CN112987633A - Bituminous paving work progress informationization management and control system - Google Patents
Bituminous paving work progress informationization management and control system Download PDFInfo
- Publication number
- CN112987633A CN112987633A CN202110254941.8A CN202110254941A CN112987633A CN 112987633 A CN112987633 A CN 112987633A CN 202110254941 A CN202110254941 A CN 202110254941A CN 112987633 A CN112987633 A CN 112987633A
- Authority
- CN
- China
- Prior art keywords
- module
- paving
- rolling
- asphalt pavement
- control system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
The invention discloses an information management and control system for an asphalt pavement construction process, which comprises a remote control analysis platform and an early warning management module, wherein the remote control analysis platform is connected with a mixing module, a transportation module, a paving module and a rolling module, the mixing module, the transportation module, the paving module and the rolling module are all provided with data acquisition modules, and the remote control analysis platform is also connected with the early warning management module. This bituminous paving work progress informationization management and control system, through using, make the project construction not only confine the inspection in the laboratory to asphalt concrete detection means, can in time carry out effectual control to the bituminous mixture of mix, the unstable factor in the production process has been stopped, reliable improvement bituminous mixture's mix quality, but the on-the-spot speed and the temperature of paving of accurate control of this system simultaneously, and the speed that rolls, temperature and number of times, it is real-time to realize bituminous pavement construction, in succession, overall process quality management and control.
Description
Technical Field
The invention relates to the technical field of food processing, in particular to an information management and control system for an asphalt pavement construction process.
Background
At present, with the continuous development of traffic technology, asphalt pavements are used more and more, and traffic directly influences the development of economy, so that the quality of traffic highway pavements is important, and the use of traffic logistics and the like is directly influenced;
at present, the construction quality of the asphalt pavement is generally detected by means of laboratory detection, and the real-time monitoring of a construction site cannot be well performed, so that an information management and control system for the asphalt pavement construction process is provided, so as to solve the problems provided in the above.
Disclosure of Invention
The invention aims to provide an information management and control system for an asphalt pavement construction process, which aims to solve the problem that the construction quality detection of the asphalt pavement in the prior art is generally detected and used by means of laboratory detection, but the real-time monitoring of a construction site cannot be well carried out.
In order to achieve the purpose, the invention provides the following technical scheme: the utility model provides an bituminous paving work progress informationization management and control system, includes remote control analysis platform and early warning management module, remote control analysis platform is connected with mix module, transportation module, the module of paving and rolls the module, and mix module, transportation module, the module of paving and roll the module and all be provided with data acquisition module, remote control analysis platform still is connected with early warning management module.
Preferably, the mixing module collects the numerical values of the mixing ratio of the asphalt mixture, the mineral aggregate metering data of each hot material bin, the oil-stone ratio, the temperature, the mixing period, the key sieve pores and the like in real time through the data acquisition module.
Preferably, the transportation module is connected with the asphalt pavement construction transportation vehicle in real time, and the transportation module collects information such as loading time, unloading time and transportation track of the transportation vehicle in real time through the data collection module.
Preferably, the paving module is provided with a GPS (global positioning system) screen and an LED (light-emitting diode) screen, and the paving module acquires data such as a pile number position, a paving temperature, a paving speed, a paving position and the like of the asphalt pavement construction paver in real time through the data acquisition module.
Preferably, the paving module displays information such as on-site paving temperature, paving speed and the like on a paving site in real time through the GPS and the LED screen, and field technicians conduct adjustment of a rolling scheme on an area with lower temperature in a targeted manner according to the paving temperature displayed in real time through the GPS and the LED screen so as to ensure the compactness of the pavement.
Preferably, the rolling module collects the position of the current pile number of the asphalt pavement construction road roller, the rolling times, the rolling temperature, the rolling speed, the rolling times and other related information in real time through the data acquisition module.
Preferably, the rolling module further comprises an LED and a GNSS antenna mounted at the top end of the on-site asphalt compaction equipment, and the rolling module is used for positioning in real time on an asphalt pavement rolling construction site and displaying information such as rolling temperature and rolling speed on the site through the LED and the GNSS antenna.
Preferably, the remote control analysis platform sends messages such as a mixing plant startup and shutdown message prompt, a refueling prompt and an early warning prompt in real time through the early warning management module.
Compared with the prior art, the invention has the beneficial effects that: the information management and control system for the asphalt pavement construction process comprises 5 functional modules for asphalt mixture mixing, transporting, paving, rolling and early warning management, and data information of the whole asphalt pavement construction process is collected in real time by using a sensing technology and a 4G transmission technology based on an Internet of things architecture;
by using the system, the detection means of the asphalt concrete in project construction is not limited to the inspection of a laboratory, the mixed asphalt mixture can be effectively monitored in time, the unstable factors in the production process are avoided, the mixing quality of the asphalt mixture is reliably improved, meanwhile, the system can accurately control the paving speed and temperature, the rolling speed, temperature and pass number on site, and the real-time, continuous and overall process quality control of asphalt pavement construction is realized;
the system can remotely check construction data through a computer or a mobile phone APP at any time and any place, and can perform real-time early warning and timely correct deviation when abnormal conditions of production of a mixing building occur.
Drawings
FIG. 1 is a schematic flow chart of the system of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: the utility model provides an bituminous paving work progress informationization management and control system, includes remote control analysis platform and early warning management module, remote control analysis platform is connected with mix module, transportation module, the module of paving and rolls the module, and mix module, transportation module, the module of paving and roll the module and all be provided with data acquisition module, remote control analysis platform still is connected with early warning management module.
Further in this scheme, the mix module passes through data acquisition module and gathers numerical values such as the mix proportion of bituminous mixture, each hot feed bin mineral aggregate measurement data, oilstone ratio, temperature, mix cycle, key sieve mesh in real time.
Further in this scheme, the transportation module links to each other with bituminous paving construction haulage vehicle in real time, and the transportation module passes through the data acquisition module and gathers information such as the loading time, the time of unloading, transportation orbit of haulage vehicle in real time.
Further in this scheme, the module of paving is provided with GPS, LED screen, and the module of paving passes through data acquisition module and gathers data such as pile number position, the temperature of paving, the speed of paving and the position of paving that bituminous paving construction paver belongs to in real time, the module of paving demonstrates at the scene of paving through information such as GPS, LED screen temperature of paving, the speed of paving in real time to the scene, and the scene technical staff is according to GPS, the adjustment that the temperature is targeted to rolling the scheme to the region that the temperature is on the low side that the temperature is corresponding of the temperature that paves that the LED screen shows in real time to ensure the road surface compactness.
Further in this scheme, the module of rolling passes through the data acquisition module and gathers asphalt pavement construction road roller current position of being located in real time, rolls the number of times, rolls the temperature, rolls speed, rolls relevant information such as the number of times, the module of rolling still includes at on-the-spot pitch compaction equipment top installation LED and GNSS antenna, and rolls the module and roll the construction site through LED and GNSS antenna and roll information such as temperature, the speed of rolling in asphalt pavement rolling construction site real-time location and on-the-spot show.
Further, in the scheme, the remote control analysis platform sends messages such as a mixing building startup and shutdown message prompt, a refueling prompt and an early warning prompt in real time through the early warning management module.
Those not described in detail in this specification are within the skill of the art. The standard parts used in the invention can be purchased from the market, the special-shaped parts can be customized according to the description of the specification and the accompanying drawings, the specific connection mode of each part adopts conventional means such as bolts, rivets, welding and the like mature in the prior art, the machines, the parts and equipment adopt conventional models in the prior art, and the circuit connection adopts the conventional connection mode in the prior art, so that the detailed description is omitted.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.
Claims (8)
1. The utility model provides an bituminous paving work progress informationization management and control system, includes remote control analysis platform and early warning management module, its characterized in that: remote control analysis platform is connected with mix module, transportation module, the module of paving and rolls the module, and mix module, transportation module, the module of paving and roll the module and all be provided with data acquisition module, remote control analysis platform still is connected with early warning management module.
2. The information management and control system for the asphalt pavement construction process according to claim 1, characterized in that: the mixing module collects the numerical values of the mixing ratio of the asphalt mixture, the ore material metering data of each hot material bin, the oil-stone ratio, the temperature, the mixing period, the key sieve mesh and the like in real time through the data acquisition module.
3. The information management and control system for the asphalt pavement construction process according to claim 1, characterized in that: the transportation module is connected with the asphalt pavement construction transportation vehicle in real time, and the transportation module collects information such as loading time, unloading time and transportation track of the transportation vehicle in real time through the data collection module.
4. The information management and control system for the asphalt pavement construction process according to claim 1, characterized in that: the paving module is provided with a GPS (global positioning system) screen and an LED (light-emitting diode) screen, and the paving module acquires data such as a pile number position, a paving temperature, a paving speed, a paving position and the like of the asphalt pavement construction paver in real time through the data acquisition module.
5. The information management and control system for the asphalt pavement construction process according to claim 4, characterized in that: the paving module displays information such as on-site paving temperature, paving speed and the like on a paving site in real time through the GPS and the LED screen, and field technicians conduct adjustment of a rolling scheme on an area with lower temperature in a targeted mode according to the paving temperature displayed in real time through the GPS and the LED screen so as to ensure the road surface compactness.
6. The information management and control system for the asphalt pavement construction process according to claim 1, characterized in that: the rolling module collects the position of the current pile number of the asphalt pavement construction road roller, the rolling times, the rolling temperature, the rolling speed, the rolling times and other related information in real time through the data acquisition module.
7. The information management and control system for the asphalt pavement construction process according to claim 6, characterized in that: the rolling module also comprises an LED and a GNSS antenna which are arranged at the top end of the on-site asphalt compaction equipment, and the rolling module is used for positioning in real time on an asphalt pavement rolling construction site and displaying information such as rolling temperature, rolling speed and the like on the site through the LED and the GNSS antenna.
8. The information management and control system for the asphalt pavement construction process according to claim 1, characterized in that: and the remote control analysis platform sends messages such as startup and shutdown message reminding, refueling reminding, early warning reminding and the like of the mixing plant in real time through the early warning management module.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110254941.8A CN112987633A (en) | 2021-03-09 | 2021-03-09 | Bituminous paving work progress informationization management and control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110254941.8A CN112987633A (en) | 2021-03-09 | 2021-03-09 | Bituminous paving work progress informationization management and control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112987633A true CN112987633A (en) | 2021-06-18 |
Family
ID=76336019
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110254941.8A Pending CN112987633A (en) | 2021-03-09 | 2021-03-09 | Bituminous paving work progress informationization management and control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112987633A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116886737A (en) * | 2023-09-08 | 2023-10-13 | 成都返空汇网络技术有限公司 | Real-time temperature monitoring and early warning system and method for asphalt mixture transportation process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202443300U (en) * | 2011-11-23 | 2012-09-19 | 上海瑞路道路工程技术有限公司 | Dynamic quality remote monitoring system for asphalt mixture paving and rolling |
CN103336499A (en) * | 2013-06-19 | 2013-10-02 | 中山市拓维电子科技有限公司 | System and method of dynamic management for construction quality of asphalt concrete pavement |
CN203429539U (en) * | 2013-08-22 | 2014-02-12 | 新疆交通建设(集团)有限责任公司 | High-precision quality control system for construction quality of bituminous pavement |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
CN110387784A (en) * | 2019-07-25 | 2019-10-29 | 中交一公局第六工程有限公司 | A kind of intelligence asphalt pavement construction method |
US20200380462A1 (en) * | 2019-05-30 | 2020-12-03 | Jeremy Alan Fenolio | Method for monitoring bituminous material |
-
2021
- 2021-03-09 CN CN202110254941.8A patent/CN112987633A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202443300U (en) * | 2011-11-23 | 2012-09-19 | 上海瑞路道路工程技术有限公司 | Dynamic quality remote monitoring system for asphalt mixture paving and rolling |
CN103336499A (en) * | 2013-06-19 | 2013-10-02 | 中山市拓维电子科技有限公司 | System and method of dynamic management for construction quality of asphalt concrete pavement |
CN203429539U (en) * | 2013-08-22 | 2014-02-12 | 新疆交通建设(集团)有限责任公司 | High-precision quality control system for construction quality of bituminous pavement |
CN109302487A (en) * | 2018-10-30 | 2019-02-01 | 广西交投科技有限公司 | Highway project quality administration information system based on cloud platform |
US20200380462A1 (en) * | 2019-05-30 | 2020-12-03 | Jeremy Alan Fenolio | Method for monitoring bituminous material |
CN110387784A (en) * | 2019-07-25 | 2019-10-29 | 中交一公局第六工程有限公司 | A kind of intelligence asphalt pavement construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116886737A (en) * | 2023-09-08 | 2023-10-13 | 成都返空汇网络技术有限公司 | Real-time temperature monitoring and early warning system and method for asphalt mixture transportation process |
CN116886737B (en) * | 2023-09-08 | 2023-11-17 | 成都返空汇网络技术有限公司 | Real-time temperature monitoring and early warning system and method for asphalt mixture transportation process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103336499A (en) | System and method of dynamic management for construction quality of asphalt concrete pavement | |
CN109302487A (en) | Highway project quality administration information system based on cloud platform | |
CN203758546U (en) | Dynamic monitoring system for onsite road construction | |
Santero et al. | Methods, impacts, and opportunities in the concrete pavement life cycle | |
CN104503410A (en) | Asphalt pavement construction quality control system and method | |
CN110705917A (en) | Robot supervision system applied to construction site | |
CN108978420B (en) | Highway pavement construction quality remote monitering system | |
Liu et al. | Automatic control and real-time monitoring system for earth–rock dam material truck watering | |
CN208815383U (en) | A kind of high road pavement construction Quality Remote Monitoring System | |
CN110488782A (en) | Cement concrete batching plant back court intelligent monitor system based on BIM platform | |
CN106400662A (en) | Equalizing beam type road surface paving thickness real-time monitoring device | |
CN110387784A (en) | A kind of intelligence asphalt pavement construction method | |
CN112987633A (en) | Bituminous paving work progress informationization management and control system | |
CN106503831A (en) | A kind of evaluation method of Construction of Asphalt Pavement energy consumption | |
CN203174477U (en) | Real-time temperature segregation detection system for asphalt concrete pavement course | |
CN110458975A (en) | A kind of asphalt mixes and stirs process monitoring system and method | |
CN202093378U (en) | Device for monitoring mixing proportioning real-time data of asphalt mixing stations | |
CN205665418U (en) | Vehicular removes traffic meteorological monitoring system | |
CN202013659U (en) | Intelligent safe traffic information platform based on embedded platform imaging processing and wireless communication | |
Newcomer et al. | Towards an automated asphalt paving construction inspection operation | |
CN106292601A (en) | Paving operation state supervisory systems based on RTK and method | |
CN212752297U (en) | Intelligent management and control system for construction quality of asphalt pavement based on cloud computing and Internet of things | |
CN108762216A (en) | Intelligence drips road managing and control system | |
CN109655853A (en) | One kind being used for pavement construction procedure quality dynamic managing and control system | |
CN201725205U (en) | Integrated mix proportion monitoring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210618 |