CN112800637B - Intelligent substation simulation test device and method - Google Patents

Intelligent substation simulation test device and method Download PDF

Info

Publication number
CN112800637B
CN112800637B CN202110386095.5A CN202110386095A CN112800637B CN 112800637 B CN112800637 B CN 112800637B CN 202110386095 A CN202110386095 A CN 202110386095A CN 112800637 B CN112800637 B CN 112800637B
Authority
CN
China
Prior art keywords
data
test
tested
message
test data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110386095.5A
Other languages
Chinese (zh)
Other versions
CN112800637A (en
Inventor
何瑞文
金园
高鹤庭
杨盛辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN202110386095.5A priority Critical patent/CN112800637B/en
Publication of CN112800637A publication Critical patent/CN112800637A/en
Application granted granted Critical
Publication of CN112800637B publication Critical patent/CN112800637B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/02Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00036Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
    • H02J13/0004Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Abstract

The application discloses an intelligent substation simulation test device and method, the source data received by a tested element and message data sent after the tested element is processed are obtained in the simulation operation process of the tested element, data extraction is respectively carried out on the source data and the message data according to the element type of the tested element and corresponding test item information, first test data and second test data are obtained, the data processing correctness test result of the tested element is determined according to the comparison result of the first test data and the second test data, and the technical problem of low test efficiency of the intelligent substation simulation element is solved.

Description

Intelligent substation simulation test device and method
Technical Field
The application relates to the technical field of transformer substations, in particular to an intelligent transformer substation simulation testing device and method.
Background
The reliability of the intelligent substation greatly depends on safe and stable operation of a communication network, network performance becomes a key factor for restricting the intelligent substation, and most of traditional test modes are actual operation measurement based on actual system network performance, but the mode is large in workload, poor in economical efficiency and very limited. Therefore, in recent years, the simulation mode gradually replaces the actual operation test mode to realize the intelligent substation test.
In order to enable the node model of the communication simulation software to meet the functional requirements of intelligent electronic equipment (IED) of the intelligent substation, secondary modeling must be performed in a targeted manner, such as an electronic transformer, a merging unit, an intelligent terminal, a protection unit and other IED simulation elements are developed, and interconnection and intercommunication of simulation of the intelligent substation are achieved. However, at present, a tool for checking the data processing correctness of the simulation element is lacking, so that the test efficiency of the simulation element of the intelligent substation is low.
Disclosure of Invention
The application provides an intelligent substation simulation testing device and method, which are used for solving the technical problem that the existing intelligent substation simulation element is low in testing efficiency.
To this end, the present application provides in a first aspect an intelligent substation simulation element testing apparatus, including: the device comprises a data acquisition module, a data processing module and a data comparison module;
the data output end of the data acquisition module is connected with the data input end of the data processing module, and the data output end of the data processing module is connected with the data input end of the data comparison module;
the data acquisition module is used for establishing communication connection with a tested element so as to acquire source data received by the tested element and message data sent by the tested element;
the data processing module is used for determining test item information of the tested simulation element according to the element type of the tested element, and respectively extracting the source data and the message data according to the test item information to obtain first test data and second test data of the tested element;
the data comparison module is used for performing data comparison on the first test data and the second test data so as to determine a correctness test result of the tested element according to the comparison result.
Preferably, the element types of the measured element specifically include: the electronic transformer element, the merging unit element, the protection unit element or the intelligent terminal element.
Preferably, when the device type of the device under test is an electronic transformer device, the first test data includes electrical quantity data input to the device under test, and the second test data includes electrical quantity data included in a message data packet sent by the device under test.
Preferably, when the element type of the tested element is a merging unit element, the first test data includes electrical quantity data included in a message data packet received by the tested element, and the second test data includes electrical quantity data included in an SV message sent by the tested element.
Preferably, when the element type of the tested element is a protection unit element, the first test data includes electrical quantity data contained in an SV message received by the tested element or a trip instruction state quantity contained in a GOOSE message, and the second test data includes a trip instruction contained in a GOOSE message sent by the tested element.
Preferably, when the device type of the device under test is an intelligent terminal device, the first test data includes a trip instruction state quantity and a message creation time included in a GOOSE trip message received by the device under test, and the second test data includes a switch state quantity and a message creation time included in a GOOSE message sent by the device under test.
Preferably, the method further comprises the following steps: a visualization processing module;
and the data input end of the visual processing module is connected with the data output end of the data comparison module and used for obtaining a comparison result output file according to the first test data and the second test data, combining the comparison result and through a data graphical/textual display mode.
The second aspect of the present application provides a method for testing a simulation element of an intelligent substation, which is applied to a testing apparatus for a simulation element of an intelligent substation according to the first aspect of the present application, and the method includes:
the data acquisition module establishes communication connection with a tested element to acquire source data received by the tested element and message data sent by the tested element;
the data processing module determines test item information of the tested simulation element according to the element type of the tested element, and respectively extracts the source data and the message data according to the test item information to obtain first test data and second test data of the tested element;
and the data comparison module is used for comparing the first test data with the second test data so as to determine the correctness test result of the tested element according to the comparison result.
Preferably, the method further comprises the following steps:
and the visual processing module is used for combining the comparison result according to the first test data and the second test data and obtaining a comparison result output file in a data graphical/textual display mode.
Preferably, the data comparing module performs data comparison on the first test data and the second test data, so as to determine the correctness test result of the tested component according to the comparison result specifically includes:
and the data comparison module compares the first test data with the second test data, and if the comparison result shows that the first test data is consistent with or corresponds to the second test data, the correctness test result of the tested element is determined to be passed.
According to the technical scheme, the method has the following advantages:
the application provides a pair of intelligent substation simulation element testing arrangement includes: the device comprises a data acquisition module, a data processing module and a data comparison module; the data output end of the data acquisition module is connected with the data input end of the data processing module, and the data output end of the data processing module is connected with the data input end of the data comparison module; the data acquisition module is used for establishing communication connection with a tested element so as to acquire source data received by the tested element and message data sent by the tested element; the data processing module is used for determining test item information of the tested simulation element according to the element type of the tested element, and respectively extracting the source data and the message data according to the test item information to obtain first test data and second test data of the tested element; the data comparison module is used for comparing the first test data with the second test data to determine a data processing correctness test result of the tested element according to the comparison result.
According to the method and the device, the source data received by the tested element and the message data sent after the tested element is processed are obtained in the simulation operation process of the tested element, data extraction is respectively carried out on the source data and the message data according to the element type of the tested element and the corresponding test item information, first test data and second test data are obtained, the data processing correctness test result of the tested element is determined according to the comparison result of the first test data and the second test data, and the technical problem of low testing efficiency of the simulation element of the intelligent substation is solved.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive exercise.
Fig. 1 is a schematic structural diagram of an embodiment of an intelligent substation simulation element testing apparatus provided in the present application;
fig. 2 is a schematic flowchart of an embodiment of a method for testing an intelligent substation simulation element according to the present application.
Detailed Description
The embodiment of the application provides an intelligent substation simulation testing device and method, which are used for solving the technical problem that the existing intelligent substation simulation element is low in testing efficiency.
In order to make the objects, features and advantages of the present invention more apparent and understandable, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application, and it is apparent that the embodiments described below are only a part of the embodiments of the present application, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
Referring to fig. 1, a simulation testing apparatus for an intelligent substation according to a first embodiment of the present application includes: the data acquisition module A1, the data processing module A2 and the data comparison module A3;
the data output end of the data acquisition module A1 is connected with the data input end of the data processing module A2, and the data output end of the data processing module A2 is connected with the data input end of the data comparison module A3;
the data acquisition module A1 is used for establishing communication connection with the tested element B to acquire source data received by the tested element B and message data sent by the tested element B;
the data processing module A2 is used for determining test item information of the tested simulation element according to the element type of the tested element B, and respectively extracting data of the source data and the message data according to the test item information to obtain first test data and second test data of the tested element B;
and the data comparison module a3 is configured to perform data comparison on the first test data and the second test data, so as to determine a correctness test result of the device under test B according to the comparison result.
First, a communication connection relationship is established between the data acquisition module a1 of the intelligent substation simulation test device and the tested element B, so as to obtain data received by the tested element B and data sent by the tested element B. Meanwhile, according to different element types of the connected tested element B, determining test item information corresponding to the type of the tested element B, performing data extraction on data acquired by the tested element B according to the test item information to obtain first test data and second test data, then performing data comparison on the first test data and the second test data to judge whether the test data before being processed by the tested element B is consistent or corresponding to the test data after being processed by the tested element B, and further determining the correctness test result of the tested element B according to the comparison result to determine whether the simulation design of the tested element B is correct.
The above is a detailed description of a first embodiment of an intelligent substation simulation testing device provided by the present application, and the following is a detailed description of a second embodiment of an intelligent substation simulation testing device provided by the present application.
On the basis of the first embodiment, further, the element types of the tested element B specifically include: the electronic transformer element, the merging unit element, the protection unit element or the intelligent terminal element.
The test item information and the test purpose of the four tested components B are specifically as follows:
1) electronic transformer: whether the electrical quantity data is correctly read and written into the data packet to be sent.
2) A merging unit: whether the electric quantity data is correctly analyzed is judged and written into the SV message to be sent.
3) The intelligent terminal: whether the received GOOSE output message is correctly analyzed and a trip instruction is sent, whether the switching value data is correctly read and the GOOSE input message is sent according to a specific rule.
4) A protection unit: whether the received SV message or the GOOSE message of the input volume can be correctly analyzed or not, whether the protection algorithm can be correctly operated or not and whether the GOOSE message of the output volume can be generated and sent according to the protection logic judgment result. In this embodiment, the four tested components B listed above are taken as an example to further explain the technical solution of the present application.
Further, when the device type of the device under test B is an electronic transformer device, the first test data includes electrical quantity data input to the device under test B, and the second test data includes electrical quantity data included in a message data packet sent by the device under test B.
It should be noted that, when the tested component B connected to the testing device is an electronic transformer component, the testing device obtains the electrical quantity data of the received electronic transformer component, such as the electrical quantity data in the PSCAD output file, and the message data packet from the electronic transformer to the merging unit, obtains the first test data according to the electrical quantity data collected by the electronic transformer, extracts and records the electrical quantity data in the message data packet according to the analysis of the message data packet, and determines whether the simulation modeling of the tested electronic transformer component is correct by comparing, if the comparison result is consistent, it indicates that the modeling of the electronic transformer component is correct, and can correctly read the input electrical quantity data and perform the next transmission.
Further, when the element type of the tested element B is the merging unit element, the first test data includes the electrical quantity data included in the message data packet received by the tested element B, and the second test data includes the electrical quantity data included in the SV message sent by the tested element B.
It should be noted that, when the tested component B connected to the testing apparatus is a merging unit component, the testing apparatus obtains the electrical quantity data included in the message data packet received by the merging unit and the electrical quantity data recorded in the SV message sent by the merging unit itself, and may further include information such as format, size, creation time, and the like of the data packet, and then obtains the first test data and the second test data of the merging unit according to the two sets of electrical quantity data, and further determines whether the simulation modeling of the tested merging unit component is correct by performing comparison, if the comparison result is consistent, it may be indicated that the merging unit component can correctly analyze the message data packet sent by the electronic transformer, and the merging unit models correctly.
Further, when the device type of the device under test B is a protection unit device, the first test data includes electrical quantity data contained in an SV message received by the device under test B or a trip instruction state quantity contained in a GOOSE message, and the second test data includes a trip instruction contained in a GOOSE message sent by the device under test B.
It should be noted that, similarly to the above-mentioned tested element B, when the tested element B connected to the testing apparatus is a protection unit element, the testing apparatus obtains an SV packet or a GOOSE packet received by the protection unit, and may further include information such as format, size, creation time, and the like of a data packet, extracts corresponding first test data from the SV packet or the GOOSE packet, and obtains a GOOSE packet sent by the protection unit after being processed by its own algorithm, and extracts second test data from the GOOSE packet, if the first test data meets the condition of triggering a trip instruction, and a trip instruction in the second test data is from 0 → 1, it may be stated that the protection starts and sends a trip instruction, which proves that the protection unit can correctly analyze the received SV packet or the input GOOSE packet and run the protection algorithm, and generates and sends an output GOOSE packet according to the protection logic judgment result.
Further, when the element type of the tested element B is an intelligent terminal element, the first test data includes a trip instruction state quantity and a message creation time included in a GOOSE trip message received by the tested element B, and the first test data includes a trip instruction and a message creation time included in a GOOSE trip message sent by the tested element B.
Similarly to the above-mentioned device under test B, when the device under test B connected to the testing apparatus is an intelligent terminal device, the testing apparatus outputs the format, size, creation time, and content of each data packet sent by the intelligent terminal (three-phase state quantity information of the circuit breaker, 0 is on, and 1 is off). Through comparison, if the data correspond to each other one by one, the fact that the intelligent terminal can correctly read the received switching value data and send the GOOSE heartbeat message or the GOOSE input message is proved. Meanwhile, when the state quantity is from 0 → 1, the intelligent terminal sends a GOOSE displacement message to control the breaker to be disconnected, and the fact that the intelligent terminal can correctly analyze the received GOOSE tripping message and send the GOOSE displacement message is proved. Meanwhile, the creation time of the first displacement message in the output text of the testing device is observed and compared with the trip information and the message creation time of the intelligent terminal, and if the trip time accords with a preset trip delay threshold (such as 20 ms), the accuracy of intelligent terminal element modeling can be proved.
Further, still include: visualization processing module a 4;
the data input end of the visualization processing module A4 is connected with the data output end of the data comparison module A3, and is used for obtaining a comparison result output file by combining the comparison result and a data graphical/textual display mode according to the first test data and the second test data. Through the processing of the visualization processing module A4, the key information is displayed in a text and graphic mode so as to perform performance demonstration and verification on the tested element B.
The above is a detailed description of the second embodiment of the intelligent substation simulation testing device provided by the present application, and the following is a detailed description of the first embodiment of the intelligent substation simulation testing method provided by the present application.
Referring to fig. 2, a third embodiment of the present invention provides a method for testing an intelligent substation in a simulation manner, where the method is applied to an intelligent substation simulation testing apparatus according to the first embodiment or the second embodiment, and the method includes:
step S1, the data acquisition module establishes communication connection with the tested element to obtain the source data received by the tested element and the message data sent by the tested element;
step S2, the data processing module determines the test item information of the tested simulation element according to the element type of the tested element, and respectively extracts the source data and the message data according to the test item information to obtain the first test data and the second test data of the tested element;
step S3, the data comparison module performs data comparison on the first test data and the second test data to determine a correctness test result of the device under test according to the comparison result.
More specifically, according to the obtained comparison result, if the comparison result shows that the first test data is consistent with or corresponds to the second test data, the correctness test result of the tested element is determined to be passed.
Further, still include:
and step S4, the visualization processing module combines the comparison result according to the first test data and the second test data, and obtains a comparison result output file through a data graphical/textual display mode.
In the several embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the units is only one logical division, and other divisions may be realized in practice, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The terms "first," "second," "third," "fourth," and the like in the description of the application and the above-described figures, if any, are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the application described herein are, for example, capable of operation in sequences other than those illustrated or otherwise described herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above embodiments are only used for illustrating the technical solutions of the present application, and not for limiting the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.

Claims (5)

1. The utility model provides an intelligent substation simulation element testing arrangement which characterized in that includes: the device comprises a data acquisition module, a data processing module and a data comparison module;
the data output end of the data acquisition module is connected with the data input end of the data processing module, and the data output end of the data processing module is connected with the data input end of the data comparison module;
the data acquisition module is used for establishing communication connection with a tested element so as to acquire source data received by the tested element and message data sent by the tested element;
the data processing module is used for determining test item information of the tested simulation element according to the element type of the tested element, and respectively extracting the source data and the message data according to the test item information to obtain first test data and second test data of the tested element;
the data comparison module is used for performing data comparison on the first test data and the second test data so as to determine a correctness test result of the tested element according to the comparison result;
the element types of the element to be tested specifically include: an electronic transformer element, a merging unit element, a protection unit element or an intelligent terminal element;
when the device type of the device under test is an electronic transformer device, the first test data includes electrical quantity data input to the device under test, and the second test data includes electrical quantity data included in a message data packet sent by the device under test;
when the element type of the tested element is a merging unit element, the first test data includes electrical quantity data included in a message data packet received by the tested element, and the second test data includes electrical quantity data included in an SV message sent by the tested element;
when the element type of the tested element is a protection unit element, the first test data includes electrical quantity data contained in an SV message received by the tested element or a trip instruction state quantity contained in a GOOSE message, and the second test data includes a trip instruction contained in a GOOSE message sent by the tested element;
when the element type of the tested element is an intelligent terminal element, the first test data includes trip instruction state quantity and message creation time contained in a GOOSE trip message received by the tested element, and the second test data includes switch state quantity and message creation time contained in a GOOSE message sent by the tested element.
2. The intelligent substation simulation element testing device of claim 1, further comprising: a visualization processing module;
and the data input end of the visual processing module is connected with the data output end of the data comparison module and used for obtaining a comparison result output file according to the first test data and the second test data, combining the comparison result and through a data graphical/textual display mode.
3. An intelligent substation simulation element testing method applied to the intelligent substation simulation element testing device according to any one of claims 1 to 2, characterized by comprising:
the data acquisition module establishes communication connection with a tested element to acquire source data received by the tested element and message data sent by the tested element;
the data processing module determines test item information of the tested simulation element according to the element type of the tested element, and respectively extracts the source data and the message data according to the test item information to obtain first test data and second test data of the tested element;
and the data comparison module is used for comparing the first test data with the second test data so as to determine the correctness test result of the tested element according to the comparison result.
4. The intelligent substation simulation element testing method of claim 3, further comprising:
and the visual processing module is used for combining the comparison result according to the first test data and the second test data and obtaining a comparison result output file in a data graphical/textual display mode.
5. The method according to claim 3, wherein the data comparison module performs data comparison on the first test data and the second test data, so as to determine the correctness test result of the tested element according to the comparison result specifically comprises:
and the data comparison module compares the first test data with the second test data, and if the comparison result shows that the first test data is consistent with or corresponds to the second test data, the correctness test result of the tested element is determined to be passed.
CN202110386095.5A 2021-04-12 2021-04-12 Intelligent substation simulation test device and method Active CN112800637B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110386095.5A CN112800637B (en) 2021-04-12 2021-04-12 Intelligent substation simulation test device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110386095.5A CN112800637B (en) 2021-04-12 2021-04-12 Intelligent substation simulation test device and method

Publications (2)

Publication Number Publication Date
CN112800637A CN112800637A (en) 2021-05-14
CN112800637B true CN112800637B (en) 2021-08-27

Family

ID=75816688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110386095.5A Active CN112800637B (en) 2021-04-12 2021-04-12 Intelligent substation simulation test device and method

Country Status (1)

Country Link
CN (1) CN112800637B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115078950B (en) * 2022-07-28 2022-10-25 南京宏泰半导体科技有限公司 Method for controlling peripheral equipment test by upper computer

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565585A (en) * 2012-01-10 2012-07-11 上海电力学院 Method for building intelligent substation relay protection cooperation simulation testing system
CN102608450A (en) * 2012-02-24 2012-07-25 江苏凌创电气自动化股份有限公司 Testing and verifying system appropriate for intelligent transformer substation and verifying method
CN103954417A (en) * 2014-04-09 2014-07-30 国家电网公司 Field testing method of optical fiber current transformer
CN105891637A (en) * 2016-04-14 2016-08-24 云南电网有限责任公司电力科学研究院 Intelligent substation secondary device testing method and intelligent substation secondary device testing system
CN108418304A (en) * 2018-03-09 2018-08-17 国家电网公司 Substation secondary circuit state monitoring method, apparatus and system
CN108663581A (en) * 2017-11-15 2018-10-16 云南电网有限责任公司大理供电局 A kind of secondary equipment of intelligent converting station test method
CN110426589A (en) * 2019-09-10 2019-11-08 南京国电南自电网自动化有限公司 A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template
CN110991037A (en) * 2019-12-01 2020-04-10 贵州电网有限责任公司 Intelligent substation test simulation system based on SCD
CN111884211A (en) * 2020-07-27 2020-11-03 国网经济技术研究院有限公司 Joint simulation method and system for primary system and secondary system of intelligent substation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11327114B2 (en) * 2018-06-15 2022-05-10 State Grid Hebei Electric Power Research Institute Fully-automatic closed-loop detection method and device for intelligent substation
CN109900994B (en) * 2019-03-29 2021-01-01 国网重庆市电力公司市区供电分公司 Intelligent substation secondary circuit comprehensive performance test system and working method
CN111654111B (en) * 2020-06-15 2023-05-23 国网宁夏电力有限公司电力科学研究院 GOOSE simulation test method for secondary system of intelligent substation
CN111884851B (en) * 2020-07-27 2021-08-13 广东工业大学 Simulation design method for process level equipment of intelligent substation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565585A (en) * 2012-01-10 2012-07-11 上海电力学院 Method for building intelligent substation relay protection cooperation simulation testing system
CN102608450A (en) * 2012-02-24 2012-07-25 江苏凌创电气自动化股份有限公司 Testing and verifying system appropriate for intelligent transformer substation and verifying method
CN103954417A (en) * 2014-04-09 2014-07-30 国家电网公司 Field testing method of optical fiber current transformer
CN105891637A (en) * 2016-04-14 2016-08-24 云南电网有限责任公司电力科学研究院 Intelligent substation secondary device testing method and intelligent substation secondary device testing system
CN108663581A (en) * 2017-11-15 2018-10-16 云南电网有限责任公司大理供电局 A kind of secondary equipment of intelligent converting station test method
CN108418304A (en) * 2018-03-09 2018-08-17 国家电网公司 Substation secondary circuit state monitoring method, apparatus and system
CN110426589A (en) * 2019-09-10 2019-11-08 南京国电南自电网自动化有限公司 A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template
CN110991037A (en) * 2019-12-01 2020-04-10 贵州电网有限责任公司 Intelligent substation test simulation system based on SCD
CN111884211A (en) * 2020-07-27 2020-11-03 国网经济技术研究院有限公司 Joint simulation method and system for primary system and secondary system of intelligent substation

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Research on Automatic Test Technology for Field Operation and Maintenance of Intelligent Substation;Di ZHOU等;《IEEE》;20200708;11-15 *
变电站在线监测智能电子设备自动化测试研究;雍明月等;《工程设备与材料》;20201231;115-116 *
智能变电站二次设备仿真测试技术研究;郭鑫;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20160215;第2016年卷(第02期);C042-904 *

Also Published As

Publication number Publication date
CN112800637A (en) 2021-05-14

Similar Documents

Publication Publication Date Title
US20190170822A1 (en) Fully-automatic closed-loop detection method and device for intelligent substation
US10288667B2 (en) Method and system for fault detection and faulted line identification in power systems using synchrophasors-based real-time state estimation
CN105116248B (en) Relay protection device of intelligent substation automated closed-loop test method
CN109872112B (en) Full-automatic closed-loop detection method and device for intelligent substation
CN108519929B (en) CRC (cyclic redundancy check) method and device for bus protection configuration management and control of intelligent substation
CN107147214A (en) A kind of secondary peace suitable for intelligent substation arranges monitoring system
CN112800637B (en) Intelligent substation simulation test device and method
CN110556920A (en) Distribution automation monitoring method, system, terminal and storage medium
CN106844432A (en) Data processing method and device
CN110166483B (en) Power grid fault and network attack identification method, device and equipment
CN110108980A (en) A kind of recognition methods of the anomalous event of electric system and device
CN114003451A (en) Interface test method, device, system and medium
CN111953657B (en) Sequence-data joint driven CPS network attack identification method for power distribution network
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN112307647A (en) Charging pile communication interruption testing method and device, storage medium and processor
CN112698584B (en) Substation one-key sequential control simulation test method, device, equipment and medium
CN110868341A (en) In-place protection intelligent management unit testing method and device
CN109507574A (en) The test method and device of relay protection device
CN114912853A (en) Method and device for evaluating stability of power grid
CN106841842A (en) The method of testing and device in the empty loop of secondary device
CN113595245A (en) Test system and method of precise load control system based on 5G communication
CN107017639B (en) CIM model load flow data conversion method and device based on JAVA platform
CN111460612A (en) Real-time simulation operation method and system for primary equipment and secondary equipment of transformer substation
CN114123513A (en) Intelligent power station secondary engineering detection method, device, terminal and medium
CN114720807B (en) Online scheduled inspection method and system for protection signals of power distribution network

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant