CN113086865A - Assembled building element hoist and mount construction platform - Google Patents
Assembled building element hoist and mount construction platform Download PDFInfo
- Publication number
- CN113086865A CN113086865A CN202110437803.3A CN202110437803A CN113086865A CN 113086865 A CN113086865 A CN 113086865A CN 202110437803 A CN202110437803 A CN 202110437803A CN 113086865 A CN113086865 A CN 113086865A
- Authority
- CN
- China
- Prior art keywords
- climbing
- self
- guide rail
- guide rails
- truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 230000009194 climbing Effects 0.000 claims description 19
- 238000009434 installation Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/28—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
The invention discloses an assembled building component hoisting construction platform which comprises a building structure, wherein two groups of self-climbing devices are arranged on the building structure, two truss guide rails are fixedly arranged at the tops of the two groups of self-climbing devices in parallel, and a single-beam crane is erected between the two truss guide rails. According to the self-climbing type self-climbing assembly, the self-climbing device is utilized to support the two truss guide rails, and the single-beam crane is erected between the two truss guide rails, so that the single-beam crane can flexibly move above a construction plane to hoist the assembly type building component, the assembly type building component can be accurately and quickly installed by flexibly walking the single-beam crane, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail can climb upwards layer by layer along with floors through the self-climbing device, and the installation work of the assembled building components of all the floors can be completed.
Description
Technical Field
The invention relates to an assembled building component hoisting construction platform, and belongs to the technical field of building construction.
Background
The existing assembly type building component hoisting is mainly completed by a tower crane, the assembly type building component in the working process is transported to a project site by an automobile, then the component is hoisted to a position needing to be installed on a construction layer by the tower crane, the installation process mainly comprises the steps that a tower crane commander feeds back the installation condition of the site component and a tower crane driver to adjust a tower crane swing arm through an interphone, the site component installer finely adjusts the component through manpower, and the tower crane is loosely bound after the position adjustment and reinforcement are completed. And the steps are circulated in such a way until all the assembled components are hoisted.
The existing technical scheme needs to occupy a tower crane for operation and construction for a long time, because a tower crane driver is far away from a hoisting construction floor, and the fine adjustment of a tower crane swing arm is difficult, in order to overcome the two problems, a tower crane commander and a plurality of field component installers need to be matched; the coordination command of tower crane commanders and tower crane drivers is often imperfect and needs to be adjusted repeatedly, resulting in low on-site construction benefit; in the process of adjustment, a tower crane driver is easy to swing the component to accidentally injure installation personnel, and the potential safety hazard is large.
Disclosure of Invention
The invention aims to provide a fabricated building component hoisting construction platform which is high in construction efficiency, convenient to operate, safe and reliable, and overcomes the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides an assembly type building element hoist and mount construction platform, includes building structure, installs two sets ofly from climbing device on building structure, has two truss guide rails at two sets ofly from climbing device's top fixed mounting parallelly, has set up the monospar driving between two truss guide rails.
Further, the self-climbing device comprises a group of wall-attached supports fixedly connected with the building structure, a climbing frame guide rail is fixedly connected to the wall-attached supports, the upper end of each climbing frame guide rail is fixedly connected with the truss guide rail, an electric hoist is installed on the upper portion of the building structure, and a hook of the electric hoist is connected with the lower end of the climbing frame guide rail.
Furthermore, each truss guide rail is fixedly connected with more than two climbing frame guide rails.
Furthermore, a small platform for operation of a person is fixedly arranged on the climbing frame guide rail.
Due to the adoption of the technical scheme, the invention has the following advantages: according to the self-climbing type self-climbing assembly, the self-climbing device is utilized to support the two truss guide rails, and the single-beam crane is erected between the two truss guide rails, so that the single-beam crane can flexibly move above a construction plane to hoist the assembly type building component, the assembly type building component can be accurately and quickly installed by flexibly walking the single-beam crane, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail can climb upwards layer by layer along with floors through the self-climbing device, and the installation work of the assembled building components of all the floors can be completed.
Drawings
FIG. 1 is a top view of a schematic of the structure of the present invention;
fig. 2 is a vertical view of a schematic of the structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention comprises the following steps: referring to fig. 1 and 2, an assembly type building component hoisting construction platform includes a building structure 1, two self-climbing devices 2 are installed on the building structure 1, two truss guide rails 3 are fixedly installed on the tops of the two self-climbing devices 2 in parallel, and a single-beam crane 4 is installed between the two truss guide rails 3. The self-climbing device 2 comprises a group of wall-attached supports 2.1 fixedly connected with the building structure 1, a climbing frame guide rail 2.2 is fixedly connected to the wall-attached supports 2.1, the upper end of each climbing frame guide rail 2.2 is fixedly connected with a truss guide rail 3, an electric hoist 2.3 is installed on the upper portion of the building structure 1, and a hook of the electric hoist 11 is connected with the lower ends of the climbing frame guide rails 2.2. Each truss guide rail 3 is fixedly connected with more than two climbing frame guide rails 2.2, so that the truss guide rails 3 are stably supported. The climbing frame guide rail 2.2 is fixedly provided with a small platform 2.4 for operating by a person, so that manual operation is facilitated.
According to the self-climbing construction method, the self-climbing device 2 is used for supporting the two truss guide rails 3, and the single-beam crane 4 is erected between the two truss guide rails 3, so that the single-beam crane 4 can flexibly move above a construction plane to hoist the assembled construction member, the assembled construction member can be ensured to flexibly move through the single-beam crane 4 to realize accurate and rapid installation, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail 3 can climb upwards along with floors layer by layer through the self-climbing device 2, and the installation work of the assembled building components of all floors can be completed.
When lifting from climbing device 2, at first need dismantle attach wall support 2.1 and climb the connecting bolt between the frame guide rail 2.2, then start electric block 11, drive through electric block 11 and climb frame guide rail 2.2 and promote to the upper strata construction floor slowly upwards, then the rethread attaches wall support 2.1 and climbs frame guide rail 2.2 fixed connection, will fix like this and also promote to the upper strata construction floor at the truss guide rail 3 at the frame guide rail 2.2 top of climbing, and then continue to adopt monospar driving 4 to hoist assembled building element. And repeating the process until the assembly type building components of all floors are installed.
Claims (4)
1. The utility model provides an assembled building element hoist and mount construction platform, includes building structure (1), its characterized in that: two groups of self-climbing devices (2) are installed on a building structure (1), two truss guide rails (3) are fixedly installed on the tops of the two groups of self-climbing devices (2) in parallel, and a single-beam traveling crane (4) is erected between the two truss guide rails (3).
2. The fabricated building element hoisting construction platform of claim 1, wherein: from climbing device (2) including with building structure (1) fixed connection a set of attach wall support (2.1), on attaching wall support (2.1) fixedly connected with climb a guide rail (2.2), every upper end and truss guide rail (3) fixed connection of climbing a guide rail (2.2), install electric block (2.3) on the upper portion of building structure (1), and the couple and the lower extreme of climbing a guide rail (2.2) of electric block (11) are connected.
3. The fabricated building element hoisting construction platform of claim 2, wherein: each truss guide rail (3) is fixedly connected with more than two climbing frame guide rails (2.2).
4. The fabricated building element hoisting construction platform of claim 2, wherein: and a small upper operating platform (2.4) is fixedly arranged on the climbing frame guide rail (2.2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110437803.3A CN113086865A (en) | 2021-04-22 | 2021-04-22 | Assembled building element hoist and mount construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110437803.3A CN113086865A (en) | 2021-04-22 | 2021-04-22 | Assembled building element hoist and mount construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113086865A true CN113086865A (en) | 2021-07-09 |
Family
ID=76679568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110437803.3A Pending CN113086865A (en) | 2021-04-22 | 2021-04-22 | Assembled building element hoist and mount construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113086865A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201891254U (en) * | 2009-10-09 | 2011-07-06 | 李训悌 | Lifting scaffold without diagonal draw bar |
CN102992198A (en) * | 2011-09-13 | 2013-03-27 | 陈家星 | Bridge crane having climbing function |
CN105540446A (en) * | 2016-01-15 | 2016-05-04 | 北京市建筑工程研究院有限责任公司 | Interior-climbing type lifting platform |
CN108560992A (en) * | 2018-03-14 | 2018-09-21 | 扬州中创模板有限公司 | The construction equipment and concrete placings construction method of towering structure |
CN216336266U (en) * | 2021-04-22 | 2022-04-19 | 中国建筑第四工程局有限公司 | Assembled building element hoist and mount construction platform structure |
-
2021
- 2021-04-22 CN CN202110437803.3A patent/CN113086865A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201891254U (en) * | 2009-10-09 | 2011-07-06 | 李训悌 | Lifting scaffold without diagonal draw bar |
CN102992198A (en) * | 2011-09-13 | 2013-03-27 | 陈家星 | Bridge crane having climbing function |
CN105540446A (en) * | 2016-01-15 | 2016-05-04 | 北京市建筑工程研究院有限责任公司 | Interior-climbing type lifting platform |
CN108560992A (en) * | 2018-03-14 | 2018-09-21 | 扬州中创模板有限公司 | The construction equipment and concrete placings construction method of towering structure |
CN216336266U (en) * | 2021-04-22 | 2022-04-19 | 中国建筑第四工程局有限公司 | Assembled building element hoist and mount construction platform structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201417657Y (en) | Installation device of indoor transformer | |
CN216336266U (en) | Assembled building element hoist and mount construction platform structure | |
CN201458567U (en) | Special angle square for profile steel trolley conductor bracket installation | |
CN113062584A (en) | Multipoint elevator shaft construction lifting platform and construction method | |
CN113958131B (en) | Suspended ceiling structure of steel structure truss string system roof and construction method thereof | |
CN113086865A (en) | Assembled building element hoist and mount construction platform | |
CN208648493U (en) | A kind of no scaffold installation elevator operation platform device | |
CN117005664A (en) | Electric translation type hanging basket | |
CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
CN210366717U (en) | Be applied to console mode and from climbing formula whole construction work platform | |
CN207608234U (en) | A kind of assembly type curtain wall hanging apparatus | |
CN216471868U (en) | Tower crane-free building assembled component hoisting platform | |
CN219098451U (en) | Car of construction elevator with telescopic ladder | |
CN218543767U (en) | Camera pan-tilt lifting device | |
CN220336505U (en) | Temporary fixing structure of arched steel structure | |
CN214935296U (en) | Lifting device convenient to big inclination steel column does not have support equipment | |
CN111335533B (en) | Construction method of solar metal inclined roof of prefabricated residential building | |
CN217205276U (en) | Assembled construction elevator superelevation attaches wall support device | |
CN115676559B (en) | Steel construction elevator well | |
CN2190644Y (en) | Self lifting beam of building door frame lift | |
CN216305332U (en) | Guide rail upright post for building construction | |
CN217201767U (en) | Rectangular air pipe hoisting device | |
CN211143697U (en) | Movable operating platform for roof reverse-hand plate installation | |
CN217557625U (en) | Building climbing frame attached support mounting and lifting device | |
CN216109859U (en) | Safety net hanging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |