CN113319540A - Zinc steel pipe product container manufacturing process - Google Patents

Zinc steel pipe product container manufacturing process Download PDF

Info

Publication number
CN113319540A
CN113319540A CN202110750815.1A CN202110750815A CN113319540A CN 113319540 A CN113319540 A CN 113319540A CN 202110750815 A CN202110750815 A CN 202110750815A CN 113319540 A CN113319540 A CN 113319540A
Authority
CN
China
Prior art keywords
box
sandwich
angle
window
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110750815.1A
Other languages
Chinese (zh)
Inventor
李山国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Jiguo Decoration Engineering Co ltd
Original Assignee
Hubei Jiguo Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Jiguo Decoration Engineering Co ltd filed Critical Hubei Jiguo Decoration Engineering Co ltd
Priority to CN202110750815.1A priority Critical patent/CN113319540A/en
Publication of CN113319540A publication Critical patent/CN113319540A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H2001/1283Small buildings of the ISO containers type

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Panels For Use In Building Construction (AREA)

Abstract

The invention discloses a manufacturing process of a zinc-wire tube product container, which comprises the following steps: surveying the scene; planning the dimension on site; drawing design; planning all materials and specifications; assembling, linking and welding; 4 upper wrap angle lifting lugs and 4 lower angle bead wrap angles are welded; performing rust prevention on all welding spots of the welding seams for two times; paving the glass magnesium board floor; angle wrapping and assembling of angle iron angle protection plates of the column beams; installing a 50 mm-by-950 mm sandwich fireproof heat-preservation cotton board wallboard; installing an anti-theft sandwich panel door; installing a color aluminum or plastic steel window; mounting a 50 mm-by-950 mm high-density foam sandwich top plate; filling the oversized parts of the side openings of all the box boards with foam rubber; gluing, waterproof protecting and sealing all plate edge closing-in and door and window inner and outer closing-in positions; spraying a contact telephone on the box body; and power supply facilities inside the box body are distributed. The container for the galvanized steel pipe products can be made into various types, can replace an engineering shed built by a user, can be moved along with the use, can flexibly move, and brings great convenience to the user.

Description

Zinc steel pipe product container manufacturing process
Technical Field
The invention relates to the field of containers, in particular to a manufacturing process of a zinc steel tube product container.
Background
The assembled container house is a novel building system which is assembled and lapped by adopting building modules, and the mobile house has the advantages of high building speed, mobility, flexible application, rapid and convenient transportation, modular production, energy conservation, environmental protection, high resource utilization rate and the like. When an independent container house unit needs extension space, often use through two sets of independent container house combinations, relate to independent transportation and independent equipment, not only the cost of transportation is high, the equipment requires highly, when bringing a lot of troubles for sealed and removal, the space is comparatively fixed, inconvenient user uses, current container house roof boarding mostly is steel sheet burst and makes, thermal-insulated heat preservation fire behavior is relatively poor, not only the travelling comfort of living in is discounted greatly, and the security is lower, the ability of anti-adventure is low, and manufacturing process is coarse, the size degree of holding is poor.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a zinc steel pipe product container manufacturing process, wherein a zinc steel pipe product container can be manufactured into various types, can replace an engineering shed built by a user, can be moved along with the use, can be flexibly moved, and brings great convenience to the user.
In order to achieve the aim of the invention, the invention adopts the specific scheme that:
a manufacturing process of a zinc steel tube product container comprises the following steps:
(1) surveying the scene;
(2) planning the dimension on site;
(3) drawing design;
(4) planning the required materials and specification models;
(5) assembling, linking and welding;
(6) 4 upper wrap angle lifting lugs and 4 lower angle bead wrap angles are welded;
(7) performing rust prevention on all welding spots of the welding seams for two times;
(8) paving the glass magnesium board floor, wherein the specification of the glass magnesium board floor is as follows: 18 mm, 1150 mm and 2790 mm;
(9) angle wrapping and assembling of angle iron angle protection plates of the column beams;
(10) installing a 50 mm-by-950 mm sandwich fireproof heat-preservation cotton board wallboard;
(11) installing an anti-theft sandwich panel door;
(12) installing a color aluminum or plastic steel window;
(13) mounting a 50 mm-by-950 mm high-density foam sandwich top plate;
(14) filling all the box board edge openings larger than 10mm with foam rubber;
(15) gluing, waterproof protecting and sealing all plate edge closing-in and door and window inner and outer closing-in positions;
(16) spraying a contact telephone on the box body;
(17) and power supply facilities inside the box body are distributed.
Preferably, the planning of all materials and specifications in step (4) comprises the following:
(1) box main timber post and crossbeam are with zinc-plated side's pipe:
①100㎜×100㎜×1.8㎜;②80㎜×80㎜×1.8㎜;
(2) auxiliary material galvanized flat pipe:
①40㎜×80㎜×(1.2-1.5)㎜;②40㎜×60㎜×(1.2-1.5)㎜;
(3) the 30 mm, 30 mm and 1.5 mm galvanized angle iron is used for the wall panel peripheral angle bead;
(4) the door is a special sandwich iron sheet anti-theft door for the movable plank house;
(5) the special 950 mm multiplied by 50 mm gray and white color bar screen window for the plate house of the window is an aluminum alloy window or a plastic steel window;
(6) the special container glass magnesium board for the floor is in the specification;
(7) the peripheral wall boards are installed by using a 50 mm-by-950 mm sandwich cotton board;
(8) the top plate is installed by a 50 mm-950 mm high-density sandwich foam plate;
(9) all the box plates are fixedly connected by using pull rivets;
(10) treating the part with the edge seam larger than 10mm with foam rubber;
(11) the thickness of the air conditioner frame stand column is 20 mm, 40 mm, 1.2 mm and 2;
(12) the edge of the box body is closed by an edge, and the edge is completely sealed by using anti-cracking high-end structural adhesive to fill a glue seam for water proofing;
(13) the size of the box body is as follows:
large box (standard box): the length (5900) -5940 mm-width (2980-3020) -mm-height 2800 mm;
a small box: the length (3980-.
Preferably, the step (17) of arranging the power supply facilities inside the box body comprises the following steps:
(1) the line is 1.5 square meters to 4 square meters;
(2) 1 master controller 32A is opened;
(3)1 air conditioner socket of 16A;
(4) five holes are formed in the big box 1 and the small box 1 respectively;
(5) 2 sets of large-box energy-saving bulbs and 1 set of small boxes;
(6) the 5-hole sockets are 4 in a large box and 2 in a small box.
The invention has the beneficial effects that:
the container can be made into various types, can replace an engineering shed built by a user, can be moved along with the use, can be flexibly moved, can be installed on site, and brings great convenience to the user. The finished product is environment-friendly and energy-saving, and has wide application, such as large-scale construction of engineering, mountain watching, weir pond watching, various fields watching and the like.
Detailed Description
The present invention is further described below by way of specific examples, but the present invention is not limited to only the following examples. Variations, combinations, or substitutions of the invention, which are within the scope of the invention or the spirit, scope of the invention, will be apparent to those of skill in the art and are within the scope of the invention.
A manufacturing process of a zinc steel tube product container comprises the following steps:
(1) surveying the scene;
(2) planning the dimension on site;
(3) drawing design;
(4) planning the required materials and specification models;
(5) assembling, linking and welding;
(6) 4 upper wrap angle lifting lugs and 4 lower angle bead wrap angles are welded;
(7) performing rust prevention on all welding spots of the welding seams for two times;
(8) paving the glass magnesium board floor, wherein the specification of the glass magnesium board floor is as follows: 18 mm, 1150 mm and 2790 mm;
(9) angle wrapping and assembling of angle iron angle protection plates of the column beams;
(10) installing a 50 mm-by-950 mm sandwich fireproof heat-preservation cotton board wallboard;
(11) installing an anti-theft sandwich panel door;
(12) installing a color aluminum or plastic steel window;
(13) mounting a 50 mm-by-950 mm high-density foam sandwich top plate;
(14) filling all the box board edge openings larger than 10mm with foam rubber;
(15) gluing, waterproof protecting and sealing all plate edge closing-in and door and window inner and outer closing-in positions;
(16) spraying a contact telephone on the box body;
(17) and power supply facilities inside the box body are distributed.
The planning of all materials and specifications in the step (4) comprises the following steps:
(1) box main timber post and crossbeam are with zinc-plated side's pipe:
①100㎜×100㎜×1.8㎜;②80㎜×80㎜×1.8㎜;
(2) auxiliary material galvanized flat pipe:
①40㎜×80㎜×(1.2-1.5)㎜;②40㎜×60㎜×(1.2-1.5)㎜;
(3) the 30 mm, 30 mm and 1.5 mm galvanized angle iron is used for the wall panel peripheral angle bead;
(4) the door is a special sandwich iron sheet anti-theft door for the movable plank house;
(5) the special 950 mm multiplied by 50 mm gray and white color bar screen window for the plate house of the window is an aluminum alloy window or a plastic steel window;
(6) the special container glass magnesium board for the floor is in the specification;
(7) the peripheral wall boards are installed by using a 50 mm-by-950 mm sandwich cotton board;
(8) the top plate is installed by a 50 mm-950 mm high-density sandwich foam plate;
(9) all the box plates are fixedly connected by using pull rivets;
(10) treating the part with the edge seam larger than 10mm with foam rubber;
(11) the thickness of the air conditioner frame stand column is 20 mm, 40 mm, 1.2 mm and 2;
(12) the edge of the box body is closed by an edge, and the edge is completely sealed by using anti-cracking high-end structural adhesive to fill a glue seam for water proofing;
(13) the size of the box body is as follows:
large box (standard box): the length (5900) -5940 mm-width (2980-3020) -mm-height 2800 mm;
a small box: the length (3980-.
The step (17) of arranging power supply facilities inside the box body comprises the following steps:
(1) the line is 1.5 square meters to 4 square meters;
(2) 1 master controller 32A is opened;
(3)1 air conditioner socket of 16A;
(4) five holes are formed in the big box 1 and the small box 1 respectively;
(5) 2 sets of large-box energy-saving bulbs and 1 set of small boxes;
(6) the 5-hole sockets are 4 in a large box and 2 in a small box.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the present invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (3)

1. The manufacturing process of the zinc steel tube product container is characterized by comprising the following steps of:
(1) surveying the scene;
(2) planning the dimension on site;
(3) drawing design;
(4) planning the required materials and specification models;
(5) assembling, linking and welding;
(6) 4 upper wrap angle lifting lugs and 4 lower angle bead wrap angles are welded;
(7) performing rust prevention on all welding spots of the welding seams for two times;
(8) paving the glass magnesium board floor, wherein the specification of the glass magnesium board floor is as follows: 18 mm, 1150 mm and 2790 mm;
(9) angle wrapping and assembling of angle iron angle protection plates of the column beams;
(10) installing a 50 mm-by-950 mm sandwich fireproof heat-preservation cotton board wallboard;
(11) installing an anti-theft sandwich panel door;
(12) installing a color aluminum or plastic steel window;
(13) mounting a 50 mm-by-950 mm high-density foam sandwich top plate;
(14) filling all the box board edge openings larger than 10mm with foam rubber;
(15) gluing, waterproof protecting and sealing all plate edge closing-in and door and window inner and outer closing-in positions;
(16) spraying a contact telephone on the box body;
(17) and power supply facilities inside the box body are distributed.
2. The process of manufacturing a container made of zinc steel tube products as claimed in claim 1, wherein the planning of all materials and specifications in the step (4) comprises the following steps:
(1) box main timber post and crossbeam are with zinc-plated side's pipe:
①100㎜×100㎜×1.8㎜;②80㎜×80㎜×1.8㎜;
(2) auxiliary material galvanized flat pipe:
①40㎜×80㎜×(1.2-1.5)㎜;②40㎜×60㎜×(1.2-1.5)㎜;
(3) the 30 mm, 30 mm and 1.5 mm galvanized angle iron is used for the wall panel peripheral angle bead;
(4) the door is a special sandwich iron sheet anti-theft door for the movable plank house;
(5) the special 950 mm multiplied by 50 mm gray and white color bar screen window for the plate house of the window is an aluminum alloy window or a plastic steel window;
(6) the special container glass magnesium board for the floor is in the specification;
(7) the peripheral wall boards are installed by using a 50 mm-by-950 mm sandwich cotton board;
(8) the top plate is installed by a 50 mm-950 mm high-density sandwich foam plate;
(9) all the box plates are fixedly connected by using pull rivets;
(10) treating the part with the edge seam larger than 10mm with foam rubber;
(11) the thickness of the air conditioner frame stand column is 20 mm, 40 mm, 1.2 mm and 2;
(12) the edge of the box body is closed by an edge, and the edge is completely sealed by using anti-cracking high-end structural adhesive to fill a glue seam for water proofing;
(13) the size of the box body is as follows:
large box (standard box): the length (5900) -5940 mm-width (2980-3020) -mm-height 2800 mm;
a small box: the length (3980-.
3. The manufacturing process of a container made of zinc-steel tube products as claimed in claim 1, wherein the step (17) of arranging power supply facilities inside the container body comprises the following steps:
(1) the line is 1.5 square meters to 4 square meters;
(2) 1 master controller 32A is opened;
(3)1 air conditioner socket of 16A;
(4) five holes are formed in the big box 1 and the small box 1 respectively;
(5) 2 sets of large-box energy-saving bulbs and 1 set of small boxes;
(6) the 5-hole sockets are 4 in a large box and 2 in a small box.
CN202110750815.1A 2021-07-02 2021-07-02 Zinc steel pipe product container manufacturing process Pending CN113319540A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110750815.1A CN113319540A (en) 2021-07-02 2021-07-02 Zinc steel pipe product container manufacturing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110750815.1A CN113319540A (en) 2021-07-02 2021-07-02 Zinc steel pipe product container manufacturing process

Publications (1)

Publication Number Publication Date
CN113319540A true CN113319540A (en) 2021-08-31

Family

ID=77425562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110750815.1A Pending CN113319540A (en) 2021-07-02 2021-07-02 Zinc steel pipe product container manufacturing process

Country Status (1)

Country Link
CN (1) CN113319540A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798846A (en) * 2010-02-05 2010-08-11 杜海平 Modularization assembled house
CN204326243U (en) * 2014-12-09 2015-05-13 杭州萧雅集成房屋有限公司 A kind of overlength device talk container house
CN204626646U (en) * 2015-02-02 2015-09-09 上海昌佳彩钢夹芯板有限公司 A kind of three-open type container mobile house
CN208329734U (en) * 2018-06-25 2019-01-04 深圳金地研发设计有限公司 A kind of fast assembling self-locking container house structure
CN208472936U (en) * 2018-06-22 2019-02-05 陕西建筑产业投资集团有限公司 A kind of packing box-type room
CN208472952U (en) * 2018-06-29 2019-02-05 陕西建筑产业投资集团有限公司 A kind of fast-assembling box-type room

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798846A (en) * 2010-02-05 2010-08-11 杜海平 Modularization assembled house
CN204326243U (en) * 2014-12-09 2015-05-13 杭州萧雅集成房屋有限公司 A kind of overlength device talk container house
CN204626646U (en) * 2015-02-02 2015-09-09 上海昌佳彩钢夹芯板有限公司 A kind of three-open type container mobile house
CN208472936U (en) * 2018-06-22 2019-02-05 陕西建筑产业投资集团有限公司 A kind of packing box-type room
CN208329734U (en) * 2018-06-25 2019-01-04 深圳金地研发设计有限公司 A kind of fast assembling self-locking container house structure
CN208472952U (en) * 2018-06-29 2019-02-05 陕西建筑产业投资集团有限公司 A kind of fast-assembling box-type room

Similar Documents

Publication Publication Date Title
CN208578370U (en) A kind of modular electrical secondary device prefabricated cabin
CN113319540A (en) Zinc steel pipe product container manufacturing process
CN207538510U (en) A kind of firmly people's container for building of good heat-insulation effect
CN202115527U (en) Roof structure of rail car
CN2409268Y (en) Movable dwellings
CN107975163A (en) A kind of mountable double-deck Side fascia and mounting structure and horizontal vertical waterproof construction
CN106972391A (en) A kind of preassembled transformer station
CN206554556U (en) Container
CN107872025A (en) A kind of double-layer plate insulation Europe becomes casing
CN206888607U (en) A kind of rail type mobile workshop for the assembling of water-storage formula generator unit
CN204163441U (en) A kind of transformer substation power distribution unit room based on unit wall quickly dismantled technology
CN203669409U (en) Container type mobile barrack
CN210767482U (en) Assembled composite external wall panel
CN202969982U (en) Mobile board room
CN113756475A (en) Noise-reduction waterproof wallboard module and mounting structure thereof
CN207228708U (en) A kind of folding communication computer room
CN218454597U (en) Container type house
CN206667474U (en) A kind of aluminium bag glass sunlight house
CN216405756U (en) Steel keel system for fixing deformation seam cover plate of outer window
CN206771528U (en) Suspended ceiling air handling group
CN205688644U (en) A kind of large space curved surface ceiling structure
CN216076132U (en) Heat-bridge-free sealed door and window mounting structure of box-type house
CN109127247B (en) Die forging working chamber structure of automobile coating production line
CN214302612U (en) Waterproof structure at node department is striden to steel construction sloping roof height
CN216075904U (en) Modular wallboard structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210831