CN113250363A - 一种装配式预制叠合板施工方法及所用支撑结构 - Google Patents
一种装配式预制叠合板施工方法及所用支撑结构 Download PDFInfo
- Publication number
- CN113250363A CN113250363A CN202110615933.1A CN202110615933A CN113250363A CN 113250363 A CN113250363 A CN 113250363A CN 202110615933 A CN202110615933 A CN 202110615933A CN 113250363 A CN113250363 A CN 113250363A
- Authority
- CN
- China
- Prior art keywords
- construction
- prefabricated
- supporting
- steel plate
- composite slab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B2005/176—Floor structures partly formed in situ with peripheral anchors or supports
Abstract
本发明公开了一种装配式预制叠合板施工方法及所用支撑结构,本发明是采用固定在预制梁(1)内侧的一组支撑牛腿(2)作为承受预制叠合板(4)的竖向荷载;替代现有技术的钢管架体。所用支撑结构包括预制梁(1);预制梁(1)内侧设有一组支撑牛腿(2);支撑牛腿(2)顶面设有调节方通(3);调节方通(3)顶部设有预制叠合板(4)。本发明采用支撑牛腿替代了现有技术的钢管架体,无需在下部楼层搭设钢管架体,为下部楼层的施工增加了空间,大大方便了下部楼层的施工。提高了施工速度和效率,节约了施工成本。
Description
技术领域
本发明涉及一种装配式预制叠合板施工方法及所用支撑结构,属于预制叠合板施工技术领域。
背景技术
由于装配式预制叠合板标准化生产,具有质量高、生产效率高等优势,被广泛应用于房屋建筑领域。现有装配式预制叠合板的施工通常是是采用在装配式预制叠合板下方搭设钢管架体的方式,钢管架体作为装配式预制叠合板施工阶段竖向承载力的支承部件。钢管架体的搭设及拆除时间较长、人工费用较大,并对下部楼层空间占用较多。在施工过程中,叠合板下部支撑架体搭设的时间及速度已经成为影响施工进度的重要因素之一。因此,现有技术仍存在不足,有待进一步改进。
发明内容
本发明的目的在于,提供一种装配式预制叠合板施工方法及所用支撑结构,以解决现有钢管架体搭设及拆除时间较长、人工费用高,对下部楼层空间占用较多的技术问题,从而克服现有技术的不足。
为实现上述目的,本发明采用如下技术方案:
本发明的一种装配式预制叠合板施工方法,该方法是采用固定在预制梁内侧的一组支撑牛腿作为承受预制叠合板的竖向荷载;替代现有技术的钢管架体。
前述方法中,通过在支撑牛腿上设置调节方通,以方便调整预制叠合板平整度。
本发明的一种用于上述方法的装配式建筑叠合板施工支撑结构为,该结构包括预制梁;其特征在于:预制梁内侧设有一组支撑牛腿;支撑牛腿顶面设有调节方通;调节方通顶部设有预制叠合板。
前述支撑结构中,所述支撑牛腿包括连接钢板, 连接钢板顶端焊接有支撑钢板,支撑钢板与连接钢板之间设有加强板;加强板两侧的连接钢板上分别设有螺栓孔,螺栓孔经高强螺栓与预制梁连接。
由于采用了上述技术方案,本发明与现有技术相比,本发明采用支撑牛腿替代了现有技术的钢管架体,无需在下部楼层搭设钢管架体,为下部楼层的施工增加了空间,大大方便了下部楼层的施工。提高了施工速度和效率,节约了施工成本。现有技术的钢管架体一般采用可调节的独立支撑,楼板的平整度主要取决的施工过程中每根独立支撑的高度调节是否一致,调节麻烦。本发明板面吊装平整度高,为后续混凝土浇筑作业的质量提供有力保障。
附图说明
图1是本发明的结构示意图;
图2是本发明的支撑牛腿的结构示意图。
图中标记如下:1-预制梁、2-支撑牛腿、3-调节方通、4-预制叠合板、5-连接钢板、6-支撑钢板、7-加强板、8-螺栓孔、9-高强螺栓、10-垫片。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
本发明的一种装配式预制叠合板施工方法,如图1所示,该方法是采用固定在预制梁1内侧的一组支撑牛腿2作为承受预制叠合板4的竖向荷载;替代现有技术的钢管架体。通过在支撑牛腿2上设置调节方通3,以适应预制叠合板4的尺寸要求。
本发明的一种用于上述方法的装配式建筑叠合板施工支撑结构,如图1所示,该结构包括预制梁1;其特征在于:预制梁1内侧设有一组支撑牛腿2;支撑牛腿2顶面设有调节方通3;调节方通3顶部设有预制叠合板4。
如图2所示,支撑牛腿2包括连接钢板5, 连接钢板5顶端焊接有支撑钢板6,支撑钢板6与连接钢板5之间设有加强板7;加强板7两侧的连接钢板5上分别设有螺栓孔8,螺栓孔8经高强螺栓9与预制梁1连接。具体实施时,可在高强螺栓9与连接钢板5之间垫上垫片10。
本发明具有以下特点:
1、减少预制叠合板下钢管支撑搭设、拆除工作,本发明的方法近乎减少工序一道,大大提高施工速度和效率,节约了施工成本。
2、传统预制叠合板下钢管支撑搭设一般采用可调节的独立支撑,板面平整度主要取决的施工过程中每根独立支撑的高度调节是否一致。本发明板面吊装平整度高,为后续混凝土浇筑作业的质量提供有力保障。
Claims (4)
1.一种装配式预制叠合板施工方法,其特征在于:该方法是采用固定在预制梁(1)内侧的一组支撑牛腿(2)作为承受预制叠合板(4)的竖向荷载;以替代现有技术的钢管架体。
2.根据权利要求1所述装配式预制叠合板施工方法,其特征在于:通过在支撑牛腿(2)上设置调节方通(3),以方便调整预制叠合板(4)的平整度。
3.一种用于权利要求1或2所述方法的装配式建筑叠合板施工支撑结构,包括预制梁(1);其特征在于:在预制梁(1)内侧设有一组支撑牛腿(2);支撑牛腿(2)顶面设有调节方通(3);调节方通(3)顶部设有预制叠合板(4)。
4.根据权利要求3所述装配式建筑叠合板施工支撑结构,其特征在于:所述支撑牛腿(2)包括连接钢板(5), 连接钢板(5)顶端焊接有支撑钢板(6),支撑钢板(6)与连接钢板(5)之间设有加强板(7);加强板(7)两侧的连接钢板(5)上分别设有螺栓孔(8),螺栓孔(8)经高强螺栓(9)与预制梁(1)连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110615933.1A CN113250363A (zh) | 2021-06-02 | 2021-06-02 | 一种装配式预制叠合板施工方法及所用支撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110615933.1A CN113250363A (zh) | 2021-06-02 | 2021-06-02 | 一种装配式预制叠合板施工方法及所用支撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113250363A true CN113250363A (zh) | 2021-08-13 |
Family
ID=77186144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110615933.1A Pending CN113250363A (zh) | 2021-06-02 | 2021-06-02 | 一种装配式预制叠合板施工方法及所用支撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113250363A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5715636A (en) * | 1995-11-15 | 1998-02-10 | Innovative Building Products, Inc. | Light transmitting roof/floor system |
CN207499427U (zh) * | 2017-11-30 | 2018-06-15 | 青岛一建集团有限公司 | 装配整体式预制叠合板支撑体系 |
CN110468955A (zh) * | 2019-08-19 | 2019-11-19 | 山东建科信息技术有限公司 | 一种装配式混凝土结构剪力墙与叠合板连接钢节点及施工方法 |
-
2021
- 2021-06-02 CN CN202110615933.1A patent/CN113250363A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5715636A (en) * | 1995-11-15 | 1998-02-10 | Innovative Building Products, Inc. | Light transmitting roof/floor system |
CN207499427U (zh) * | 2017-11-30 | 2018-06-15 | 青岛一建集团有限公司 | 装配整体式预制叠合板支撑体系 |
CN110468955A (zh) * | 2019-08-19 | 2019-11-19 | 山东建科信息技术有限公司 | 一种装配式混凝土结构剪力墙与叠合板连接钢节点及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109914244B (zh) | 一种适用于高塔钢混结合横梁钢结构安装及底、顶板混凝土浇筑的弱支架系统及其操作方法 | |
CN110644664A (zh) | 装配式建筑施工方法及叠合板施工支撑系统 | |
CN112049439A (zh) | 一种受限空间内整体提升安装钢平台的方法 | |
CN109989590B (zh) | 用于屋顶超长钢梁安装的辅助固定装置及钢梁的吊装方法 | |
CN111188278A (zh) | 胎架结构、胎架组件及施工方法 | |
CN112343230A (zh) | 一种装配式模板桁架支撑装置 | |
CN113250363A (zh) | 一种装配式预制叠合板施工方法及所用支撑结构 | |
CN212105103U (zh) | 一种核电站大跨度设备间厚楼板桁模支架 | |
CN114251518A (zh) | 一种无层板封闭式管井的管道安装结构及其施工方法 | |
CN113309259A (zh) | 一种叠合剪力墙整体式水平接缝及施工方法 | |
CN219509288U (zh) | 一种非搁置式预制叠合梁、叠合板安装支撑架 | |
CN219730220U (zh) | 一种定型化可调节施工电梯回顶顶托装置 | |
CN219343707U (zh) | 一种钢桁架楼承板补偿装置 | |
CN220267014U (zh) | 一种部分浇筑h型钢混凝土组合梁 | |
CN215484582U (zh) | 一种用于悬挑脚手架的可调节式型钢支撑装置 | |
CN220868875U (zh) | 一种楼承板临时支撑次梁安装装置 | |
CN219099821U (zh) | 一种预制梁桥桥面外悬板现浇工作平台 | |
CN114086478B (zh) | 一种牛腿兼做临时支撑的主塔下横梁施工体系及方法 | |
CN215166572U (zh) | 钢柱顶部与压型钢板混凝土组合板连接节点 | |
CN218990553U (zh) | 一种易于混凝土浇筑作业的双钢板剪力墙结构 | |
CN220450682U (zh) | 一种基于新桥系梁的临时施工支架 | |
CN213654221U (zh) | 一种索塔内外整体滑升模板 | |
CN220487095U (zh) | 一种用于斜坡浇筑的自动化模板 | |
CN220058085U (zh) | 一种格构柱穿结构梁转换施工结构 | |
CN220503695U (zh) | 一种v型桥墩模板支撑体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210813 |
|
RJ01 | Rejection of invention patent application after publication |