CN112967039A - Multi-platform enterprise management system integrating auxiliary design - Google Patents
Multi-platform enterprise management system integrating auxiliary design Download PDFInfo
- Publication number
- CN112967039A CN112967039A CN202110303766.7A CN202110303766A CN112967039A CN 112967039 A CN112967039 A CN 112967039A CN 202110303766 A CN202110303766 A CN 202110303766A CN 112967039 A CN112967039 A CN 112967039A
- Authority
- CN
- China
- Prior art keywords
- module
- model selection
- management
- terminal
- center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000013461 design Methods 0.000 title claims abstract description 34
- 238000007726 management method Methods 0.000 claims abstract description 45
- 238000004519 manufacturing process Methods 0.000 claims abstract description 31
- 238000000034 method Methods 0.000 claims abstract description 13
- 239000000463 material Substances 0.000 claims abstract description 10
- 238000011981 development test Methods 0.000 claims abstract description 7
- 238000012360 testing method Methods 0.000 claims description 6
- 238000005452 bending Methods 0.000 claims description 3
- 238000011161 development Methods 0.000 claims description 3
- 230000018109 developmental process Effects 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000033772 system development Effects 0.000 claims description 3
- 238000013439 planning Methods 0.000 abstract description 4
- 239000002699 waste material Substances 0.000 abstract description 4
- 230000010354 integration Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F21/00—Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
- G06F21/60—Protecting data
- G06F21/604—Tools and structures for managing or administering access control systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Automation & Control Theory (AREA)
- Primary Health Care (AREA)
- Manufacturing & Machinery (AREA)
- Bioethics (AREA)
- Computer Hardware Design (AREA)
- Computer Security & Cryptography (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an integrated auxiliary design multi-platform enterprise management system, which comprises a cloud data center, a system management terminal, a production management terminal, a development test terminal and a multi-platform terminal, wherein the cloud data center is used for storing a plurality of enterprise information; the auxiliary design module comprises model selection, real-time BOM generation and detailed report generation; the model selection comprises parameter model selection, bus model selection and accessory model selection; the generated detailed report comprises material, quantity, working procedures, cost and cost. The invention has the advantages that: by adopting the multi-platform enterprise management system, the convenience of using the system by the staff and the managers can be effectively improved; the integration of production and planning is realized; by adopting the auxiliary design module of the model selection-generation real-time BOM, designers can visually see various resources and parameters required by different design schemes, and confirm that detailed reports generated after model selection can be used for guiding production and purchase, so that the cooperation efficiency among multiple departments is effectively improved, and the waste of materials and manpower is reduced to the maximum extent.
Description
Technical Field
The invention particularly relates to a multi-platform enterprise management system with integrated auxiliary design.
Background
At present, a management system for a productive enterprise is generally limited to the aspects of personnel management and project flow management of the enterprise, the production and research and development integration degree of the enterprise is insufficient, and a production department basically transmits information to a management layer in a layer-by-layer reporting and step-by-step communication mode. The problems of misplacement and delay of production planning and enterprise planning, purchasing, production non-matching, material waste and human resource waste are easily caused.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides an integrated auxiliary design multi-platform enterprise management system which comprises a cloud data center, a system management terminal, a production management terminal, a development test terminal and a multi-platform terminal;
the cloud data center comprises a uniform user center, a uniform authentication center, a uniform data center and a big data report center;
the data management center comprises a user identity management center, a user authority management center, a system module management center and a big data processing center;
the production management terminal comprises project process approval, production purchase management, production process management, financial item approval and employee vehicle taking approval;
the development test terminal comprises a system development module, a system test module, an auxiliary design development module and an auxiliary design test module;
the multi-platform terminal comprises a vehicle using application module, a GPS positioning module, a project application module and an auxiliary design module;
the auxiliary design module comprises model selection, real-time BOM generation and detailed report generation; the model selection comprises parameter model selection, bus model selection and accessory model selection; the generated detailed report comprises material, quantity, working procedures, cost and cost.
Furthermore, the employee vehicle taking approval of the production management terminal is used for processing the vehicle taking application sent by the employee vehicle taking application module, searching available vehicles in the range where the employees are located through the GPS positioning module, and assigning the available vehicles to the employees for use.
Furthermore, the project process of the production management terminal approves the project application sent by the project application module.
Furthermore, the financial affair approval of the production management terminal is used for generating a detailed report sent by the detailed report.
Furthermore, the multi-platform terminal comprises a nailing small program, a WeChat small program and a webpage end.
Furthermore, the data generated by the auxiliary design module and output in real time by the real-time BOM during the parameterization type selection comprises a model, a layer number, a row thickness, a PE row thickness, a row width, a bus height, a bus total width and a bus total height.
Furthermore, the data generated by the auxiliary design module and output in real time by the BOM during bus model selection comprises material name, specification, blanking length, socket position, number, bending point and process.
Has the advantages that: the invention has the following advantages: (1) the enterprise management system with multiple platforms is adopted, so that the convenience of using the system by staff and managers can be effectively improved, the cloud center on the market can automatically adapt the system to a mobile terminal and a webpage terminal, and the system can be loaded in a nail and a WeChat and can be freely used;
(2) the enterprise management system integrated with the auxiliary design can directly get through a plurality of departments between design-production-management, and all information before and after production can be smoothly transmitted to a management layer in real time, so that production and planning are integrated;
(3) by adopting the auxiliary design module for type selection and real-time BOM generation, designers can visually see various resources and parameters required by different design schemes, and can quickly obtain the real-time BOM by using the auxiliary design module conveniently and rapidly by combining the characteristics of multiple platforms when the designers go on business and are inconvenient to operate a computer, so that the working strength of the designers is greatly reduced, and the working efficiency is improved; the detailed report generated after confirming the type selection can be used for guiding production and purchase, and the cooperation efficiency among multiple departments is effectively improved, so that the waste of materials and manpower is reduced to the maximum extent.
Drawings
FIG. 1 is a schematic diagram of a multi-platform enterprise management system incorporating design aids;
FIG. 2 is a system diagram of an auxiliary design module
Detailed Description
For the purpose of enhancing the understanding of the present invention, the present invention will be further described in detail with reference to the following examples and the accompanying drawings, which are only used for explaining the present invention and are not to be construed as limiting the scope of the present invention.
As shown in fig. 1-2, an integrated aided design multi-platform enterprise management system includes a cloud data center, a system management terminal, a production management terminal, a development test terminal, and a multi-platform terminal;
the cloud data center comprises a uniform user center, a uniform authentication center, a uniform data center and a big data report center;
the data management center comprises a user identity management center, a user authority management center, a system module management center and a big data processing center;
the production management terminal comprises project process approval, production purchase management, production process management, financial item approval and employee vehicle taking approval;
the development test terminal comprises a system development module, a system test module, an auxiliary design development module and an auxiliary design test module;
the multi-platform terminal comprises a vehicle using application module, a GPS positioning module, a project application module and an auxiliary design module;
the auxiliary design module comprises model selection, real-time BOM generation and detailed report generation; the model selection comprises parameter model selection, bus model selection and accessory model selection; the generated detailed report comprises material, quantity, working procedures, cost and cost.
In this embodiment, the employee car taking approval at the production management terminal is used for processing the car taking application sent by the employee car taking application module, searching available vehicles in the range where the employees are located through the GPS positioning module, and assigning the available vehicles to the employees for use.
In this embodiment, the project process of the production management terminal approves the project application issued by the project application module.
In this embodiment, the financial affair approval of the production management terminal is used to generate a detailed report sent by the detailed report.
In this embodiment, the multi-platform terminal includes a nailing applet, a WeChat applet and a web page terminal.
In this embodiment, the data generated by the auxiliary design module and output in real time by the real-time BOM during the parameterized model selection includes a model number, a layer number, a row thickness, a PE row thickness, a row width, a bus height, a bus total width, and a bus total height.
In this embodiment, the data generated by the design assistant module and output in real time by the real-time BOM during the bus model selection includes a material name, a specification, a blanking length, a socket position, a number, a bending point, and a process.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.
Claims (7)
1. The multi-platform enterprise management system with integrated auxiliary design is characterized by comprising a cloud data center, a system management terminal, a production management terminal, a development test terminal and a multi-platform terminal;
the cloud data center comprises a uniform user center, a uniform authentication center, a uniform data center and a big data report center;
the data management center comprises a user identity management center, a user authority management center, a system module management center and a big data processing center;
the production management terminal comprises project process approval, production purchase management, production process management, financial item approval and employee vehicle taking approval;
the development test terminal comprises a system development module, a system test module, an auxiliary design development module and an auxiliary design test module;
the multi-platform terminal comprises a vehicle using application module, a GPS positioning module, a project application module and an auxiliary design module;
the auxiliary design module comprises model selection, real-time BOM generation and detailed report generation; the model selection comprises parameter model selection, bus model selection and accessory model selection; the generated detailed report comprises material, quantity, working procedures, cost and cost.
2. The integrated auxiliary design multi-platform enterprise management system according to claim 1, wherein the staff vehicle application approval of the production management terminal is used for processing the vehicle application issued by the staff vehicle application module, and the GPS positioning module is used for searching available vehicles within the range of the staff and assigning the available vehicles to the staff.
3. The integrated design-aided multi-platform enterprise management system of claim 1, wherein project processes of the production management terminal approve project applications issued by the project application module.
4. The system of claim 1, wherein the financial transaction approval of the production management terminal is used to generate a detailed report from the detailed report.
5. The integrated design-aided multi-platform enterprise management system of claim 1, wherein said multi-platform terminal comprises a nailing applet, a WeChat applet and a web site.
6. The system of claim 1, wherein the data generated by the design-aided module and output in real time by the real-time BOM during the parameterized type selection comprises model number, layer number, row thickness, PE row thickness, row width, bus height, total bus width, and total bus height.
7. The system of claim 1, wherein the data generated by the design aiding module and output in real time by the real-time BOM during bus model selection comprises material name, specification, blanking length, socket position, number, bending point and process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110303766.7A CN112967039A (en) | 2021-03-22 | 2021-03-22 | Multi-platform enterprise management system integrating auxiliary design |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110303766.7A CN112967039A (en) | 2021-03-22 | 2021-03-22 | Multi-platform enterprise management system integrating auxiliary design |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112967039A true CN112967039A (en) | 2021-06-15 |
Family
ID=76277996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110303766.7A Pending CN112967039A (en) | 2021-03-22 | 2021-03-22 | Multi-platform enterprise management system integrating auxiliary design |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112967039A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102324074A (en) * | 2011-10-28 | 2012-01-18 | 山东城通科技有限公司 | Informatization application cluster platform of small and medium enterprises |
KR20160058062A (en) * | 2014-11-14 | 2016-05-24 | 푸드앤디자인협동조합 | ERP system for social enterprise |
CN108229932A (en) * | 2018-02-26 | 2018-06-29 | 唐健雄 | A kind of multi-platform cooperative management system based on scientific and technical innovation type enterprise ERP |
CN110969413A (en) * | 2019-11-22 | 2020-04-07 | 易景环境科技(天津)股份有限公司 | Enterprise management platform based on multi-system data linkage |
CN111260316A (en) * | 2020-01-13 | 2020-06-09 | 中船第九设计研究院工程有限公司 | Management and control integrated platform for project management |
CN112506514A (en) * | 2020-12-30 | 2021-03-16 | 江苏沙钢高科信息技术有限公司 | Multi-platform service sharing system |
-
2021
- 2021-03-22 CN CN202110303766.7A patent/CN112967039A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102324074A (en) * | 2011-10-28 | 2012-01-18 | 山东城通科技有限公司 | Informatization application cluster platform of small and medium enterprises |
KR20160058062A (en) * | 2014-11-14 | 2016-05-24 | 푸드앤디자인협동조합 | ERP system for social enterprise |
CN108229932A (en) * | 2018-02-26 | 2018-06-29 | 唐健雄 | A kind of multi-platform cooperative management system based on scientific and technical innovation type enterprise ERP |
CN110969413A (en) * | 2019-11-22 | 2020-04-07 | 易景环境科技(天津)股份有限公司 | Enterprise management platform based on multi-system data linkage |
CN111260316A (en) * | 2020-01-13 | 2020-06-09 | 中船第九设计研究院工程有限公司 | Management and control integrated platform for project management |
CN112506514A (en) * | 2020-12-30 | 2021-03-16 | 江苏沙钢高科信息技术有限公司 | Multi-platform service sharing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8660878B2 (en) | Model-driven assignment of work to a software factory | |
Liu et al. | Automatically updating maintenance information from a BIM database | |
CN114186984B (en) | Two-dimensional and three-dimensional integrated collaborative design system for architectural design enterprise | |
CN109522527B (en) | Method for compiling field construction process by using software system | |
CN106127608A (en) | Method for electrically is done on a kind of power marketing line | |
CN105809551A (en) | Visual platform for automobile insurance management | |
CN112967039A (en) | Multi-platform enterprise management system integrating auxiliary design | |
CN115034768B (en) | Method for transferring fixed assets to resources in rail transit construction project | |
CN116630082A (en) | Method and device for allocating production resources, electronic equipment and storage medium | |
CN115471174A (en) | New symbol execution workflow process rejection approval method and system | |
CN114493522A (en) | Workflow configuration method and related device | |
CN107067137A (en) | A kind of power marketing metering class's routine work management control method and system | |
CN112884455A (en) | Task plan processing system, method and device | |
CN112184068A (en) | ERP-based road engineering project information cooperation method | |
CN105955718A (en) | Software customization method and system | |
CN109447430A (en) | Production planning and the integrated method, apparatus of scheduled production and electronic equipment | |
CN110889654A (en) | Express delivery terminal service platform and service method | |
Pouria et al. | Transaction and implementation standards in AEC/FM industry | |
CN112750026B (en) | Dynamic extensible method, device and medium for service matching core-cancellation framework | |
CN110827126B (en) | Overhauling quotation processing method, device and system | |
CN110349068B (en) | Public service system | |
US20200320637A1 (en) | Automated potential risk relationship initial review and finalization via partner platform | |
CN115797091A (en) | Comprehensive budget management system and method and research and development enterprise management system | |
CN106980496A (en) | Tool integration method and system based on FOG data/address bus | |
KR100598906B1 (en) | Materials management system of railway using inforamtion system, and the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |