Device and method for deep grouting in sandy cobble stratum shield construction tunnel Download PDFInfo
- Publication number
- CN110645033A CN110645033A CN201910986230.2A CN201910986230A CN110645033A CN 110645033 A CN110645033 A CN 110645033A CN 201910986230 A CN201910986230 A CN 201910986230A CN 110645033 A CN110645033 A CN 110645033A
- Authority
- CN
- China
- Prior art keywords
- drilling
- grouting
- anchor rod
- hole
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
- E21D21/0046—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts formed by a plurality of elements arranged longitudinally
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/46—Drill bits characterised by wear resisting parts, e.g. diamond inserts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/03—Couplings; joints between drilling rod or pipe and drill motor or surface drive, e.g. between drilling rod and hammer
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/04—Couplings; joints between rod or the like and bit or between rod and rod or the like
- E21B17/042—Threaded
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/003—Machines for drilling anchor holes and setting anchor bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/021—Grouting with inorganic components, e.g. cement
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
- E21D20/02—Setting anchoring-bolts with provisions for grouting
- E21D20/028—Devices or accesories for injecting a grouting liquid in a bore-hole
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Structural Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Inorganic Chemistry (AREA)
- Soil Sciences (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种砂卵石地层盾构施工洞内深层注浆的装置及其方法,涉及盾构施工技术领域,包括钻进连接结构,钻进连接结构的所述第一锚杆、若干所述连接锚杆和钻进锚杆呈直线依次连接,所述第一锚杆的一端与其相邻的所述连接锚杆的一端通过连接套连接,所述第一锚杆的另一端与钻孔连接接头或者注浆连接结构可拆卸连接,相邻两个所述连接锚杆通过所述连接套连接,所述钻进锚杆的一端与其相邻的所述连接锚杆的一端通过连接套连接,另一端连接有楔形钻头;若干所述连接锚杆和钻进锚杆的杆身均设置有注浆孔。该装置结构简单、能够在砂卵石地层盾构施工洞内实施并能够高效钻进较高深度,可以避免坍塌发展影响地面及建筑物安全,同时注浆方法快速便捷。
The invention discloses a device and a method for deep grouting in a shield tunnel construction hole in sand and pebble stratum, and relates to the technical field of shield tunnel construction, comprising a drilling connection structure, the first anchor rod of the drilling connection structure, several The connecting anchor rod and the drilling anchor rod are sequentially connected in a straight line, one end of the first anchor rod is connected with one end of the adjacent connecting anchor rod through a connecting sleeve, and the other end of the first anchor rod is connected with the drilled hole. The connecting joint or the grouting connecting structure can be detachably connected, two adjacent connecting anchor rods are connected through the connecting sleeve, and one end of the drilling anchor rod is connected with one end of the adjacent connecting anchor rod through the connecting sleeve , and the other end is connected with a wedge-shaped drill bit; several of the connecting anchor rods and the shafts of the drilling anchor rods are provided with grouting holes. The device has a simple structure, can be implemented in a shield construction tunnel in sand and pebble strata, and can efficiently drill to a higher depth, which can avoid the development of collapse and affect the safety of the ground and buildings, and at the same time, the grouting method is fast and convenient.
Description
技术领域technical field
本发明涉及盾构施工技术领域,具体为一种砂卵石地层盾构施工洞内深层注浆的装置及其方法。The invention relates to the technical field of shield construction, in particular to a device and a method for deep grouting in a shield construction cave in sand and pebble strata.
背景技术Background technique
砂卵石地层是一种比较特殊的地质条件,具有强度高、地层松散和稳定性差等特点。盾构在掘进过程中无法避免地对周围地层产生扰动和破坏,在盾构掘进范围上方形成坍腔并逐渐上移至地面,造成地面沉降和坍塌或建筑物沉降和破坏,坍腔位置根据砂卵石地层的稳定性不同而反映出随时间快速上移和扩展,并远离盾构掘进管片至地面。另外,砂卵石岩体强度很高,如单纯依靠钻头钻进则钻孔效率很低,成孔速度慢。Sand and pebble formation is a relatively special geological condition, which has the characteristics of high strength, loose formation and poor stability. During the excavation process, the shield inevitably disturbs and destroys the surrounding strata. A collapse cavity is formed above the shield excavation range and gradually moves up to the ground, resulting in ground subsidence and collapse or building settlement and damage. The location of the collapse cavity depends on the sand. The stability of the pebble formation varies and reflects rapid upward movement and expansion over time and away from the shield tunnel segment to the surface. In addition, the strength of the sand and pebble rock mass is very high. If it is simply drilled by a drill bit, the drilling efficiency is very low, and the hole forming speed is slow.
现有的坍腔加固和充填的成孔方式为,采用前段为尖状的带孔钢花管,用风钻冲击打入砂卵石地层中,端部焊接带球阀的钢管连接注浆设备和管路进行注浆,或采用风钻和钻杆钻进成孔后,插入带孔钢花管,端部焊接带球阀的钢管连接注浆设备和管路进行注浆。The existing hole-forming method for slump cavity reinforcement and filling is to use a pointed steel flower tube with a hole in the front section, impact it with a pneumatic drill into the sand and pebble formation, and weld a steel pipe with a ball valve at the end to connect the grouting equipment and pipeline. Grouting, or using a pneumatic drill and drill pipe to drill into a hole, insert a steel flower tube with a hole, and weld a steel pipe with a ball valve at the end to connect the grouting equipment and pipeline for grouting.
这样的成孔方式主要存在的缺点有:The main disadvantages of this pore forming method are:
1、受盾构机结构限制,盾构机上部无较长钢管或钻杆的作业空间,需在盾构台车脱离需要加固区域后方可实施,时机严重滞后。因为盾构台车长度一般在80m以上,砂卵石地层盾构掘进速度较慢但沉降发展较快,如等盾构台车全部通过待加固区域再进行钻眼注浆加固,坍腔已向上发展深度较大或已造成地面坍塌或建筑物沉降和破坏,注浆加固时机严重滞后且效果不佳。1. Due to the limitation of the structure of the shield machine, there is no working space for long steel pipes or drill pipes on the upper part of the shield machine. It can only be implemented after the shield trolley is separated from the area to be reinforced, and the timing is seriously delayed. Because the length of the shield trolley is generally more than 80m, the tunneling speed of the shield in the sand and pebble stratum is relatively slow but the settlement development is relatively fast. The depth is large or the ground has collapsed or the building has subsided and destroyed, and the timing of grouting reinforcement is seriously delayed and the effect is not good.
2、带孔钢花管打入地层时,由于其头部无钻进装置,仅依靠风钻的冲击力打击钢管尾端,在砂卵石地层中无法达到预定深度,难以达到空腔所在位置,注浆填充或加固效果不好。2. When the perforated steel flower pipe is driven into the stratum, since there is no drilling device at the head, it only relies on the impact force of the pneumatic drill to hit the end of the steel pipe. Filling or reinforcement is not good.
3、采用风钻钻杆配合一字或十字钻头钻孔后再插入带孔钢花管的方式,除施工的时机滞后外,由于单个砂卵石强度高钻进速度慢且易造成塌孔钢管无法穿入。3. The method of using a pneumatic drill pipe with a flat or cross drill bit to drill holes and then inserting a steel flower tube with holes. In addition to the lag of construction time, due to the high strength of a single sand and pebble, the drilling speed is slow and it is easy to cause collapsed holes. The steel pipe cannot penetrate .
为了解决盾构机在砂卵石地层施工成孔时遇见的这些技术问题,需要采用一种能够在狭小空间内尽早快速钻进成孔并提高注浆工作效率的装置。In order to solve these technical problems encountered by the shield machine when constructing holes in sand and pebble formations, it is necessary to adopt a device that can quickly drill holes in a narrow space and improve the efficiency of grouting.
发明内容SUMMARY OF THE INVENTION
本发明提供一种砂卵石地层盾构施工洞内深层注浆的装置及其方法,该装置结构简单、能够在砂卵石地层盾构施工洞内实施并能够高效钻进较高深度,可以避免坍塌发展影响地面及建筑物安全,同时注浆连接方法快速便捷。The invention provides a device and a method for deep grouting in a shield tunnel construction hole in sand and pebble stratum. The device has a simple structure, can be implemented in a shield tunnel construction hole in a sand pebble stratum, can efficiently drill into a higher depth, and can avoid collapse The development affects the safety of the ground and buildings, and the grouting connection method is fast and convenient.
本发明的目的是通过以下技术方案来实现的:The purpose of this invention is to realize through the following technical solutions:
一种砂卵石地层盾构施工洞内深层注浆的装置,包括钻进连接结构,所述钻进连接结构包括楔形钻头、若干连接套、空心的第一锚杆,空心的钻进锚杆和若干空心的连接锚杆;所述第一锚杆、若干所述连接锚杆和所述钻进锚杆呈直线依次连接,所述第一锚杆的一端与其相邻的所述连接锚杆的一端通过所述连接套连接,所述第一锚杆的另一端与钻孔连接接头或者注浆连接结构可拆卸连接,相邻两个所述连接锚杆通过所述连接套连接,所述钻进锚杆的一端与其相邻的所述连接锚杆的一端通过所述连接套连接,所述钻进锚杆的另一端连接有楔形钻头;若干所述连接锚杆和所述钻进锚杆的杆身均设置有注浆孔。A device for deep grouting in a shield tunnel construction hole in sand and pebble stratum includes a drilling connection structure, the drilling connection structure includes a wedge-shaped drill bit, a plurality of connection sleeves, a hollow first bolt, a hollow drilling bolt and Several hollow connecting anchor rods; the first anchor rod, the several connecting anchor rods and the drilling anchor rods are connected in a straight line in sequence, and one end of the first anchor rod is connected to the adjacent connecting anchor rods. One end is connected through the connecting sleeve, the other end of the first anchor rod is detachably connected with the drilling connection joint or the grouting connection structure, and the two adjacent connecting anchor rods are connected through the connecting sleeve, and the drilling One end of the drilling anchor rod is connected with one end of the adjacent connecting anchor rod through the connecting sleeve, and the other end of the drilling anchor rod is connected with a wedge-shaped drill bit; a plurality of the connecting anchor rods and the drilling anchor rods The shafts are provided with grouting holes.
通过采用上述技术方案,该装置的钻进连接结构包括楔形钻头、连接套、空心的第一锚杆、空心的钻进锚杆和若干空心的连接锚杆,连接锚杆辅以连接套逐节连接,在盾构管片脱出盾尾即可利用台车上部作业空间;钻进锚杆固定有楔形钻头,楔形钻头在密实砂卵石地层中挤开小直径卵石或凿开大卵石,实现在砂卵石地层中顺利快速成孔;然后第一锚杆连接的钻孔连接接头利用风钻连接钻孔连接接头带动钻进锚杆的楔形钻头进行钻孔,第一锚杆连接的注浆连接结构向连接锚杆和钻进锚杆杆身注浆,注浆液通过锚杆的注浆孔对坍腔进行充填和对周围地层进行注浆加固,制止坍腔向上发展和减少地面沉降;注浆连接结构实现第一锚杆与不同直径的注浆管路的快速连接,缩短注浆时间;该装置结构简单、能够在砂卵石地层盾构施工洞内实施并能够高效钻进较高深度,同时可以避免坍塌发展影响地面及建筑物安全。By adopting the above technical solution, the drilling connection structure of the device includes a wedge-shaped drill bit, a connecting sleeve, a hollow first anchor rod, a hollow drilling anchor rod and several hollow connecting anchor rods, and the connecting anchor rods are supplemented by the connecting sleeves section by section. Connection, the upper working space of the trolley can be used when the shield segment is out of the shield tail; the drilling bolt is fixed with a wedge-shaped drill bit, and the wedge-shaped drill bit squeezes small-diameter pebbles or chiseled large pebbles in the dense sand and pebble stratum to realize the Holes are formed smoothly and quickly in the pebble stratum; then the borehole connecting joint connected by the first anchor rod uses the pneumatic drill to connect the borehole connecting joint to drive the wedge-shaped drill bit that drills into the anchor rod for drilling, and the grouting connecting structure connected by the first anchor rod is connected to the The bolt and the drilling bolt shaft are grouted, and the grouting liquid fills the collapsed cavity through the grouting hole of the bolt and reinforces the surrounding strata by grouting, preventing the upward development of the collapsed cavity and reducing the ground subsidence; grouting connection structure The quick connection between the first anchor rod and the grouting pipelines of different diameters is realized, and the grouting time is shortened; the device has a simple structure, can be implemented in the shield construction hole of the sand and pebble stratum, and can efficiently drill to a higher depth, and can avoid The development of the collapse affects the safety of the ground and buildings.
优选地,所述钻孔连接接头包括钻孔连接套和六棱工具钢,所述钻孔连接套的一端与所述第一锚杆相连,所述钻孔连接套的另一端与所述六棱工具钢相连。所述注浆连接结构包括异形连接套筒、球阀和带螺纹的注浆钢管,所述异形连接套筒的一端与所述球阀密闭连接,所述异形连接套筒的另一端与所述第一锚杆相连,所述球阀远离所述异形连接套筒的一端所述注浆钢管的一端密闭相连。Preferably, the drilled connection joint comprises a drilled connection sleeve and a hexagonal tool steel, one end of the drilled connection sleeve is connected with the first anchor rod, and the other end of the drilled connection sleeve is connected with the hexagonal tool steel. Rib tool steel connected. The grouting connection structure includes a special-shaped connecting sleeve, a ball valve and a threaded grouting steel pipe, one end of the special-shaped connecting sleeve is airtightly connected to the ball valve, and the other end of the special-shaped connecting sleeve is connected to the first The anchor rods are connected, the end of the ball valve away from the special-shaped connection sleeve and the end of the grouting steel pipe are airtightly connected.
通过采用上述技术方案,钻孔连接接头的钻孔连接套的一端与锚杆相连,另一端与六棱工具钢相连,便于快速连接锚杆和风钻;异形连接套筒一端与第一锚杆密闭相连,另一端与球阀密闭连接,异形连接套筒起到连接的作用,同时球阀与异形连接套筒的另一端与带螺纹的注浆钢管连接且注浆钢管的另一端接入注浆管路和设备,让注浆液能够顺利通过注浆连接结构而不会发生漏浆。当外部需要的注浆液从连接球阀的注浆管进入然后经过球阀,这时球阀可以对经过的注浆液的流经流量进行控制。By adopting the above technical solution, one end of the drilling connecting sleeve of the drilling connecting joint is connected with the anchor rod, and the other end is connected with the hexagonal tool steel, which is convenient for quick connection between the anchor rod and the pneumatic drill; one end of the special-shaped connecting sleeve is sealed with the first anchor rod Connected, the other end is tightly connected with the ball valve, the special-shaped connecting sleeve plays the role of connection, and the other end of the ball valve and the special-shaped connecting sleeve is connected with the threaded grouting steel pipe, and the other end of the grouting steel pipe is connected to the grouting pipeline and equipment, so that the grouting fluid can smoothly pass through the grouting connection structure without grouting. When the externally required grouting liquid enters from the grouting pipe connected to the ball valve and then passes through the ball valve, the ball valve can control the flow rate of the passing grouting liquid.
优选地,所述异形连接套筒一端设有与所述第一锚杆相适配的内螺纹,所述异形连接套筒的另一端设有与所述球阀相适配的外螺纹。Preferably, one end of the special-shaped connecting sleeve is provided with an internal thread matching with the first anchor rod, and the other end of the special-shaped connecting sleeve is provided with an external thread matching with the ball valve.
通过采用上述技术方案,异形连接套筒设有与第一锚杆相适配的内螺纹和球阀相适配的外螺纹,这样便于通过异形连接套筒实现快速与锚杆与球阀的连接,防止注浆时松动漏浆。By adopting the above technical solution, the special-shaped connecting sleeve is provided with an internal thread that matches the first anchor rod and an external thread that matches the ball valve, which facilitates the quick connection between the anchor rod and the ball valve through the special-shaped connecting sleeve, and prevents the Loosen and leak grout during grouting.
优选地,所述第一锚杆、钻进锚杆和若干所述连接锚杆的长度均为1m~1.5m。Preferably, the lengths of the first anchor rod, the drilling anchor rod and several of the connecting anchor rods are all 1m-1.5m.
通过采用上述技术方案,解决受盾构机结构限制,盾构机上部作业空间较小的问题,实现快速钻孔和注浆,防止坍腔向上发展深度较大或造成地面坍塌或建筑物沉降和破坏,把第一锚杆、钻进锚杆和连接锚杆的长度均设置为1m~1.5m,方便在施工作业面快速作业。By adopting the above technical solutions, the problem that the upper working space of the shield machine is limited due to the structure of the shield machine is solved, and the rapid drilling and grouting can be realized, so as to prevent the collapse cavity from developing to a large depth or causing ground collapse or building settlement and If it is damaged, the lengths of the first anchor rod, the drilling anchor rod and the connecting anchor rod are all set to 1m~1.5m, which is convenient for quick operation on the construction work surface.
优选地,若干所述注浆孔在所述连接锚杆和所述钻进锚杆上均布设置。Preferably, a plurality of the grouting holes are uniformly arranged on the connecting anchor rod and the drilling anchor rod.
通过采用上述技术方案,注浆孔在连接锚杆和钻进锚杆上均布设置的目的是,可以使注浆液能够通过注浆孔均匀注入在所处地层和空腔内,防止由于注浆不均造成注浆效果不好,影响地面及建筑物安全。By adopting the above technical solution, the purpose of uniformly distributing the grouting holes on the connecting bolt and the drilling bolt is to enable the grouting fluid to be uniformly injected into the formation and cavity through the grouting holes, preventing the Uneven grouting results in poor grouting effect and affects the safety of the ground and buildings.
优选地,所述楔形钻头为合金材质。Preferably, the wedge-shaped drill bit is made of alloy material.
通过采用上述技术方案,楔形钻头为合金材质,高强度的合金楔形钻头一方面能够在密实砂卵石地层中挤开小直径卵石,另一方面有足够的强度凿开大卵石,在砂卵石地层中顺利快速成孔。By adopting the above technical solution, the wedge-shaped drill bit is made of alloy material. On the one hand, the high-strength alloy wedge-shaped drill bit can extrude small-diameter pebbles in dense sand and pebble formations, and on the other hand, it has sufficient strength to chisel large pebbles. Smooth and fast hole formation.
优选地,所述连接套腔体内设有与若干所述连接锚杆均相适配的内螺纹。Preferably, the cavity of the connection sleeve is provided with internal threads that are adapted to the plurality of connection anchor rods.
通过采用上述技术方案,连接套腔体内设有与连接锚杆相适配的内螺纹,可以实现连接套和连接锚杆的快速连接,以便可以快速钻进成孔,节省时间,注浆效果好。By adopting the above technical solution, the connecting sleeve cavity is provided with an internal thread that matches the connecting anchor rod, which can realize the quick connection between the connecting sleeve and the connecting anchor rod, so that the hole can be drilled quickly, saving time and good grouting effect. .
优选地,一种使用权利要求1~8任意一项所述的砂卵石地层盾构施工洞内深层注浆的装置进行灌浆的方法,步骤如下:Preferably, a method for grouting using the device for deep grouting in a shield tunnel construction tunnel in sand and pebble formations according to any one of claims 1 to 8, the steps are as follows:
S1:所述钻进锚杆的钻进,首先在所述钻进锚杆的一端焊接特制的合金楔形钻头,所述钻进锚杆的另一端连接钻孔连接接头,钻孔连接接头的另一端与风钻相连,利用所述风钻的钻进力,带动所述钻进锚杆的的楔形钻头转动,实现钻孔;S1: For the drilling of the drilling anchor rod, firstly, a special alloy wedge-shaped drill bit is welded to one end of the drilling anchor rod, the other end of the drilling anchor rod is connected to a drilling connection joint, and the other end of the drilling connection joint is One end is connected with the pneumatic drill, and the wedge-shaped drill bit for drilling the anchor rod is driven to rotate by the drilling force of the pneumatic drill to realize drilling;
S2:所述钻进锚杆的的杆身钻进孔洞以后,取下钻孔连接接头,快速把需要钻进的连接锚杆通过所述连接套与钻进锚杆相连接,随后把所述钻孔连接接头一端接入所述连接锚杆的端头,,所述钻孔连接接头另一端连接风钻继续,直到连接锚杆的杆身钻进孔洞;S2: After the shaft of the drilling anchor rod is drilled into the hole, remove the drilling connection joint, quickly connect the connecting anchor rod to be drilled with the drilling anchor rod through the connecting sleeve, and then connect the One end of the drilling connection joint is connected to the end of the connecting anchor rod, and the other end of the drilling connecting joint is connected to the pneumatic drill and continues until the shaft of the connecting anchor rod is drilled into the hole;
S3:然后重复上述S2过程,直到钻进到所述钻进锚杆与所述连接锚杆的连接总长度为设计孔洞深度且小于所述第一锚杆的长度时,然后换上第一锚杆钻进,直到钻进到设计孔洞深度为止。S3: Then repeat the above S2 process until the total length of the connection between the drilling anchor rod and the connecting anchor rod is the designed hole depth and less than the length of the first anchor rod, and then replace the first anchor rod The rod is drilled until the designed hole depth is reached.
S4:随后拆除所述钻孔连接接头,同时所述第一锚杆的杆身不设置注浆孔,所述第一锚杆的端部重新连接换上注浆连接结构,用于快速完成注浆液的注入;S4: The drilling connection joint is then removed, while the shaft of the first anchor rod is not provided with grouting holes, and the end of the first anchor rod is reconnected and replaced with a grouting connection structure for quickly completing the injection injection of slurry;
S5:直到注浆液注满或达到设计数量后停止注浆,在浆液初凝后拆除连接注浆连接结构,随后用砂轮片切割掉露在孔洞外部的部分所述第一锚杆的杆身,再用水泥砂浆封堵预留的孔洞,完成灌注浆。S5: Stop grouting until the grouting liquid is filled or reach the designed quantity, remove the connecting grouting connection structure after the initial setting of the grout, and then use a grinding wheel to cut off the part of the first anchor rod exposed outside the hole , and then plug the reserved holes with cement mortar to complete the grouting.
通过采用上述技术方案,该注浆方法的第一步,钻进锚杆的钻进,可以利用风钻的钻进力,带动钻进锚杆的楔形钻头转动,实现钻孔;第二步,连接锚杆的连接,利用特制的连接套可以实现连接锚杆之间的快速连接;第三步,然后换上第一锚杆钻进,直到钻进到设计孔洞深度为止;第四步,最后一节锚杆的切除和孔洞的封堵养护,用砂轮片切割掉露在孔洞外部的部分第一锚杆的杆身,用水泥砂浆封堵预留的孔洞,完成注浆。By adopting the above technical solution, the first step of the grouting method, the drilling of the drilling anchor rod, can use the drilling force of the pneumatic drill to drive the wedge-shaped drill bit for drilling the anchor rod to rotate to realize drilling; the second step is to connect For the connection of the bolts, the special connection sleeve can be used to realize the quick connection between the bolts; the third step is to replace the first bolt and drill until the depth of the designed hole is drilled; the fourth step, the last For the cutting of the anchor bolt and the sealing and maintenance of the hole, use the grinding wheel to cut off part of the shaft of the first bolt exposed outside the hole, and seal the reserved hole with cement mortar to complete the grouting.
本发明的有益效果是:The beneficial effects of the present invention are:
1、该装置的钻进连接结构包括楔形钻头、连接套、空心的第一锚杆、空心的钻进锚杆和若干空心的连接锚杆,连接锚杆辅以连接套逐节连接,在盾构管片脱出盾尾即可利用台车上部作业空间;钻进锚杆固定有楔形钻头,楔形钻头在密实砂卵石地层中挤开小直径卵石或凿开大卵石,实现在砂卵石地层中顺利快速成孔;然后第一锚杆连接的钻孔连接接头利用风钻连接钻孔连接接头带动钻进锚杆的楔形钻头进行钻孔,第一锚杆连接的注浆连接结构向连接锚杆和钻进锚杆杆身注浆,注浆液通过锚杆的注浆孔对坍腔进行充填和对周围地层进行注浆加固,制止坍腔向上发展和减少地面沉降;注浆连接结构实现第一锚杆与不同直径的注浆管路的快速连接,缩短注浆时间;该装置结构简单、能够在砂卵石地层盾构施工洞内实施并能够高效钻进较高深度,同时可以避免坍塌发展影响地面及建筑物安全。1. The drilling connection structure of the device includes a wedge-shaped drill bit, a connecting sleeve, a hollow first anchor rod, a hollow drilling anchor rod and several hollow connecting anchor rods. The upper working space of the trolley can be used when the segment is out of the shield tail; the drilling bolt is fixed with a wedge-shaped drill bit, and the wedge-shaped drill bit squeezes out small-diameter pebbles or large pebbles in the dense sand and pebble stratum, so as to achieve smooth operation in the sand and pebble stratum. The hole is formed quickly; then the drill connection joint connected by the first anchor rod uses the pneumatic drill to connect the drilling connection joint to drive the wedge-shaped drill bit that drills into the anchor rod for drilling, and the grouting connection structure connected by the first anchor rod is connected to the anchor rod and the drill rod. The bolt shaft is grouted, and the grouting liquid fills the collapsed cavity through the grouting hole of the bolt and reinforces the surrounding strata by grouting, preventing the upward development of the collapsed cavity and reducing the ground subsidence; the grouting connection structure realizes the first anchorage. The quick connection between the rod and the grouting pipelines of different diameters shortens the grouting time; the device has a simple structure, can be implemented in the shield construction hole of the sand and pebble stratum, and can efficiently drill to a higher depth, and at the same time, it can avoid the collapse development affecting the ground. and building safety.
2、钻孔连接接头的钻孔连接套的一端与锚杆相连,另一端与六棱工具钢相连,便于快速连接锚杆和风钻;异形连接套筒一端与第一锚杆密闭相连,另一端与球阀密闭连接,异形连接套筒起到连接的作用,同时球阀与异形连接套筒的另一端与带螺纹的注浆钢管连接且注浆钢管的另一端接入注浆管路和设备,让注浆液能够顺利通过注浆连接结构而不会发生漏浆。当外部需要的注浆液从连接球阀的注浆管进入然后经过球阀,这时球阀可以对经过的注浆液的流经流量进行控制。2. One end of the drilling connection sleeve of the drilling connection joint is connected with the anchor rod, and the other end is connected with the hexagonal tool steel, which is convenient to quickly connect the anchor rod and the pneumatic drill; one end of the special-shaped connecting sleeve is airtightly connected with the first anchor rod, and the other end It is airtightly connected with the ball valve, and the special-shaped connecting sleeve plays the role of connection. At the same time, the other end of the ball valve and the special-shaped connecting sleeve is connected with a threaded grouting steel pipe, and the other end of the grouting steel pipe is connected to the grouting pipeline and equipment. The grouting fluid can smoothly pass through the grouting connection structure without grout leakage. When the externally required grouting liquid enters from the grouting pipe connected to the ball valve and then passes through the ball valve, the ball valve can control the flow rate of the passing grouting liquid.
3、异形连接套筒设有与第一锚杆相适配的内螺纹和球阀相适配的外螺纹,这样便于通过异形连接套筒实现快速与锚杆与球阀的连接,防止注浆时松动漏浆;解决受盾构机结构限制,盾构机上部作业空间较小的问题,实现快速钻孔和注浆,防止坍腔向上发展深度较大或造成地面坍塌或建筑物沉降和破坏,把第一锚杆、钻进锚杆和连接锚杆的长度均设置为1m~1.5m,方便在施工作业面快速作业。3. The special-shaped connecting sleeve is provided with an internal thread that matches the first anchor rod and an external thread that matches the ball valve, which facilitates the quick connection between the anchor rod and the ball valve through the special-shaped connecting sleeve and prevents loosening during grouting Slurry leakage; solve the problem of limited working space on the upper part of the shield machine due to the structure of the shield machine, realize rapid drilling and grouting, prevent the collapse cavity from developing to a greater depth or cause ground collapse or building settlement and damage, and prevent The lengths of the first anchor rod, the drilling anchor rod and the connecting anchor rod are all set to 1m~1.5m, which is convenient for quick operation on the construction work surface.
4、注浆孔在连接锚杆和钻进锚杆上均布设置的目的是,可以使注浆液能够通过注浆孔均匀注入在所处地层和空腔内,防止由于注浆不均造成注浆效果不好,影响地面及建筑物安全;楔形钻头为合金材质,高强度的合金楔形钻头一方面能够在密实砂卵石地层中挤开小直径卵石,另一方面有足够的强度凿开大卵石,在砂卵石地层中顺利快速成孔;连接套腔体内设有与连接锚杆相适配的内螺纹,可以实现连接套和连接锚杆的快速连接,以便可以快速钻进成孔,节省时间,注浆效果好。4. The purpose of evenly distributing grouting holes on the connecting bolts and drilling bolts is to enable the grouting fluid to be evenly injected into the formation and cavity through the grouting holes, to prevent uneven grouting caused by The grouting effect is not good, which affects the safety of the ground and buildings; the wedge-shaped drill bit is made of alloy. Pebble can form holes smoothly and quickly in sand and pebble formations; the connecting sleeve cavity is provided with an internal thread that matches the connecting anchor rod, which can realize the quick connection between the connecting sleeve and the connecting anchor rod, so that the hole can be drilled quickly and save energy. time, the grouting effect is good.
5、该注浆方法的第一步,钻进锚杆的钻进,可以利用风钻的钻进力,带动钻进锚杆的楔形钻头转动,实现钻孔;第二步,连接锚杆的连接,利用特制的连接套可以实现连接锚杆之间的快速连接;第三步,然后换上第一锚杆钻进,直到钻进到设计孔洞深度为止;第四步,最后一节锚杆的切除和孔洞的封堵养护,用砂轮片切割掉露在孔洞外部的部分第一锚杆的杆身,用水泥砂浆封堵预留的孔洞,完成注浆。5. The first step of the grouting method, the drilling of the drilling anchor rod, can use the drilling force of the pneumatic drill to drive the wedge-shaped drill bit drilling the anchor rod to rotate to realize drilling; the second step is to connect the connection of the anchor rod , the use of a special connecting sleeve can realize the quick connection between the connecting bolts; the third step, then replace the first bolt and drill until the depth of the designed hole is drilled; the fourth step, the last section of the bolt For excision and hole sealing and maintenance, use a grinding wheel to cut off part of the shaft of the first anchor rod exposed outside the hole, and seal the reserved hole with cement mortar to complete the grouting.
附图说明Description of drawings
图1为本发明一种砂卵石地层盾构施工洞内深层注浆的装置的结构示意图;1 is a schematic structural diagram of a device for deep grouting in a shield tunnel construction tunnel in sand and pebble strata of the present invention;
图2为本发明一种砂卵石地层盾构施工洞内深层注浆的装置的钻孔连接接头结构示意图;2 is a schematic diagram of the structure of the borehole connection joint of a device for deep grouting in a shield tunnel construction hole in sand and pebble strata according to the present invention;
图3为本发明一种砂卵石地层盾构施工洞内深层注浆的装置的注浆连接结构示意图;3 is a schematic diagram of a grouting connection structure of a device for deep grouting in a shield tunnel construction tunnel in sand and pebble strata according to the present invention;
图4为图3的A-A剖面示意图;Fig. 4 is the A-A sectional schematic diagram of Fig. 3;
图5为本发明一种砂卵石地层盾构施工洞内深层注浆的方法的施工工艺流程示意图。FIG. 5 is a schematic diagram of the construction process flow of a method for deep grouting in a shield construction tunnel in a sand and pebble stratum according to the present invention.
图中,1-楔形钻头,2-第一锚杆,3-注浆孔,4-连接套,5-六棱工具钢,6-钻孔连接接头,7-异形连接套筒,8-球阀,9-注浆钢管,21-钻进锚杆,22-连接锚杆,41-钻孔连接套。In the figure, 1- wedge-shaped drill bit, 2- first anchor rod, 3- grouting hole, 4- connecting sleeve, 5- hexagonal tool steel, 6- drilling connection joint, 7- special-shaped connecting sleeve, 8- ball valve , 9-grouting steel pipe, 21-drilling bolt, 22-connecting bolt, 41-drilling connecting sleeve.
具体实施方式Detailed ways
下面结合附图进一步详细描述本发明的技术方案,但本发明的保护范围不局限于以下所述。The technical solutions of the present invention are further described in detail below with reference to the accompanying drawings, but the protection scope of the present invention is not limited to the following.
盾构在掘进过程中常常会遇见砂卵石地层,砂卵石地层是一种比较特殊的地质条件,具有强度高、地层松散和稳定性差等特点。这样盾构机对周围地层产生扰动和破坏,在盾构掘进范围上方形成坍腔并逐渐上移至地面,造成地面沉降和坍塌或建筑物沉降和破坏,坍腔位置根据砂卵石地层的稳定性不同而反映出随时间快速上移和扩展,并远离盾构掘进管片至地面。另外,砂卵石岩体强度很高,如单纯依靠钻头钻进则钻孔效率很低,成孔速度慢。为了解决盾构机掘进过程中遇见这样的技术问题,设计了如图1至图5所示的本发明一种砂卵石地层盾构施工洞内深层注浆的装置及其方法。During the excavation process of shield tunneling, sand and pebble strata are often encountered. The sand and pebble stratum is a relatively special geological condition, which has the characteristics of high strength, loose stratum and poor stability. In this way, the shield machine disturbs and destroys the surrounding strata, forms a collapse cavity above the shield excavation range and gradually moves up to the ground, causing ground subsidence and collapse or building subsidence and damage. The difference reflects the rapid upward movement and expansion over time and away from the shield tunnel segment to the ground. In addition, the strength of the sand and pebble rock mass is very high. If it is simply drilled by a drill bit, the drilling efficiency is very low, and the hole forming speed is slow. In order to solve the technical problems encountered in the shield tunneling process, a device and method for deep grouting in a shield tunnel construction hole in sand and pebble formations of the present invention as shown in Figures 1 to 5 are designed.
一种砂卵石地层盾构施工洞内深层注浆的装置,包括钻进连接结构,钻进连接结构包括楔形钻头1、若干连接套4、空心的第一锚杆2,空心的钻进锚杆21和若干空心的连接锚杆22;第一锚杆2、若干连接锚杆22和钻进锚杆21呈直线依次连接,第一锚杆2的一端与其相邻的连接锚杆22的一端通过连接套4连接,第一锚杆2的另一端与钻孔连接接头6或者注浆连接结构可拆卸连接,相邻两个连接锚杆22通过连接套4连接,钻进锚杆21的一端与其相邻的连接锚杆22的一端通过连接套4连接,钻进锚杆21的另一端连接有楔形钻头1;若干连接锚杆2和钻进锚杆21的杆身均设置有注浆孔3。该装置的连接锚杆21辅以连接套逐节连接,在盾构管片脱出盾尾即可利用台车上部作业空间;钻进锚杆21固定有楔形钻头1,楔形钻头1在密实砂卵石地层中挤开小直径卵石或凿开大卵石,实现在砂卵石地层中顺利快速成孔;然后第一锚杆2连接的钻孔连接接头利用风钻连接钻孔连接接头带动钻进锚杆21的楔形钻头1进行钻孔,第一锚杆2连接的注浆连接结构向连接锚杆22和钻进锚杆21杆身注浆,注浆液通过锚杆的注浆孔3对坍腔进行充填和对周围地层进行注浆加固,制止坍腔向上发展和减少地面沉降;注浆连接结构实现第一锚杆2与不同直径的注浆管路的快速连接,缩短注浆时间。A device for deep grouting in a shield construction hole in sand and pebble strata, comprising a drilling connection structure, the drilling connection structure includes a wedge-shaped drill bit 1, a plurality of connection sleeves 4, a hollow first bolt 2, and a hollow drilling bolt 21 and several hollow connecting
本装置在实际中具体使用时,本装置的包括钻进连接结构,包括钻进连接结构,钻进连接结构包括楔形钻头1、若干连接套4、空心的第一锚杆2,空心的钻进锚杆21和若干空心的连接锚杆22;第一锚杆2、若干连接锚杆22和钻进锚杆21呈直线依次连接,第一锚杆2的一端与其相邻的连接锚杆22的一端通过连接套4连接,第一锚杆2的另一端与钻孔连接接头6或者注浆连接结构可拆卸连接,连接钻孔连接接头6一端用于连接第一锚杆2的钻进,另一端可连接钻进的动力装置;连接注浆连接结构的目的在于浆液的注入。钻孔连接接头6包括钻孔连接套41和六棱工具钢5,钻孔连接套41的一端刚开始钻进的时候与钻进锚杆21相连,钻孔连接套41的另一端与六棱工具钢5相连,在实际使用中六棱工具钢5与钻孔连接套41要连接牢固并对其强度进行试验,满足要求才可以使用,六棱工具钢5的一端连接风钻,利用风钻的钻进力,带动钻进锚杆21的楔形钻头1转动,实现钻孔。因为受盾构机结构限制,盾构机上部无较长钢管和钻杆的作业空间,需在盾构台车脱离需要加固区域后方可实施,时机严重滞后,所以第一锚杆2、钻进锚杆21和若干连接锚杆22的长度均为1m~1.5m,这样方便在盾构上部施工作业面快速作业;盾构台车长度一般在80m以上,在砂卵石地层盾构掘进速度较慢而沉降发展较快,如果等盾构台车全部通过待加固区域再进行钻孔注浆加固,坍腔已向上发展深度较大或已造成地面坍塌或建筑物沉降和破坏,注浆加固时机严重滞后且效果不佳,为了能够快速的实现成孔注浆,楔形钻头1为合金材质,高强度的合金楔形钻头1,楔形钻头1在密实砂卵石地层中挤开小直径卵石或凿开大卵石,实现在砂卵石地层中顺利快速钻进;风钻的输出端连接钻孔连接接头6,保证能够实现钻孔连接接头6能够与所使用的风钻或其他钻孔装置形状适配,以便连接使用。连接好连接锚杆22与钻进锚杆21以后接上钻孔连接接头6,然后继续钻进,直到钻进到钻进锚杆21与连接锚杆22的连接总长度为设计孔洞深度且小于所述第一锚杆2的长度时,然后换上第一锚杆2钻进,直到钻进到设计孔洞深度为止。随后按照此钻进顺序进行其他孔洞的钻进,在此钻孔成型过程中,若干连接锚杆2和钻进锚杆的杆身均设置有注浆孔3;此注浆孔3的直径为φ5mm,并采用间距20cm梅花形布置,以便使注浆液在通过注浆孔3时能够均匀注入在地层或空腔内,防止注浆不均而影响注浆效果;成型孔洞中的第一锚杆1的杆身不设注浆孔3,利于抑制第一锚杆2注浆液逸出和保持注浆时的压力。When the device is used in practice, the device includes a drilling connection structure, including a drilling connection structure, and the drilling connection structure includes a wedge-shaped drill bit 1, several connecting sleeves 4, a hollow first anchor rod 2, and a hollow drilling connection structure. The anchor rod 21 and several hollow connecting
进一步的,在实际注浆的过程中,留在孔外的第一锚杆2采用注浆连接结构与注浆设备和管路连接,可以节省连接接头的时间。注浆连接结构包括异形连接套筒7、球阀8和带螺纹的注浆钢管9,异形连接套筒7的一端与球阀8密闭连接,异形连接套筒7的另一端与第一锚杆2相连,球阀8远离异形连接套筒7的一端与注浆钢管9的一端密闭相连;与锚杆2连接的注浆连接结构可以实现不同直径的注浆管路与锚杆2的快速连接,同时注浆管路无需现场焊接和绑扎固定,缩短注浆作业时间,具有安装方便、速度快、承压能力强、不漏浆等优点;在连接的时候,钻进锚杆21的一端通过连接套4与若干连接锚杆22的最后一根连接锚杆22呈直线连接,且尽可能的两端头相抵拢,这样可以使钻进连接锚杆22每一节锚杆在同一直线上,以便注浆液能够顺利通过,大大提高注浆的质量。进一步的,钻进完成安装好第一锚杆2以后取下风钻,拆除钻孔连接接头6,随后将注浆连接结构的异形连接套筒7的一端与第一锚杆2留在孔洞外的杆身一端相连,异形连接套筒7的另一端与球阀8密闭连接,为了防止在注浆的时候漏浆,异形连接套筒7一端设有与第一锚杆2相适配的内螺纹,异形连接套筒7的另一端设有与球阀8相适配的外螺纹。注浆钢管9的一端连接注浆管路,注浆管路的端头连接注浆设备,以便于注浆时使用。Further, in the actual grouting process, the first anchor rod 2 left outside the hole is connected with the grouting equipment and pipeline by the grouting connection structure, which can save the time for connecting the joints. The grouting connection structure includes a special-shaped connecting
进一步的,当外部的注浆液需要注入到本装置时,利用高压注浆泵注入一定的浆液,注入的浆液通过注浆管路然后经过带螺纹钢管9,再通过球阀8和异形连接套筒7,注入的浆液进入到第一锚杆2里,注入的浆液在高压注浆泵的压力下通过连接锚杆22和钻进锚杆21杆身上的开设的注浆孔3扩散注入到孔洞的地层或填充空腔。注浆根据设计要求,通过高压注浆泵可以注入纯水泥浆,也可以是水泥水玻璃,还可以是微膨胀水泥浆等,直到注浆液把空腔或地层注满为止,随后关闭球阀8,待浆液初凝后用砂轮片切割掉露在孔洞外部的部分锚杆2,用水泥砂浆封堵预留的孔洞,完成灌注浆。Further, when the external grouting liquid needs to be injected into the device, a high-pressure grouting pump is used to inject a certain amount of slurry, the injected slurry passes through the grouting pipeline, then passes through the threaded
进一步的,为了配合使用该装置,需要一种合适的方法,所以设计出了一种砂卵石地层盾构施工洞内深层注浆的方法,具体施工工艺流程如图5所示,该方法包括步骤如下:Further, in order to cooperate with the device, a suitable method is required, so a method for deep grouting in a shield tunnel construction hole in sand and pebble stratum is designed. The specific construction process is shown in Figure 5, and the method includes steps. as follows:
S1:第一节锚杆2的钻进,开始钻进时,利用该装置的钻进锚杆21的一端连接的钻孔连接接头6,钻孔连接接头6的另一端连接风钻,利用风钻的钻进力,带动第一节锚杆2的楔形钻头1转动,实现钻孔。在钻进的过程过程中,楔形钻头1在密实砂卵石地层中挤开小直径卵石或凿开大卵石,实现在砂卵石地层中顺利快速成孔。直到钻进锚杆2进入到孔洞以后,然后用连接套4连接需要钻进的连接锚杆22。S1: The first section of the drilling of the anchor rod 2, when the drilling starts, the drilling connection joint 6 connected to one end of the drilling anchor rod 21 of the device is used, and the other end of the drilling connection joint 6 is connected to the pneumatic drill. The drilling force drives the wedge-shaped drill bit 1 of the first section of the anchor rod 2 to rotate to realize drilling. During the drilling process, the wedge-shaped drill bit 1 squeezes out small-diameter pebbles or digs out large pebbles in the dense sand and pebble stratum, so as to realize smooth and rapid hole formation in the sand and pebble stratum. Until the drilling bolt 2 enters the hole, then use the connecting sleeve 4 to connect the connecting
S2:钻进锚杆21的的杆身钻进孔洞以后,取下钻孔连接接头6,快速把需要钻进的连接锚杆22通过连接套4与钻进锚杆21相连接,随后把钻孔连接接头6一端接入连接锚杆22的端头,钻孔连接接头6另一端连接风钻继续,直到连接锚杆22的杆身钻进孔洞。S2: After the shaft of the drilling anchor 21 is drilled into the hole, remove the drilling connecting joint 6, quickly connect the connecting
S3:然后重复上述S2过程,直到钻进到钻进锚杆21与连接锚杆22的连接总长度为设计孔洞深度且小于第一锚杆的长度时,然后换上第一锚杆2钻进,直到钻进到设计孔洞深度为止。S3: Then repeat the above S2 process until the total length of the connection between the drilling anchor rod 21 and the connecting
S4:随后拆除钻孔连接接头6,同时第一锚杆2的杆身不设置注浆孔3,第一锚杆2的端部重新连接换上注浆连接结构,用于快速完成注浆液的注入。S4: Then remove the drilling connection joint 6, and at the same time, the shaft of the first anchor rod 2 is not provided with the
S5:直到注浆液注满或达到设计数量后停止注浆,在浆液初凝后拆除连接注浆连接结构,随后用砂轮片切割掉露在孔洞外部的部分第一锚杆2的杆身,再用水泥砂浆封堵预留的孔洞,完成灌注浆。S5: Stop grouting until the grouting liquid is full or reach the designed quantity, remove the connecting grouting connection structure after the initial setting of the grout, and then use a grinding wheel to cut off part of the shaft of the first anchor rod 2 exposed outside the hole, Then seal the reserved holes with cement mortar to complete the grouting.
以上所述仅是本发明的优选实施方式,应当理解本发明并非局限于本文所披露的形式,不应看作是对其他实施例的排除,而可用于各种其他组合、修改和环境,并能够在本文所述构想范围内,通过上述教导或相关领域的技术或知识进行改动。而本领域人员所进行的改动和变化不脱离本发明的精神和范围,则都应在本发明所附权利要求的保护范围内。The foregoing are only preferred embodiments of the present invention, and it should be understood that the present invention is not limited to the forms disclosed herein, and should not be construed as an exclusion of other embodiments, but may be used in various other combinations, modifications, and environments, and Modifications can be made within the scope of the concepts described herein, from the above teachings or from skill or knowledge in the relevant field. However, modifications and changes made by those skilled in the art do not depart from the spirit and scope of the present invention, and should all fall within the protection scope of the appended claims of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910986230.2A CN110645033A (en) | 2019-10-17 | 2019-10-17 | Device and method for deep grouting in sandy cobble stratum shield construction tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910986230.2A CN110645033A (en) | 2019-10-17 | 2019-10-17 | Device and method for deep grouting in sandy cobble stratum shield construction tunnel |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110645033A true CN110645033A (en) | 2020-01-03 |
Family
ID=69012998
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910986230.2A Pending CN110645033A (en) | 2019-10-17 | 2019-10-17 | Device and method for deep grouting in sandy cobble stratum shield construction tunnel |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110645033A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111946372A (en) * | 2020-07-06 | 2020-11-17 | 青岛市地铁六号线有限公司 | Grouting device for high-coagulability grouting material |
| CN112195908A (en) * | 2020-10-12 | 2021-01-08 | 湖南捷和建筑工程有限公司 | Foundation drilling and grouting reinforcement method suitable for construction in narrow space |
| CN112832833A (en) * | 2021-03-04 | 2021-05-25 | 中国电建集团华东勘测设计研究院有限公司 | Fiberglass bolt installation device, self-propelled fiberglass bolt and installation method |
| CN113863298A (en) * | 2021-10-08 | 2021-12-31 | 长沙理工大学 | A kind of multifunctional bolt structure and setting method |
| CN115434737A (en) * | 2022-10-08 | 2022-12-06 | 昆明理工大学 | Device and method for drilling hole and preventing hole collapse of anchor rod of soft rock tunnel |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101737060A (en) * | 2009-12-28 | 2010-06-16 | 中铁二局股份有限公司 | Beneath-soil through-tunnel superlarge diameter pipe curtain construction method |
| CN203081294U (en) * | 2013-03-11 | 2013-07-24 | 广州电力建筑安装工程有限公司 | Drilling tool of trenchless rig for guided construction in silty soil layer |
| CN106499351A (en) * | 2016-11-08 | 2017-03-15 | 内蒙古科技大学 | A kind of novel pneumatic hand-held jumbolter water filling drill rod connector |
| CN107288671A (en) * | 2017-08-21 | 2017-10-24 | 河南理工大学 | Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method |
| CN206874297U (en) * | 2017-06-16 | 2018-01-12 | 中国水利水电第十四工程局有限公司 | A kind of collection drilling, slip casting, it is anchored in integral novel anchor rod |
| CN210977540U (en) * | 2019-10-17 | 2020-07-10 | 中铁八局集团有限公司 | Device for deep grouting in sandy cobble stratum shield construction hole |
-
2019
- 2019-10-17 CN CN201910986230.2A patent/CN110645033A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101737060A (en) * | 2009-12-28 | 2010-06-16 | 中铁二局股份有限公司 | Beneath-soil through-tunnel superlarge diameter pipe curtain construction method |
| CN203081294U (en) * | 2013-03-11 | 2013-07-24 | 广州电力建筑安装工程有限公司 | Drilling tool of trenchless rig for guided construction in silty soil layer |
| CN106499351A (en) * | 2016-11-08 | 2017-03-15 | 内蒙古科技大学 | A kind of novel pneumatic hand-held jumbolter water filling drill rod connector |
| CN206874297U (en) * | 2017-06-16 | 2018-01-12 | 中国水利水电第十四工程局有限公司 | A kind of collection drilling, slip casting, it is anchored in integral novel anchor rod |
| CN107288671A (en) * | 2017-08-21 | 2017-10-24 | 河南理工大学 | Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note and its construction method |
| CN210977540U (en) * | 2019-10-17 | 2020-07-10 | 中铁八局集团有限公司 | Device for deep grouting in sandy cobble stratum shield construction hole |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111946372A (en) * | 2020-07-06 | 2020-11-17 | 青岛市地铁六号线有限公司 | Grouting device for high-coagulability grouting material |
| CN111946372B (en) * | 2020-07-06 | 2021-06-18 | 青岛市地铁六号线有限公司 | Grouting device for high coagulation grouting material |
| CN112195908A (en) * | 2020-10-12 | 2021-01-08 | 湖南捷和建筑工程有限公司 | Foundation drilling and grouting reinforcement method suitable for construction in narrow space |
| CN112832833A (en) * | 2021-03-04 | 2021-05-25 | 中国电建集团华东勘测设计研究院有限公司 | Fiberglass bolt installation device, self-propelled fiberglass bolt and installation method |
| CN113863298A (en) * | 2021-10-08 | 2021-12-31 | 长沙理工大学 | A kind of multifunctional bolt structure and setting method |
| CN115434737A (en) * | 2022-10-08 | 2022-12-06 | 昆明理工大学 | Device and method for drilling hole and preventing hole collapse of anchor rod of soft rock tunnel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102278130B (en) | Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel | |
| CN101251017B (en) | Subsection retrusive slip-casting method for porthole slurry-stop jackrod | |
| CN105350519A (en) | Advanced pre-grouting device suitable for shallow-buried tunnel construction in sand soil layer and construction process | |
| CN206352481U (en) | Pipe-following drilling system and the anti-collapse aperture apparatus of steel floral tube | |
| CN106381863B (en) | Drilling-injection compound device and construction technology for grouting reinforcement of water-rich sand layer | |
| CN110259383A (en) | A kind of protrusive bores note integrated device and application method | |
| CN110185413A (en) | A method of stable slip casting channel is formed on easy collapse hole stratum | |
| CN102926774B (en) | Bolting and grouting process for governing roadway floor heave | |
| CN104895073B (en) | Can being dismounted for multiple times anchor cable construction system and its construction method | |
| CN105422150B (en) | A kind of FRP sprinkler irrigation combination bolt | |
| CN116291482A (en) | A Method of Advanced Grouting Reinforcement for Deep-Buried Long Tunnels on the Surface | |
| CN102168419A (en) | Method for compounding anchor rod by geotextile reinforcing | |
| CN208136918U (en) | A kind of tubular type Soil-Nailing Wall Structure | |
| CN109026015A (en) | A kind of pre-grouting control method suitable for urban subway tunnel | |
| CN210315529U (en) | Self-drilling high-pressure rotary-jetting bag grouting expanding anti-floating anchor rod | |
| CN107447755A (en) | A kind of anchor pole equipment and armature boring construction method | |
| CN114087000B (en) | Recyclable positioning grouting anchor pipe and positioning grouting anchoring method | |
| CN115726803A (en) | Anchor-pull type pipe jacking construction device and construction method thereof | |
| CN207406345U (en) | Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction | |
| CN202170778U (en) | Returnable pressure equalizing super long grouting pipe | |
| CN209818093U (en) | Be used for soft rock tunnel face reinforcing apparatus | |
| CN202544855U (en) | Hollow grouting device for large-aperture pre-tensioning base plate | |
| CN203584445U (en) | Staged controllable anchor rod grouting support surrounding rock consolidation integrated system | |
| CN210977540U (en) | Device for deep grouting in sandy cobble stratum shield construction hole | |
| CN201214788Y (en) | Grouting device under pressure for mortar anchor rod |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200103 |
|
| RJ01 | Rejection of invention patent application after publication |