CN112921968A - 高压水辅助打桩方法 - Google Patents
高压水辅助打桩方法 Download PDFInfo
- Publication number
- CN112921968A CN112921968A CN202110107552.2A CN202110107552A CN112921968A CN 112921968 A CN112921968 A CN 112921968A CN 202110107552 A CN202110107552 A CN 202110107552A CN 112921968 A CN112921968 A CN 112921968A
- Authority
- CN
- China
- Prior art keywords
- steel pile
- pipe
- pressure water
- spray pipe
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
高压水辅助打桩方法,包括钢桩,所述钢桩固定相连有喷管,所述喷管的出水朝下;所述喷管通过管路与高压泵相连;打桩前打桩机就位,搭设导向架;起吊带有喷管的钢桩移至打桩位置,带有喷管的钢桩下沉至不动;起吊振动锤移至带有喷管的钢桩上方,利用振动锤的自重使钢桩再次下沉;启动振动锤,打设带有喷管的钢桩,高压泵启动喷管喷出高压水,喷出的高压水冲击土体。
Description
技术领域
本发明涉及高压水辅助打桩方法。
背景技术
现有打桩施工阶段采用大功率RP200振动锤进行打桩,钢管桩入土约25m左右后进尺缓慢,此时激振力及电流已到上限。由于不利地质因素以及钢管桩自身长度、自身直径、锁扣摩擦力等原因造成桩体打设艰难。
发明内容
本发明的目的在于提供一种利于打桩的高压水辅助打桩方法。
本发明所采用的技术方案是:高压水辅助打桩方法,包括钢桩,所述钢桩固定相连有喷管,所述喷管的出水朝下;所述喷管通过管路与高压泵相连;打桩前打桩机就位,搭设导向架;起吊带有喷管的钢桩移至打桩位置,带有喷管的钢桩下沉至不动;起吊振动锤移至带有喷管的钢桩上方,利用振动锤的自重使钢桩再次下沉;启动振动锤,打设带有喷管的钢桩,高压泵启动喷管喷出高压水,喷出的高压水冲击土体。
其中,起吊带有喷管的钢桩,将其从土体拔除,拔出过程中,喷管持续喷水,将另一钢桩打入带有喷管的钢桩的拔除位置。
其中,所述喷管固定设置在钢桩的外围,喷管与一总管相连通,所述总管与高压泵相管接。
其中,高压水的压力为10MPa-100MPa。
其中,喷管是一管材,所述管材折弯呈U型,U型的中部与总管相连通。
其中,从土体拔除带有喷管的钢桩时振动锤保持振动工作。
其中,钢桩为圆管桩,折弯呈U型的管材紧贴设置在圆管桩的外壁;折弯呈U型的管材对称设置在圆管桩外壁。
与现有技术相比,本发明的有益效果在于:本发明根据地层承载力情况配置相应高压泵及配套管路,可以有效穿透硬质地层。振动锤利用其高频振动,以高加速度振动钢桩,将机械产生的垂直振动传给钢桩,使钢桩周围的土体结构因振动液化。同时,由高压泵产生的高压水通过管路经喷管切入硬质粘土层,在桩底与土体之间形成空隙减小桩端下沉阻力,而喷出的高速水流沿土体与钢桩之间形成水膜。在振动锤及水刀的合力作用下,使桩侧与土体的摩擦阻力及桩端阻力减少,然后以振动锤与钢桩自重将桩沉入土中。
附图说明
图1是本发明的结构示意图。
具体实施方式
下面结合附图并通过实施例对本发明作进一步说明。
如图1所示,本实施例所述高压水辅助打桩方法,包括钢桩1,所述钢桩1固定相连有喷管2,所述喷管2的出水朝下;所述喷管2通过管路5与高压泵3相连;打桩前打桩机就位,搭设导向架;采用履带吊起吊带有喷管2的钢桩1移至打桩位置,带有喷管2的钢桩1下沉至不动;起吊振动锤移至带有喷管2的钢桩1上方,利用振动锤的自重使钢桩1再次下沉;启动振动锤,打设带有喷管2的钢桩1,高压泵3启动喷管2喷出高压水,喷出的高压水冲击土体。本实施例中,在钢桩1主体四周焊接喷管2,管路为无缝钢管,本发明将高压水喷管2与钢桩1结合在一起,一起打入地下,利用高压水切割土体,从而冲散地质层,使得钢管桩与土体间摩擦力减小。
本实施例中起吊带有喷管2的钢桩1,将其从土体拔除,拔出过程中,喷管2持续喷水,将另一钢桩1打入带有喷管2的钢桩1的拔除位置。拔出过程中喷管2喷射高压水给予钢桩1反作用力和水膜,从而利于拔出。
本实施例中,所述喷管2固定设置在钢桩1的外围,喷管2与总管4相连通,所述总管4与高压泵3相管接。通过总管4的汇总将各喷管2与同一高压泵3相连,喷射出冲击力相等的水压。
本实施例中,高压水的压力为10MPa-100MPa。作为优选,高压水的压力为50MPa、55MPa、60MPa。
本实施例中,喷管2是一管材,所述管材折弯呈U型,U型的中部与总管4相连通。
本实施例中,从土体拔除带有喷管2的钢桩1时振动锤保持振动工作。拔除过程中,振动锤的振动使钢桩1与土地相活动从而利于拔出。
本实施例中,钢桩1为圆管桩,折弯呈U型的管材紧贴设置在圆管桩的外壁;折弯呈U型的管材对称设置在圆管桩外壁。
Claims (7)
1.高压水辅助打桩方法,其特征是,包括钢桩,所述钢桩固定相连有喷管,所述喷管的出水朝下;所述喷管通过管路与高压泵相连;打桩前打桩机就位,搭设导向架;起吊带有喷管的钢桩移至打桩位置,带有喷管的钢桩下沉至不动;起吊振动锤移至带有喷管的钢桩上方,利用振动锤的自重使钢桩再次下沉;启动振动锤,打设带有喷管的钢桩,高压泵启动喷管喷出高压水,喷出的高压水冲击土体。
2.如权利要求1所述的高压水辅助打桩方法,其特征是,起吊带有喷管的钢桩,将其从土体拔除,拔出过程中,喷管持续喷水,将另一钢桩打入带有喷管的钢桩的拔除位置。
3.如权利要求1所述的高压水辅助打桩方法,其特征是,所述喷管固定设置在钢桩的外围,喷管与一总管相连通,所述总管与高压泵相管接。
4.如权利要求1所述的高压水辅助打桩方法,其特征是,高压水的压力为10MPa-100MPa。
5.如权利要求3所述的高压水辅助打桩方法,其特征是,喷管是一管材,所述管材折弯呈U型,U型的中部与总管相连通。
6.如权利要求3所述的高压水辅助打桩方法,其特征是,从土体拔除带有喷管的钢桩时振动锤保持振动工作。
7.如权利要求5所述的高压水辅助打桩方法,其特征是,钢桩为圆管桩,折弯呈U型的管材紧贴设置在圆管桩的外壁;折弯呈U型的管材对称设置在圆管桩外壁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110107552.2A CN112921968A (zh) | 2021-01-27 | 2021-01-27 | 高压水辅助打桩方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110107552.2A CN112921968A (zh) | 2021-01-27 | 2021-01-27 | 高压水辅助打桩方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112921968A true CN112921968A (zh) | 2021-06-08 |
Family
ID=76166569
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110107552.2A Withdrawn CN112921968A (zh) | 2021-01-27 | 2021-01-27 | 高压水辅助打桩方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112921968A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113653053A (zh) * | 2021-09-02 | 2021-11-16 | 厦门大学 | 一种易回收的流化减阻拔桩装置 |
CN113668530A (zh) * | 2021-09-02 | 2021-11-19 | 厦门大学 | 一种易回收的流化减阻拔桩的施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103628482A (zh) * | 2012-08-27 | 2014-03-12 | 上海中技桩业股份有限公司 | 一种高压射流引桩施工方法 |
CN105672316A (zh) * | 2016-02-03 | 2016-06-15 | 上海市基础工程集团有限公司 | 钢桩下沉减阻装置及施工方法 |
CN111980011A (zh) * | 2020-09-01 | 2020-11-24 | 苏州中宝市政园林工程有限公司 | 一种用于拉森钢板桩的成槽装置及其施工方法 |
-
2021
- 2021-01-27 CN CN202110107552.2A patent/CN112921968A/zh not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103628482A (zh) * | 2012-08-27 | 2014-03-12 | 上海中技桩业股份有限公司 | 一种高压射流引桩施工方法 |
CN105672316A (zh) * | 2016-02-03 | 2016-06-15 | 上海市基础工程集团有限公司 | 钢桩下沉减阻装置及施工方法 |
CN111980011A (zh) * | 2020-09-01 | 2020-11-24 | 苏州中宝市政园林工程有限公司 | 一种用于拉森钢板桩的成槽装置及其施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113653053A (zh) * | 2021-09-02 | 2021-11-16 | 厦门大学 | 一种易回收的流化减阻拔桩装置 |
CN113668530A (zh) * | 2021-09-02 | 2021-11-19 | 厦门大学 | 一种易回收的流化减阻拔桩的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100591859C (zh) | 一种用拔桩机进行拔桩的施工方法 | |
CN112921968A (zh) | 高压水辅助打桩方法 | |
CN100485134C (zh) | 抱压式phc管桩桩端自引孔静压入岩施工工艺 | |
CN102733389B (zh) | 一种高压射流振动沉桩装置及沉桩工艺 | |
CN103628463A (zh) | 复杂地层的超深振冲碎石桩的施工方法 | |
CN110258571A (zh) | 一种灌注桩沉管压灌施工方法 | |
CN105672316A (zh) | 钢桩下沉减阻装置及施工方法 | |
CN201074340Y (zh) | 一种拔桩机 | |
JP4885313B2 (ja) | 基礎用鋼製部材、基礎用鋼製部材の打設方法、及び基礎用鋼製連続壁 | |
CN104563118A (zh) | 全套管振动取土预制灌注组合桩施工方法 | |
CN202492847U (zh) | 高压水射流套管拔桩工具 | |
CN214832587U (zh) | 一种新型钢桩 | |
CN212129131U (zh) | 一种挤土成孔锚杆施工结构 | |
CN102400467A (zh) | 高压射水辅助插打钢板桩围堰施工方法 | |
JP5887193B2 (ja) | 地中斜材の設置方法 | |
JP2003147771A (ja) | 杭抜き工法およびその装置、改良地盤ならびに地盤改良工法 | |
CN114352189B (zh) | 旋喷桩施工方法 | |
KR20060079446A (ko) | 파일의 인발저항력 저감장치 및 이를 이용한 파일인발방법 | |
CN103132511A (zh) | 静压沉管扩底灌注桩的成桩方法及成桩装置 | |
CN102251518B (zh) | 旋泵成孔桩机 | |
CN214033712U (zh) | 一种用于水冲拔桩的拔桩工具 | |
CN105821878B (zh) | 预应力砼管桩沉桩方法 | |
JP5300094B2 (ja) | 水平締固め工法および地盤改良構造 | |
CN219671307U (zh) | 一种适用于穿透硬层的振冲器 | |
CN218969999U (zh) | 一种基础灌浆的快速成孔装置及其钻孔桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 314000 Room 301, 251 Chengxiu Road, Xincheng street, Xiuzhou District, Jiaxing City, Zhejiang Province Applicant after: Xingtu Co.,Ltd. Address before: 314000 Room 301, 251 Chengxiu Road, Xincheng street, Xiuzhou District, Jiaxing City, Zhejiang Province Applicant before: ZHEJIANG XINGTU BRIDGE TEMPORARY STEEL STRUCTURE ENGINEERING CO.,LTD. |
|
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20210608 |