4 (en) | A method and system for writingan effective thesis for applied research project | |
CN111917565A (zh) | 一种实时告警统计方法及系统 | |
CN110019164A (zh) | 一种异构结构化数据融合概率的计算方法及系统 | |
JPH10134040A (ja) | 時間スケールの管理方法および時間表現表示装置 | |
US20240176961A1 (en) | Systems and methods for performing and visualizing semi-automated systematic reviews, ontological hierarchies, and network meta-analysis | |
CN106250493A (zh) | 一种数据处理方法及装置 | |
CN115510827A (zh) | 基于行数据类型标签的数据处理方法、装置、设备和介质 | |
US20210350305A1 (en) | Notifying key performance indicators of interest in a business intelligence system | |
CN116580766A (zh) | 一种基于多亲本的遗传图谱标记开发方法与装置及计算机可读存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |