CN105388416A - Intelligent substation relay protection remote test system - Google Patents

Intelligent substation relay protection remote test system Download PDF

Info

Publication number
CN105388416A
CN105388416A CN201510784668.4A CN201510784668A CN105388416A CN 105388416 A CN105388416 A CN 105388416A CN 201510784668 A CN201510784668 A CN 201510784668A CN 105388416 A CN105388416 A CN 105388416A
Authority
CN
China
Prior art keywords
test
intelligent substation
protective device
relay
distant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510784668.4A
Other languages
Chinese (zh)
Other versions
CN105388416B (en
Inventor
张立辉
陈磊
陈炎
乔辉
尹宏
王江涛
伍艳
张罡帅
王光华
时广毅
马晶晶
王冠
张雷
崔良
王晓蒙
南康
芦杰敏
李晓影
赵炜
牛理达
张乾
刘培
马彦敏
孔令号
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510784668.4A priority Critical patent/CN105388416B/en
Publication of CN105388416A publication Critical patent/CN105388416A/en
Application granted granted Critical
Publication of CN105388416B publication Critical patent/CN105388416B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an intelligent substation relay protection remote test system comprising a remote control terminal, a relay protection tester, a switch, and a local control terminal. The remote control terminal comprises a remote control system for issuing a test starting instruction and a telecontroller connected with the remote control system. The relay protection tester is arranged inside an intelligent substation, the enable end of the relay protection tester is connected with the telecontroller through the switch to receive the test starting instruction transmitted by the telecontroller, multiple output ends of the relay protection tester are correspondingly connected with test interfaces of a variety of protection devices inside the intelligent substation, and the input end of the relay protection tester is connected with network interfaces of the protection devices through the switch. The local control terminal is arranged inside the intelligent substation, and a first output end of the local control terminal is connected with the enable end of the relay protection tester through the switch. By adopting the technical scheme, the efficiency of test during protection device debugging is improved.

Description

The distant check system of having a try of intelligent substation relay protection
Technical field
The present invention relates to the field tests of transforming plant protecting device, particularly the distant check system of having a try of a kind of intelligent substation relay protection.
Background technology
The protective device of transformer station is the core of protecting electrical power system, the correctness of its logic and setting to be related to when electric system is broken down isolating switch can tripping rapidly and accurately to excise fault, thus ensure the stable operation of electric system.Therefore, the debug process of protective device is extremely important, and it directly affects correct operation and the power system stability operation of protective device.
In prior art, when protective device is debugged, needing commissioning staff to scene by being connected on protective device by relay-protection tester, then carrying out related commissioning work.Of a great variety due to protective device, and be distributed in different location, it is large that this scheme adds the debugging work load making protective device undoubtedly, and task is heavy, and testing efficiency is low.
Summary of the invention
Fundamental purpose of the present invention is to provide the distant check system of having a try of a kind of intelligent substation relay protection, with the problem that the testing efficiency at least solving the protective device existed in prior art is low.
In order to achieve the above object, embodiments provide the distant check system of having a try of a kind of intelligent substation relay protection, it comprises: remote control terminal, relay-protection tester, switch and local control terminal; Described remote control terminal has the distant place control system issuing test initiation command and the telecontrol communication machine be connected with described distant place control system; Described relay-protection tester is arranged in intelligent substation, the Enable Pin of described relay-protection tester is connected with described telecontrol communication machine by described switch, to receive the test initiation command that described telecontrol communication machine transmits, multiple output terminal of described relay-protection tester is connected one by one with the test interface of the multiple protective device in described intelligent substation, the input end of described relay-protection tester is connected with the network interface of multiple described protective device by described switch, to identify protective device to be tested; Described local control terminal is arranged in described intelligent substation, and the first output terminal of described local control terminal is connected by the Enable Pin of described switch with described relay-protection tester.
Have a try in check system intelligent substation relay protection as above is distant, preferably, described remote control terminal also comprises the first fingerprint machine, and the output terminal of described first fingerprint machine is connected with the start end of described distant place control system.
Have a try in check system intelligent substation relay protection as above is distant; preferably; described local control terminal comprises the second fingerprint machine and monitoring equipment; the output terminal of described second fingerprint machine is connected with the start end of described monitoring equipment, and the first output terminal of described monitoring equipment is the first output terminal of described local control terminal.
Have a try in check system intelligent substation relay protection as above is distant; preferably; described local control terminal also comprises printer; the input end of described printer is connected with the second output terminal of described monitoring equipment, and the second output terminal of described monitoring equipment is the second output terminal of described local control terminal.
Have a try in check system intelligent substation relay protection as above is distant, preferably, described relay-protection tester is connected with described protective device by optical fiber.
Have a try in check system intelligent substation relay protection as above is distant; preferably; the output terminal of described protective device is connected by the intelligent terminal of optical fiber with described intelligent substation, and described intelligent terminal is connected by the isolating switch of cable and described intelligent substation and disconnector.
Have a try in check system intelligent substation relay protection as above is distant, preferably, described distant place control system is used for according to dissimilar protective device, and be previously stored with corresponding template file, described template file comprises test item sequence and the detection ordering of often kind of protective device; After described test initiation command sends; described distant place control system identifies the type of protective device; and performing test item one by one according to the detection ordering of corresponding protective device, described test item is used to indicate the execution of described relay-protection tester and tests described protective device.
Have a try in check system intelligent substation relay protection as above is distant, preferably, described distant place control system also can original configuration information of fetch protection device, and described configuration information comprises the definite value and soft pressing plate of protecting described protection unit, and carries out backup; At the end of test, can again contrast the configuration information of protective device, if test is changed described original configuration information, volume after test terminates, the backup before automatically recovering.
Have a try in check system intelligent substation relay protection as above is distant; preferably; if described test item is the project manually completed; then described distant place control system all can carry out information prompting to instruct user to complete the operation relevant to this test item to user; after having operated; press continuation key and proceed test, thus complete whole test process.
The beneficial effect that embodiment provided by the invention is brought is as follows:
By intelligent substation Relay Protection Experiment System, the test of protective device all can be able to be completed in remote side and local side; improve the convenience of protective device test; enhance the security to protective device test; improve the rapidity of multiple protective device test, improve the testing efficiency to protective device.
Accompanying drawing explanation
Fig. 1 is the structural representation of the distant check system of having a try of a kind of intelligent substation relay protection provided by the invention;
Wherein, in figure, symbol description is as follows:
10 distant place control system, 11 telecontrol communication machine, 20 monitoring equipments, 21 printers, 3 relay-protection testers, 4 protective devices, 5 switches, 6 isolating switchs, 7 disconnectores, 80 netting twines, 81 optical fiber, 82 cables.
Embodiment
For making the object, technical solutions and advantages of the present invention clearly, below in conjunction with accompanying drawing, embodiment of the present invention is described further in detail.
See Fig. 1, the invention provides the distant check system of having a try of a kind of intelligent substation relay protection, it comprises: remote control terminal, relay-protection tester 3, switch 5 and local control terminal.
Wherein, remote control terminal by controlling relay-protection tester 3 in strange land, thus realizes the Long-distance Control to protective device 4, and it comprises distant place control system 10 and telecontrol communication machine 11.Distant place control system 10 issues test initiation command, and test initiation command starts for controlling relay-protection tester 3.Telecontrol communication machine 11 is for sending this test initiation command to relay-protection tester 3 by network.
Relay-protection tester 3 is arranged in intelligent substation; its Enable Pin is connected with switch 5 by netting twine 80; switch 5 is connected with telecontrol communication machine 11 by netting twine 80; thus make the test initiation command that the long-range reception telecontrol communication machine 11 of relay-protection tester transmits; its multiple output terminal is connected one by one with the test interface of the multiple protective device 4 in intelligent substation; with output action instruction; the input end of relay-protection tester 3 is connected by the network interface of switch with multiple protective device 4, to identify protective device to be tested.Because optical fiber has transmission capacity greatly, transmission quality is good, and loss is little, the advantage that repeater span is long, and relay-protection tester 3 is connected with protective device 4 preferably by optical fiber 81.
Local control terminal is arranged in intelligent substation; for controlling relay-protection tester 3 in local (namely with relay-protection tester in same usage space); thus realize controlling this locality of protective device 4, its first output terminal is connected with the Enable Pin of relay-protection tester 3 by switch 5.
Stable operation due to electric system is that productive life is able to the normal powerful guarantee run; and whether the distant check system of having a try of intelligent substation relay protection obtains the stable operation that reasonable employment is related to electric system; therefore remote control terminal also comprises the first fingerprint machine, and it is for exporting enabling signal.In reality, the operator belonging to the distant check system of having a try of this intelligent substation relay protection exports enabling signal to start distant place control system 10 by the first fingerprint machine, thus ensure that the security of the distant check system of having a try of intelligent substation relay protection.
Local control terminal comprises monitoring equipment 20, and the first output terminal of monitoring equipment 20 is as the first output terminal of local control terminal.In order to strengthen the security of local control terminal, local control terminal also comprises the second fingerprint machine, for exporting enabling signal.In reality, the operator belonging to the distant check system of having a try of this intelligent substation relay protection exports enabling signal to start monitoring equipment 20 in local side by the second fingerprint machine, thus ensure that the security of local control terminal.
For the ease of grasping operating process to monitoring equipment 20, local control terminal also comprises printer 21, and its input end is connected with the second output terminal of monitoring equipment 20, and the second output terminal of monitoring equipment 20 is as the second output terminal of local control terminal.
The output terminal of protective device 4 is connected by optical fiber 81 with the intelligent terminal 9 of intelligent substation; intelligent terminal 9 is connected with the action control end of the isolating switch 6 of intelligent substation and the action control end of disconnector 7 by cable 82, thus makes isolating switch 6 or disconnector 7 carry out a deciliter action after receiving action command.
Each output terminal of relay-protection tester 4 has mark, identifies the type for characterizing the protective device be connected with output terminal, so can the type of identification protecting device fast, thus improves testing efficiency.
In order to improve testing efficiency further, distant place control system is specifically used for, according to dissimilar protective device, being previously stored with corresponding template file, and this template file comprises test item sequence and the detection ordering of often kind of protective device.After test initiation command (now also can be called distant place side test enabled instruction) sends; the type of distant place control system meeting identification protecting device; and performing test item one by one according to the detection ordering of corresponding protective device, test item is used to indicate relay-protection tester execution and tests protective device.
The definite value related to due to different test event is different with soft pressing plate, and in automatic testing process, distant place control system can automatically revise protective device definite value according to different test events and soft pressing plate is moved back in throwing.Particularly first can fetch protection device configuration information; this configuration information comprises the definite value of protective device; soft pressing plate; and carry out backup, for test provides safety assurance, at the end of test; can again contrast configuration information; if test is changed former configuration information, so after test terminates, the backup before automatically recovering.
If test item is the project manually completed, then distant place control system can carry out information prompting to instruct user to complete the operation relevant to this test item to user, after having operated, presses continuation key and proceeds test, thus complete whole test process.
If test item is relay protective scheme test event; distant place control system can Lookup protocol test parameter control relay-protection tester and complete test; the action message of all right automatic acquisition protection of distant place control system; automatic decision test result; and the test report of Auto-writing standard form, thus finished item detects.Need in prior art artificial select test module, artificially throws the soft pressing plate moved back, artificial optimum configurations, the test duration of manual control, the action message of artificially reading, the people calculated fill in and the test report arranged; the local reaying protection test system of intelligent substation is used automatically to complete; really accomplish that " one-touch " is tested, saved manpower and time greatly.To sum up, the present invention has manufactured the distant check system of having a try of intelligent substation relay protection of complete set, when namely testing, by far to control or distant examination monitoring hands-operation can control relay-protection tester in this locality, imports template, carries out testing and transferring report.For protective device inspection provides a standardization and high efficiency solution, the demand of user to the one-touch test of protective device can be met; Meanwhile, the automatic test of optical fiber power, attenuation is realized.Compared with conventional test methods, this system can carry out testing according to the testing scheme of editor automatically, can automatic decision test result, can Auto-writing test record in standard Word report template, automatically generate test report.
Intelligent substation relay protection is distant have a try check system not only for test whether can control isolating switch and disconnector deciliter, also for automatically complete various protective device transmission test, automatically generate test report.As controlled relay-protection tester to main transformer protection device dosage, whether test transform er differential protection can correct operation, and whether trip boundary condition meets definite value, and whether pressing plate function is correct.
In order to improve the testing efficiency of local control terminal; in order to improve testing efficiency further; local control terminal is specifically used for, according to dissimilar protective device, being previously stored with corresponding template file, and this template file comprises test item sequence and the detection ordering of often kind of protective device.After local side test enabled instruction sends, the type of local control terminal meeting identification protecting device, and perform test item one by one according to the detection ordering of corresponding protective device, test item is used to indicate relay-protection tester execution and tests protective device.
The definite value related to due to different test event is different with soft pressing plate, and in automatic testing process, local control terminal can automatically revise protective device definite value according to different test events and soft pressing plate is moved back in throwing.Particularly first can fetch protection device configuration information; this configuration information comprises the definite value of protective device; soft pressing plate; and carry out backup, for test provides safety assurance, at the end of test; can again contrast configuration information; if test is changed former configuration information, so after test terminates, the backup before automatically recovering.
If test item is the project manually completed, then local control terminal can carry out information prompting to instruct user to complete the operation relevant to this test item to user, after having operated, presses continuation key and proceeds test, thus complete whole test process.If test item is relay protective scheme test event; local control terminal can Lookup protocol test parameter control relay-protection tester and complete test; the action message of all right automatic acquisition protection of local control terminal; automatic decision test result; and the test report of Auto-writing standard form, thus finished item detects.
Because the protective device in transformer station has multiple, for the ease of testing multiple protective device, in other enforcement, relay-protection tester comprises recognition device and proving installation; Recognition device is used for identification protecting device kind, and the input/output terminal of recognition device is connected with the input/output terminal of protective device; The input end of proving installation is connected with the output terminal of recognition device, and the output terminal of proving installation, as the output terminal of relay protection instrument, is connected with the test interface of protective device.The quantity of proving installation can be multiple, the kind one_to_one corresponding of multiple proving installation and protective device, and the output terminal of recognition device selects to hold with the sheet of multiple proving installation and is connected, thus completes the test to certain protective device fast.
In sum; the present invention makes the test of protective device all can be able to complete in remote side and local side by the distant check system of having a try of intelligent substation relay protection; improve the convenience of protective device test; enhance the security to protective device test; improve the rapidity of multiple protective device test, improve testing efficiency when protective device is debugged.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (9)

1. the distant check system of having a try of intelligent substation relay protection, is characterized in that, the distant check system of having a try of described intelligent substation relay protection comprises: remote control terminal, relay-protection tester, switch and local control terminal;
Described remote control terminal has the distant place control system issuing test initiation command and the telecontrol communication machine be connected with described distant place control system;
Described relay-protection tester is arranged in intelligent substation, the Enable Pin of described relay-protection tester is connected with described telecontrol communication machine by described switch, to receive the test initiation command that described telecontrol communication machine transmits, multiple output terminal of described relay-protection tester is connected one by one with the test interface of the multiple protective device in described intelligent substation, the input end of described relay-protection tester is connected with the network interface of multiple described protective device by described switch, to identify protective device to be tested;
Described local control terminal is arranged in described intelligent substation, and the first output terminal of described local control terminal is connected by the Enable Pin of described switch with described relay-protection tester.
2. the distant check system of having a try of intelligent substation relay protection according to claim 1, it is characterized in that, described remote control terminal also comprises the first fingerprint machine, and the output terminal of described first fingerprint machine is connected with the start end of described distant place control system.
3. the distant check system of having a try of intelligent substation relay protection according to claim 1; it is characterized in that; described local control terminal comprises the second fingerprint machine and monitoring equipment; the output terminal of described second fingerprint machine is connected with the start end of described monitoring equipment, and the first output terminal of described monitoring equipment is the first output terminal of described local control terminal.
4. the distant check system of having a try of intelligent substation relay protection according to claim 3; it is characterized in that; described local control terminal also comprises printer; the input end of described printer is connected with the second output terminal of described monitoring equipment, and the second output terminal of described monitoring equipment is the second output terminal of described local control terminal.
5. the distant check system of having a try of intelligent substation relay protection according to claim 1, it is characterized in that, described relay-protection tester is connected with described protective device by optical fiber.
6. the distant check system of having a try of intelligent substation relay protection according to claim 1; it is characterized in that; the output terminal of described protective device is connected by the intelligent terminal of optical fiber with described intelligent substation, and described intelligent terminal is connected by the isolating switch of cable and described intelligent substation and disconnector.
7. the distant check system of having a try of intelligent substation relay protection according to claim 1, it is characterized in that, described distant place control system is used for according to dissimilar protective device, be previously stored with corresponding template file, described template file comprises test item sequence and the detection ordering of often kind of protective device;
After described test initiation command sends; described distant place control system identifies the type of protective device; and performing test item one by one according to the detection ordering of corresponding protective device, described test item is used to indicate the execution of described relay-protection tester and tests described protective device.
8. the distant check system of having a try of intelligent substation relay protection according to claim 7, it is characterized in that, described distant place control system also can original configuration information of fetch protection device, and described configuration information comprises the definite value and soft pressing plate of protecting described protection unit, and carries out backup;
At the end of test, can again contrast the configuration information of protective device, if test is changed described original configuration information, volume after test terminates, the backup before automatically recovering.
9. the distant check system of having a try of intelligent substation relay protection according to claim 8; it is characterized in that; if described test item is the project manually completed; then described distant place control system all can carry out information prompting to instruct user to complete the operation relevant to this test item to user; after having operated; press continuation key and proceed test, thus complete whole test process.
CN201510784668.4A 2015-11-16 2015-11-16 The distant check system of having a try of intelligent substation relay protection Active CN105388416B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510784668.4A CN105388416B (en) 2015-11-16 2015-11-16 The distant check system of having a try of intelligent substation relay protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510784668.4A CN105388416B (en) 2015-11-16 2015-11-16 The distant check system of having a try of intelligent substation relay protection

Publications (2)

Publication Number Publication Date
CN105388416A true CN105388416A (en) 2016-03-09
CN105388416B CN105388416B (en) 2018-06-22

Family

ID=55420910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510784668.4A Active CN105388416B (en) 2015-11-16 2015-11-16 The distant check system of having a try of intelligent substation relay protection

Country Status (1)

Country Link
CN (1) CN105388416B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106124879A (en) * 2016-05-26 2016-11-16 国网浙江省电力公司嘉兴供电公司 A kind of multifunctional relay protection equipment test go-cart
CN107132435A (en) * 2017-04-16 2017-09-05 国网浙江省电力公司紧水滩水力发电厂 A kind of power plant protective relaying device remote diagnosis system and diagnostic method
CN107942279A (en) * 2017-12-13 2018-04-20 国网江苏省电力有限公司电力科学研究院 Voltage transformer scene movable detecting platform and detection method in energy metering device
CN108181537A (en) * 2018-03-13 2018-06-19 云南电网有限责任公司电力科学研究院 A kind of protective device automatic testing method and system
CN108508291A (en) * 2018-03-13 2018-09-07 云南电网有限责任公司电力科学研究院 A kind of direct current protecting function detecting method and system
CN109507574A (en) * 2018-11-19 2019-03-22 国网新疆电力有限公司塔城供电公司 The test method and device of relay protection device
CN110633901A (en) * 2019-09-03 2019-12-31 国网河北省电力有限公司 Intelligent substation relay protection device operation situation perception and remote maintenance system
CN112134351A (en) * 2020-08-21 2020-12-25 国网山东省电力公司 Remote telemetry acceptance system and method based on transformer substation distribution network

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064612A (en) * 2011-01-13 2011-05-18 许继电气股份有限公司 System and method for maintaining condition of relay protection
CN102594910A (en) * 2012-03-15 2012-07-18 天津市电力公司 Method adopting data service bus to realize single-instance transformer station programmed processing
CN102694366A (en) * 2011-03-24 2012-09-26 辽宁省电力有限公司朝阳供电公司 Remote monitoring apparatus for disconnection of replaying protection outlet tripping circuit
CN104009547A (en) * 2014-06-13 2014-08-27 国家电网公司 Motoring device for breaker remote operation function and transformer substation remote operation system
CN204116558U (en) * 2014-10-17 2015-01-21 浙江开关厂有限公司 A kind of isolating switch on-Line Monitor Device
CN204287418U (en) * 2014-12-09 2015-04-22 潍坊五洲浩特电气有限公司 A kind of circuit breaker switch state pick-up unit
CN205139323U (en) * 2015-11-16 2016-04-06 国家电网公司 Distant examination testing system of intelligent substation relay protection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064612A (en) * 2011-01-13 2011-05-18 许继电气股份有限公司 System and method for maintaining condition of relay protection
CN102694366A (en) * 2011-03-24 2012-09-26 辽宁省电力有限公司朝阳供电公司 Remote monitoring apparatus for disconnection of replaying protection outlet tripping circuit
CN102594910A (en) * 2012-03-15 2012-07-18 天津市电力公司 Method adopting data service bus to realize single-instance transformer station programmed processing
CN104009547A (en) * 2014-06-13 2014-08-27 国家电网公司 Motoring device for breaker remote operation function and transformer substation remote operation system
CN204116558U (en) * 2014-10-17 2015-01-21 浙江开关厂有限公司 A kind of isolating switch on-Line Monitor Device
CN204287418U (en) * 2014-12-09 2015-04-22 潍坊五洲浩特电气有限公司 A kind of circuit breaker switch state pick-up unit
CN205139323U (en) * 2015-11-16 2016-04-06 国家电网公司 Distant examination testing system of intelligent substation relay protection

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106124879A (en) * 2016-05-26 2016-11-16 国网浙江省电力公司嘉兴供电公司 A kind of multifunctional relay protection equipment test go-cart
CN107132435A (en) * 2017-04-16 2017-09-05 国网浙江省电力公司紧水滩水力发电厂 A kind of power plant protective relaying device remote diagnosis system and diagnostic method
CN107942279A (en) * 2017-12-13 2018-04-20 国网江苏省电力有限公司电力科学研究院 Voltage transformer scene movable detecting platform and detection method in energy metering device
CN108181537A (en) * 2018-03-13 2018-06-19 云南电网有限责任公司电力科学研究院 A kind of protective device automatic testing method and system
CN108508291A (en) * 2018-03-13 2018-09-07 云南电网有限责任公司电力科学研究院 A kind of direct current protecting function detecting method and system
CN109507574A (en) * 2018-11-19 2019-03-22 国网新疆电力有限公司塔城供电公司 The test method and device of relay protection device
CN110633901A (en) * 2019-09-03 2019-12-31 国网河北省电力有限公司 Intelligent substation relay protection device operation situation perception and remote maintenance system
CN112134351A (en) * 2020-08-21 2020-12-25 国网山东省电力公司 Remote telemetry acceptance system and method based on transformer substation distribution network
CN112134351B (en) * 2020-08-21 2022-09-06 国网山东省电力公司临沂供电公司 Remote telemetry acceptance system and method based on transformer substation distribution network

Also Published As

Publication number Publication date
CN105388416B (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN105388416A (en) Intelligent substation relay protection remote test system
CN103051065B (en) The distributed FA interlock method of testing of a kind of power distribution automation and system
CN104539473B (en) Intelligent substation network virtual secondary circuit whole group of method of calibration and system
CN105978159A (en) Telecontrol testing online execution-free check method for transformer station
CN207798999U (en) A kind of distribution automation system detection device
CN103941240B (en) A kind of detection method of the extension set detecting device that communicates based on radar system
CN108982996B (en) Outdoor scene substitution type extra-high voltage direct current protection field testing device
CN104391244A (en) Closed loop test method of relay protection apparatus and system thereof
CN103852697A (en) Cable partial discharge detection device
CN109613906A (en) Third generation intelligent substation observing and controlling handset test macro and its application method
CN105094120A (en) Testing device capable of simulating action behaviors of primary equipment
CN110932406B (en) Remote signaling information checking method and device for intelligent substation scheduling master station
CN101895153A (en) Intelligent transformer substation computer monitoring anti-misoperation system
CN205139323U (en) Distant examination testing system of intelligent substation relay protection
CN108449133B (en) Intelligent substation optical power testing method
CN105553782B (en) communication link test method and system
CN113343446B (en) Data analysis and verification method and system for transformer substation monitoring system
CN205139276U (en) Local relay protection testing system of intelligent substation
CN105467233A (en) Intelligent substation local relay protection test system
CN104638761A (en) Packet sensing and packet simulation verification based GOOSE (generic object oriented substation event) virtual terminal connection method
CN201860169U (en) Computer monitoring anti-error operating system in intelligent transformer substation
CN109598996B (en) Load cutting training system for distribution transformer area
CN203950010U (en) Cable local discharge detection device
CN107765205B (en) A kind of two distant basic model distribution terminal automatic Verification pipelining methods
CN112345960A (en) Scene-type spare power automatic switching logic verification system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant