Prior art keywords
climbing
self
guide rail
guide rails
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110437803.3A
Other languages
Chinese (zh)
Inventor
观开剑
孙清臣
叶文杰
李家盛
陈荣朗
胡俊
俞旺新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202110437803.3A priority Critical patent/CN113086865A/en
Publication of CN113086865A publication Critical patent/CN113086865A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • B66C23/28Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail constructed to operate at successively higher levels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Transportation (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses an assembled building component hoisting construction platform which comprises a building structure, wherein two groups of self-climbing devices are arranged on the building structure, two truss guide rails are fixedly arranged at the tops of the two groups of self-climbing devices in parallel, and a single-beam crane is erected between the two truss guide rails. According to the self-climbing type self-climbing assembly, the self-climbing device is utilized to support the two truss guide rails, and the single-beam crane is erected between the two truss guide rails, so that the single-beam crane can flexibly move above a construction plane to hoist the assembly type building component, the assembly type building component can be accurately and quickly installed by flexibly walking the single-beam crane, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail can climb upwards layer by layer along with floors through the self-climbing device, and the installation work of the assembled building components of all the floors can be completed.

Description

Assembled building element hoist and mount construction platform
Technical Field
The invention relates to an assembled building component hoisting construction platform, and belongs to the technical field of building construction.
Background
The existing assembly type building component hoisting is mainly completed by a tower crane, the assembly type building component in the working process is transported to a project site by an automobile, then the component is hoisted to a position needing to be installed on a construction layer by the tower crane, the installation process mainly comprises the steps that a tower crane commander feeds back the installation condition of the site component and a tower crane driver to adjust a tower crane swing arm through an interphone, the site component installer finely adjusts the component through manpower, and the tower crane is loosely bound after the position adjustment and reinforcement are completed. And the steps are circulated in such a way until all the assembled components are hoisted.
The existing technical scheme needs to occupy a tower crane for operation and construction for a long time, because a tower crane driver is far away from a hoisting construction floor, and the fine adjustment of a tower crane swing arm is difficult, in order to overcome the two problems, a tower crane commander and a plurality of field component installers need to be matched; the coordination command of tower crane commanders and tower crane drivers is often imperfect and needs to be adjusted repeatedly, resulting in low on-site construction benefit; in the process of adjustment, a tower crane driver is easy to swing the component to accidentally injure installation personnel, and the potential safety hazard is large.
Disclosure of Invention
The invention aims to provide a fabricated building component hoisting construction platform which is high in construction efficiency, convenient to operate, safe and reliable, and overcomes the defects in the prior art.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides an assembly type building element hoist and mount construction platform, includes building structure, installs two sets ofly from climbing device on building structure, has two truss guide rails at two sets ofly from climbing device's top fixed mounting parallelly, has set up the monospar driving between two truss guide rails.
Further, the self-climbing device comprises a group of wall-attached supports fixedly connected with the building structure, a climbing frame guide rail is fixedly connected to the wall-attached supports, the upper end of each climbing frame guide rail is fixedly connected with the truss guide rail, an electric hoist is installed on the upper portion of the building structure, and a hook of the electric hoist is connected with the lower end of the climbing frame guide rail.
Furthermore, each truss guide rail is fixedly connected with more than two climbing frame guide rails.
Furthermore, a small platform for operation of a person is fixedly arranged on the climbing frame guide rail.
Due to the adoption of the technical scheme, the invention has the following advantages: according to the self-climbing type self-climbing assembly, the self-climbing device is utilized to support the two truss guide rails, and the single-beam crane is erected between the two truss guide rails, so that the single-beam crane can flexibly move above a construction plane to hoist the assembly type building component, the assembly type building component can be accurately and quickly installed by flexibly walking the single-beam crane, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail can climb upwards layer by layer along with floors through the self-climbing device, and the installation work of the assembled building components of all the floors can be completed.
Drawings
FIG. 1 is a top view of a schematic of the structure of the present invention;
fig. 2 is a vertical view of a schematic of the structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The embodiment of the invention comprises the following steps: referring to fig. 1 and 2, an assembly type building component hoisting construction platform includes a building structure 1, two self-climbing devices 2 are installed on the building structure 1, two truss guide rails 3 are fixedly installed on the tops of the two self-climbing devices 2 in parallel, and a single-beam crane 4 is installed between the two truss guide rails 3. The self-climbing device 2 comprises a group of wall-attached supports 2.1 fixedly connected with the building structure 1, a climbing frame guide rail 2.2 is fixedly connected to the wall-attached supports 2.1, the upper end of each climbing frame guide rail 2.2 is fixedly connected with a truss guide rail 3, an electric hoist 2.3 is installed on the upper portion of the building structure 1, and a hook of the electric hoist 11 is connected with the lower ends of the climbing frame guide rails 2.2. Each truss guide rail 3 is fixedly connected with more than two climbing frame guide rails 2.2, so that the truss guide rails 3 are stably supported. The climbing frame guide rail 2.2 is fixedly provided with a small platform 2.4 for operating by a person, so that manual operation is facilitated.
According to the self-climbing construction method, the self-climbing device 2 is used for supporting the two truss guide rails 3, and the single-beam crane 4 is erected between the two truss guide rails 3, so that the single-beam crane 4 can flexibly move above a construction plane to hoist the assembled construction member, the assembled construction member can be ensured to flexibly move through the single-beam crane 4 to realize accurate and rapid installation, the labor is reduced, the construction safety is ensured, and the construction efficiency is greatly improved; meanwhile, the truss guide rail 3 can climb upwards along with floors layer by layer through the self-climbing device 2, and the installation work of the assembled building components of all floors can be completed.
When lifting from climbing device 2, at first need dismantle attach wall support 2.1 and climb the connecting bolt between the frame guide rail 2.2, then start electric block 11, drive through electric block 11 and climb frame guide rail 2.2 and promote to the upper strata construction floor slowly upwards, then the rethread attaches wall support 2.1 and climbs frame guide rail 2.2 fixed connection, will fix like this and also promote to the upper strata construction floor at the truss guide rail 3 at the frame guide rail 2.2 top of climbing, and then continue to adopt monospar driving 4 to hoist assembled building element. And repeating the process until the assembly type building components of all floors are installed.

Claims (4)

1. The utility model provides an assembled building element hoist and mount construction platform, includes building structure (1), its characterized in that: two groups of self-climbing devices (2) are installed on a building structure (1), two truss guide rails (3) are fixedly installed on the tops of the two groups of self-climbing devices (2) in parallel, and a single-beam traveling crane (4) is erected between the two truss guide rails (3).
2. The fabricated building element hoisting construction platform of claim 1, wherein: from climbing device (2) including with building structure (1) fixed connection a set of attach wall support (2.1), on attaching wall support (2.1) fixedly connected with climb a guide rail (2.2), every upper end and truss guide rail (3) fixed connection of climbing a guide rail (2.2), install electric block (2.3) on the upper portion of building structure (1), and the couple and the lower extreme of climbing a guide rail (2.2) of electric block (11) are connected.
3. The fabricated building element hoisting construction platform of claim 2, wherein: each truss guide rail (3) is fixedly connected with more than two climbing frame guide rails (2.2).
4. The fabricated building element hoisting construction platform of claim 2, wherein: and a small upper operating platform (2.4) is fixedly arranged on the climbing frame guide rail (2.2).
CN202110437803.3A 2021-04-22 2021-04-22 Assembled building element hoist and mount construction platform Pending CN113086865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110437803.3A CN113086865A (en) 2021-04-22 2021-04-22 Assembled building element hoist and mount construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110437803.3A CN113086865A (en) 2021-04-22 2021-04-22 Assembled building element hoist and mount construction platform

Publications (1)

Publication Number Publication Date
CN113086865A true CN113086865A (en) 2021-07-09

Family

ID=76679568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110437803.3A Pending CN113086865A (en) 2021-04-22 2021-04-22 Assembled building element hoist and mount construction platform

Country Status (1)

Country Link
CN (1) CN113086865A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201891254U (en) * 2009-10-09 2011-07-06 李训悌 Lifting scaffold without diagonal draw bar
CN102992198A (en) * 2011-09-13 2013-03-27 陈家星 Bridge crane having climbing function
CN105540446A (en) * 2016-01-15 2016-05-04 北京市建筑工程研究院有限责任公司 Interior-climbing type lifting platform
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN216336266U (en) * 2021-04-22 2022-04-19 中国建筑第四工程局有限公司 Assembled building element hoist and mount construction platform structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201891254U (en) * 2009-10-09 2011-07-06 李训悌 Lifting scaffold without diagonal draw bar
CN102992198A (en) * 2011-09-13 2013-03-27 陈家星 Bridge crane having climbing function
CN105540446A (en) * 2016-01-15 2016-05-04 北京市建筑工程研究院有限责任公司 Interior-climbing type lifting platform
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN216336266U (en) * 2021-04-22 2022-04-19 中国建筑第四工程局有限公司 Assembled building element hoist and mount construction platform structure

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN216336266U (en) Assembled building element hoist and mount construction platform structure
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN113958131B (en) Suspended ceiling structure of steel structure truss string system roof and construction method thereof
CN113086865A (en) Assembled building element hoist and mount construction platform
CN208648493U (en) A kind of no scaffold installation elevator operation platform device
CN117005664A (en) Electric translation type hanging basket
CN215291319U (en) Multi-point elevator shaft construction lifting platform
CN210366717U (en) Be applied to console mode and from climbing formula whole construction work platform
CN207608234U (en) A kind of assembly type curtain wall hanging apparatus
CN216471868U (en) Tower crane-free building assembled component hoisting platform
CN219098451U (en) Car of construction elevator with telescopic ladder
CN218543767U (en) Camera pan-tilt lifting device
CN220336505U (en) Temporary fixing structure of arched steel structure
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN111335533B (en) Construction method of solar metal inclined roof of prefabricated residential building
CN217205276U (en) Assembled construction elevator superelevation attaches wall support device
CN115676559B (en) Steel construction elevator well
CN2190644Y (en) Self lifting beam of building door frame lift
CN216305332U (en) Guide rail upright post for building construction
CN217201767U (en) Rectangular air pipe hoisting device
CN211143697U (en) Movable operating platform for roof reverse-hand plate installation
CN217557625U (en) Building climbing frame attached support mounting and lifting device
CN216109859U (en) Safety net hanging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination