CN113090187A - Pipeline traction construction method - Google Patents

Pipeline traction construction method Download PDF

Info

Publication number
CN113090187A
CN113090187A CN202110337623.8A CN202110337623A CN113090187A CN 113090187 A CN113090187 A CN 113090187A CN 202110337623 A CN202110337623 A CN 202110337623A CN 113090187 A CN113090187 A CN 113090187A
Authority
CN
China
Prior art keywords
pipeline
guide
drilling
reaming
drill bit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110337623.8A
Other languages
Chinese (zh)
Inventor
燕守志
吴友祥
陆欢佳
范松涛
汪徽
郝增艮
唐建兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Lingyun Construction Co ltd
Original Assignee
Suzhou Lingyun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lingyun Construction Co ltd filed Critical Suzhou Lingyun Construction Co ltd
Priority to CN202110337623.8A priority Critical patent/CN113090187A/en
Publication of CN113090187A publication Critical patent/CN113090187A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Abstract

The invention provides a pipeline traction construction method, which comprises the following steps: s1, construction preparation; s2, forming guide holes, wherein the guide holes are formed according to a pre-designed track by adopting a drilling machine and matching with a guide instrument; s3, reaming step by step; s4, dragging the buried pipe, connecting the pipes into a pipeline with the length matched with that of the drilled hole, sealing two ends of the pipeline, connecting one end of the pipeline with a drill bit, and dragging the pipeline into the formed drilled hole through the drill bit; s5, performing a water closing test, namely flushing and pressurizing the interior of the pipeline, and performing appearance inspection on the pipeline; in the construction method, the drill bit with the gradually increased diameter is adopted to continuously enlarge the inner diameter of the drilled hole, so that the impact force applied to the drill bit in the drilling process can be reduced, the service life of the drill bit is prolonged, and the drilling success rate and the smoothness inside the drilled hole are ensured.

Description

Pipeline traction construction method
Technical Field
The invention belongs to the technical field of construction methods, and particularly relates to a pipeline traction construction method.
Background
The pipeline traction construction belongs to one aspect of the non-excavation technology, and the non-excavation technology refers to a new construction technology for laying, replacing and repairing various underground pipelines under the condition of small-area excavation of the earth surface (generally referred to small-area excavation of an inlet and an outlet) through means of guiding, directional drilling and the like, and has small interference on the earth surface, so that the novel construction technology has higher social and economic effects. Mainly comprises technical methods of horizontal directional drilling, pipe jacking, micro tunnels, pipe bursting, impact and the like. The technology is originated in the 70 th of the 20 th century and introduced into China in the 90 th, and is widely applied to new pipeline construction and old pipeline repair in the fields of water supply, water drainage, electric power, communication, gas and the like, and can also be applied to the aspects of protection of cultural relics, ancient buildings and the like.
In the prior art, a Chinese patent with application number of CN201310535901.6 discloses a trenchless construction method of an ultra-large-diameter PE drain pipe. The technical problem that the existing ultra-large-diameter PE pipe is difficult to arrange is solved. The method comprises the following steps: A. drilling; B. equipment installation; C. arranging pipes for the first time; D. continuing pipe distribution; E. and finishing pipe distribution. The trenchless construction method of the ultra-large-diameter PE drain pipe has the advantages that: the construction is simple, and the difficulty degree is little in the pull of super large bore PE pipe body, and the construction hole of excavation is little, is difficult for the slippage during dragging, and the difficult fracture of body during dragging, the difficult fish tail of body, body seal nature are strong, need not to rinse the body is inside, and the body butt joint is firm.
However, in the prior art, the drill holes are formed by drilling once, the construction difficulty is high, the inner parts of the drill holes are not protected in the drilling process, the drill holes are easy to collapse, and the construction difficulty is further increased. Therefore, a pipeline traction construction method which reduces the drilling difficulty and improves the drilling success rate and the internal smoothness of the drilled hole is needed to be designed to solve the technical problems at present.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the pipeline traction construction method which can reduce the drilling difficulty and improve the drilling success rate and the internal smoothness of the drilled hole.
The technical scheme of the invention is as follows: the pipeline traction construction method comprises the following steps:
s1, construction preparation;
s2, forming guide holes, wherein the guide holes are formed according to a pre-designed track by adopting a drilling machine and matching with a guide instrument;
s3, reaming step by step, selecting drill bits with specification diameters 1.3-1.7 times of the inner diameter of the guide hole, completing reaming of one drilling along the guide hole, selecting drill bits with specification diameters increasing according to the multiple sequence of 1.3-1.7 respectively to complete reaming of the drilling until the drilled hole after reaming is matched with the outer diameter of the buried pipeline, and introducing additives into the drilling during reaming;
s4, dragging the buried pipe, connecting the pipes into a pipeline with the length matched with that of the drilled hole, sealing two ends of the pipeline, connecting one end of the pipeline with a drill bit, and dragging the pipeline into the formed drilled hole through the drill bit;
and S5, performing a water closing test, flushing and pressurizing the inside of the pipeline, and performing appearance inspection on the pipeline.
In the step S1, the underground pipeline condition in the construction range is investigated, measurement and lofting are carried out according to the construction drawing after the underground pipeline condition is clearly checked, the lengths of the pipes and the traction pipeline are determined according to the geological condition, the burial depth and the pipe diameter in the construction range, and the drill pipe track is designed.
In the step S2, the drilling machine is a mandril drilling machine, the detection rod is arranged in the guide head, the rear end of the guide head of the drilling machine is connected with the steel pipe, then the mandril drilling machine applies pressure to the steel pipe to push the guide head, and the guide head is driven into the ground; the guide instrument can receive the direction and depth information of the guide head at any time, and the pipe-jacking drilling machine can rotate the guide head in time according to the direction and depth information of the guide head.
In the step S3, the additive is bentonite slurry, and the bentonite slurry is injected into the borehole through the drill pipe.
In the step S5, the pressure in the pipeline is 0.8-1.0 Mpa, and the observation time is more than or equal to 30 min.
The invention has the beneficial effects that:
(1) in the construction method, the drill bit with gradually increased diameter is adopted to continuously enlarge the inner diameter of the drilled hole, so that the impact force applied to the drill bit in the drilling process can be reduced, the service life of the drill bit is prolonged, and the success rate of drilling and the smoothness of the inside of the drilled hole are ensured;
(2) in the reaming process, the additive is continuously introduced into the drill hole through the drill rod, the friction can be reduced through the additive, the rotation torque and the pull-back resistance are reduced, and the additive also has the effects of reinforcing the hole wall, preventing the drill hole from collapsing and cooling the drill bit.
Drawings
FIG. 1 is a flow chart of a pipeline traction construction method according to the present invention.
Detailed Description
The following describes the embodiments of the present invention with reference to the drawings and examples.
As shown in fig. 1, the pipeline traction construction method comprises the following steps: s1, construction preparation, namely, preparation before construction is finished, and the drilling track is determined; s2, forming guide holes, wherein the guide holes are formed according to a pre-designed track by adopting a drilling machine and matching with a guide instrument; s3, reaming step by step, selecting drill bits with specification diameters 1.3-1.7 times of the inner diameter of the guide hole, completing reaming of one drilling along the guide hole, selecting drill bits with specification diameters increasing according to the multiple sequence of 1.3-1.7 respectively to complete reaming of the drilling until the drilled hole after reaming is matched with the outer diameter of the buried pipeline, and introducing additives into the drilling during reaming; s4, dragging the buried pipe, connecting the pipes into a pipeline with the length matched with that of the drilled hole, sealing two ends of the pipeline, connecting one end of the pipeline with a drill bit, and dragging the pipeline into the formed drilled hole through the drill bit; s5, performing a water closing test, namely flushing and pressurizing the interior of the pipeline, and performing appearance inspection on the pipeline; in the embodiment, the drill bit with the gradually increased diameter is adopted to continuously enlarge the inner diameter of the drilled hole, so that the impact force applied to the drill bit in the drilling process can be reduced, the service life of the drill bit is prolonged, and the success rate of drilling and the smoothness of the inside of the drilled hole are ensured; in the reaming process, the additive is continuously introduced into the drill hole through the drill rod, the friction can be reduced through the additive, the rotation torque and the pull-back resistance are reduced, and the additive also has the effects of reinforcing the hole wall, preventing the drill hole from collapsing and cooling the drill bit.
In the above embodiment, in step S1, more specifically, the underground pipeline condition within the construction range is investigated, and after the underground pipeline condition is clearly checked, the measurement and lofting are performed according to the construction drawing, so that the existing pipeline on the site can be prevented from being damaged in the construction process, the lengths of the pipe and the towed pipe can be determined according to the geological condition, the burial depth and the pipe diameter of the construction range, and the drill pipe trajectory is designed.
In the above embodiment, in the step S2, more specifically, the drilling machine is a push rod drilling machine, the probe rod is loaded into the guide head, the rear end of the guide head of the drilling machine is connected to the steel pipe, and then the push rod drilling machine applies pressure to the steel pipe to push the guide head, so as to drive the guide head into the ground; the guide instrument can receive the direction and depth information of the guide head at any time, and the pipe-jacking drilling machine can rotate the guide head in time according to the direction and depth information of the guide head, so that the accuracy of drilling the guide hole by the drilling machine is improved.
In the above embodiment, in the step S3, specifically, the additive is bentonite slurry, the bentonite slurry is injected into the borehole through the drill rod, the bentonite slurry is continuously conveyed into the borehole from the drill rod in the process of reaming, the friction between the drill bit and the borehole can be reduced through the bentonite slurry, the rotation torque of the drill bit and the resistance to pull back are reduced, the hole wall of the borehole can be reinforced through the bentonite slurry, collapse of the borehole is prevented, and in addition, the heat of the drill bit can be continuously absorbed and transferred through the continuous flow of the bentonite slurry, so as to play a role in cooling the drill bit.
In the step S3, more specifically, during reaming, firstly, a drill bit with a specification diameter 1.3 to 1.7 times the inner diameter of the pilot hole is rotated, primary reaming is completed along the pilot hole, secondary reaming is not performed if the hole diameter of the drill hole after primary reaming meets the pipeline installation requirement, secondary reaming is performed if the pipeline installation requirement is not met, the drill bit with the specification diameter 1.3 to 1.7 times the inner diameter of the drill hole after primary reaming is selected for secondary reaming, secondary reaming is completed along the pilot hole, similarly, three times of reaming is not performed if the hole diameter of the drill hole after secondary reaming meets the pipeline installation requirement, and three times of reaming is performed if the hole diameter of the drill hole after secondary reaming does not meet the pipeline installation requirement, so that the diameter of the drill hole after reaming meets the pipeline installation requirement; wherein, 1.3 to 1.7 times can be selected in the multiple interval according to actual needs.
In the above embodiment, in the step S5, further, the pressure in the pipeline is 0.8 to 1.0Mpa, and the observation time is greater than or equal to 30min, where the normal working pressure of the pipeline is 0.3Mpa, and the experimental pressure is 0.8Mpa, 0.9Mpa or 1.0Mpa, specifically, in this embodiment, the experimental pressure is 0.9Mpa, and applying a pressure higher than the normal working pressure value to the inside of the pipeline can accelerate the leakage condition at the leakage position of the pipeline, so as to facilitate the operator to find the leakage in time, after the pipeline is pressurized for more than 30min, the pipeline interface, the pipe body and the well body are observed to be not leaked, and it can be considered that through the water shut-off test, when the test pressure reaches the specified pressure, the water leakage amount of the pipeline is observed until the observation is finished, water and pressure should be continuously supplied to the test pipeline section, so as to keep the pressure constant in the test pipeline, and the observation time of the water leakage amount should not be.
The above-mentioned embodiments only express some embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (5)

1. A pipeline traction construction method is characterized by comprising the following steps:
s1, construction preparation;
s2, forming guide holes, wherein the guide holes are formed according to a pre-designed track by adopting a drilling machine and matching with a guide instrument;
s3, reaming step by step, selecting drill bits with specification diameters 1.3-1.7 times of the inner diameter of the guide hole, completing reaming of one drilling along the guide hole, selecting drill bits with specification diameters increasing according to the multiple sequence of 1.3-1.7 respectively to complete reaming of the drilling until the drilled hole after reaming is matched with the outer diameter of the buried pipeline, and introducing additives into the drilling during reaming;
s4, dragging the buried pipe, connecting the pipes into a pipeline with the length matched with that of the drilled hole, sealing two ends of the pipeline, connecting one end of the pipeline with a drill bit, and dragging the pipeline into the formed drilled hole through the drill bit;
and S5, performing a water closing test, flushing and pressurizing the inside of the pipeline, and performing appearance inspection on the pipeline.
2. The pipeline hauling construction method as claimed in claim 1, wherein: in the step S1, the underground pipeline condition in the construction range is investigated, measurement and lofting are carried out according to the construction drawing after the underground pipeline condition is clearly checked, the lengths of the pipes and the traction pipeline are determined according to the geological condition, the burial depth and the pipe diameter in the construction range, and the drill pipe track is designed.
3. The pipeline hauling construction method as claimed in claim 1, wherein: in the step S2, the drilling machine is a mandril drilling machine, the detection rod is arranged in the guide head, the rear end of the guide head of the drilling machine is connected with the steel pipe, then the mandril drilling machine applies pressure to the steel pipe to push the guide head, and the guide head is driven into the ground; the guide instrument can receive the direction and depth information of the guide head at any time, and the pipe-jacking drilling machine can rotate the guide head in time according to the direction and depth information of the guide head.
4. The pipeline hauling construction method as claimed in claim 1, wherein: in the step S3, the additive is bentonite slurry, and the bentonite slurry is injected into the borehole through the drill pipe.
5. The pipeline hauling construction method as claimed in claim 1, wherein: in the step S5, the pressure in the pipeline is 0.8-1.0 Mpa, and the observation time is more than or equal to 30 min.
CN202110337623.8A 2021-03-30 2021-03-30 Pipeline traction construction method Pending CN113090187A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110337623.8A CN113090187A (en) 2021-03-30 2021-03-30 Pipeline traction construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110337623.8A CN113090187A (en) 2021-03-30 2021-03-30 Pipeline traction construction method

Publications (1)

Publication Number Publication Date
CN113090187A true CN113090187A (en) 2021-07-09

Family

ID=76671223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110337623.8A Pending CN113090187A (en) 2021-03-30 2021-03-30 Pipeline traction construction method

Country Status (1)

Country Link
CN (1) CN113090187A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082937A (en) * 2003-03-20 2004-09-30 (주)동양엠티 Method for Digging a Tunnel
CN101793125A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling pipeline rock strata crossing composite reaming construction method
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN104389520A (en) * 2014-09-25 2015-03-04 西南石油大学 Electric-driven directional crossing chambering method
CN105447239A (en) * 2015-11-17 2016-03-30 西南石油大学 Method for determining stage difference of horizontal directional reaming
CN105562765A (en) * 2016-03-04 2016-05-11 山东太古飞机工程有限公司 Fastener hole centering drilling device for seat guide rail in lower pound column area of passenger-to-cargo airplane
CN106870819A (en) * 2017-03-24 2017-06-20 广州市恒盛建设工程有限公司 A kind of high density polyethylene (HDPE) non-pressure pipe horizontal directional drilling construction method
CN109027420A (en) * 2018-09-07 2018-12-18 中水电第十工程局(郑州)有限公司 A kind of municipal pipeline no-dig technique Directional Drilling construction method
CN110566120A (en) * 2019-09-11 2019-12-13 中煤科工集团西安研究院有限公司 Multi-power directional combined drilling tool for hard rock of coal mine underground coal seam bottom plate and hole forming method thereof
CN110778323A (en) * 2019-09-05 2020-02-11 青岛安装建设股份有限公司 Construction method for pulling and passing buried pipeline
CN110924864A (en) * 2019-12-09 2020-03-27 浙江中水工程技术有限公司 Directional drilling traction construction method for offshore water delivery pipeline
CN112252973A (en) * 2020-10-10 2021-01-22 广东省构建工程建设有限公司 Non-excavation directional drilling construction method for pipeline buried channel

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082937A (en) * 2003-03-20 2004-09-30 (주)동양엠티 Method for Digging a Tunnel
CN101793125A (en) * 2010-03-18 2010-08-04 中国石油化工集团公司 Horizontal directional drilling pipeline rock strata crossing composite reaming construction method
CN102953683A (en) * 2012-11-27 2013-03-06 福建省泷澄建设集团有限公司 Pipe pulling construction method through horizontal directional drilling
CN104389520A (en) * 2014-09-25 2015-03-04 西南石油大学 Electric-driven directional crossing chambering method
CN105447239A (en) * 2015-11-17 2016-03-30 西南石油大学 Method for determining stage difference of horizontal directional reaming
CN105562765A (en) * 2016-03-04 2016-05-11 山东太古飞机工程有限公司 Fastener hole centering drilling device for seat guide rail in lower pound column area of passenger-to-cargo airplane
CN106870819A (en) * 2017-03-24 2017-06-20 广州市恒盛建设工程有限公司 A kind of high density polyethylene (HDPE) non-pressure pipe horizontal directional drilling construction method
CN109027420A (en) * 2018-09-07 2018-12-18 中水电第十工程局(郑州)有限公司 A kind of municipal pipeline no-dig technique Directional Drilling construction method
CN110778323A (en) * 2019-09-05 2020-02-11 青岛安装建设股份有限公司 Construction method for pulling and passing buried pipeline
CN110566120A (en) * 2019-09-11 2019-12-13 中煤科工集团西安研究院有限公司 Multi-power directional combined drilling tool for hard rock of coal mine underground coal seam bottom plate and hole forming method thereof
CN110924864A (en) * 2019-12-09 2020-03-27 浙江中水工程技术有限公司 Directional drilling traction construction method for offshore water delivery pipeline
CN112252973A (en) * 2020-10-10 2021-01-22 广东省构建工程建设有限公司 Non-excavation directional drilling construction method for pipeline buried channel

Similar Documents

Publication Publication Date Title
AU2007245987B2 (en) Method for trenchless pipeline laying
RU2392390C2 (en) Trenchless pipe driving method
CN111306360A (en) Trenchless pipeline jacking and laying construction method
CN104481582B (en) Tunnel close the door landslide Quick rescue method
CN110778323A (en) Construction method for pulling and passing buried pipeline
CN206681760U (en) Deep hole grouting device after shield duct piece wall
CN111236904B (en) Geothermal exploitation method for double horizontal wells in butt joint communication to extract heat by water separation
CN106761593A (en) A kind of bad ground pretreating process
CN106088293A (en) A kind of small-bore sewage conduct restorative procedure
CN108533271A (en) A kind of two-tube tunnel radial grouting construction method in a hole
CN104847263A (en) Coal bed methane far-end butt joint horizontal well drilling method
CN103912304A (en) Method for locally extracting gas of soft coal seams
CN114060036A (en) Horizontal positioning grouting reinforcement construction process suitable for municipal construction of silt soft soil stratum
CN113090187A (en) Pipeline traction construction method
CN104790895B (en) Cable transmits drillable water supply well blocking method
CN110645033A (en) Device and method for deep grouting in sandy cobble stratum shield construction tunnel
CN111287722A (en) Method for repeated fracturing of horizontal well after drilling and grinding of open hole packer completion
CN115199296A (en) Disassembly-free grouting and tapping method for shield segment
CN105443042B (en) A kind of multi-functional reamer
CN210622733U (en) Composite drill rod capable of deeply drilling
CN105134124B (en) Crude oil pipeline coagulates pipe paraffin blockage emergency repairing technology
Gang et al. Experimental Research on the Technology of Hydra-Jet Sidetracking of Radial Micro-borehole.
CN114233190A (en) Cable construction process for crossing river
CN201241646Y (en) Borehole wall restoring pipe column combining body expansion casing tube and corrugated tube
CN107060776A (en) The unit development machine combination of underground interface channel draws in construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination