CN104790895B - Cable transmits drillable water supply well blocking method - Google Patents

Cable transmits drillable water supply well blocking method Download PDF

Info

Publication number
CN104790895B
CN104790895B CN201510115688.2A CN201510115688A CN104790895B CN 104790895 B CN104790895 B CN 104790895B CN 201510115688 A CN201510115688 A CN 201510115688A CN 104790895 B CN104790895 B CN 104790895B
Authority
CN
China
Prior art keywords
water supply
well
supply well
drillable
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510115688.2A
Other languages
Chinese (zh)
Other versions
CN104790895A (en
Inventor
朱颖超
姚艳华
周宏�
刘志刚
张志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CN201510115688.2A priority Critical patent/CN104790895B/en
Publication of CN104790895A publication Critical patent/CN104790895A/en
Application granted granted Critical
Publication of CN104790895B publication Critical patent/CN104790895B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B29/00Cutting or destroying pipes, packers, plugs, or wire lines, located in boreholes or wells, e.g. cutting of damaged pipes, of windows; Deforming of pipes in boreholes or wells; Reconditioning of well casings while in the ground
    • E21B29/10Reconditioning of well casings, e.g. straightening
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing, or removing tools, packers or the like in the boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/002Survey of boreholes or wells by visual inspection
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/08Measuring diameters or related dimensions at the borehole

Abstract

The present invention relates to a kind of water supply well well workover technology field, more particularly to a kind of cable transmission drillable water supply well blocking method.The method step is as follows:First, gushing sand, going out salt water situation according to problem water supply well, coordinates under-mine TV to find out the leak source position of problem water supply well with logging truck, determines the breakage of leak source, while the hole diameter size measured by problem water supply well.Present invention achieves improve transfer rate, different depth water supply well leak stopping within 2000 meters can be realized, can water supply well be carried out repeating operation, reached with mouth water supply well can multiple leak stopping repair purpose, increased well workover success rate, the service life of water supply well is extended, well workover labor intensity is reduced, workover cost is reduced.

Description

Cable transmits drillable water supply well blocking method
Technical field:
The present invention relates to a kind of water supply well well workover technology field, more particularly to a kind of cable transmission drillable water supply well leak stopping Method.
Background technology:
At present, exploitation of all trades and professions to subsoil water is more and more, and the well construction of deep water source is continuously increased, these water supply well wells Age has many decades mostly.During routine use, there is leak source in water source casing, make normal water supply well gush sand, go out it is salty The problems such as water, water quality string layer.Water supply well leak stopping at present is typically coordinated with crane, transmits steel liner to leak source with drilling tool or oil pipe Position, carries out leak stopping by expanded rubber expansion.Transmitted with drilling tool, generally 200 ms/h or so of transfer rate, transfer rate Slowly, thus the leak stopping that is only suitable within 800 meters, depth can cause expanded rubber when design attitude is not sent to more than 800 meters Just expanded, thus ultradeep well leak stopping cannot be realized.Existing leak stopping mode belongs to disposable leak stopping simultaneously, after some time Once new leak source occur under former leak source or screen casing going wrong, the milling of steel patching tube is difficult, and during milling Water supply well tunica pipe is easily damaged, is made the repair again of the well be difficult to carry out, the water supply well may finally be caused to scrap.
The content of the invention:
The technical problem to be solved in the present invention is to provide a kind of cable transmission drillable water supply well blocking method, the method reality Show and improve transfer rate, different depth water supply well leak stopping within can realizing 2000 meters can repeat to water supply well Operation, reached with mouth water supply well can multiple leak stopping repair purpose, increased well workover success rate, extend water supply well Service life, reduces well workover labor intensity, reduces workover cost.Overcome existing water supply well blocking method and can not realize ultradeep well Leak stopping, it is impossible to carry out the deficiency of leak stopping repair is repeated several times.
The technical solution used in the present invention is:A kind of cable transmits drillable water supply well blocking method, the method step It is as follows:
First, gushing sand, going out salt water situation according to problem water supply well, coordinates under-mine TV to find out problem water supply well with logging truck Leak source position, determine the breakage of leak source, while the hole diameter size measured by problem water supply well;
2nd, drillable patching tube, drillable patching tube are made according to the breakage of problem water supply well hole diameter size, leak source Including base tube, on base tube, uniform intervals are set with multiple expanded rubbers, and expanded rubber two ends are equipped with plastics gear hoop, plastics gear hoop Neighbouring expanded rubber one end is designed with a circle tank, and saw-tooth grooves, plastics are enclosed in the design one on the plastics gear hoop on the outside of tank Gear hoop and base tube are made using PVC-U plastics or PP-R plastics;
3rd, with the cable connection of logging truck well logging inserting tube, well logging inserting tube by magnetic orientation inserting tube, hole diameter inserting tube, telescopic pin and Centralizer is constituted, and magnetic orientation inserting tube, hole diameter inserting tube, centralizer are sequentially connected with, and telescopic pin is arranged on hole diameter inserting tube, telescopic pin energy Enough flexible, drillable patching tube is sleeved on the outside of well logging inserting tube, and telescopic pin is stretched out and inserts the peace on drillable subsidy inside pipe wall In dress hole, cable transmission drillable patching tube, transmit process medium velocity are maintained at 20-30 m/min, are sent to design subsidy leakage Behind point position, wait for peacefully 72 hours, expanded rubber is expanded after meeting water naturally, the multiple tracks expanded rubber expansion on drillable patching tube Afterwards, drillable patching tube is made to be integrally fixed with water supply well well casing, now water supply well leak source closure is completed, and telescopic pin is shunk, and carries Go out inserting tube of logging well, water supply well leak stopping repair terminates;
4th, after successful leak stopping, if occur new leak source under leak source or filter pipe goes wrong, upper production rig, Existing drillable patching tube is cleaned out with milling alloy scraper drill bit, then to the problem water supply well according to above-mentioned one, 2nd, three steps carry out repair again from bottom to up to each leak source, and same water supply well can repeatedly repair.
The invention has the beneficial effects as follows:Side of the present invention as a result of the cable transmission drillable patching tube of logging truck Formula, thus have and improve transfer rate, the advantage of different depth water supply well leak stopping within 2000 meters can be realized, can be to water Source well carries out repeating operation, reached with mouth water supply well can multiple leak stopping repair purpose, increased well workover success rate, prolong The service life of water supply well has been grown, well workover labor intensity has been reduced, workover cost has been reduced.
Description of the drawings:
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the schematic diagram of the present invention.
Fig. 2 is the structural representation of well logging inserting tube.
Structural representations of the Fig. 3 for drillable patching tube.
Specific embodiment:
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of cable transmits drillable water supply well blocking method, and the method step is as follows:
First, gushing sand, going out salt water situation according to problem water supply well, coordinates under-mine TV to find out problem water source with logging truck 1 The leak source position of well, determines the breakage of leak source, while the hole diameter size measured by problem water supply well;
2nd, drillable patching tube 4, drillable subsidy are made according to the breakage of problem water supply well hole diameter size, leak source Pipe 4 includes base tube 11, and on base tube 11, uniform intervals are set with multiple expanded rubbers 9, and 9 two ends of expanded rubber are equipped with plastics gear hoop 10, plastics gear hoop 10 is designed with a circle tank adjacent to 9 one end of expanded rubber, and the design one on the plastics gear hoop 10 on the outside of tank is enclosed Saw-tooth grooves 12, plastics gear hoop 10 and base tube 11 are made using PVC-U plastics or PP-R plastics;
3rd, with the cable 2 of logging truck 1 connection well logging inserting tube 3, well logging inserting tube 3 by magnetic orientation inserting tube 5, hole diameter inserting tube 6, stretch Contracting pin 7 and centralizer 8 are constituted, and magnetic orientation inserting tube 5, hole diameter inserting tube 6, centralizer 8 are sequentially connected with, and telescopic pin 7 is visited installed in hole diameter On pipe 6, telescopic pin 7 can be stretched, and drillable patching tube 4 is sleeved on the outside of well logging inserting tube 3, and telescopic pin 7 is stretched out and inserted and can bore In installing hole on 4 inwall of formula patching tube, the transmission of cable 2 drillable patching tube 4, transmit process medium velocity be maintained at 20-30 rice/ Minute, after being sent to design subsidy leak source position, to wait for peacefully 72 hours, expanded rubber 9 is expanded after meeting water naturally, drillable patching tube After multiple tracks expanded rubber 9 on 4 expands, drillable patching tube 4 is made to be integrally fixed with water supply well well casing, now water supply well leak source Closure is completed, and telescopic pin 7 is shunk, and proposes well logging inserting tube 3, and water supply well leak stopping repair terminates;
4th, after successful leak stopping, if occur new leak source under leak source or filter pipe goes wrong, can above workover treatment Machine, cleans out existing drillable patching tube 4 with milling alloy scraper drill bit, then to the problem water supply well according to above-mentioned First, two, three steps carry out repair again from bottom to up to each leak source, and same water supply well can repeatedly repair.
The present invention carries out water supply well leak stopping repair with the transmission drillable of cable 2 patching tube 4 of logging truck 1.With well logging Car cable is transmitted, and can be greatly improved transfer rate, be made expanded rubber 9 smoothly be sent to design attitude before inflation, make to surpass Deep-well leak stopping comes true.
It is understood that above with respect to the specific descriptions of the present invention, being merely to illustrate the present invention and being not limited to this Technical scheme described by inventive embodiments, it will be understood by those within the art that, still the present invention can be carried out Modification or equivalent, to reach identical technique effect;As long as meet use needs, all protection scope of the present invention it It is interior.

Claims (1)

1. a kind of cable transmits drillable water supply well blocking method, it is characterised in that:The method step is as follows:
First, gushing sand, going out salt water situation according to problem water supply well, coordinates under-mine TV to find out problem water supply well with logging truck (1) Leak source position, determine the breakage of leak source, while the hole diameter size measured by problem water supply well;
2nd, drillable patching tube (4), drillable patching tube are made according to the breakage of problem water supply well hole diameter size, leak source (4) including base tube (11), on base tube (11), uniform intervals are set with multiple expanded rubbers (9), and expanded rubber (9) two ends are equipped with Plastics gear hoop (10), neighbouring expanded rubber (9) one end of plastics gear hoop (10) are designed with a circle tank, the plastics gear on the outside of tank Saw-tooth grooves (12) are enclosed in design one on hoop (10), and plastics gear hoop (10) and base tube (11) are using PVC-U plastics or PP-R plastics Make;
3rd, with the cable (2) connection well logging inserting tube (3) of logging truck (1), well logging inserting tube (3) is visited by magnetic orientation inserting tube (5), hole diameter Pipe (6), telescopic pin (7) and centralizer (8) composition, magnetic orientation inserting tube (5), hole diameter inserting tube (6), centralizer (8) are sequentially connected with, stretch On hole diameter inserting tube (6), telescopic pin (7) can be stretched for contracting pin (7), and drillable patching tube (4) is sleeved on well logging inserting tube (3) Outside, telescopic pin (7) are stretched out and are inserted in the installing hole on drillable patching tube (4) inwall, cable (2) transmission drillable subsidy Pipe (4), transmit process medium velocity are maintained at 20-30 m/min, after being sent to design subsidy leak source position, wait for peacefully 72 hours, swollen Swollen rubber (9) is expanded after meeting water naturally, after multiple tracks expanded rubber (9) expansion on drillable patching tube (4), subsidizes drillable Pipe (4) is integrally fixed with water supply well well casing, and now water supply well leak source closure is completed, and telescopic pin (7) is shunk, and proposes well logging inserting tube (3), water supply well leak stopping repair terminates;
4th, after successful leak stopping, if occur new leak source under leak source or filter pipe goes wrong, upper production rig, with mill Milling alloy scraper drill bit cleans out existing drillable patching tube (4), then to the problem water supply well according to above-mentioned one, 2nd, three steps carry out repair again from bottom to up to each leak source, and same water supply well can repeatedly repair.
CN201510115688.2A 2015-03-17 2015-03-17 Cable transmits drillable water supply well blocking method Expired - Fee Related CN104790895B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510115688.2A CN104790895B (en) 2015-03-17 2015-03-17 Cable transmits drillable water supply well blocking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510115688.2A CN104790895B (en) 2015-03-17 2015-03-17 Cable transmits drillable water supply well blocking method

Publications (2)

Publication Number Publication Date
CN104790895A CN104790895A (en) 2015-07-22
CN104790895B true CN104790895B (en) 2017-03-29

Family

ID=53556031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510115688.2A Expired - Fee Related CN104790895B (en) 2015-03-17 2015-03-17 Cable transmits drillable water supply well blocking method

Country Status (1)

Country Link
CN (1) CN104790895B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761514A (en) * 2016-12-15 2017-05-31 中国石油天然气股份有限公司 A kind of casing damaged well self-expanding rubber patch device and its subsidy method
CN109630804B (en) * 2018-12-05 2021-03-09 中煤第三建设集团机电安装工程有限责任公司 Method for quickly plugging vertical shaft bobbin leakage point
CN112727442B (en) * 2019-10-28 2024-02-06 中国石油化工股份有限公司 Coiled tubing visual well repair operation tubular column and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2190692Y (en) * 1993-12-15 1995-03-01 中原石油勘探局勘探公司 Sleeve explosion mending device
US6283211B1 (en) * 1998-10-23 2001-09-04 Polybore Services, Inc. Method of patching downhole casing
CN202611643U (en) * 2012-06-08 2012-12-19 中国石油天然气股份有限公司青海油田分公司 Cable drifting gauge
CN103899244A (en) * 2012-12-25 2014-07-02 新疆中核天山铀业有限公司 Method for repairing damaged drilled hole for in-situ leaching uranium mining through a plurality of layers of expanding materials
CN104213865A (en) * 2013-06-05 2014-12-17 中国石油天然气集团公司 Self-expansion method improving sealing ability and self-expansion packer

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2362062A1 (en) * 2010-02-22 2011-08-31 Welltec A/S An annular barrier

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2190692Y (en) * 1993-12-15 1995-03-01 中原石油勘探局勘探公司 Sleeve explosion mending device
US6283211B1 (en) * 1998-10-23 2001-09-04 Polybore Services, Inc. Method of patching downhole casing
CN202611643U (en) * 2012-06-08 2012-12-19 中国石油天然气股份有限公司青海油田分公司 Cable drifting gauge
CN103899244A (en) * 2012-12-25 2014-07-02 新疆中核天山铀业有限公司 Method for repairing damaged drilled hole for in-situ leaching uranium mining through a plurality of layers of expanding materials
CN104213865A (en) * 2013-06-05 2014-12-17 中国石油天然气集团公司 Self-expansion method improving sealing ability and self-expansion packer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
水井套管渗漏的查找与修复;张岚;《探矿工程(岩土钻掘工程)》;19930325(第03期);第37-39页 *
管内自膨胀封隔器的研制与应用;郑金中等;《石油矿场机械》;20140831;第43卷(第8期);第82-84页 *

Also Published As

Publication number Publication date
CN104790895A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN109267983B (en) Horizontal well repeated fracturing device and method based on open hole preset pipe string well completion
CN105201458B (en) A kind of coal bed gas horizontal well fiberglass sieve tube completion method
ATE386240T1 (en) METHOD FOR PRODUCING A GETHER HEAT PROBE
CN105064919A (en) Ultra-short-radius radial lateral drilling method for horizontal wells
CN104832208A (en) Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine
CN104141470A (en) Pore-forming and sealing method for hydraulic fracturing borehole casing section in underground coal mine
CN104790895B (en) Cable transmits drillable water supply well blocking method
WO2013133718A1 (en) Method for removal of casings in an underground well
CN107143284A (en) The application method of the method for coal mine long range throughbore draining, equipment and equipment
CN104453727B (en) Composite bushing and drilling restorative procedure
CN108361001A (en) A kind of deep trona drilling well exploitation cementing stage technique
CN104847263A (en) Coal bed methane far-end butt joint horizontal well drilling method
CN105986795A (en) Coal bed gas horizontal well coal bed transformation method
CN111622728B (en) Horizontal well perforation process for connecting perforation of cable tractor with hydraulic conveying perforation
CN110725661B (en) Segmented spiral rubber bag hole sealing device
CN110748315A (en) Method for treating casing damage of oil-water well
CN106930722A (en) The permanent shut-in well method of the natural gas well
CN109578058B (en) Method for improving gas extraction concentration of extraction borehole through auxiliary drilling
CN106150428A (en) Split type exempting from bores plug completion tubular column and completion method thereof
CN103089193A (en) Tail pipe completion method by plugging expandable casing on top of screen pipe
CN112431579B (en) Preset small-diameter pipe internal fracturing device and method for side drilling well and small-hole well
CN102877813A (en) Halfway gas-filling well cementing method
CN104343424A (en) Coalbed-methane horizontal-well PE (poly ethylene) screen pipe well completion application process method
CN109322621B (en) Broken layer pipe fixing and grouting method
CN104912480B (en) Coal bed gas near-end docks the brill completion method of horizontal well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20200317