CN109507574A - The test method and device of relay protection device - Google Patents

The test method and device of relay protection device Download PDF

Info

Publication number
CN109507574A
CN109507574A CN201811374008.9A CN201811374008A CN109507574A CN 109507574 A CN109507574 A CN 109507574A CN 201811374008 A CN201811374008 A CN 201811374008A CN 109507574 A CN109507574 A CN 109507574A
Authority
CN
China
Prior art keywords
test
protection device
measured
relay protection
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811374008.9A
Other languages
Chinese (zh)
Inventor
张立辉
吕意飞
马站宏
徐子航
牛建新
周宏�
彭冲
胡海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tacheng Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Tacheng Power Supply Co Of Xinjiang Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tacheng Power Supply Co Of Xinjiang Power Co Ltd, State Grid Corp of China SGCC filed Critical Tacheng Power Supply Co Of Xinjiang Power Co Ltd
Priority to CN201811374008.9A priority Critical patent/CN109507574A/en
Publication of CN109507574A publication Critical patent/CN109507574A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/327Testing of circuit interrupters, switches or circuit-breakers
    • G01R31/3277Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
    • G01R31/3278Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches of relays, solenoids or reed switches

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The application provides the test method and device of a kind of relay protection device, is applied to test terminal, which comprises the whole station configuration file of substation is imported the test terminal;According to the parameter information of the relay protection device to be measured;According to the protection type of the relay protection device to be measured;According to the parameter information of the relay protection device to be measured, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state be attached to the relay protection device to be measured under in the test terminal;Required test template is imported into the test terminal;It receives and obtains test result after the relay protection device to be measured is tested according to test template and experiment parameter and generate test report.The test to relay protection device is carried out using the method in the application.Entire test process is intelligent, and the report generation after preparation process to test since test does not all need excessive manual operation, improves work efficiency.

Description

The test method and device of relay protection device
Technical field
This application involves substation relay protection device technical fields, in particular to the test of relay protection device Method and device.
Background technique
It is existing currently, as people's lives level increasingly improves, the high speed development of social economy, power industry as with this Change closely bound up field a bit, is also increasingly taken seriously.The universal of intelligent substation meets various distribution power supplies Problem.And the relay protection device in intelligent substation, it is a very important component part in intelligent substation, effect It is the key that guarantee that entire intelligent substation operates normally.So the maintenance and detection of relay protection device, are indispensable 's.
At present when detecting relay protection device, whether before testing to the definite value and pressing plate of relay protection device to be measured The processing of state still requires manually to input to the processing of each detection project in the detection process.Moreover, one The protection type of a relay protection device, it is also desirable to which artificial goes to judge, then just can be carried out test after the completion of judging, efficiency is very Lowly, it is unable to satisfy that entire electric field is large number of and different types of relay protection device.
In view of this, intellectually and automatically when how to realize detection relay protection device, needs to solve at present Problem.
Summary of the invention
A kind of test method and device for being designed to provide relay protection device of the application.
In a first aspect, the embodiment of the present application provides a kind of test method of relay protection device, it is applied to test terminal, institute The method of stating includes:
The whole station configuration file of substation is imported into the test terminal, obtains the parameter letter of relay protection device to be measured Breath;
According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;
According to the protection type of the relay protection device to be measured, corresponding control instruction and sampled data are generated, and will Control instruction and sampling data transmitting give relay protection device to be measured, so that the relay equipment to be measured meets test condition;
According to the parameter information of the relay protection device to be measured, by the corresponding fixed value list of the relay protection device to be measured In value data and pressing plate state be attached to the relay protection device to be measured under in the test terminal so that described to be measured Relay protection device enters state to be tested;
Test item is added according to the protection type of the relay protection device to be measured, and raw according to the test item of the addition At the test template of corresponding with fixed value list content and sequence consensus;
Required test template is imported into the test terminal, and experiment parameter is configured;
It receives after the relay protection device to be measured is tested according to test template and experiment parameter and obtains test result;
When testing completion, the test result is subjected to record and test report is generated according to the test result.
Optionally, in the parameter information according to the relay protection device to be measured, by the relay protection device pair to be measured The value data in fixed value list and pressing plate state answered be attached under in the test terminal relay protection device to be measured it Before, which comprises
The corresponding fixed value list template of relay protection device to be measured is chosen from fixed value list template library, with obtain it is described it is to be measured after The corresponding definite value of electric protection equipment and pressing plate state.
Establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing it is to be measured after The corresponding fixed value list template of electric protection equipment, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
Optionally, described that test item is added according to the protection type of the relay protection device to be measured, and added according to described The test item added generates the test template of corresponding with the fixed value list content and sequence consensus, comprising:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Optionally, which comprises
The test item of user's addition and the operation of testing sequence are responded, and generates a new test template.
The operation of the new test template of response creation, according to the new test of test item and testing sequence creation inputted in the operation Template.
Optionally, which comprises
After a test by the state before the definite value of the relay protection device to be measured and pressing plate state reduction to test.
Second aspect, the embodiment of the present application provide a kind of test device of relay protection device, are applied to test terminal, institute Stating device includes:
Data obtaining module obtains relay to be measured for the whole station configuration file of substation to be imported the test terminal Protect the parameter information of equipment;
It is also used to the parameter information according to the relay protection device to be measured, obtains the protection class of relay protection device to be measured Type;
It is also used to generate corresponding control instruction and hits according to the protection type of the relay protection device to be measured According to, and give control instruction and sampling data transmitting to relay protection device to be measured, so that the relay equipment to be measured meets test Condition;
Under die-filling piece, for the parameter information according to the relay protection device to be measured, the relay protection to be measured is set Value data and pressing plate state in standby corresponding fixed value list are attached to the relay protection to be measured under in the test terminal and set It is standby, so that the relay protection device to be measured enters state to be tested;
Test module, for adding test item according to the protection type of the relay protection device to be measured, and according to described The test item of addition generates the test template of corresponding with fixed value list content and sequence consensus;
It is also used to required test template importing the test terminal, and experiment parameter is configured;
It is also used to receive after the relay protection device to be measured is tested according to test template and experiment parameter and be surveyed Test result;
Report generation module, for the test result being carried out record and is tied according to the test when testing completion Fruit generates test report.
Optionally, under described before die-filling piece, described device includes:
Template library module, for choosing the corresponding fixed value list template of relay protection device to be measured from fixed value list template library, To obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
It is also used to establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing The corresponding fixed value list template of relay protection device to be measured, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate shape State.
Optionally, the test module is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Optionally, described device includes:
Hand-held block for responding the test item of user's addition and the operation of testing sequence, and generates a new test Template.
It is also used to the operation of the new test template of response creation, is created according to the test item and testing sequence inputted in the operation New test template.
Optionally, described device includes:
Recovery module, for after a test by the definite value of the relay protection device to be measured and pressing plate state reduction to test Preceding state.
Compared with prior art, beneficial effect provided by the present application includes: that the application provides a kind of survey of relay protection device Method for testing and device are applied to test terminal, which comprises the whole station configuration file of substation is imported the test eventually End, obtains the parameter information of relay protection device to be measured;According to the parameter information of the relay protection device to be measured, obtain to be measured The protection type of relay protection device;According to the protection type of the relay protection device to be measured, corresponding control instruction is generated And sampled data, and give control instruction and sampling data transmitting to relay protection device to be measured, so that the relay equipment to be measured Meet test condition;It is according to the parameter information of the relay protection device to be measured, the relay protection device to be measured is corresponding Value data and pressing plate state in fixed value list are attached to the relay protection device to be measured under in the test terminal, so that institute Relay protection device to be measured is stated into state to be tested;It is added and is tested according to the protection type of the relay protection device to be measured , and according to the test template of the test item of addition generation corresponding with fixed value list content and sequence consensus;By required survey Die trial plate imports the test terminal, and configures to experiment parameter;The relay protection device to be measured is received according to test Template and experiment parameter obtain test result after being tested;When testing completion, the test result record simultaneously root Test report is generated according to the test result.The test to relay protection device is carried out using the method in the application.It is entire to survey Examination process is intelligent, and the report generation after preparation process to test since test does not all need excessive artificial behaviour Make, improves work efficiency.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described.It should be appreciated that the following drawings illustrates only some embodiments of the application, therefore it is not construed as pair The restriction of range.It for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the frame diagram of the test macro of relay protection device provided by the embodiments of the present application;
The structural schematic block diagram of the position Fig. 2 test terminal provided by the embodiments of the present application;
Fig. 3 is the test method steps flow chart schematic diagram of relay protection device provided by the embodiments of the present application;
Fig. 4 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 5 is the sub-step flow diagram of step S205 in Fig. 3;
Fig. 6 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 7 is another flow diagram of test method step of relay protection device provided by the embodiments of the present application;
Fig. 8 is the structural block diagram of the test device of relay protection device provided by the embodiments of the present application;
Fig. 9 is the overall structure block diagram of the test device of relay protection device provided by the embodiments of the present application.
Icon: the test macro of 10- relay protection device;100- tests terminal;200- relay protection device;110- relay Protect the test device of equipment;111- memory;112- processor;113- communication unit;1101- data obtaining module;1102- Under die-filling piece;1103- test module;1104- report generation module;1105- template library module;1106- hand-held block;1107- Recovery module.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application In attached drawing, the technical scheme in the embodiment of the application is clearly and completely described.Obviously, described embodiment is Some embodiments of the present application, instead of all the embodiments.The application being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiments herein provided in the accompanying drawings is not intended to limit below claimed Scope of the present application, but be merely representative of the selected embodiment of the application.Based on the embodiment in the application, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model of the application protection It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present application, it is to be understood that the instruction such as term " on ", "lower", "inner", "outside", "left", "right" Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings or this application product using when usually put Orientation or positional relationship or the orientation or positional relationship that usually understands of those skilled in the art, be merely for convenience of retouching It states the application and simplifies description, rather than the equipment of indication or suggestion meaning or element must have a particular orientation, with specific Orientation construction and operation, therefore should not be understood as the limitation to the application.
In addition, term " first ", " second " etc. are only used for distinguishing description, it is not understood to indicate or imply relatively important Property.
In the description of the present application, it is also necessary to which explanation is unless specifically defined or limited otherwise, " setting ", " even Connect " etc. terms shall be understood in a broad sense, for example, " connection " may be a fixed connection, may be a detachable connection, or integrally connect It connects;It can be mechanical connection, be also possible to be electrically connected;It can be and be directly connected to, can also be indirectly connected with by intermediary, it can To be the connection inside two elements.For the ordinary skill in the art, can understand as the case may be above-mentioned The concrete meaning of term in this application.
With reference to the accompanying drawing, the specific embodiment of the application is described in detail.
Fig. 1 is please referred to, Fig. 1 is the test of the relay protection device of relay protection device 200 provided by the embodiments of the present application The frame diagram of system 10.The test macro 10 of the relay protection device includes testing terminal 100 and relay protection device 200, Wherein, test terminal 100 can be connected with relay protection device 200 by wireless communication, the relay protection device 200 The test signal issued for receiving the test terminal 100.It is understood that above-mentioned connection type is example, do not answer When being interpreted as the limitation to the present embodiment, in the other embodiments of the present embodiment, terminal 100 and relay protection device are tested 200 can be connected by optical fiber.
Referring to figure 2., Fig. 2 is the structural schematic block diagram that terminal 100 is tested in Fig. 1.The test terminal 100 includes relay Protect test device 110, memory 111, processor 112 and the communication unit 113 of equipment.
Each element of the memory 111, processor 112 and communication unit 113 is directly or indirectly electrical between each other Connection, to realize the transmission or interaction of data.For example, these elements can pass through one or more communication bus or letter between each other Number line, which is realized, to be electrically connected.
Wherein, the memory 111 may be, but not limited to, random access memory (Random Access Memory, RAM), read-only memory (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..Wherein, memory 111 is for storing program, the processor 112 after receiving and executing instruction, Execute described program.The communication unit 113 is used to establish the test terminal 100 and other equipment by network and (for example uses Family terminal) between communication connection, and for being sended and received by network progress data.For example, in the present embodiment, surveying It tries terminal 100 and data communication is carried out by communication unit 113 and relay protection device 200.
Referring to figure 3., Fig. 3 is that the test method steps flow chart of relay protection device 200 provided by the embodiments of the present application shows It is intended to, which comprises
The whole station configuration file of substation is imported the test terminal 100, obtains relay protection device by step S201 200 parameter information.
In the present embodiment, parameter information can refer to the whole station configuration file by importing tested protective relaying device come Obtain the information such as parameter, the channel configuration of tested protective relaying device.And visualization function can also be configured, by IED (Intelligent Electronic Device, intelligent electronic device) chain graph, signal graph, virtual terminator figure, virtual terminator table into Row visualizes, and can check virtual terminator, equipment interconnecting relation and establish intuitive signal data flow direction.
Step S202 obtains the protection of relay protection device 200 according to the parameter information of the relay protection device 200 Type.
In the present embodiment, the protection type of the relay protection device 200 can be overcurrent protection: fault current is super Overcurrent protection definite value is crossed, failure time of occurrence is more than to issue trip signal after protecting the definite value time.In other embodiments, relay The protection type of protection equipment 200 can also be that overvoltage protection, under-voltage protection, differential protection, distance protection and direction are protected Shield.
Step S203 generates corresponding control instruction and hits according to the protection type of the relay protection device 200 According to, and give control instruction and sampling data transmitting to relay protection device 200, so that the relay equipment to be measured meets test-strips Part.
In the present embodiment, the control instruction can be GOOSE (Generic Object Oriented Substation Event, the transformer substation case towards general object), for realizing multiple intelligent electronic devices (IED) it Between information transmitting, including transmission breaker tripping and closing, connection locking etc. multi-signals.The sampled data can be SV (Sampled Value, sampled value), the communication service for real-time Transmission digital sample information.
Step S204, it is according to the parameter information of the relay protection device 200, the relay protection device 200 is corresponding Fixed value list in value data and pressing plate state be attached to the relay protection device 200 under in the test terminal 100, with The relay protection device 200 is set to enter state to be tested.
In the present embodiment, by the value data and pressing plate state in the corresponding fixed value list of the relay protection device 200 The relay protection device 200 is attached under in the test terminal 100 can refer to required value data through network It is downloaded and installed into the relay protection device 200 with pressing plate state.In other embodiments, MMS network work can be passed through Pretend under tool (MSS-ethereal) and closes definite value and relay protection device may be selected in relaying configuration pressing plate state, reviewer 200 store path backs up definite value, pressing plate state.
Step S205 adds test item according to the protection type of the relay protection device 200, and according to the addition Test item generates the test template of corresponding with fixed value list content and sequence consensus.
Required test template is imported the test terminal 100, and configured to experiment parameter by step S206.
Step S207 is received after the relay protection device 200 is tested according to test template and experiment parameter and is obtained Test result.
The test result is carried out record and is generated according to the test result to survey by step S208 when testing completion Examination report.
In the present embodiment, after the completion of test, the test result of each single item, and the form by result to report can be shown Multiple format output is supported in export, export report.All test assignments all after the completion of, the export of every test result can be integrated.
Referring to figure 4., Fig. 4 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application Journey schematic diagram.
Before step S207, which comprises
Step S209 chooses the corresponding fixed value list template of relay protection device 200, from fixed value list template library to obtain State the corresponding definite value of relay protection device 200 and pressing plate state.
Step S210 establishes fixed value list template library according to the parameter information of the relay protection device 200, selects before testing The corresponding fixed value list template of middle relay protection device 200, to obtain the corresponding definite value of the relay protection device 200 and pressing plate shape State.
Referring to figure 5., step S205 includes sub-step S2051 and sub-step S2052:
Sub-step S2051 adds test item according to the inspection project and fixed value list of similar protection.
Sub-step S2052 is generated and the test content and testing sequence one in the fixed value list according to the test item of addition The test template of cause.
Fig. 6 is please referred to, Fig. 6 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application Journey schematic diagram;
Step S211, the test item of response user's addition and the operation of testing sequence, and generate a new test template.
In the present embodiment, adding test item and testing sequence can be and automatically generated by test terminal 100, be also possible to Test item and testing sequence are added manually by user to the test terminal 100.
Step S212, the operation of the new test template of response creation, according to the test item and testing sequence inputted in the operation Create new test template.
Fig. 7 is please referred to, Fig. 7 is another stream of test method step of relay protection device 200 provided by the embodiments of the present application Journey schematic diagram;
Step S213, after a test will be before the definite value of the relay protection device 200 and pressing plate state reduction to test State.
In the present embodiment, important circuit can also be prompted before testing, prevents from leading to important circuit because of test Damage (such as start failure protection, jump mother of the switch).
Fig. 8 is please referred to, Fig. 8 is the structural block diagram of the test device of relay protection device 200 provided by the embodiments of the present application, Described device includes:
Data obtaining module 1101, for the whole station configuration file of substation to be imported the test terminal 100, acquisition after The parameter information of electric protection equipment 200.
It is also used to the parameter information according to the relay protection device 200, obtains the protection class of relay protection device 200 Type.
It is also used to generate corresponding control instruction and sampled data according to the protection type of the relay protection device 200, And give control instruction and sampling data transmitting to relay protection device 200, so that the relay equipment to be measured meets test condition.
Under die-filling piece 1102, for the parameter information according to the relay protection device 200, by the relay protection device Value data and pressing plate state in 200 corresponding fixed value lists are attached to the relay protection under in the test terminal 100 and set Standby 200, so that the relay protection device 200 enters state to be tested.
Test module 1103, for adding test item according to the protection type of the relay protection device 200, and according to institute The test item for stating addition generates the test template of corresponding with fixed value list content and sequence consensus.
It is also used to required test template importing the test terminal 100, and experiment parameter is configured.
It is also used to receive after the relay protection device 200 is tested according to test template and experiment parameter and be tested As a result.
Report generation module 1104, for the test result being carried out record and according to the survey when testing completion Test result generates test report.
Further, under described before die-filling piece 1102, described device includes:
Template library module 1105, for choosing the corresponding definite value single mode of relay protection device 200 from fixed value list template library Plate, to obtain the corresponding definite value of the relay protection device 200 and pressing plate state.
It is also used to establish fixed value list template library according to the parameter information of the relay protection device 200, choose before testing The corresponding fixed value list template of relay protection device 200, to obtain the corresponding definite value of the relay protection device 200 and pressing plate shape State.
Further, the test module 1103 is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
Further, described device includes:
Hand-held block 1106, for responding the test item of user's addition and the operation of testing sequence, and generate one it is new Test template.
It is also used to the operation of the new test template of response creation, is created according to the test item and testing sequence inputted in the operation New test template.
Further, described device includes:
Recovery module 1107, for after a test arriving the definite value of the relay protection device 200 and pressing plate state reduction State before test.
Further, in the present embodiment, a kind of side of test device 110 for detecting relay protection device is additionally provided Method, the specific steps are as follows:
Whether test device GOOSE receives and sends normal.
Whether test device action behavior is normal.
Whether test device GOOSE sends mechanism correct.
Test GOOSE communication channel delay.
Test the test device response time.
The hard contact of test test device GOOSE message turn is outputed, the position of the switch is indexed to GOOSE displacement message output.
Test device, which receives GOOSE breaker tripping and closing message to switch, becomes the response time of rear GOOSE message output.
In conclusion the application provides the test method and device of a kind of relay protection device, it is applied to test terminal, institute The method of stating includes: that the whole station configuration file of substation is imported the test terminal, obtains the parameter of relay protection device to be measured Information;According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;According to institute The protection type for stating relay protection device to be measured, generates corresponding control instruction and sampled data, and by control instruction and sampling Data are sent to relay protection device to be measured, so that the relay equipment to be measured meets test condition;According to the relay to be measured The parameter information for protecting equipment, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state from The relay protection device to be measured is attached under in the test terminal, so that the relay protection device to be measured enters shape to be tested State;According to the protection type of the relay protection device to be measured add test item, and according to the test item of the addition generate with The test template of fixed value list corresponding content and sequence consensus;Required test template is imported into the test terminal, and to experiment Parameter is configured;It receives after the relay protection device to be measured is tested according to test template and experiment parameter and is tested As a result;When testing completion, the test result is subjected to record and test report is generated according to the test result.Use this Method in application carries out the test to relay protection device.Entire test process is intelligent, the preparation process since test Report generation after test does not all need excessive manual operation, improves work efficiency.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. a kind of test method of relay protection device is applied to test terminal, which is characterized in that the described method includes:
The whole station configuration file of substation is imported into the test terminal, obtains the parameter information of relay protection device to be measured;
According to the parameter information of the relay protection device to be measured, the protection type of relay protection device to be measured is obtained;
According to the protection type of the relay protection device to be measured, corresponding control instruction and sampled data are generated, and will control Instruction and sampling data transmitting give relay protection device to be measured, so that the relay equipment to be measured meets test condition;
It, will be in the corresponding fixed value list of the relay protection device to be measured according to the parameter information of the relay protection device to be measured Value data and pressing plate state are attached to the relay protection device to be measured under in the test terminal, so that the relay to be measured Equipment is protected to enter state to be tested;
According to the protection type of the relay protection device to be measured add test item, and according to the test item of the addition generate with The test template of fixed value list corresponding content and sequence consensus;
Required test template is imported into the test terminal, and experiment parameter is configured;
It receives after the relay protection device to be measured is tested according to test template and experiment parameter and obtains test result;
When testing completion, the test result is subjected to record and test report is generated according to the test result.
2. the method according to claim 1, wherein believing according to the parameter of the relay protection device to be measured Breath, by the corresponding fixed value list of the relay protection device to be measured value data and pressing plate state under in the test terminal It is attached to before the relay protection device to be measured, which comprises
The corresponding fixed value list template of relay protection device to be measured is chosen from fixed value list template library, is protected with obtaining the relay to be measured Protect the corresponding definite value of equipment and pressing plate state;
Fixed value list template library is established according to the parameter information of the relay protection device to be measured, relay to be measured is chosen to protect before testing The corresponding fixed value list template of equipment is protected, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
3. the method according to claim 1, wherein the protection class according to the relay protection device to be measured Type adds test item, and the test of corresponding with the fixed value list content and sequence consensus is generated according to the test item of the addition Template, comprising:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
4. the method according to claim 1, wherein the described method includes:
The test item of user's addition and the operation of testing sequence are responded, and generates a new test template;
The operation of the new test template of response creation, according to the new test mould of test item and testing sequence creation inputted in the operation Plate.
5. the method according to claim 1, wherein the described method includes:
After a test by the state before the definite value of the relay protection device to be measured and pressing plate state reduction to test.
6. a kind of test device of relay protection device, it is applied to test terminal, which is characterized in that described device includes:
Data obtaining module obtains relay protection to be measured for the whole station configuration file of substation to be imported the test terminal The parameter information of equipment;
It is also used to the parameter information according to the relay protection device to be measured, obtains the protection type of relay protection device to be measured;
It is also used to the protection type according to the relay protection device to be measured, generates corresponding control instruction and sampled data, and Control instruction and sampling data transmitting are given to relay protection device to be measured, so that the relay equipment to be measured meets test condition;
Under die-filling piece, for the parameter information according to the relay protection device to be measured, by the relay protection device pair to be measured The value data in fixed value list and pressing plate state answered are attached to the relay protection device to be measured under in the test terminal, with The relay protection device to be measured is set to enter state to be tested;
Test module, for adding test item according to the protection type of the relay protection device to be measured, and according to the addition Test item generate the test template of corresponding with fixed value list content and sequence consensus;
It is also used to required test template importing the test terminal, and experiment parameter is configured;
It is also used to receive and obtains test knot after the relay protection device to be measured is tested according to test template and experiment parameter Fruit;
Report generation module, for the test result being carried out record and according to test result life when testing completion At test report.
7. device according to claim 6, which is characterized in that under described before die-filling piece, described device includes:
Template library module, for choosing the corresponding fixed value list template of relay protection device to be measured from fixed value list template library, to obtain Take the corresponding definite value of the relay protection device to be measured and pressing plate state;
It is also used to establish fixed value list template library according to the parameter information of the relay protection device to be measured, choose before testing to be measured The corresponding fixed value list template of relay protection device, to obtain the corresponding definite value of the relay protection device to be measured and pressing plate state.
8. device according to claim 6, which is characterized in that the test module is specifically used for:
According to the inspection project and fixed value list of similar protection, test item is added;
It is generated and the test content and the consistent test template of testing sequence in the fixed value list according to the test item of addition.
9. device according to claim 6, which is characterized in that described device includes:
Hand-held block for responding the test item of user's addition and the operation of testing sequence, and generates a new test template;
It is also used to the operation of the new test template of response creation, is surveyed according to test item and the testing sequence creation inputted in the operation is new Die trial plate.
10. device according to claim 6, which is characterized in that described device includes:
Recovery module, for after a test will be before the definite value of the relay protection device to be measured and pressing plate state reduction to test State.
CN201811374008.9A 2018-11-19 2018-11-19 The test method and device of relay protection device Pending CN109507574A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811374008.9A CN109507574A (en) 2018-11-19 2018-11-19 The test method and device of relay protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811374008.9A CN109507574A (en) 2018-11-19 2018-11-19 The test method and device of relay protection device

Publications (1)

Publication Number Publication Date
CN109507574A true CN109507574A (en) 2019-03-22

Family

ID=65748993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811374008.9A Pending CN109507574A (en) 2018-11-19 2018-11-19 The test method and device of relay protection device

Country Status (1)

Country Link
CN (1) CN109507574A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113613099A (en) * 2021-08-06 2021-11-05 国网浙江省电力有限公司检修分公司 Secondary equipment test system based on internet of things
CN113866528A (en) * 2021-08-17 2021-12-31 广西电网有限责任公司防城港供电局 Method for automatically testing acceptance and generating report file

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN104391244A (en) * 2014-11-21 2015-03-04 广东电网有限责任公司电力调度控制中心 Closed loop test method of relay protection apparatus and system thereof
CN105388416A (en) * 2015-11-16 2016-03-09 国家电网公司 Intelligent substation relay protection remote test system
CN205139276U (en) * 2015-11-16 2016-04-06 国家电网公司 Local relay protection testing system of intelligent substation
CN108279340A (en) * 2017-12-29 2018-07-13 国网浙江省电力公司湖州供电公司 Site protective relaying device test method and system
CN108549017A (en) * 2018-04-09 2018-09-18 南京南瑞继保电气有限公司 A kind of relay protection test method and system shared based on cloud

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103792448A (en) * 2014-01-22 2014-05-14 国家电网公司 Digitized protective device automatic test control system and control method thereof
CN104391244A (en) * 2014-11-21 2015-03-04 广东电网有限责任公司电力调度控制中心 Closed loop test method of relay protection apparatus and system thereof
CN105388416A (en) * 2015-11-16 2016-03-09 国家电网公司 Intelligent substation relay protection remote test system
CN205139276U (en) * 2015-11-16 2016-04-06 国家电网公司 Local relay protection testing system of intelligent substation
CN108279340A (en) * 2017-12-29 2018-07-13 国网浙江省电力公司湖州供电公司 Site protective relaying device test method and system
CN108549017A (en) * 2018-04-09 2018-09-18 南京南瑞继保电气有限公司 A kind of relay protection test method and system shared based on cloud

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113613099A (en) * 2021-08-06 2021-11-05 国网浙江省电力有限公司检修分公司 Secondary equipment test system based on internet of things
CN113866528A (en) * 2021-08-17 2021-12-31 广西电网有限责任公司防城港供电局 Method for automatically testing acceptance and generating report file

Similar Documents

Publication Publication Date Title
US8810251B2 (en) Systems, methods, and apparatus for locating faults on an electrical distribution network
CN105116248B (en) Relay protection device of intelligent substation automated closed-loop test method
Zhu et al. Standard function blocks for flexible IED in IEC 61850-based substation automation
CN105388416B (en) The distant check system of having a try of intelligent substation relay protection
CN103941079B (en) Power distribution network PT on-line monitoring and fault diagnosis system
US20140351572A1 (en) Automatically Configurable Intelligent Electronic Device
CN109449059A (en) Intelligent breaker with self-checking function
CN105116270A (en) Mutual inductor fault detection method for merging unit and protection control device
CN109507574A (en) The test method and device of relay protection device
CN109449931A (en) In conjunction with the cascading failure collection construction method of weighting trend entropy and whole process simulation
Uddin et al. Detection and locating the point of fault in distribution side of power system using WSN technology
CN113629830A (en) Safety protection method for electric vehicle charging facility
CN113884787B (en) Method and system for testing tripping and closing verification function of intelligent recorder
Daboul et al. Testing protection relays based on IEC 61850 in substation automation systems
KR100969155B1 (en) Functional testing method of bus protective ied using uml test model
CN105277825B (en) A kind of relay protection action failure analytical equipment and method
CN105467233B (en) Intelligent substation local reaying protection test system
CN104316823B (en) A kind of method and device of defects detection
CN203838251U (en) Integration test system for quick connection of low-voltage relay protection device
CN113075511A (en) Line insulation monitoring method, system and device based on distributed fault recording
CN207301792U (en) Interface test system between direct current control system and stable control system
Zhu et al. Evidence theory-based fake measurement identification and fault-tolerant protection in digital substations
CN112713651B (en) Temporary electricity safety monitoring system and method
Yang et al. Protection performance testing in IEC 61850 based systems
Mirza et al. Design and fabrication of underground fault distance locator using arduino and GSM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322

RJ01 Rejection of invention patent application after publication