CN113169537B - 电缆螺纹连接件 - Google Patents
电缆螺纹连接件 Download PDFInfo
- Publication number
- CN113169537B CN113169537B CN201980077480.2A CN201980077480A CN113169537B CN 113169537 B CN113169537 B CN 113169537B CN 201980077480 A CN201980077480 A CN 201980077480A CN 113169537 B CN113169537 B CN 113169537B
- Authority
- CN
- China
- Prior art keywords
- cable
- housing part
- housing
- sealing body
- threaded connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/06—Joints for connecting lengths of protective tubing or channels, to each other or to casings, e.g. to distribution boxes; Ensuring electrical continuity in the joint
- H02G3/0616—Joints for connecting tubing to casing
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/22—Installations of cables or lines through walls, floors or ceilings, e.g. into buildings
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Cable Accessories (AREA)
- Installation Of Indoor Wiring (AREA)
- Connector Housings Or Holding Contact Members (AREA)
- Insertion, Bundling And Securing Of Wires For Electric Apparatuses (AREA)
Abstract
本发明涉及一种电缆螺纹连接件,其具有:电缆贯通壳体,该电缆贯通壳体由第一壳体部件(10)和第二壳体部件(11)以两个零件形成,第一壳体部件和第二壳体部件在组装期间在壁孔口的相反两侧上在该壁孔口处布置并且可释放地彼此连接,以便将围绕壁孔口的壁部分夹持在该第一壳体部件与第二壳体部件之间;电缆通路,当第一壳体部件(10)和第二壳体部件(11)被连接到彼此时,该电缆通路形成为穿过该电缆贯通壳体;以及电缆密封件,该电缆密封件形成在该电缆贯通壳体上且具有密封本体(19),该密封本体绕电缆通路形成并且以密封方式容纳被接纳在其中的电缆;其中,该电缆贯通壳体和该密封本体(19)由不同的合成材料制成,并且该密封本体(19)以一件形成在该电缆贯通壳体上。
Description
技术领域
本发明涉及一种电缆螺纹连接件,该电缆螺纹连接件用于将电缆引导穿过壁开口。
背景技术
此类电缆螺纹连接件用于将一个或多个电缆引导穿过壁中的开口,例如引导穿过电气装置或控制柜的壳体壁。原则上,此类电缆螺纹连接件可以例如用于由金属或塑料材料制成的任何壳体。该电缆通常以密封方式被引导穿过壁,特别是为了防止灰尘和/或湿气穿过壁开口进入。
已知的电缆螺纹连接件以若干零件制成,使得在电缆贯通壳体中,旋拧在一起的壳体零件设置成布置在壁开口的相反两侧上。为了形成电缆螺纹连接件,壳体部件布置在壁开口的相反两侧上,并且通过产生螺纹连接件而穿过壁开口连接到彼此。此外,设置了一个或多个密封本体,当壳体部件旋拧在一起时,所述一个或多个密封本体一体化,以便形成用于被引导穿过贯通壳体的电缆的密封件。
发明内容
本发明的目的是提供一种电缆螺纹连接件,该电缆螺纹密封件能够以简单的方式组装。
为了实现所述目的,提供一种根据独立权利要求1所述的电缆螺纹连接件。实施例是从属权利要求的主题。
根据一个方面,提供一种电缆螺纹连接件,该电缆螺纹连接件具有电缆贯通壳体,该电缆贯通壳体由第一壳体部件和第二壳体部件形成,当该第一壳体部件和第二壳体部件被安装在壁开口上时,该第一壳体部件和第二壳体部件被布置在壁开口的相反两侧上并且被可释放地连接到彼此,以便将围绕壁开口的壁部段夹持在该第一壳体部件与第二壳体部件之间。该电缆螺纹连接件还具有电缆通路,当该第一壳体部件和第二壳体部件例如被可释放地连接到彼此时,该电缆通路形成为穿过该电缆贯通壳体。设置有电缆密封件,该电缆密封件被形成在电缆贯通壳体上且具有密封本体,该密封本体被形成为绕该电缆贯通部并且密封地容纳被接纳在其中的电缆。该电缆贯通壳体和密封本体由不同的塑料材料制成,其中,该密封本体被一体地形成在该电缆贯通壳体上。
如果用于形成该电缆螺纹连接件或电缆壁贯通部的电缆贯通壳体被安装在壁开口上,并且至少一个电缆被布置在电缆贯通部中,则可以对于密封本体而言形成与所述至少一个电缆的周向接触,以便提供密封效果。当连接了第一壳体部件和第二壳体部件时,该密封本体被按压且由此变形,以便产生密封效果。例如,通过螺纹连接件或夹连接件,能够执行壳体部件的可释放连接。在螺纹连接件的情形中,第一壳体部件可以设计为拧入式本体,并且第二部件设计为压力螺丝,当连接这些壳体部件时,该拧入式本体的部段旋拧到该压力螺丝中。
虽然该电缆贯通壳体由两个壳体部件构成,但也可以提供其它部件,例如至少一个垫圈,以形成电缆螺纹连接件,所述至少一个垫圈可以被推动或滑移到第一壳体部件的可选地设置有外螺纹的部段上。当连接了两个壳体部件时,该垫圈则可以搁抵在围绕壁开口的边缘上。
该密封本体可以一体地形成在该第一壳体部件上。当连接两个壳体部件时,压缩压力可以施加在该密封本体上,以便发展密封效果。
当第一壳体部件和第二壳体部件被连接到彼此时,该密封本体可以被一体地形成在第一壳体部件的在第二壳体部件中布置的端部段中的端上。在第一壳体部件上在前侧上的端部段处可以一体地形成该密封本体,使得当连接了这些壳体部件时,该第二壳体部件按压抵靠前密封本体。
第一壳体部件的端部段在外侧和内侧上可以被该密封本体以一件包围。端部段(例如,前侧部段)的外侧和内侧包围在周缘上可以中断或连续。
该密封本体可以一体地形成在该第二壳体部件上。在该实施例中,该密封本体一体地形成在第二壳体部件上。例如,该密封本体可以一体地形成在该第二壳体部件的内侧上。该密封本体可以相对于壁开口布置在第二壳体部件的远端部段上。当例如通过将第一壳体部件和第二壳体部件旋拧在一起而连接该第一壳体部件和第二壳体部件时,该第一壳体部件则可以按压抵靠内密封本体。
该密封本体可以设计为多个零件,特别地使得第一密封本体一体地形成在第一壳体部件上,并且第二密封本体一体地形成在第二壳体部件上。当连接第一壳体部件和第二壳体部件时,该第一密封本体和第二密封本体可以彼此搁抵或接触,以便共同地为电缆通路中的所述至少一个电缆形成密封件。在一个实施例中,当连接所述两个壳体部件以形成电缆贯通壳体时,在第一密封本体上形成的突起(例如,密封唇)可以接合在第二密封本体上形成的凹槽(例如,沟槽)中。
该密封本体可以一体地形成在第二壳体部件的与该第二壳体部件的前侧开口(相对于壁开口在远端)相邻的内侧上,使得当连接了第一壳体部件和第二壳体部件时,该第一壳体部件的前侧按压部段被按压抵靠该密封本体。该密封本体可连续地或间断地包围该远端前侧开口。
螺纹部段可以布置在该第一壳体部件的外侧上,该螺纹部段分配给壁开口,并且该螺纹部段能够旋拧到壁开口中。可以设计为拧入式本体的第一壳体部件上的外螺纹例如可以用于将第一壳体部件旋拧到壁开口中。替代地,第一壳体部件的延伸穿过壁开口的部段可以到达穿过壁开口(松松地),而在该过程中并不形成螺纹连接件。例如,第一壳体部件的壳体部段可以被简便地推动穿过壁开口,以便在相反侧例如通过螺纹连接件被连接到第二壳体部件。在一个示例中,在被推动穿过壁开口之后,该第一壳体部件能够初始通过锁紧螺母被紧固到或夹持到该壁开口,以便随后旋拧在该第二壳体部件上。
分配给壁开口的圆锥形塞入式部段可以布置在该第一壳体部件的外侧上,该圆锥形塞入式部段可以插入到该壁开口中。借助一个或多个圆锥形塞入式部段,该第一壳体部件能够在插入到壁开口中时特别是在连接到该第二壳体部件(如果该第二壳体部件在一个实施例中旋拧到该第一壳体部件上)时被夹持,以便将围绕壁开口的边缘夹持在这两个壳体部件之间。通过当连接这两个壳体部件时提供的力,具有该圆锥形塞入式部段的第一壳体部件能够进一步被拉入到壁开口中。多个圆锥形部段能够以周向分布的方式设置在该第一壳体部件的外侧上。还可以提供圆锥形突起,该圆锥形突起在四周连续地形成。
作为软部件,该密封本体能够由热塑性弹性体制成。该第一壳体部件和/或第二壳体部件能够设计为2C注塑部件,该2C注塑部件用于密封本体的一件式模塑。该电缆贯通壳体,也就是说该第一壳体部件和/或第二壳体部件,形成硬部件,该硬部件由与密封本体相比硬的塑料材料制成,该密封本体形成由热塑性弹性体制成的软部件。
该电缆密封件可以设计成形成电缆应变释缓件(strain relief)。在该实施例中,设置了多功能密封本体,当第一壳体部件和第二壳体部件连接到彼此时,该多功能密封本体除了密封以外还形成电缆应变释缓件。
另一密封本体可以布置在电缆贯通壳体上,该另一密封本体密封壁开口,并且一体地形成在电缆贯通壳体上。
该第二壳体部件可以具有带有内螺纹的螺帽,该螺帽可以旋拧到该第一壳体部件的外螺纹上,且由此按压该密封本体。
结合该电缆螺纹连接件,提供一种用于产生电缆螺纹连接件的方法,其中,通过将组成电缆贯通壳体的第一壳体部件和第二壳体部件在装配在壁开口上期间布置在壁开口的相反两侧上并且(可释放地)彼此连接来产生两件式电缆贯通壳体,使得围绕壁开口的壁部段(边缘)被夹持在该第一壳体部件与第二壳体部件之间。在电缆通路或电缆贯通部中,布置待引导穿过壁开口的至少一个电缆,当第一壳体部件和第二壳体部件被连接到彼此时,该电缆通路或电缆贯通部形成为穿过该电缆贯通壳体。借助在电缆贯通壳体上形成且具有密封本体的电缆密封件来密封所述至少一个电缆,该密封本体绕电缆通路形成并且密封地容纳被布置在其中的电缆。为了产生电缆螺纹连接件,使用由不同塑料材料制成的电缆贯通壳体和密封本体,其中,该密封本体一体地形成在该电缆贯通壳体上。在已经插入到壁开口中并且已经使前部段被推动穿过该壁开口之后,如有必要,该第一壳体部件可以通过锁紧螺母被紧固或夹持到壁开口的区域中的壁,该锁紧螺母旋拧到该第一壳体部件上。
在该方法中,该第一壳体部件能够初始从具有壁开口的壁的内侧或外侧插入到壁开口中(并且使各个部段被推动穿过),然后诸如螺帽或压力螺丝之类的第二壳体部件可以从相反侧被旋拧上。
附图说明
下文将参照附图更详细地解释进一步的实施例,附图中:
图1示出了处于未组装状态下的用于电缆贯通壳体的壳体部件和用于电缆螺纹连接件的垫圈的示意透视图;
图2以剖切视图示出了根据图1的布置的另一透视图;
图3以剖切视图示出了具有来自图1的壳体部件的电缆螺纹连接件的示意图;
图4A和图4B示出了来自图3的电缆螺纹连接件的示意透视图;
图5示出了处于未组装状态下的、用于另一电缆贯通壳体的壳体部件和用于另一电缆螺纹连接件的垫圈的示意透视图;
图6以剖切视图示出了根据图5的布置的另一透视图;
图7以剖切视图示出了具有来自图5的壳体部件的另一电缆螺纹连接件的示意图;以及
图8A和图8B示出了来自图7的另一电缆螺纹连接件的示意透视图。
具体实施方式
图1示出了第一壳体部件10和第二壳体部件11以及垫圈12的示意透视图,可以使用该垫圈12以从第一壳体部件10和第二壳体部件11产生具有电缆贯通壳体13a的电缆螺纹连接件或电缆壁贯通部13,这如图3和图4A、图4B所示。图2以剖视图示出了来自图1的布置的另一示意透视图。
第一壳体部件10和第二壳体部件11各自由塑料材料制成为例如注塑部件。在所示的实施例中,第一壳体部件10设计成拧入式本体,其中,被设计成具有内螺纹15的压力螺丝的第二壳体部件11旋拧到外螺纹14上(参照图3)。作为结果,形成图3中所示的电缆螺纹连接件13,该电缆螺纹连接件布置在壁17的壁开口16的区域中,以便以密封方式将一个或多个电缆(未示出)引导穿过壁开口16。
为了形成用于至少一个电缆的密封件,为电缆密封件18设置密封本体19,该密封本体19例如通过2C注塑来在第一壳体部件10上一体地形成为软部件。例如,密封本体19由热塑性弹性体构成。当连接第一壳体部件10和第二壳体部件11时(在所示出的实施例中,这通过旋拧来执行),第二壳体部件11按压抵靠密封本体19,使得朝向电缆通路18的中心按压该密封本体19,以便周向地接触并且密封所述至少一个电缆。
另一密封本体21在分配给壁17的端面20的区域中一体地形成在第二壳体部件11上,当第二壳体部件11旋拧到第一壳体部件10上以形成电缆螺纹连接件13时,该另一密封本体21形成朝向壁17的密封件。
根据图1,第一壳体部件10具有另一外螺纹部段22,当形成了电缆螺纹连接件13时,该另一外螺纹部段22旋拧到壁开口16中。此外,设置了圆锥形塞入式部段23,以便将第一壳体部件10夹持在壁开口16中。
在图5到图8中,示出了具有电缆贯通壳体13a的另一电缆螺纹连接件30。将与图1到图4中相同的附图标记用于相同的特征。
与图1到图4中所示的示例相对照,密封本体19现在一体地形成在第二壳体部件11的内侧上(参照图6和图7)。
根据图7,在那里示出的示例中,密封本体19和另一密封本体21经由通道31连接,该通道31填充有如下材料:密封本体19和另一密封本体21也由该材料制成。如果通过注塑来产生用于另一电缆螺纹连接件30的第二壳体部件11,则能够经由注塑工具中的开口引入用于密封本体19、21的材料,以便形成两个密封本体19、21,其中,诸如热塑性弹性体之类的软部件的材料传播例如经由通道31发生。类似于通道31,沿着第二壳体部件11的周缘,可以设置多个单独的通道(也参照图7)。
在以上描述、权利要求以及附图中公开的特征可以与实施不同的实施例(无论个别地,还是以任何组合)相关。
Claims (11)
1.一种电缆螺纹连接件(13;30),具有:
-电缆贯通壳体(13a),所述电缆贯通壳体(13a)由第一壳体部件(10)和第二壳体部件(11)以两件形成,当所述第一壳体部件(10)和所述第二壳体部件(11)被安装于壁开口(16)上时,所述第一壳体部件(10)和所述第二壳体部件(11)被布置在所述壁开口(16)的相反两侧上并且被可释放地连接到彼此,以便将围绕所述壁开口(16)的壁部段夹持在所述第一壳体部件(10)与所述第二壳体部件(11)之间;
-电缆通路,当所述第一壳体部件(10)和所述第二壳体部件(11)连接到彼此时,所述电缆通路被形成为穿过所述电缆贯通壳体(13a);以及
-电缆密封件(18),所述电缆密封件(18)形成在所述电缆贯通壳体(13a)上且具有密封本体(19),所述密封本体(19)被形成为绕所述电缆通路,以将电缆密封地接纳在所述电缆通路中;
其中,所述电缆贯通壳体(13a)和所述密封本体(19)由不同的塑料材料制成,并且所述密封本体(19)被一体地形成在所述电缆贯通壳体(13a)上,
其特征在于:
在所述第一壳体部件(10)上在前侧上的端部段处一体地形成所述密封本体(19),使得当所述第一壳体部件(10)和所述第二壳体部件(11)彼此连接时,所述第二壳体部件(11)按压抵靠前侧密封本体;和/或
在所述第二壳体部件(11)上在与所述第二壳体部件(11)的相对于所述壁开口(16)在远端的端面开口相邻的内侧上一体地形成所述密封本体(19),使得当所述第一壳体部件(10)和所述第二壳体部件(11)彼此连接时,所述第一壳体部件(10)的端面按压部段被按压抵靠所述密封本体(19)。
2.根据权利要求1所述的电缆螺纹连接件(13;30),其特征在于,所述密封本体(19)被一体地形成在所述第一壳体部件(10)上。
3.根据权利要求2所述的电缆螺纹连接件(13;30),其特征在于,当所述第一壳体部件(10)和所述第二壳体部件(11)连接到彼此时,所述密封本体(19)被一体地形成在所述第一壳体部件(10)的在所述第二壳体部件(11)中布置的端部段中的端上。
4.根据权利要求3所述的电缆螺纹连接件(13;30),其特征在于,所述第一壳体部件(10)的所述端部段在外侧和内侧上被所述密封本体(19)以一件包围。
5.根据权利要求1所述的电缆螺纹连接件(13;30),其特征在于,所述密封本体(19)被一体地形成在所述第二壳体部件(11)上。
6.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,被分配给所述壁开口(16)的螺纹部段(22)布置在所述第一壳体部件(10)的外侧上,所述螺纹部段(22)能够被旋拧到所述壁开口(16)中。
7.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,被分配给所述壁开口(16)的圆锥形塞入式部段(23)布置在所述第一壳体部件(10)的外侧上,所述圆锥形塞入式部段能够被插塞到所述壁开口(16)中。
8.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,作为软部件的所述密封本体(19)由热塑性弹性体制成。
9.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,所述电缆密封件被设计为形成电缆应变释缓件。
10.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,密封所述壁开口(16)的另一密封本体(21)被布置在所述电缆贯通壳体(13a)上,并且被一体地形成在所述电缆贯通壳体(13a)上。
11.根据权利要求1-5中任一项所述的电缆螺纹连接件(13;30),其特征在于,所述第二壳体部件(11)具有带有内螺纹的螺帽,所述螺帽能够被旋拧到所述第一壳体部件(10)的外螺纹上,且由此按压所述密封本体(19)。
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202018106798.2 | 2018-11-29 | ||
DE202018106798.2U DE202018106798U1 (de) | 2018-11-29 | 2018-11-29 | Kabelverschraubung |
PCT/DE2019/101021 WO2020108706A1 (de) | 2018-11-29 | 2019-11-29 | Kabelverschraubung |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113169537A CN113169537A (zh) | 2021-07-23 |
CN113169537B true CN113169537B (zh) | 2023-06-16 |
Family
ID=68840835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201980077480.2A Active CN113169537B (zh) | 2018-11-29 | 2019-11-29 | 电缆螺纹连接件 |
Country Status (6)
Country | Link |
---|---|
US (1) | US12040602B2 (zh) |
EP (1) | EP3888205A1 (zh) |
JP (1) | JP7474763B2 (zh) |
CN (1) | CN113169537B (zh) |
DE (1) | DE202018106798U1 (zh) |
WO (1) | WO2020108706A1 (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3660995B1 (de) * | 2018-11-28 | 2023-01-11 | WISKA Hoppmann GmbH | Integral hergestellte kabelverschraubung |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101636891A (zh) * | 2007-03-09 | 2010-01-27 | 安东-胡梅尔管理有限公司 | 具有对应套筒或锁紧螺母的电缆螺栓紧固装置 |
CN202384650U (zh) * | 2011-09-30 | 2012-08-15 | 烙克赛克有限公司 | 密封装置 |
DE202013002059U1 (de) * | 2013-03-05 | 2014-06-06 | Wiska Hoppmann & Mulsow Gmbh | Kabeldurchführung zur Durchführung sowie Zugentlastung und Abdichtung eines Kabels |
DE202015102280U1 (de) * | 2015-05-05 | 2016-05-10 | Conta-Clip Verbindungstechnik Gmbh | Anordnung mit einer Wanddurchführung für mehrere Kabel und Bausatz |
CN207195650U (zh) * | 2017-07-03 | 2018-04-06 | 陆博汽车电子(曲阜)有限公司 | 密封装置 |
CN108631170A (zh) * | 2018-05-10 | 2018-10-09 | 国电南瑞科技股份有限公司 | 一种多功能穿缆防护弯头 |
Family Cites Families (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE7522286U (de) | 1975-07-12 | 1976-01-15 | Zumtobel Kg, Dornbirn (Oesterreich) | Einrichtung zur Durchführung eines elektrischen Kabels durch eine Bohrung einer Gehäusewand |
GB1543678A (en) * | 1976-07-16 | 1979-04-04 | Lapp Kg U | Clamping device for cables leads hoses or the like |
JPS5744731Y2 (zh) * | 1978-01-26 | 1982-10-02 | ||
US4358079A (en) * | 1981-10-15 | 1982-11-09 | Pass And Seymour, Inc. | Moisture resistant clamp for portable cables |
US4525000A (en) * | 1984-02-17 | 1985-06-25 | General Signal Corporation | Cable fitting with variable inner diameter grommet assembly |
DE3535595A1 (de) * | 1985-10-05 | 1987-04-09 | Kleinhuis Hermann Gmbh | Verschraubung aus kunststoff zur ein- und durchfuehrung, abdichtung und zugentlastung von kabel, leitungen oder schlaeuchen |
DE3604214C2 (de) * | 1986-02-11 | 1995-03-16 | Hermann Holzmann | Kabelverschraubung |
DE3730686A1 (de) * | 1987-09-12 | 1989-03-23 | Lapp Kg U I | Kabelverschraubung |
DE3903354C1 (zh) * | 1989-02-04 | 1990-02-01 | Anton Hummel Gmbh Metallwarenfabrik, 7808 Waldkirch, De | |
DE4127162C1 (zh) * | 1991-08-16 | 1992-11-19 | Anton Hummel Verwaltungs Gmbh, 7808 Waldkirch, De | |
DE4215635C2 (de) * | 1992-05-12 | 1998-09-03 | Kleinhuis Hermann Gmbh | Verschraubung aus Kunststoff zur Ein- und Durchführung, Abdichtung und Zugentlastung von Kabeln, Leitungen oder Schläuchen |
CN1095805A (zh) * | 1992-11-30 | 1994-11-30 | 麦卡伯工业有限公司 | 一种固定装置 |
US5405172A (en) * | 1993-05-13 | 1995-04-11 | Heyco Molded Products, Inc. | Plastic liquid tight connector for cable, tubes or rods |
US5866853A (en) * | 1993-10-07 | 1999-02-02 | Sheehan; Robert K. | Liquid-tight, strain-relief connector for connecting conduit and the like |
US5627343A (en) | 1994-08-03 | 1997-05-06 | Xl Technologies, Inc. | Re-enterable conduit sealing assembly |
JPH09284954A (ja) | 1996-04-05 | 1997-10-31 | Nikko Kogyo Kk | 防水用グロメット |
US6488317B1 (en) | 2000-02-01 | 2002-12-03 | Avaya Technology Corp. | Cable strain relief adapter with gel sealing grommet |
FR2819116B1 (fr) | 2000-12-29 | 2003-03-28 | Legrand Sa | Dispositif d'entree de cable |
DE102004027255A1 (de) | 2004-06-03 | 2005-12-22 | Yukita Electric Wire Co., Ltd. | Wasserdichter Steckverbinder |
US7186127B2 (en) | 2004-06-25 | 2007-03-06 | John Mezzalingua Associates, Inc. | Nut seal assembly for coaxial connector |
DE102005051226A1 (de) | 2005-10-26 | 2007-05-03 | Bimed Teknik A.S., Büyükcekmece | Kabel- oder Schlauchverschraubung |
US7563993B2 (en) * | 2006-09-22 | 2009-07-21 | Lapp Engineering & Co. | Insert for an opening of an appliance |
US8523503B2 (en) | 2010-07-30 | 2013-09-03 | Nuovo Pignone, S.P.A. | Threaded joint and method of sealing a threaded joint |
ES2546497T3 (es) * | 2012-11-26 | 2015-09-24 | Lapp Engineering & Co. | Dispositivo para el paso estanco de piezas moldeadas largas |
DE102013218733A1 (de) | 2013-09-18 | 2015-03-19 | Bimed Teknik A.S. | Kabeldurchführungseinrichtung |
DE102015208395A1 (de) * | 2015-05-06 | 2016-11-10 | Eaton Protection Systems Ip Gmbh & Co. Kg | Kabel-/Leitungseinführung |
CN105610102B (zh) | 2015-12-22 | 2017-08-29 | 江苏省电力公司涟水县供电公司 | 一种具有密封装置的电缆接线管 |
JP6239696B1 (ja) | 2016-06-16 | 2017-11-29 | 星和電機株式会社 | ケーブルグランド |
JP6800782B2 (ja) | 2017-03-10 | 2020-12-16 | オーム電機株式会社 | ケーブルクランプ |
-
2018
- 2018-11-29 DE DE202018106798.2U patent/DE202018106798U1/de active Active
-
2019
- 2019-11-29 JP JP2021530908A patent/JP7474763B2/ja active Active
- 2019-11-29 EP EP19817585.3A patent/EP3888205A1/de active Pending
- 2019-11-29 WO PCT/DE2019/101021 patent/WO2020108706A1/de unknown
- 2019-11-29 CN CN201980077480.2A patent/CN113169537B/zh active Active
- 2019-11-29 US US17/295,936 patent/US12040602B2/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101636891A (zh) * | 2007-03-09 | 2010-01-27 | 安东-胡梅尔管理有限公司 | 具有对应套筒或锁紧螺母的电缆螺栓紧固装置 |
CN202384650U (zh) * | 2011-09-30 | 2012-08-15 | 烙克赛克有限公司 | 密封装置 |
DE202013002059U1 (de) * | 2013-03-05 | 2014-06-06 | Wiska Hoppmann & Mulsow Gmbh | Kabeldurchführung zur Durchführung sowie Zugentlastung und Abdichtung eines Kabels |
DE202015102280U1 (de) * | 2015-05-05 | 2016-05-10 | Conta-Clip Verbindungstechnik Gmbh | Anordnung mit einer Wanddurchführung für mehrere Kabel und Bausatz |
CN207195650U (zh) * | 2017-07-03 | 2018-04-06 | 陆博汽车电子(曲阜)有限公司 | 密封装置 |
CN108631170A (zh) * | 2018-05-10 | 2018-10-09 | 国电南瑞科技股份有限公司 | 一种多功能穿缆防护弯头 |
Also Published As
Publication number | Publication date |
---|---|
EP3888205A1 (de) | 2021-10-06 |
WO2020108706A1 (de) | 2020-06-04 |
US12040602B2 (en) | 2024-07-16 |
US20210399538A1 (en) | 2021-12-23 |
DE202018106798U1 (de) | 2020-03-04 |
JP2022511797A (ja) | 2022-02-01 |
JP7474763B2 (ja) | 2024-04-25 |
CN113169537A (zh) | 2021-07-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4273405A (en) | Jacketed metal clad cable connector | |
US7579557B2 (en) | Cable entry device for easy installation | |
US7582836B2 (en) | Core for a cable entry device | |
US3945701A (en) | Water-tight connectors for electric cables | |
JP3419761B2 (ja) | ケーブル保持装置 | |
US8410360B2 (en) | Sealing structure for wire lead-out hole | |
US20070240902A1 (en) | Cable Entry Device Comprising Means for Adjustment | |
JP2006180696A (ja) | 密封される導線ブッシング用のねじ締め装置 | |
KR20130044320A (ko) | 파이프 피팅 | |
US8609990B2 (en) | Gasket for electric cables | |
FI3488133T3 (fi) | Laite tiivistettyyn läpikulkuun pitkänomaisen osan läpi | |
JP4099471B2 (ja) | 改善されたケーブルシール部を備えたプラグケーシング | |
CN113169537B (zh) | 电缆螺纹连接件 | |
US7338319B2 (en) | Sealing system for multiterminal electrical connector | |
US6160221A (en) | Screwed cable gland for a shielded cable | |
KR101428771B1 (ko) | 케이블 그랜드 | |
CN113330654B (zh) | 用于将线缆馈送通过分隔元件的线缆馈通和组件 | |
US11486517B2 (en) | Gland for a sealed feedthrough of an orifice of a partition | |
US20050026489A1 (en) | Cable sealing for a plug connector | |
EP1387456B1 (en) | Sealing device | |
EP3537548A3 (en) | Vibration limiting compression protrusions | |
KR20160000195U (ko) | 파이프 연결구 | |
EP1016166B1 (en) | A connector | |
KR101480047B1 (ko) | 수밀성과 분리 용이성을 가진 냉각마개 | |
EP1944844A1 (en) | Safety cable clamp for electric appliances |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |