CN109507574A - The test method and device of relay protection device - Google Patents
The test method and device of relay protection device Download PDFInfo
- Publication number
- CN109507574A CN109507574A CN201811374008.9A CN201811374008A CN109507574A CN 109507574 A CN109507574 A CN 109507574A CN 201811374008 A CN201811374008 A CN 201811374008A CN 109507574 A CN109507574 A CN 109507574A
- Authority
- CN
- China
- Prior art keywords
- test
- protection device
- measured
- relay protection
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/3277—Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
- G01R31/3278—Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The application provides the test method and device of a kind of relay protection device, is applied to test terminal, which comprises the whole station configuration file of substation is imported the test terminal;According to the parameter information of the relay protection device to be measured;According to the protection type of the relay protection device to be measured;According to the parameter information of the relay protection device to be measured, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state be attached to the relay protection device to be measured under in the test terminal;Required test template is imported into the test terminal;It receives and obtains test result after the relay protection device to be measured is tested according to test template and experiment parameter and generate test report.The test to relay protection device is carried out using the method in the application.Entire test process is intelligent, and the report generation after preparation process to test since test does not all need excessive manual operation, improves work efficiency.
Description
Technical field
This application involves substation relay protection device technical fields, in particular to the test of relay protection device
Method and device.
Background technique
It is existing currently, as people's lives level increasingly improves, the high speed development of social economy, power industry as with this
Change closely bound up field a bit, is also increasingly taken seriously.The universal of intelligent substation meets various distribution power supplies
Problem.And the relay protection device in intelligent substation, it is a very important component part in intelligent substation, effect
It is the key that guarantee that entire intelligent substation operates normally.So the maintenance and detection of relay protection device, are indispensable
's.
At present when detecting relay protection device, whether before testing to the definite value and pressing plate of relay protection device to be measured
The processing of state still requires manually to input to the processing of each detection project in the detection process.Moreover, one
The protection type of a relay protection device, it is also desirable to which artificial goes to judge, then just can be carried out test after the completion of judging, efficiency is very
Lowly, it is unable to satisfy that entire electric field is large number of and different types of relay protection device.
In view of this, intellectually and automatically when how to realize detection relay protection device, needs to solve at present
Problem.
Summary of the invention
A kind of test method and device for being designed to provide relay protection device of the application.
In a first aspect, the embodiment of the present application provides a kind of test method of relay protection device, it is applied to test terminal, institute
The method of stating includes:
The whole station configuration file of substation is imported into the test terminal, obtains the parameter letter of relay protection device to be measured
Breath;
According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;
According to the protection type of the relay protection device to be measured, corresponding control instruction and sampled data are generated, and will
Control instruction and sampling data transmitting give relay protection device to be measured, so that the relay equipment to be measured meets test condition;
According to the parameter information of the relay protection device to be measured, by the corresponding fixed value list of the relay protection device to be measured
In value data and pressing plate state be attached to the relay protection device to be measured under in the test terminal so that described to be measured
Relay protection device enters state to be tested;
Test item is added according to the protection type of the relay protection device to be measured, and raw according to the test item of the addition
At the test template of corresponding with fixed value list content and sequence consensus;
Required test template is imported into the test terminal, and experiment parameter is configured;
It receives after the relay protection device to be measured is tested according to test template and experiment parameter and obtains test result;
When testing completion, the test result is subjected to record and test report is generated according to the test result.
Optionally, in the parameter information according to the relay protection device to be measured, by the relay protection device pair to be measured
The value data in fixed value list and pressing plate state answered be attached under in the test terminal relay protection device to be measured it
Before, which comprises
The corresponding fixed value list template of relay protection device to be measured is chosen from fixed value list template library, with obtain it is described it is to be measured after
The corresponding definite value of electric protection equipment and pressing plate state.
Establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing it is to be measured after
The corresponding fixed value list template of electric protection equipment, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
Optionally, described that test item is added according to the protection type of the relay protection device to be measured, and added according to described
The test item added generates the test template of corresponding with the fixed value list content and sequence consensus, comprising:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Optionally, which comprises
The test item of user's addition and the operation of testing sequence are responded, and generates a new test template.
The operation of the new test template of response creation, according to the new test of test item and testing sequence creation inputted in the operation
Template.
Optionally, which comprises
After a test by the state before the definite value of the relay protection device to be measured and pressing plate state reduction to test.
Second aspect, the embodiment of the present application provide a kind of test device of relay protection device, are applied to test terminal, institute
Stating device includes:
Data obtaining module obtains relay to be measured for the whole station configuration file of substation to be imported the test terminal
Protect the parameter information of equipment;
It is also used to the parameter information according to the relay protection device to be measured, obtains the protection class of relay protection device to be measured
Type;
It is also used to generate corresponding control instruction and hits according to the protection type of the relay protection device to be measured
According to, and give control instruction and sampling data transmitting to relay protection device to be measured, so that the relay equipment to be measured meets test
Condition;
Under die-filling piece, for the parameter information according to the relay protection device to be measured, the relay protection to be measured is set
Value data and pressing plate state in standby corresponding fixed value list are attached to the relay protection to be measured under in the test terminal and set
It is standby, so that the relay protection device to be measured enters state to be tested;
Test module, for adding test item according to the protection type of the relay protection device to be measured, and according to described
The test item of addition generates the test template of corresponding with fixed value list content and sequence consensus;
It is also used to required test template importing the test terminal, and experiment parameter is configured;
It is also used to receive after the relay protection device to be measured is tested according to test template and experiment parameter and be surveyed
Test result;
Report generation module, for the test result being carried out record and is tied according to the test when testing completion
Fruit generates test report.
Optionally, under described before die-filling piece, described device includes:
Template library module, for choosing the corresponding fixed value list template of relay protection device to be measured from fixed value list template library,
To obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
It is also used to establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing
The corresponding fixed value list template of relay protection device to be measured, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate shape
State.
Optionally, the test module is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Optionally, described device includes:
Hand-held block for responding the test item of user's addition and the operation of testing sequence, and generates a new test
Template.
It is also used to the operation of the new test template of response creation, is created according to the test item and testing sequence inputted in the operation
New test template.
Optionally, described device includes:
Recovery module, for after a test by the definite value of the relay protection device to be measured and pressing plate state reduction to test
Preceding state.
Compared with prior art, beneficial effect provided by the present application includes: that the application provides a kind of survey of relay protection device
Method for testing and device are applied to test terminal, which comprises the whole station configuration file of substation is imported the test eventually
End, obtains the parameter information of relay protection device to be measured;According to the parameter information of the relay protection device to be measured, obtain to be measured
The protection type of relay protection device;According to the protection type of the relay protection device to be measured, corresponding control instruction is generated
And sampled data, and give control instruction and sampling data transmitting to relay protection device to be measured, so that the relay equipment to be measured
Meet test condition;It is according to the parameter information of the relay protection device to be measured, the relay protection device to be measured is corresponding
Value data and pressing plate state in fixed value list are attached to the relay protection device to be measured under in the test terminal, so that institute
Relay protection device to be measured is stated into state to be tested;It is added and is tested according to the protection type of the relay protection device to be measured
, and according to the test template of the test item of addition generation corresponding with fixed value list content and sequence consensus;By required survey
Die trial plate imports the test terminal, and configures to experiment parameter;The relay protection device to be measured is received according to test
Template and experiment parameter obtain test result after being tested;When testing completion, the test result record simultaneously root
Test report is generated according to the test result.The test to relay protection device is carried out using the method in the application.It is entire to survey
Examination process is intelligent, and the report generation after preparation process to test since test does not all need excessive artificial behaviour
Make, improves work efficiency.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached
Figure is briefly described.It should be appreciated that the following drawings illustrates only some embodiments of the application, therefore it is not construed as pair
The restriction of range.It for those of ordinary skill in the art, without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the frame diagram of the test macro of relay protection device provided by the embodiments of the present application;
The structural schematic block diagram of the position Fig. 2 test terminal provided by the embodiments of the present application;
Fig. 3 is the test method steps flow chart schematic diagram of relay protection device provided by the embodiments of the present application;
Fig. 4 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 5 is the sub-step flow diagram of step S205 in Fig. 3;
Fig. 6 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 7 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 8 is the structural block diagram of the test device of relay protection device provided by the embodiments of the present application;
Fig. 9 is the overall structure block diagram of the test device of relay protection device provided by the embodiments of the present application.
Icon: the test macro of 10- relay protection device;100- tests terminal;200- relay protection device;110- relay
Protect the test device of equipment;111- memory;112- processor;113- communication unit;1101- data obtaining module;1102-
Under die-filling piece;1103- test module;1104- report generation module;1105- template library module;1106- hand-held block;1107-
Recovery module.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application
In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described.Obviously, described embodiment is
Some embodiments of the present application, instead of all the embodiments.The application being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiments herein provided in the accompanying drawings is not intended to limit below claimed
Scope of the present application, but be merely representative of the selected embodiment of the application.Based on the embodiment in the application, this field is common
Technical staff's every other embodiment obtained without creative efforts belongs to the model of the application protection
It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present application, it is to be understood that the instruction such as term " on ", "lower", "inner", "outside", "left", "right"
Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings or this application product using when usually put
Orientation or positional relationship or the orientation or positional relationship that usually understands of those skilled in the art, be merely for convenience of retouching
It states the application and simplifies description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with specific
Orientation construction and operation, therefore should not be understood as the limitation to the application.
In addition, term " first ", " second " etc. are only used for distinguishing description, it is not understood to indicate or imply relatively important
Property.
In the description of the present application, it is also necessary to which explanation is unless specifically defined or limited otherwise, " setting ", " even
Connect " etc. terms shall be understood in a broad sense, for example, " connection " may be a fixed connection, may be a detachable connection, or integrally connect
It connects;It can be mechanical connection, be also possible to be electrically connected;It can be and be directly connected to, can also be indirectly connected with by intermediary, it can
To be the connection inside two elements.For the ordinary skill in the art, can understand as the case may be above-mentioned
The concrete meaning of term in this application.
With reference to the accompanying drawing, the specific embodiment of the application is described in detail.
Fig. 1 is please referred to, Fig. 1 is the test of the relay protection device of relay protection device 200 provided by the embodiments of the present application
The frame diagram of system 10.The test macro 10 of the relay protection device includes testing terminal 100 and relay protection device 200,
Wherein, test terminal 100 can be connected with relay protection device 200 by wireless communication, the relay protection device 200
The test signal issued for receiving the test terminal 100.It is understood that above-mentioned connection type is example, do not answer
When being interpreted as the limitation to the present embodiment, in the other embodiments of the present embodiment, terminal 100 and relay protection device are tested
200 can be connected by optical fiber.
Referring to figure 2., Fig. 2 is the structural schematic block diagram that terminal 100 is tested in Fig. 1.The test terminal 100 includes relay
Protect test device 110, memory 111, processor 112 and the communication unit 113 of equipment.
Each element of the memory 111, processor 112 and communication unit 113 is directly or indirectly electrical between each other
Connection, to realize the transmission or interaction of data.For example, these elements can pass through one or more communication bus or letter between each other
Number line, which is realized, to be electrically connected.
Wherein, the memory 111 may be, but not limited to, random access memory (Random Access
Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable
Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only
Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only
Memory, EEPROM) etc..Wherein, memory 111 is for storing program, the processor 112 after receiving and executing instruction,
Execute described program.The communication unit 113 is used to establish the test terminal 100 and other equipment by network and (for example uses
Family terminal) between communication connection, and for being sended and received by network progress data.For example, in the present embodiment, surveying
It tries terminal 100 and data communication is carried out by communication unit 113 and relay protection device 200.
Referring to figure 3., Fig. 3 is that the test method steps flow chart of relay protection device 200 provided by the embodiments of the present application shows
It is intended to, which comprises
The whole station configuration file of substation is imported the test terminal 100, obtains relay protection device by step S201
200 parameter information.
In the present embodiment, parameter information can refer to the whole station configuration file by importing tested protective relaying device come
Obtain the information such as parameter, the channel configuration of tested protective relaying device.And visualization function can also be configured, by IED
(Intelligent Electronic Device, intelligent electronic device) chain graph, signal graph, virtual terminator figure, virtual terminator table into
Row visualizes, and can check virtual terminator, equipment interconnecting relation and establish intuitive signal data flow direction.
Step S202 obtains the protection of relay protection device 200 according to the parameter information of the relay protection device 200
Type.
In the present embodiment, the protection type of the relay protection device 200 can be overcurrent protection: fault current is super
Overcurrent protection definite value is crossed, failure time of occurrence is more than to issue trip signal after protecting the definite value time.In other embodiments, relay
The protection type of protection equipment 200 can also be that overvoltage protection, under-voltage protection, differential protection, distance protection and direction are protected
Shield.
Step S203 generates corresponding control instruction and hits according to the protection type of the relay protection device 200
According to, and give control instruction and sampling data transmitting to relay protection device 200, so that the relay equipment to be measured meets test-strips
Part.
In the present embodiment, the control instruction can be GOOSE (Generic Object Oriented
Substation Event, the transformer substation case towards general object), for realizing multiple intelligent electronic devices (IED) it
Between information transmitting, including transmission breaker tripping and closing, connection locking etc. multi-signals.The sampled data can be SV (Sampled
Value, sampled value), the communication service for real-time Transmission digital sample information.
Step S204, it is according to the parameter information of the relay protection device 200, the relay protection device 200 is corresponding
Fixed value list in value data and pressing plate state be attached to the relay protection device 200 under in the test terminal 100, with
The relay protection device 200 is set to enter state to be tested.
In the present embodiment, by the value data and pressing plate state in the corresponding fixed value list of the relay protection device 200
The relay protection device 200 is attached under in the test terminal 100 can refer to required value data through network
It is downloaded and installed into the relay protection device 200 with pressing plate state.In other embodiments, MMS network work can be passed through
Pretend under tool (MSS-ethereal) and closes definite value and relay protection device may be selected in relaying configuration pressing plate state, reviewer
200 store path backs up definite value, pressing plate state.
Step S205 adds test item according to the protection type of the relay protection device 200, and according to the addition
Test item generates the test template of corresponding with fixed value list content and sequence consensus.
Required test template is imported the test terminal 100, and configured to experiment parameter by step S206.
Step S207 is received after the relay protection device 200 is tested according to test template and experiment parameter and is obtained
Test result.
The test result is carried out record and is generated according to the test result to survey by step S208 when testing completion
Examination report.
In the present embodiment, after the completion of test, the test result of each single item, and the form by result to report can be shown
Multiple format output is supported in export, export report.All test assignments all after the completion of, the export of every test result can be integrated.
Referring to figure 4., Fig. 4 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application
Journey schematic diagram.
Before step S207, which comprises
Step S209 chooses the corresponding fixed value list template of relay protection device 200, from fixed value list template library to obtain
State the corresponding definite value of relay protection device 200 and pressing plate state.
Step S210 establishes fixed value list template library according to the parameter information of the relay protection device 200, selects before testing
The corresponding fixed value list template of middle relay protection device 200, to obtain the corresponding definite value of the relay protection device 200 and pressing plate shape
State.
Referring to figure 5., step S205 includes sub-step S2051 and sub-step S2052:
Sub-step S2051 adds test item according to the inspection project and fixed value list of similar protection.
Sub-step S2052 is generated and the test content and testing sequence one in the fixed value list according to the test item of addition
The test template of cause.
Fig. 6 is please referred to, Fig. 6 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application
Journey schematic diagram;
Step S211, the test item of response user's addition and the operation of testing sequence, and generate a new test template.
In the present embodiment, adding test item and testing sequence can be and automatically generated by test terminal 100, be also possible to
Test item and testing sequence are added manually by user to the test terminal 100.
Step S212, the operation of the new test template of response creation, according to the test item and testing sequence inputted in the operation
Create new test template.
Fig. 7 is please referred to, Fig. 7 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application
Journey schematic diagram;
Step S213, after a test will be before the definite value of the relay protection device 200 and pressing plate state reduction to test
State.
In the present embodiment, important circuit can also be prompted before testing, prevents from leading to important circuit because of test
Damage (such as start failure protection, jump mother of the switch).
Fig. 8 is please referred to, Fig. 8 is the structural block diagram of the test device of relay protection device 200 provided by the embodiments of the present application,
Described device includes:
Data obtaining module 1101, for the whole station configuration file of substation to be imported the test terminal 100, acquisition after
The parameter information of electric protection equipment 200.
It is also used to the parameter information according to the relay protection device 200, obtains the protection class of relay protection device 200
Type.
It is also used to generate corresponding control instruction and sampled data according to the protection type of the relay protection device 200,
And give control instruction and sampling data transmitting to relay protection device 200, so that the relay equipment to be measured meets test condition.
Under die-filling piece 1102, for the parameter information according to the relay protection device 200, by the relay protection device
Value data and pressing plate state in 200 corresponding fixed value lists are attached to the relay protection under in the test terminal 100 and set
Standby 200, so that the relay protection device 200 enters state to be tested.
Test module 1103, for adding test item according to the protection type of the relay protection device 200, and according to institute
The test item for stating addition generates the test template of corresponding with fixed value list content and sequence consensus.
It is also used to required test template importing the test terminal 100, and experiment parameter is configured.
It is also used to receive after the relay protection device 200 is tested according to test template and experiment parameter and be tested
As a result.
Report generation module 1104, for the test result being carried out record and according to the survey when testing completion
Test result generates test report.
Further, under described before die-filling piece 1102, described device includes:
Template library module 1105, for choosing the corresponding definite value single mode of relay protection device 200 from fixed value list template library
Plate, to obtain the corresponding definite value of the relay protection device 200 and pressing plate state.
It is also used to establish fixed value list template library according to the parameter information of the relay protection device 200, choose before testing
The corresponding fixed value list template of relay protection device 200, to obtain the corresponding definite value of the relay protection device 200 and pressing plate shape
State.
Further, the test module 1103 is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Further, described device includes:
Hand-held block 1106, for responding the test item of user's addition and the operation of testing sequence, and generate one it is new
Test template.
It is also used to the operation of the new test template of response creation, is created according to the test item and testing sequence inputted in the operation
New test template.
Further, described device includes:
Recovery module 1107, for after a test arriving the definite value of the relay protection device 200 and pressing plate state reduction
State before test.
Further, in the present embodiment, a kind of side of test device 110 for detecting relay protection device is additionally provided
Method, the specific steps are as follows:
Whether test device GOOSE receives and sends normal.
Whether test device action behavior is normal.
Whether test device GOOSE sends mechanism correct.
Test GOOSE communication channel delay.
Test the test device response time.
The hard contact of test test device GOOSE message turn is outputed, the position of the switch is indexed to GOOSE displacement message output.
Test device, which receives GOOSE breaker tripping and closing message to switch, becomes the response time of rear GOOSE message output.
In conclusion the application provides the test method and device of a kind of relay protection device, it is applied to test terminal, institute
The method of stating includes: that the whole station configuration file of substation is imported the test terminal, obtains the parameter of relay protection device to be measured
Information;According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;According to institute
The protection type for stating relay protection device to be measured, generates corresponding control instruction and sampled data, and by control instruction and sampling
Data are sent to relay protection device to be measured, so that the relay equipment to be measured meets test condition;According to the relay to be measured
The parameter information for protecting equipment, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state from
The relay protection device to be measured is attached under in the test terminal, so that the relay protection device to be measured enters shape to be tested
State;According to the protection type of the relay protection device to be measured add test item, and according to the test item of the addition generate with
The test template of fixed value list corresponding content and sequence consensus;Required test template is imported into the test terminal, and to experiment
Parameter is configured;It receives after the relay protection device to be measured is tested according to test template and experiment parameter and is tested
As a result;When testing completion, the test result is subjected to record and test report is generated according to the test result.Use this
Method in application carries out the test to relay protection device.Entire test process is intelligent, the preparation process since test
Report generation after test does not all need excessive manual operation, improves work efficiency.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field
For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair
Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Claims (10)
1. a kind of test method of relay protection device is applied to test terminal, which is characterized in that the described method includes:
The whole station configuration file of substation is imported into the test terminal, obtains the parameter information of relay protection device to be measured;
According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;
According to the protection type of the relay protection device to be measured, corresponding control instruction and sampled data are generated, and will control
Instruction and sampling data transmitting give relay protection device to be measured, so that the relay equipment to be measured meets test condition;
It, will be in the corresponding fixed value list of the relay protection device to be measured according to the parameter information of the relay protection device to be measured
Value data and pressing plate state are attached to the relay protection device to be measured under in the test terminal, so that the relay to be measured
Equipment is protected to enter state to be tested;
According to the protection type of the relay protection device to be measured add test item, and according to the test item of the addition generate with
The test template of fixed value list corresponding content and sequence consensus;
Required test template is imported into the test terminal, and experiment parameter is configured;
It receives after the relay protection device to be measured is tested according to test template and experiment parameter and obtains test result;
When testing completion, the test result is subjected to record and test report is generated according to the test result.
2. the method according to claim 1, wherein believing according to the parameter of the relay protection device to be measured
Breath, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state under in the test terminal
It is attached to before the relay protection device to be measured, which comprises
The corresponding fixed value list template of relay protection device to be measured is chosen from fixed value list template library, is protected with obtaining the relay to be measured
Protect the corresponding definite value of equipment and pressing plate state;
Fixed value list template library is established according to the parameter information of the relay protection device to be measured, relay to be measured is chosen to protect before testing
The corresponding fixed value list template of equipment is protected, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
3. the method according to claim 1, wherein the protection class according to the relay protection device to be measured
Type adds test item, and the test of corresponding with the fixed value list content and sequence consensus is generated according to the test item of the addition
Template, comprising:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
4. the method according to claim 1, wherein the described method includes:
The test item of user's addition and the operation of testing sequence are responded, and generates a new test template;
The operation of the new test template of response creation, according to the new test mould of test item and testing sequence creation inputted in the operation
Plate.
5. the method according to claim 1, wherein the described method includes:
After a test by the state before the definite value of the relay protection device to be measured and pressing plate state reduction to test.
6. a kind of test device of relay protection device, it is applied to test terminal, which is characterized in that described device includes:
Data obtaining module obtains relay protection to be measured for the whole station configuration file of substation to be imported the test terminal
The parameter information of equipment;
It is also used to the parameter information according to the relay protection device to be measured, obtains the protection type of relay protection device to be measured;
It is also used to the protection type according to the relay protection device to be measured, generates corresponding control instruction and sampled data, and
Control instruction and sampling data transmitting are given to relay protection device to be measured, so that the relay equipment to be measured meets test condition;
Under die-filling piece, for the parameter information according to the relay protection device to be measured, by the relay protection device pair to be measured
The value data in fixed value list and pressing plate state answered are attached to the relay protection device to be measured under in the test terminal, with
The relay protection device to be measured is set to enter state to be tested;
Test module, for adding test item according to the protection type of the relay protection device to be measured, and according to the addition
Test item generate the test template of corresponding with fixed value list content and sequence consensus;
It is also used to required test template importing the test terminal, and experiment parameter is configured;
It is also used to receive and obtains test knot after the relay protection device to be measured is tested according to test template and experiment parameter
Fruit;
Report generation module, for the test result being carried out record and according to test result life when testing completion
At test report.
7. device according to claim 6, which is characterized in that under described before die-filling piece, described device includes:
Template library module, for choosing the corresponding fixed value list template of relay protection device to be measured from fixed value list template library, to obtain
Take the corresponding definite value of the relay protection device to be measured and pressing plate state;
It is also used to establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing to be measured
The corresponding fixed value list template of relay protection device, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
8. device according to claim 6, which is characterized in that the test module is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
9. device according to claim 6, which is characterized in that described device includes:
Hand-held block for responding the test item of user's addition and the operation of testing sequence, and generates a new test template;
It is also used to the operation of the new test template of response creation, is surveyed according to test item and the testing sequence creation inputted in the operation is new
Die trial plate.
10. device according to claim 6, which is characterized in that described device includes:
Recovery module, for after a test will be before the definite value of the relay protection device to be measured and pressing plate state reduction to test
State.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811374008.9A CN109507574A (en) | 2018-11-19 | 2018-11-19 | The test method and device of relay protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811374008.9A CN109507574A (en) | 2018-11-19 | 2018-11-19 | The test method and device of relay protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109507574A true CN109507574A (en) | 2019-03-22 |
Family
ID=65748993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811374008.9A Pending CN109507574A (en) | 2018-11-19 | 2018-11-19 | The test method and device of relay protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109507574A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113613099A (en) * | 2021-08-06 | 2021-11-05 | 国网浙江省电力有限公司检修分公司 | Secondary equipment test system based on internet of things |
CN113866528A (en) * | 2021-08-17 | 2021-12-31 | 广西电网有限责任公司防城港供电局 | Method for automatically testing acceptance and generating report file |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103792448A (en) * | 2014-01-22 | 2014-05-14 | 国家电网公司 | Digitized protective device automatic test control system and control method thereof |
CN104391244A (en) * | 2014-11-21 | 2015-03-04 | 广东电网有限责任公司电力调度控制中心 | Closed loop test method of relay protection apparatus and system thereof |
CN105388416A (en) * | 2015-11-16 | 2016-03-09 | 国家电网公司 | Intelligent substation relay protection remote test system |
CN205139276U (en) * | 2015-11-16 | 2016-04-06 | 国家电网公司 | Local relay protection testing system of intelligent substation |
CN108279340A (en) * | 2017-12-29 | 2018-07-13 | 国网浙江省电力公司湖州供电公司 | Site protective relaying device test method and system |
CN108549017A (en) * | 2018-04-09 | 2018-09-18 | 南京南瑞继保电气有限公司 | A kind of relay protection test method and system shared based on cloud |
-
2018
- 2018-11-19 CN CN201811374008.9A patent/CN109507574A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103792448A (en) * | 2014-01-22 | 2014-05-14 | 国家电网公司 | Digitized protective device automatic test control system and control method thereof |
CN104391244A (en) * | 2014-11-21 | 2015-03-04 | 广东电网有限责任公司电力调度控制中心 | Closed loop test method of relay protection apparatus and system thereof |
CN105388416A (en) * | 2015-11-16 | 2016-03-09 | 国家电网公司 | Intelligent substation relay protection remote test system |
CN205139276U (en) * | 2015-11-16 | 2016-04-06 | 国家电网公司 | Local relay protection testing system of intelligent substation |
CN108279340A (en) * | 2017-12-29 | 2018-07-13 | 国网浙江省电力公司湖州供电公司 | Site protective relaying device test method and system |
CN108549017A (en) * | 2018-04-09 | 2018-09-18 | 南京南瑞继保电气有限公司 | A kind of relay protection test method and system shared based on cloud |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113613099A (en) * | 2021-08-06 | 2021-11-05 | 国网浙江省电力有限公司检修分公司 | Secondary equipment test system based on internet of things |
CN113866528A (en) * | 2021-08-17 | 2021-12-31 | 广西电网有限责任公司防城港供电局 | Method for automatically testing acceptance and generating report file |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8810251B2 (en) | Systems, methods, and apparatus for locating faults on an electrical distribution network | |
CN105116248B (en) | Relay protection device of intelligent substation automated closed-loop test method | |
Zhu et al. | Standard function blocks for flexible IED in IEC 61850-based substation automation | |
CN105388416B (en) | The distant check system of having a try of intelligent substation relay protection | |
CN103941079B (en) | Power distribution network PT on-line monitoring and fault diagnosis system | |
US20140351572A1 (en) | Automatically Configurable Intelligent Electronic Device | |
CN109449059A (en) | Intelligent breaker with self-checking function | |
CN105116270A (en) | Mutual inductor fault detection method for merging unit and protection control device | |
CN109507574A (en) | The test method and device of relay protection device | |
CN109449931A (en) | In conjunction with the cascading failure collection construction method of weighting trend entropy and whole process simulation | |
Uddin et al. | Detection and locating the point of fault in distribution side of power system using WSN technology | |
CN113629830A (en) | Safety protection method for electric vehicle charging facility | |
CN113884787B (en) | Method and system for testing tripping and closing verification function of intelligent recorder | |
Daboul et al. | Testing protection relays based on IEC 61850 in substation automation systems | |
KR100969155B1 (en) | Functional testing method of bus protective ied using uml test model | |
CN105277825B (en) | A kind of relay protection action failure analytical equipment and method | |
CN105467233B (en) | Intelligent substation local reaying protection test system | |
CN104316823B (en) | A kind of method and device of defects detection | |
CN203838251U (en) | Integration test system for quick connection of low-voltage relay protection device | |
CN113075511A (en) | Line insulation monitoring method, system and device based on distributed fault recording | |
CN207301792U (en) | Interface test system between direct current control system and stable control system | |
Zhu et al. | Evidence theory-based fake measurement identification and fault-tolerant protection in digital substations | |
CN112713651B (en) | Temporary electricity safety monitoring system and method | |
Yang et al. | Protection performance testing in IEC 61850 based systems | |
Mirza et al. | Design and fabrication of underground fault distance locator using arduino and GSM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190322 |
|
RJ01 | Rejection of invention patent application after publication |