CN112969313B - PTH (plated through hole) half-hole manufacturing method - Google Patents

PTH (plated through hole) half-hole manufacturing method Download PDF

Info

Publication number
CN112969313B
CN112969313B CN202110133179.8A CN202110133179A CN112969313B CN 112969313 B CN112969313 B CN 112969313B CN 202110133179 A CN202110133179 A CN 202110133179A CN 112969313 B CN112969313 B CN 112969313B
Authority
CN
China
Prior art keywords
hole
gong
copper
finished product
gongs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110133179.8A
Other languages
Chinese (zh)
Other versions
CN112969313A (en
Inventor
梁涛
游定国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Haoyijia Circuit Board Co ltd
Original Assignee
Hunan Haoyijia Circuit Board Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Haoyijia Circuit Board Co ltd filed Critical Hunan Haoyijia Circuit Board Co ltd
Priority to CN202110133179.8A priority Critical patent/CN112969313B/en
Publication of CN112969313A publication Critical patent/CN112969313A/en
Application granted granted Critical
Publication of CN112969313B publication Critical patent/CN112969313B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K3/00Apparatus or processes for manufacturing printed circuits
    • H05K3/40Forming printed elements for providing electric connections to or between printed circuits
    • H05K3/42Plated through-holes or plated via connections
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K2201/00Indexing scheme relating to printed circuits covered by H05K1/00
    • H05K2201/09Shape and layout
    • H05K2201/09209Shape and layout details of conductors
    • H05K2201/095Conductive through-holes or vias

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

The invention provides a PTH half-hole manufacturing method. The manufacturing method of the PTH half-hole comprises the following steps: s1: defining half-holes: when the number of the continuous half holes is less than or equal to 3 and the aperture of the half hole is more than 1.75mm and less than 8mm, the finished gong is obtained; when the number of continuous half holes is more than 3 and the aperture of the half hole is more than 0.45 and less than or equal to 1.75mm, etching the first gong by alkali; s2: and (3) manufacturing a half hole: aiming at the finished gong: when the copper cutting position is arc-shaped, the cutter is arranged at the copper cutting position of the half hole; when the copper cutting position is a right angle, designing a routing path of a routing tool at the copper cutting position of the half hole to be 45 degrees, and cutting into the right angle position for 3 mils so as to avoid generating burrs when an outer frame is routed; aiming at alkaline etching of the previous gong: and according to different diameters of the half holes of the finished product, performing the steps of copper sheet drilling, scrap pulling, rough routing and fine routing. The PTH half-hole manufacturing method provided by the invention has the advantages of high working efficiency and cost saving.

Description

一种PTH半孔制作方法A kind of PTH semi-hole manufacturing method

技术领域technical field

本发明涉及电路板技术领域,尤其涉及一种PTH半孔制作方法。The invention relates to the technical field of circuit boards, in particular to a method for manufacturing PTH half-holes.

背景技术Background technique

现行业内制作半孔板大多因半孔毛刺及半孔无铜造成品质异常,针对解决半孔毛刺的方法各式各样。半孔板常规做法:钻孔-电镀-线路-二铜-渡锡-成型一锣-退膜-退锡-蚀刻,在成型一锣时,既没有对半孔是否真的需要一锣做出界定,也没有针对半孔毛刺及半孔无铜提出管控方法。这样就使一部份本可以放了成品可以锣出的板也放到了一锣,造成成本的浪费。其次针对半孔毛刺和半孔无铜,也需要一个明确的管控方法。At present, most half-hole plates produced in the industry are of abnormal quality due to half-hole burrs and half-hole copper-free. There are various methods for solving half-hole burrs. Conventional method of semi-hole plate: drilling - electroplating - circuit - two copper - tinning - forming a gong - stripping film - stripping tin - etching, when forming a gong, there is no question whether the half hole really needs to be made in one gong There is no definition, and there is no control method for half-hole burrs and half-hole copper-free. In this way, a part of the boards that could have been put into the finished product can also be put into the same board, resulting in a waste of cost. Secondly, a clear control method is also needed for half-hole burrs and half-hole copper-free.

因此,有必要提供一种新的PTH半孔制作方法解决上述技术问题。Therefore, it is necessary to provide a new PTH semi-hole manufacturing method to solve the above technical problems.

发明内容Contents of the invention

本发明解决的技术问题是提供一种工作效率高、节约成本的PTH半孔制作方法。The technical problem solved by the invention is to provide a PTH semi-hole manufacturing method with high working efficiency and cost saving.

为解决上述技术问题,本发明提供的PTH半孔制作方法包括以下步骤:In order to solve the above-mentioned technical problems, the PTH semi-hole manufacturing method provided by the invention comprises the following steps:

S1:对半孔进行界定:S1: Defining the half hole:

当连续半孔≤3个,且半孔孔径1.75mm<D<8mm,为成品锣;When there are ≤3 consecutive semi-holes, and the diameter of the semi-holes is 1.75mm<D<8mm, it is a finished gong;

当连续半孔>3个,且半孔孔径0.45<D≤1.75mm,为碱蚀前When there are more than 3 consecutive semi-holes, and the diameter of the semi-holes is 0.45<D≤1.75mm, it is before alkali etching

一锣;a gong;

S2:对半孔进行制作:S2: Make the half hole:

针对成品锣:削铜处为弧形时,在半孔削铜处下刀;削铜处为直角时,在半孔削铜处锣刀路径设计45°,并切进直角处3mil,以避免锣外框时产生披锋;For the finished gong: when the copper cutting part is arc-shaped, cut the knife at the half-hole copper cutting part; when the copper cutting part is right-angled, design the path of the gong knife at the half-hole copper cutting part at 45°, and cut 3mil into the right-angle part to avoid When the gong is outside the frame, it produces a front;

针对碱蚀前一锣:根据成品半孔直径不同,进行钻铜皮、拉废料、粗锣和精锣步骤。For the work before alkali etching: according to the diameter of the half hole of the finished product, the steps of drilling copper skin, pulling waste, roughing and finishing are carried out.

优选的,所述步骤S1中,当半孔孔径1.75mm<D<3mm时,采用1.2锣刀正反锣;当半孔孔径3mm≤D<8mm时,采用1.4锣刀正反锣。Preferably, in the step S1, when the diameter of the half hole is 1.75mm<D<3mm, a 1.2 gong knife front and back gong is used; when the half hole diameter is 3mm≤D<8mm, a 1.4 gong knife front and back gong is used.

优选的,所述步骤S2中:Preferably, in the step S2:

当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度≥70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product surface is ≥70um, and the diameter of the half hole of the finished product is ≥1/2, the sequence of gongs and knives is waste pulling, coarse gongs, and fine gongs, and one gong and a half hole is pre-finished on one side. Leave 4mil, the finished product has a half hole;

当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度<70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣;When the diameter of the half-hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product is less than 70um, and the diameter of the half-hole of the finished product is ≥1/2, the order of the belt cutter is scrap, coarse, and fine;

当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度≥70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;成品半孔直径<1/2,锣带刀序为钻铜皮、拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product surface is ≥70um, and the diameter of the half hole of the finished product is ≥1/2, the sequence of the gong belt knife is scrap pulling, coarse gong, and fine gong, and one gong and a half hole is pre-finished on one side. Leave 4mil, the finished gong has a fine half hole; the diameter of the finished half hole is <1/2, the gong belt knife sequence is to drill copper skin, pull scraps, rough gong, fine gong, reserve 4mil on one side of a gong and a half hole, and the finished gong is fine gong half hole;

当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度<70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣;成品半孔直径<1/2,锣带刀序为钻铜皮、拉废料、粗锣、精锣。When the diameter of the half hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product surface is less than 70um, the diameter of the half hole of the finished product is ≥1/2, and the sequence of gongs and knives is scrap, coarse gong, and fine gong; the diameter of the finished half hole is less than 1/2 2. The sequence of gongs with knives is drilling copper skin, pulling waste, rough gongs, and fine gongs.

优选的,所述步骤S2中削铜处为直角时,在半孔削铜处锣刀路径设计45°,且孔内下刀点距离孔铜≥0.2mm。Preferably, when the copper cutting point in the step S2 is at a right angle, the path of the gong knife is designed to be 45° at the half hole copper cutting point, and the distance between the cutting point in the hole and the hole copper is ≥ 0.2mm.

优选的,所述锣刀刀径为1.0 -1.4mm。Preferably, the diameter of the gong knife is 1.0-1.4mm.

优选的,所述拉废料步骤中只拉半孔对侧基材以达到除尘效果,废料使用锣刀清除。Preferably, in the step of pulling waste materials, only the base material on the opposite side of the half hole is pulled to achieve the dust removal effect, and the waste materials are removed with a gong knife.

优选的,所述半孔间距<1.2mm时会接触到半孔,锣刀用1.0mm型号。Preferably, when the distance between the half-holes is less than 1.2mm, the half-holes will be touched, and the gong knife is 1.0mm.

优选的,所述锣刀锣半孔时优先保证不锣破,废料和粗锣刀与半孔边最小间距为0.1mm。Preferably, when the gong knife is half-holed, it is given priority to ensure that the gong is not broken, and the minimum distance between waste and rough gong knife and the edge of the half-hole is 0.1 mm.

优选的,所述钻铜皮步骤中,所述锣刀刀径使用1.0mm型号,角度为45°,切进深度为3mil。Preferably, in the step of drilling the copper skin, the diameter of the gong cutter is 1.0mm, the angle is 45°, and the cutting depth is 3mil.

优选的,所述铜皮步骤中,上下排相邻半孔,上下最小间距<1.2mm时,将半孔以PTH槽方式钻出。Preferably, in the step of copper skin, adjacent half holes are arranged up and down, and when the minimum distance between the upper and lower sides is less than 1.2 mm, the half holes are drilled in the form of PTH grooves.

与相关技术相比较,本发明提供的PTH半孔制作方法具有如下有益效果:Compared with related technologies, the PTH semi-hole manufacturing method provided by the present invention has the following beneficial effects:

本发明提供一种PTH半孔制作方法,可以让一部份可以成品锣出的PTH半孔,不用走一锣流程,大大节省了成本,而且对半孔毛刺和半孔无铜,制定了好的管控方法。The invention provides a method for manufacturing PTH half-holes, which can make a part of PTH half-holes that can be produced as a finished product without going through a single process, which greatly saves costs, and has a good formula for half-hole burrs and half-holes without copper. control method.

附图说明Description of drawings

图1为本发明提供的PTH半孔制作方法的一种较佳实施例的结构示意图;Fig. 1 is the structural representation of a kind of preferred embodiment of PTH semi-hole manufacturing method provided by the present invention;

图2为图1所示的钻头组件的结构示意图;Fig. 2 is a schematic structural view of the drill bit assembly shown in Fig. 1;

图3为图1所示的A部放大示意图;FIG. 3 is an enlarged schematic diagram of part A shown in FIG. 1;

图4为图1所示的钻头安装座的结构示意图;Fig. 4 is a schematic structural view of the drill bit mount shown in Fig. 1;

图5为图1所示的安装块的结构示意图。FIG. 5 is a schematic structural diagram of the mounting block shown in FIG. 1 .

图中标号:1、钻孔设备,2、钻头安装座,3、安装槽,4、钻头组件,5、安装块,6、钻头,7、楔形卡槽,8、通孔,9、滑杆,10、楔形卡块,11、丝杆,12、把手,13、轴承,14、条形限位孔,15、限位块,16、定位槽,17、定位块。Symbols in the figure: 1. Drilling equipment, 2. Drill mounting seat, 3. Installation slot, 4. Drill assembly, 5. Mounting block, 6. Drill, 7. Wedge-shaped slot, 8. Through hole, 9. Slider , 10, wedge-shaped block, 11, screw mandrel, 12, handle, 13, bearing, 14, strip limit hole, 15, limit block, 16, positioning groove, 17, positioning block.

具体实施方式Detailed ways

下面结合附图和实施方式对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

第一实施例:First embodiment:

在本发明的实施例中,PTH半孔制作方法包括以下步骤:In an embodiment of the present invention, the PTH semi-hole manufacturing method includes the following steps:

S1:对半孔进行界定:S1: Defining the half hole:

当连续半孔≤3个,且半孔孔径1.75mm<D<8mm,为成品锣;When there are ≤3 consecutive semi-holes, and the diameter of the semi-holes is 1.75mm<D<8mm, it is a finished gong;

当连续半孔>3个,且半孔孔径0.45<D≤1.75mm,为碱蚀前When there are more than 3 consecutive semi-holes, and the diameter of the semi-holes is 0.45<D≤1.75mm, it is before alkali etching

一锣;a gong;

S2:对半孔进行制作:S2: Make the half hole:

针对成品锣:削铜处为弧形时,在半孔削铜处下刀;削铜处为直角时,在半孔削铜处锣刀路径设计45°,并切进直角处3mil,以避免锣外框时产生披锋;For the finished gong: when the copper cutting part is arc-shaped, cut the knife at the half-hole copper cutting part; when the copper cutting part is right-angled, design the path of the gong knife at the half-hole copper cutting part at 45°, and cut 3mil into the right-angle part to avoid When the gong is outside the frame, it produces a front;

针对碱蚀前一锣:根据成品半孔直径不同,进行钻铜皮、拉废料、粗锣和精锣步骤。For the work before alkali etching: according to the diameter of the half hole of the finished product, the steps of drilling copper skin, pulling waste, roughing and finishing are carried out.

所述步骤S1中,当半孔孔径1.75mm<D<3mm时,采用1.2锣刀正反锣;当半孔孔径3mm≤D<8mm时,采用1.4锣刀正反锣。In the step S1, when the diameter of the half hole is 1.75 mm<D<3 mm, use a 1.2 gong knife front and back gong; when the half hole diameter is 3 mm≤D<8 mm, use a 1.4 gong knife front and back gong.

所述步骤S2中:In the step S2:

当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度≥70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product surface is ≥70um, and the diameter of the half hole of the finished product is ≥1/2, the sequence of gongs and knives is waste pulling, coarse gongs, and fine gongs, and one gong and a half hole is pre-finished on one side. Leave 4mil, the finished product has a half hole;

当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度<70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣;When the diameter of the half-hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product is less than 70um, and the diameter of the half-hole of the finished product is ≥1/2, the order of the belt cutter is scrap, coarse, and fine;

当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度≥70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product surface is ≥70um, and the diameter of the half hole of the finished product is ≥1/2, the sequence of the gong belt knife is scrap pulling, coarse gong, and fine gong, and one gong and a half hole is pre-finished on one side. Leave 4mil, the finished product has a half hole;

成品半孔直径<1/2,锣带刀序为钻铜皮、拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;The diameter of the half hole of the finished product is less than 1/2. The sequence of the gong belt knife is to drill the copper skin, pull the scrap, rough gong, and fine gong. 4mil is reserved on one side of the half hole, and the finished gong is fine and half hole;

当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度<70um,成品半孔直径≥1/2,锣带刀序为拉废料、粗锣、精锣;When the diameter of the half-hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product surface is less than 70um, and the diameter of the half-hole of the finished product is ≥1/2, the order of the cutting tool is scrap, coarse and fine;

成品半孔直径<1/2,锣带刀序为钻铜皮、拉废料、粗锣、精锣。The diameter of the half-hole of the finished product is less than 1/2, and the sequence of gongs and knives is to drill copper skin, pull scraps, rough gongs, and fine gongs.

所述步骤S2中削铜处为直角时,在半孔削铜处锣刀路径设计45°,且孔内下刀点距离孔铜≥0.2mm。In the step S2, when the copper cutting point is at a right angle, the path of the gong knife at the copper cutting point of the half hole is designed to be 45°, and the distance between the cutting point in the hole and the hole copper is ≥0.2mm.

所述锣刀刀径为1.0 -1.4mm。The diameter of the gong cutter is 1.0-1.4mm.

所述拉废料步骤中只拉半孔对侧基材以达到除尘效果,废料使用锣刀清除。In the waste pulling step, only the substrate on the opposite side of the half hole is pulled to achieve the dust removal effect, and the waste is removed with a gong knife.

所述半孔间距<1.2mm时会接触到半孔,锣刀用1.0mm型号。When the distance between the half-holes is less than 1.2mm, it will touch the half-holes, and the gong knife uses a 1.0mm model.

所述锣刀锣半孔时优先保证不锣破,废料和粗锣刀与半孔边最小间距为0.1mm。When the gong knife is half-holed, the priority is to ensure that the gong does not break, and the minimum distance between waste and rough gong knife and the half-hole edge is 0.1mm.

所述钻铜皮步骤中,所述锣刀刀径使用1.0mm型号,角度为45°,切进深度为3mil。In the step of drilling the copper skin, the diameter of the gong cutter is 1.0 mm, the angle is 45°, and the cutting depth is 3 mil.

所述铜皮步骤中,上下排相邻半孔,上下最小间距<1.2mm时,将半孔以PTH槽方式钻出。In the copper skin step, the upper and lower rows of adjacent half holes, when the minimum distance between the upper and lower sides is less than 1.2mm, the half holes are drilled in the form of PTH grooves.

一种PTH半孔详细的介定及制作方法如下表:The detailed definition and production method of a PTH semi-pore is as follows:

Figure 655697DEST_PATH_IMAGE002
Figure 655697DEST_PATH_IMAGE002

与相关技术相比较,本发明提供的PTH半孔制作方法具有如下有益效果:Compared with related technologies, the PTH semi-hole manufacturing method provided by the present invention has the following beneficial effects:

本发明提供一种PTH半孔制作方法,可以让一部份可以成品锣出的PTH半孔,不用走一锣流程,大大节省了成本,而且对半孔毛刺和半孔无铜,制定了好的管控方法。The invention provides a method for manufacturing PTH half-holes, which can make a part of PTH half-holes that can be produced as a finished product without going through a single process, which greatly saves costs, and has a good formula for half-hole burrs and half-holes without copper. control method.

第二实施例:Second embodiment:

基于本申请的第一实施例提供的PTH半孔制作方法,本申请的第二实施例提出另一种PTH半孔制作方法。第二实施例仅仅是第一实施例的优选的方式,第二实施例的实施对第一实施例的单独实施不会造成影响。Based on the PTH half-hole manufacturing method provided in the first embodiment of the present application, the second embodiment of the present application proposes another PTH half-hole manufacturing method. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.

下面结合附图和实施方式对本发明的第二实施例作进一步说明。The second embodiment of the present invention will be further described below in conjunction with the drawings and implementation methods.

请结合参阅图1-图5,本实施例与第一实施例的区别在于,使用钻孔设备1进行钻孔,所述钻孔设备1的输出轴上安装有钻头安装座2,所述钻头安装座2的底侧开设有安装槽3,所述安装槽3内安装有钻头组件4,所述钻头组件4的底端延伸至所述安装槽3外。Please refer to Fig. 1-Fig. 5 in combination, the difference between this embodiment and the first embodiment is that the drilling equipment 1 is used for drilling, and the output shaft of the drilling equipment 1 is equipped with a drill mounting base 2, and the drill bit The bottom side of the mounting seat 2 is provided with a mounting groove 3 , and a drill assembly 4 is installed in the mounting groove 3 , and the bottom end of the drill assembly 4 extends out of the mounting groove 3 .

所述钻头组件4包括安装块5和钻头6,所述安装块5的两侧均开设有楔形卡槽7。The drill bit assembly 4 includes a mounting block 5 and a drill bit 6 , and wedge-shaped slots 7 are opened on both sides of the mounting block 5 .

所述安装槽3的两侧内壁上均开设有通孔8,所述通孔8内滑动安装有滑杆9,所述滑杆9的一端延伸至所述安装槽3内并固定安装有楔形卡块10,所述楔形卡块10与所述楔形卡槽7相适配,所述通孔8内转动安装有丝杆11,所述丝杆11与所述滑杆9螺纹套接,所述丝杆11的一端延伸至所述通孔8外并固定安装有把手12。Both sides of the installation groove 3 are provided with through holes 8, and a slide bar 9 is slidably installed in the through hole 8, and one end of the slide bar 9 extends into the installation groove 3 and is fixedly installed with a wedge Block 10, the wedge-shaped block 10 is adapted to the wedge-shaped slot 7, a screw 11 is installed in the through hole 8, and the screw 11 is threadedly connected with the slide rod 9. One end of the threaded rod 11 extends out of the through hole 8 and is fixedly mounted with a handle 12 .

所述通孔8内安装有轴承13,所述轴承13的内圈与所述丝杆11固定套接。A bearing 13 is installed in the through hole 8 , and the inner ring of the bearing 13 is fixedly socketed with the screw rod 11 .

所述通孔8的顶侧内壁上开设有条形限位孔14,所述滑杆9的顶侧固定安装有限位块15,所述限位块15与所述条形限位孔14滑动连接。A bar-shaped limiting hole 14 is provided on the top side inner wall of the through hole 8, and a limiting block 15 is fixedly installed on the top side of the slide bar 9, and the limiting block 15 slides with the bar-shaped limiting hole 14. connect.

所述安装槽3的两侧内壁上均开设有定位槽16,所述定位槽16的底侧为开口,所述安装块5的两侧均固定安装有定位块17,所述定位块17与所述定位槽16相适配。Both sides inner walls of the mounting groove 3 are provided with a positioning groove 16, the bottom side of the positioning groove 16 is an opening, and both sides of the mounting block 5 are fixedly equipped with a positioning block 17, and the positioning block 17 and the The positioning groove 16 is suitable.

以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本发明的专利保护范围内。The above is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process conversion made by using the description of the present invention and the contents of the accompanying drawings, or directly or indirectly used in other related technologies fields, all of which are equally included in the scope of patent protection of the present invention.

Claims (7)

1.一种PTH半孔制作方法,其特征在于,包括以下步骤:1. A PTH semi-hole manufacturing method, is characterized in that, comprises the following steps: S1:对半孔进行界定:S1: Defining the half hole: 当连续半孔≤3个,且半孔孔径1.75mm<D<8mm,为成品锣;When there are ≤3 consecutive semi-holes, and the diameter of the semi-holes is 1.75mm<D<8mm, it is a finished gong; 当连续半孔>3个,且半孔孔径0.45mm<D≤1.75mm,为碱蚀前一锣;When there are more than 3 consecutive semi-holes, and the diameter of the semi-holes is 0.45mm<D≤1.75mm, it is the first gong before alkali etching; S2:对半孔进行制作:S2: Make the half hole: 针对成品锣:削铜处为弧形时,在半孔削铜处下刀;削铜处为直角时,在半孔削铜处锣刀路径设计45°,并切进直角处3mil,以避免锣外框时产生披锋;For the finished gong: when the copper cutting part is arc-shaped, cut the knife at the half-hole copper cutting part; when the copper cutting part is right-angled, design the path of the gong knife at the half-hole copper cutting part at 45°, and cut 3mil into the right-angle part to avoid When the gong is outside the frame, it produces a front; 针对碱蚀前一锣:根据成品半孔直径不同,进行钻铜皮、拉废料、粗锣和精锣步骤;For the first stage of alkali etching: according to the diameter of the half hole of the finished product, the steps of drilling copper skin, pulling waste, roughing and finishing are carried out; 所述步骤S1中,当半孔孔径1.75mm<D<3mm时,采用1.2锣刀正反锣;当半孔孔径3mm≤D<8mm时,采用1.4锣刀正反锣;In the step S1, when the diameter of the half hole is 1.75mm<D<3mm, use a 1.2 gong knife front and back; when the half hole diameter is 3mm≤D<8mm, use a 1.4 gong knife front and back gong; 所述步骤S2中:In the step S2: 当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度≥70um,成品半孔面积≥1/2整孔面积,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product is ≥70um, and the area of the half hole of the finished product is ≥1/2 of the whole hole area, the sequence of gongs and knives is scrap pulling, coarse gongs, fine gongs, one gong and a half hole 4mil is reserved on one side, and the finished product has half a hole; 当半孔孔径0.45mm<D≤0.8mm,且成品面铜厚度<70um,成品半孔面积≥1/2整孔面积,锣带刀序为拉废料、粗锣、精锣;When the diameter of the half-hole is 0.45mm<D≤0.8mm, and the copper thickness of the finished product is less than 70um, and the area of the half-hole of the finished product is ≥1/2 the area of the whole hole, the order of the gongs and knives is waste pulling, coarse gongs, and fine gongs; 当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度≥70um,成品半孔面积≥1/2整孔面积,锣带刀序为拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;成品半孔面积<1/2整孔面积,锣带刀序为钻铜皮、拉废料、粗锣、精锣,一锣半孔单边预留4mil,成品锣精锣半孔;When the diameter of the half hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product is ≥70um, and the area of the half hole of the finished product is ≥1/2 the area of the whole hole, the sequence of gongs and knives is scrap pulling, coarse gongs, fine gongs, one gong and a half hole 4mil is reserved on one side, and the finished product has a half hole and a fine hole; the area of the half hole of the finished product is less than 1/2 the area of the whole hole. Leave 4mil, the finished product has a half hole; 当半孔孔径0.8mm<D≤1.75mm,且成品面铜厚度<70um,成品半孔面积≥1/2整孔面积,锣带刀序为拉废料、粗锣、精锣;成品半孔面积<1/2整孔面积,锣带刀序为钻铜皮、拉废料、粗锣、精锣。When the diameter of the half hole is 0.8mm<D≤1.75mm, and the copper thickness of the finished product surface is less than 70um, and the area of the half hole of the finished product is ≥1/2 of the whole hole area, the sequence of the gongs and knives is waste, rough gongs, and fine gongs; the area of the half holes of the finished product <1/2 of the whole hole area, the sequence of gongs and knives is to drill copper skin, pull scraps, rough gongs, and fine gongs. 2.根据权利要求1所述的PTH半孔制作方法,其特征在于,所述步骤S2中削铜处为直角时,在半孔削铜处锣刀路径设计45°,且孔内下刀点距离孔铜≥0.2mm。2. The PTH half-hole manufacturing method according to claim 1, characterized in that, when the copper-cutting place is a right angle in the step S2, the path design of the gong knife at the half-hole copper-cutting place is 45°, and the cutting point in the hole is Distance from hole copper ≥ 0.2mm. 3.根据权利要求1所述的PTH半孔制作方法,其特征在于,所述拉废料步骤中只拉半孔对侧基材以达到除尘效果,废料使用锣刀清除。3. The PTH half-hole manufacturing method according to claim 1, characterized in that, in the waste pulling step, only the opposite side base material of the half hole is pulled to achieve the dust removal effect, and the waste is removed using a gong knife. 4.根据权利要求3所述的PTH半孔制作方法,其特征在于,所述半孔间距<1.2mm时会接触到半孔,拉废料锣刀用1.0mm型号。4. The PTH half-hole manufacturing method according to claim 3, characterized in that, when the distance between the half-holes is less than 1.2 mm, the half-holes will be touched, and a gong knife of 1.0 mm is used for pulling waste. 5.根据权利要求1所述的PTH半孔制作方法,其特征在于,所述锣刀锣半孔时优先保证不锣破,废料和粗锣刀与半孔边最小间距为0.1mm。5. The PTH half-hole manufacturing method according to claim 1, characterized in that, when the gong knife is used to make the half-hole, the priority is to ensure that the gong does not break, and the minimum distance between the waste and the thick gong knife and the side of the half-hole is 0.1 mm. 6.根据权利要求1所述的PTH半孔制作方法,其特征在于,所述钻铜皮步骤中,所述锣刀刀径使用1.0mm型号,角度为45°,切进深度为3mil。6. The PTH semi-hole manufacturing method according to claim 1, characterized in that, in the step of drilling the copper skin, the diameter of the gong cutter is 1.0mm, the angle is 45°, and the depth of cut is 3mil. 7.根据权利要求1所述的PTH半孔制作方法,其特征在于,所述钻铜皮步骤中,上下排相邻半孔,上下最小间距<1.2mm时,将半孔以PTH槽方式钻出。7. The PTH half-hole manufacturing method according to claim 1, characterized in that, in the step of drilling the copper skin, adjacent half-holes are arranged up and down, and when the minimum distance between the upper and lower sides is less than 1.2 mm, the half-holes are drilled in the form of PTH grooves out.
CN202110133179.8A 2021-02-03 2021-02-03 PTH (plated through hole) half-hole manufacturing method Active CN112969313B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110133179.8A CN112969313B (en) 2021-02-03 2021-02-03 PTH (plated through hole) half-hole manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110133179.8A CN112969313B (en) 2021-02-03 2021-02-03 PTH (plated through hole) half-hole manufacturing method

Publications (2)

Publication Number Publication Date
CN112969313A CN112969313A (en) 2021-06-15
CN112969313B true CN112969313B (en) 2023-02-17

Family

ID=76273547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110133179.8A Active CN112969313B (en) 2021-02-03 2021-02-03 PTH (plated through hole) half-hole manufacturing method

Country Status (1)

Country Link
CN (1) CN112969313B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115958226A (en) * 2023-01-10 2023-04-14 湖北全成信精密电路有限公司 Improved process for burr by using forming auxiliary groove

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1309298A (en) * 1961-10-02 1962-11-16 Machining process for half bores
CN102615318A (en) * 2012-04-11 2012-08-01 景旺电子(深圳)有限公司 Routing method for PCB (printed circuit board)
CN103179791A (en) * 2011-12-21 2013-06-26 北大方正集团有限公司 Metal half-hole forming method and printed circuit board manufacturing method
CN108237253A (en) * 2018-02-05 2018-07-03 惠州联创宏科技有限公司 A kind of high non-metallic half bore CNC processing methods of TG planks PCB
CN110972396A (en) * 2019-11-22 2020-04-07 厦门鸿鹭联创工具有限公司 Forming and processing method for printed circuit board with semi-copper hole
CN112040652A (en) * 2020-08-24 2020-12-04 胜宏科技(惠州)股份有限公司 Forming method for improving PTH half-hole burrs

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1309298A (en) * 1961-10-02 1962-11-16 Machining process for half bores
CN103179791A (en) * 2011-12-21 2013-06-26 北大方正集团有限公司 Metal half-hole forming method and printed circuit board manufacturing method
CN102615318A (en) * 2012-04-11 2012-08-01 景旺电子(深圳)有限公司 Routing method for PCB (printed circuit board)
CN108237253A (en) * 2018-02-05 2018-07-03 惠州联创宏科技有限公司 A kind of high non-metallic half bore CNC processing methods of TG planks PCB
CN110972396A (en) * 2019-11-22 2020-04-07 厦门鸿鹭联创工具有限公司 Forming and processing method for printed circuit board with semi-copper hole
CN112040652A (en) * 2020-08-24 2020-12-04 胜宏科技(惠州)股份有限公司 Forming method for improving PTH half-hole burrs

Also Published As

Publication number Publication date
CN112969313A (en) 2021-06-15

Similar Documents

Publication Publication Date Title
CN204425769U (en) A kind of circuit board prebored hole structure
CN103124469A (en) Step printed circuit board and manufacture method of the step printed circuit board
CN103687338A (en) Method for drilling circuit board with high-precision and depth-controlled hole
CN112969313B (en) PTH (plated through hole) half-hole manufacturing method
CN104768338A (en) PCB edge semi-hole metallization manufacturing process
CN107580419A (en) A kind of preparation method of printed substrate metallized semi-pore
CN109168265A (en) A kind of high-frequency microwave plate high density interconnection board manufacturing method
CN105578771A (en) Circuit board inner groove machining method
Li et al. Investigation of burr formation and its influence in micro-drilling hole of flexible printed circuit board
CN111542170A (en) Method for processing sound hole of MEMS carrier plate
CN114423161B (en) PCB processing method and PCB
CN106879175A (en) A kind of forming method of pcb board
CN108112173A (en) A kind of half-pore plate burr burr improves technological process
CN117528964A (en) Method for improving problem of burrs of intersecting holes
CN109688707A (en) A kind of manufacturing method of communications connector module board
CN112969312B (en) PCB metallized half-hole processing technology
CN112423477B (en) High-precision stepped press connection hole machining method
CN210469902U (en) Half-hole machining structure of PCB
CN206977836U (en) A kind of pcb board of WIFI module metallized semi-pore
JPH0346393A (en) Manufacture of printed wiring board
TWM624986U (en) Improved structure of drill bit chip removal
JPH07205095A (en) Drilling device of ceramic green sheet
CN216912169U (en) OZ copper thick auto plate drilling structure
CN113473710B (en) Circuit board manufacturing method and circuit board
CN217775670U (en) Double-edge-angle drilling tool for PCB

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 413000 Changchun Road, Ziyang District, Yiyang City, Hunan Province

Applicant after: Hunan haoyijia circuit board Co.,Ltd.

Address before: 413000 Changchun Road, Ziyang District, Yiyang City, Hunan Province

Applicant before: Hunan Haoyijia Circuit Board Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20210615

Assignee: Yiyang Mingxin Small and Medium sized Enterprise Public Service Platform Co.,Ltd.

Assignor: Hunan haoyijia circuit board Co.,Ltd.

Contract record no.: X2024980038703

Denomination of invention: A method for making PTH half hole

Granted publication date: 20230217

License type: Common License

Record date: 20241218

EE01 Entry into force of recordation of patent licensing contract
OL01 Intention to license declared
OL01 Intention to license declared
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20210615

Assignee: Yiyang Aiyi Information Technology Co.,Ltd.

Assignor: Hunan haoyijia circuit board Co.,Ltd.

Contract record no.: X2024980038694

Denomination of invention: A method for making PTH half hole

Granted publication date: 20230217

License type: Common License

Record date: 20241218

EE01 Entry into force of recordation of patent licensing contract