CN105388416B - The distant check system of having a try of intelligent substation relay protection - Google Patents
The distant check system of having a try of intelligent substation relay protection Download PDFInfo
- Publication number
- CN105388416B CN105388416B CN201510784668.4A CN201510784668A CN105388416B CN 105388416 B CN105388416 B CN 105388416B CN 201510784668 A CN201510784668 A CN 201510784668A CN 105388416 B CN105388416 B CN 105388416B
- Authority
- CN
- China
- Prior art keywords
- relay
- intelligent substation
- test
- protection
- distant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 claims abstract description 98
- 230000001681 protective effect Effects 0.000 claims abstract description 69
- 238000004891 communication Methods 0.000 claims abstract description 14
- 230000000977 initiatory effect Effects 0.000 claims abstract description 12
- 230000005540 biological transmission Effects 0.000 claims abstract description 7
- 238000001514 detection method Methods 0.000 claims description 30
- 238000012544 monitoring process Methods 0.000 claims description 18
- 239000013307 optical fiber Substances 0.000 claims description 9
- 238000000034 method Methods 0.000 claims description 8
- 230000008569 process Effects 0.000 claims description 8
- 230000009471 action Effects 0.000 description 9
- 238000003825 pressing Methods 0.000 description 9
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a kind of distant check system of having a try of intelligent substation relay protection, including:Remote control terminal, relay-protection tester, interchanger and local control terminal;Remote control terminal has the telecontrol communication machine for issuing the distant place control system of test initiation command and being connect with distant place control system;Relay-protection tester is arranged in intelligent substation; the Enable Pin of relay-protection tester is connect by interchanger with telecontrol communication machine; to receive the test initiation command of telecontrol communication machine transmission; multiple output terminals of relay-protection tester are connect one by one with the test interface of a variety of protective devices in intelligent substation, and the input terminal of relay-protection tester is connect by interchanger with the network interface of a variety of protective devices;Local control terminal is arranged in intelligent substation, and the first output terminal of local control terminal is connected by the Enable Pin of interchanger and relay-protection tester.Pass through above-mentioned technical proposal of the present invention improves testing efficiency during protective device debugging.
Description
Technical field
The present invention relates to the testing field of transforming plant protecting device, more particularly to a kind of distant examination of intelligent substation relay protection
Pilot system.
Background technology
The protective device of substation is the core of protecting electrical power system, and logic and the correctness set are related in electric power
Can breaker rapidly and accurately tripping be to cut off failure during system jam, so as to ensure the stable operation of electric system.
Therefore, the debugging process of protective device is extremely important, it directly affects the correct action of protective device and power system stability fortune
Row.
In the prior art, when being debugged to protective device, need commissioning staff to scene by by relay protection test
Instrument is connected in protective device, then carries out related commissioning work.Since the type of protective device is various, and it is distributed in differently
Point, this scheme undoubtedly increases so that the debugging work load of protective device is big, and task is heavy, and testing efficiency is low.
Invention content
The main object of the present invention is to provide a kind of distant check system of having a try of intelligent substation relay protection, existing at least to solve
There is the problem of testing efficiency of protective device present in technology is low.
In order to achieve the above object, an embodiment of the present invention provides a kind of intelligent substation relay protection it is distant have a try to test be
System, including:Remote control terminal, relay-protection tester, interchanger and local control terminal;The remote control terminal tool
There are the distant place control system for issuing test initiation command and the telecontrol communication machine being connect with the distant place control system;The relay protection
Tester is arranged in intelligent substation, and the Enable Pin of the relay-protection tester passes through the interchanger and the telecontrol communication machine
Connection, to receive the test initiation command of telecontrol communication machine transmission, multiple output terminals of the relay-protection tester with it is described
The test interface of a variety of protective devices in intelligent substation connects one by one, and the input terminal of the relay-protection tester passes through institute
The network interface that interchanger is stated with a variety of protective devices is connect, to identify protective device to be tested;The local control
Terminal is arranged in the intelligent substation, it is described local control terminal the first output terminal by the interchanger with it is described after
The Enable Pin connection of electric protection tester.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the remote control terminal is also
Including the first fingerprint machine, the output terminal of first fingerprint machine is connect with the start end of the distant place control system.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the local control terminal packet
The second fingerprint machine and monitoring equipment are included, the output terminal of second fingerprint machine is connect with the start end of the monitoring equipment, the monitoring
First output terminal of first output terminal of machine for the local control terminal.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the local control terminal is also
Including printer, the input terminal of the printer is connect with the second output terminal of the monitoring equipment, and the second of the monitoring equipment is defeated
Second output terminal of the outlet for the local control terminal.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the relay-protection tester
It is connect by optical fiber with the protective device.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the output of the protective device
End is connect by optical fiber with the intelligent terminal of the intelligent substation, and the intelligent terminal passes through cable and the intelligent substation
Breaker connected with disconnecting switch.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the distant place control system is used
According to different types of protective device, corresponding template file is previously stored with, the template file includes each protection dress
The detection project sequence and detection ordering put;After the test initiation command is sent out, the distant place control system identifies protection
The type of device, and detection project is performed one by one according to the detection ordering of corresponding protective device, the detection project is used to indicate
The protective device is tested in the relay-protection tester execution.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that the distant place control system is also
Original configuration information of protective device can be read, the configuration information includes protecting the definite value of the protection unit and soft pressing plate, and do
Good backup;At the end of test, the configuration information of protective device can be compared again, if test is to original configuration
Information is changed, and volume is after test, the backup before restoring automatically.
In the distant check system of having a try of intelligent substation relay protection as described above, it is preferable that if the detection project is hand
The project completed is moved, then the distant place control system can carry out user information alert so that user to be instructed to complete and the detection
Mesh relevant operation after the completion of operation, continues to test by after continued key, so as to complete entire test process.
What embodiment provided by the invention was brought has the beneficial effect that:
It can be in remote side and local side by the test of intelligent substation Relay Protection Experiment System protective device
It can complete, improve the convenience of protective device test, enhance the safety tested protective device, improve a variety of guarantors
The rapidity of protection unit test, improves the testing efficiency to protective device.
Description of the drawings
Fig. 1 is a kind of structure diagram of the distant check system of having a try of intelligent substation relay protection provided by the invention;
Wherein, symbol description is as follows in figure:
10 distant place control systems, 11 telecontrol communication machines, 20 monitoring equipments, 21 printers, 3 relay-protection testers, 4 protective devices, 5
Interchanger, 6 breakers, 7 disconnecting switch, 80 cables, 81 optical fiber, 82 cables.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to embodiment party of the present invention
Formula is described in further detail.
Referring to Fig. 1, the present invention provides a kind of distant check system of having a try of intelligent substation relay protection, including:Long-range control
Terminal processed, relay-protection tester 3, interchanger 5 and local control terminal.
Wherein, remote control terminal is filled by being controlled in strange land relay-protection tester 3 so as to fulfill to protection
4 remote control is put, including distant place control system 10 and telecontrol communication machine 11.Distant place control system 10 issues test initiation command,
Test initiation command is used to that relay-protection tester 3 to be controlled to start.Telecontrol communication machine 11 is used to the test initiation command passing through network
Send relay-protection tester 3 to.
Relay-protection tester 3 is arranged in intelligent substation, and Enable Pin is connect by cable 80 with interchanger 5, is handed over
It changes planes and 5 is connect by cable 80 with telecontrol communication machine 11, so that relay-protection tester remotely receives the survey of the transmission of telecontrol communication machine 11
Experimental starting instructs, and multiple output terminals are connect one by one with the test interface of a variety of protective devices 4 in intelligent substation, with output
Action command, the input terminal of relay-protection tester 3 are connect by interchanger with the network interface of a variety of protective devices 4, to know
Protective device not to be tested.The advantages of transmission capacity is big, and transmission quality is good since optical fiber has, and loss is small, and repeater span is long,
Relay-protection tester 3 is preferably connect by optical fiber 81 with protective device 4.
Local control terminal is arranged in intelligent substation, for (making locally with relay-protection tester same
With in space) relay-protection tester 3 is controlled, it is controlled so as to fulfill the local to protective device 4, the first output terminal
It is connect by interchanger 5 with the Enable Pin of relay-protection tester 3.
Since the stable operation of electric system is the powerful guarantee that production and living are able to normal operation, and intelligent substation after
Whether the distant check system of having a try of electric protection obtains the stable operation that reasonable employment is related to electric system, therefore remote control terminal is also
Including the first fingerprint machine, it is used to export enabling signal.In practice, belong to the distant check system of having a try of the intelligent substation relay protection
Operator by the first fingerprint machine export enabling signal to start distant place control system 10, so as to ensure that intelligent substation after
The safety of the distant check system of having a try of electric protection.
Local control terminal includes monitoring equipment 20, and the first output terminal of monitoring equipment 20 is first defeated as local control terminal
Outlet.In order to enhance the safety of local control terminal, local control terminal further includes the second fingerprint machine, starts letter for exporting
Number.In practice, the operator for belonging to the distant check system of having a try of the intelligent substation relay protection passes through the second fingerprint machine in local side
Enabling signal is exported to start monitoring equipment 20, so as to ensure that the safety of local control terminal.
For the ease of grasping the operating process to monitoring equipment 20, local control terminal further includes printer 21, input terminal
It is connect with the second output terminal of monitoring equipment 20, the second output terminal of the second output terminal of monitoring equipment 20 as local control terminal.
The output terminal of protective device 4 and the intelligent terminal 9 of intelligent substation are connected by optical fiber 81, and intelligent terminal 9 passes through
Cable 82 is connect with the action control end of the breaker 6 of intelligent substation and the action control end of disconnecting switch 7, so as to make open circuit
Device 6 or disconnecting switch 7 carry out division action after action command is received.
Each output terminal of relay-protection tester 4 has mark, the protection dress that mark connect for characterization with output terminal
The type put, so can quick identification protecting device type, so as to improve testing efficiency.
In order to further improve testing efficiency, distant place control system is specifically used for according to different types of protective device,
Corresponding template file is previously stored with, which includes the detection project sequence and detection ordering of each protective device.
After test initiation command (being referred to as distant place side test enabled instruction at this time) is sent out, distant place control system can identification protecting dress
The type put, and detection project is performed one by one according to the detection ordering of corresponding protective device, detection project is used to indicate relay guarantor
Protective device is tested in shield tester execution.
Due to the definite value that different test events are related to and soft pressing plate difference, in automatic testing process, distant place control system
System can change protective device definite value automatically according to different test events and soft pressing plate is moved back in throwing.Protection dress can be specifically read first
Configuration information is put, which includes the definite value of protective device, soft pressing plate, and carries out backup, and safety assurance is provided for test,
At the end of test, configuration information can be compared again, if former configuration information is changed in test, then surveying
After examination, the backup before restoring automatically.
If detection project is the project manually completed, distant place control system can carry out information alert to instruct to use to user
Family is completed and the relevant operation of the detection project, after the completion of operation, continues to test by after continued key, so as to complete entirely to test
Process.
If detection project is relay protective scheme test event, distant place control system can set test parameter automatically and control relay
Tester is protected to complete test, distant place control system can also obtain the action message of protection automatically, automatic decision test result,
And the test report of Auto-writing standard form, so as to which finished item detects.The test mould artificially selected is needed in the prior art
Block, artificially throw the soft pressing plate moved back, the parameter setting artificially calculated, the testing time artificially controlled, the action message artificially read,
The artificial test report filled in and arranged, can be automatically performed, very using intelligent substation local reaying protection test system
Just accomplish " one-touch " test, greatly save manpower and time.To sum up, the present invention has manufactured the intelligent power transformation of complete set
The distant check system of having a try of relay protection of standing, that is, when testing, by far controlling or being protected in local distant examination monitoring hands- operation to relay
Shield tester is controlled, and is imported template, is tested and transferred report.For protective device inspection provide one standardization and
Efficient solution can meet the demand of one-touch test of the user to protective device;Meanwhile realization optical fiber power,
The automatic test of attenuation.Compared with conventional test methods, which can automatically be tested according to the testing scheme of editor, energy
Enough automatic decision test results, can in standard Word report templates Auto-writing test record, automatically generate test report.
The distant check system of having a try of intelligent substation relay protection is applied not only to test whether that breaker and disconnecting switch can be controlled
Division, be additionally operable to be automatically performed the transmission test of various protective devices, automatically generate test report.Such as relay protection is controlled to survey
Examination instrument gives main transformer protection device dosage, and whether test transform er differential protection can correctly act, and whether trip boundary condition meets fixed
Whether value, pressing plate function are correct.
In order to improve the testing efficiency of local control terminal, in order to further improve testing efficiency, local control terminal tool
It is used for body according to different types of protective device, is previously stored with corresponding template file, which protects including each
The detection project sequence and detection ordering of protection unit.After local side test enabled instruction is sent out, local control terminal can identify guarantor
The type of protection unit, and detection project is performed one by one according to the detection ordering of corresponding protective device, detection project be used to indicate after
Protective device is tested in the execution of electric protection tester.
Due to the definite value that different test events are related to and soft pressing plate difference, in automatic testing process, local control is eventually
End can change protective device definite value automatically according to different test events and soft pressing plate is moved back in throwing.Protection dress can be specifically read first
Configuration information is put, which includes the definite value of protective device, soft pressing plate, and carries out backup, and safety assurance is provided for test,
At the end of test, configuration information can be compared again, if former configuration information is changed in test, then surveying
After examination, the backup before restoring automatically.
If detection project is the project manually completed, local control terminal can carry out information alert to instruct to use to user
Family is completed and the relevant operation of the detection project, after the completion of operation, continues to test by after continued key, so as to complete entirely to test
Process.If detection project is relay protective scheme test event, local control terminal can set test parameter automatically and relay is controlled to protect
It protects tester and completes test, local control terminal can also obtain the action message of protection automatically, automatic decision test result, and
The test report of Auto-writing standard form, so as to which finished item detects.
Due to there are many protective devices in substation, for the ease of testing a variety of protective devices, in others
In implementation, relay-protection tester includes identification device and test device;Identification device is used for identification protecting device type, identification
The input/output terminal of device and the input/output terminal of protective device connect;The input terminal of test device and the output terminal of identification device
Connection, the output terminal of the output terminal of test device as relay protection instrument, connect with the test interface of protective device.Test device
Quantity can be multiple, the type of multiple test devices and protective device corresponds, the output terminal of identification device with it is multiple
The chip select terminal connection of test device, so as to which the test to certain protective device be rapidly completed.
In conclusion the present invention can by the distant test for having a try check system protective device of intelligent substation relay protection
Can be completed in remote side and local side, the convenience of protective device test is improved, enhances what protective device was tested
Safety improves the rapidity of a variety of protective device tests, improves testing efficiency when being debugged to protective device.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all the present invention spirit and
Within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention.
Claims (8)
1. a kind of distant check system of having a try of intelligent substation relay protection, which is characterized in that the intelligent substation relay protection is distant
Check system of having a try includes:Remote control terminal, relay-protection tester, interchanger and local control terminal;
The remote control terminal has the distant place control system for issuing test initiation command and connects with the distant place control system
The telecontrol communication machine connect;
The relay-protection tester is arranged in intelligent substation, and the Enable Pin of the relay-protection tester passes through the friendship
It changes planes and is connect with the telecontrol communication machine, to receive the test initiation command of the telecontrol communication machine transmission, the relay-protection tester
Multiple output terminals are connect one by one with the test interface of a variety of protective devices in the intelligent substation, the relay protection test
The input terminal of instrument is connect by the interchanger with the network interface of a variety of protective devices, to identify that protection to be tested fills
It puts;
The local control terminal is arranged in the intelligent substation, and the first output terminal of the local control terminal passes through institute
The Enable Pin that interchanger is stated with the relay-protection tester is connect;
The distant place control system is used to, according to different types of protective device, be previously stored with corresponding template file, described
Template file includes the detection project sequence and detection ordering of each protective device;
After the test initiation command is sent out, the distant place control system identifies the type of protective device, and is protected according to corresponding
The detection ordering of protection unit performs detection project one by one, and the detection project is used to indicate the relay-protection tester execution pair
The protective device is tested.
2. the distant check system of having a try of intelligent substation relay protection according to claim 1, which is characterized in that the long-range control
Terminal processed further includes the first fingerprint machine, and the output terminal of first fingerprint machine is connect with the start end of the distant place control system.
3. the distant check system of having a try of intelligent substation relay protection according to claim 1, which is characterized in that the local control
Terminal processed includes the second fingerprint machine and monitoring equipment, and the output terminal of second fingerprint machine is connect with the start end of the monitoring equipment,
First output terminal of first output terminal of the monitoring equipment for the local control terminal.
4. the distant check system of having a try of intelligent substation relay protection according to claim 3, which is characterized in that the local control
Terminal processed further includes printer, and the input terminal of the printer is connect with the second output terminal of the monitoring equipment, the monitoring equipment
Second output terminal of the second output terminal for the local control terminal.
5. the distant check system of having a try of intelligent substation relay protection according to claim 1, which is characterized in that the relay is protected
Shield tester is connect by optical fiber with the protective device.
6. the distant check system of having a try of intelligent substation relay protection according to claim 1, which is characterized in that the protection dress
The output terminal put is connect by optical fiber with the intelligent terminal of the intelligent substation, and the intelligent terminal passes through cable and the intelligence
The breaker of energy substation is connected with disconnecting switch.
7. the distant check system of having a try of intelligent substation relay protection according to claim 1, which is characterized in that the distant place control
System processed can also read original configuration information of protective device, and the configuration information includes the definite value of the protective device and soft pressure
Plate, and carry out backup;
At the end of test, the configuration information of protective device can be compared again, if test is to described original with confidence
Breath is changed, then after test, the backup before restoring automatically.
8. the distant check system of having a try of intelligent substation relay protection according to claim 7, which is characterized in that if the detection
Project is the project manually completed, then the distant place control system can to user carry out information alert with instruct user complete with
The detection project relevant operation after the completion of operation, continues to test by after continued key, so as to complete entire test process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510784668.4A CN105388416B (en) | 2015-11-16 | 2015-11-16 | The distant check system of having a try of intelligent substation relay protection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510784668.4A CN105388416B (en) | 2015-11-16 | 2015-11-16 | The distant check system of having a try of intelligent substation relay protection |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105388416A CN105388416A (en) | 2016-03-09 |
CN105388416B true CN105388416B (en) | 2018-06-22 |
Family
ID=55420910
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510784668.4A Active CN105388416B (en) | 2015-11-16 | 2015-11-16 | The distant check system of having a try of intelligent substation relay protection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105388416B (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106124879A (en) * | 2016-05-26 | 2016-11-16 | 国网浙江省电力公司嘉兴供电公司 | A kind of multifunctional relay protection equipment test go-cart |
CN107132435B (en) * | 2017-04-16 | 2019-10-18 | 国网浙江省电力公司紧水滩水力发电厂 | A kind of power plant protective relaying device remote diagnosis system and diagnostic method |
CN107942279A (en) * | 2017-12-13 | 2018-04-20 | 国网江苏省电力有限公司电力科学研究院 | Voltage transformer scene movable detecting platform and detection method in energy metering device |
CN108508291A (en) * | 2018-03-13 | 2018-09-07 | 云南电网有限责任公司电力科学研究院 | A kind of direct current protecting function detecting method and system |
CN108181537A (en) * | 2018-03-13 | 2018-06-19 | 云南电网有限责任公司电力科学研究院 | A kind of protective device automatic testing method and system |
CN109507574A (en) * | 2018-11-19 | 2019-03-22 | 国网新疆电力有限公司塔城供电公司 | The test method and device of relay protection device |
CN110633901A (en) * | 2019-09-03 | 2019-12-31 | 国网河北省电力有限公司 | Intelligent substation relay protection device operation situation perception and remote maintenance system |
CN112134351B (en) * | 2020-08-21 | 2022-09-06 | 国网山东省电力公司临沂供电公司 | Remote telemetry acceptance system and method based on transformer substation distribution network |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102064612B (en) * | 2011-01-13 | 2013-05-22 | 许继电气股份有限公司 | System and method for maintaining condition of relay protection |
CN102694366A (en) * | 2011-03-24 | 2012-09-26 | 辽宁省电力有限公司朝阳供电公司 | Remote monitoring apparatus for disconnection of replaying protection outlet tripping circuit |
CN102594910B (en) * | 2012-03-15 | 2014-12-10 | 天津市电力公司 | Method adopting data service bus to realize single-instance transformer station programmed processing |
CN104009547B (en) * | 2014-06-13 | 2016-05-04 | 国家电网公司 | Breaker remote operation function monitoring arrangement and transformer station's remote operation system |
CN204116558U (en) * | 2014-10-17 | 2015-01-21 | 浙江开关厂有限公司 | A kind of isolating switch on-Line Monitor Device |
CN204287418U (en) * | 2014-12-09 | 2015-04-22 | 潍坊五洲浩特电气有限公司 | A kind of circuit breaker switch state pick-up unit |
CN205139323U (en) * | 2015-11-16 | 2016-04-06 | 国家电网公司 | Distant examination testing system of intelligent substation relay protection |
-
2015
- 2015-11-16 CN CN201510784668.4A patent/CN105388416B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105388416A (en) | 2016-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105388416B (en) | The distant check system of having a try of intelligent substation relay protection | |
CN111830846B (en) | Power distribution network fault testing method and system based on simulation testing platform | |
CN104539473B (en) | Intelligent substation network virtual secondary circuit whole group of method of calibration and system | |
CN103051065B (en) | The distributed FA interlock method of testing of a kind of power distribution automation and system | |
CN108982996B (en) | Outdoor scene substitution type extra-high voltage direct current protection field testing device | |
CN105388370B (en) | A kind of substation's wall connection latching logic automated closed-loop test method | |
CN104246521B (en) | The method and device that intelligent substation relay protection function is tested automatically | |
CN105302121A (en) | Sequential control operation order automatic anti-error check method based on simulation IED device | |
CN103904779A (en) | Intelligent substation intelligent terminal analog device and using method thereof | |
CN102788915A (en) | Feeder automation online simulation method based on maintenance workstation | |
CN105978159A (en) | Telecontrol testing online execution-free check method for transformer station | |
CN104020762A (en) | Automatic feeder testing method free of networking | |
CN113343446A (en) | Data analysis and verification method and system for transformer substation monitoring system | |
CN105467233B (en) | Intelligent substation local reaying protection test system | |
CN205139323U (en) | Distant examination testing system of intelligent substation relay protection | |
CN205139276U (en) | Local relay protection testing system of intelligent substation | |
CN109768619B (en) | Automatic debugging system and debugging method for monitoring information | |
CN108493906B (en) | Decentralized bus protection handset repair method and decentralized bus protection system | |
KR101971031B1 (en) | Apparatus and method for dynamic performance test of digital protection relay | |
CN102508052A (en) | Test method for field band channel operation of automatic bus transfer system of area network | |
CN109507574A (en) | The test method and device of relay protection device | |
CN104682359A (en) | Relay protection method of power supply line | |
CN208924243U (en) | A kind of homologous test macro of transformer station's signal | |
CN208459514U (en) | Relay protection operation and maintenance system | |
CN104316823B (en) | A kind of method and device of defects detection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |