CN110426589A - A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template - Google Patents
A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template Download PDFInfo
- Publication number
- CN110426589A CN110426589A CN201910852978.3A CN201910852978A CN110426589A CN 110426589 A CN110426589 A CN 110426589A CN 201910852978 A CN201910852978 A CN 201910852978A CN 110426589 A CN110426589 A CN 110426589A
- Authority
- CN
- China
- Prior art keywords
- test
- tester
- secondary device
- interface
- substation secondary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Abstract
The invention discloses a kind of substation secondary device automatic testing methods based on general-purpose interface template, including create general controls interface model for tester;General interface model file sample is created for tester, tester provides or configuration interface model file;The interface model file that all kinds of testers provide is loaded, generates reusable in the test case of a variety of testers;Load test use-case starts test assignment, carries out functional test;Upload the specification analog module of result information extremely;The several steps of data comparison;Its server and system are also disclosed simultaneously;The present invention can be realized the multi multiplexing for different tester equipment of the test case library of Auto-Test System, reduces testing cost, improves the detection efficiency of secondary equipment of intelligent converting station.
Description
Technical field
The invention belongs to the preservation & testing technical fields of smart grid, and in particular to a kind of change based on general-purpose interface template
Power station secondary device automatic testing method, server and system.
Background technique
In recent years, the demand growing to electric power with national product, the construction of domestication intelligent substation are also swift and violent
Develop, the secondary device type and function in intelligent substation also increasingly increase, therefore the automatic survey to substation secondary device
Examination technology is also quickly grown.
The relevant departments, companies such as external ABB, GE and SIEMENS have carried out the research of automatic test technology, due to its with
The secondary equipment of intelligent converting station tester producer cooperation of an external line is close, has had the intelligence of highly developed single device to become
Power station secondary device automatic test technology has played very important effect in industrial production and factory test.It is based on
The secondary device automatic test technology of intelligent substation list device has had many actual base applications, can support individually
Serializing test automatically.
It is at high cost, build week although simulation precision is high currently, the RTDS analogue system used both at home and abroad is tested
Phase is long and simulator quantity is few, but the testing requirement for not being able to satisfy the multiple secondary devices of intelligent substation while adjusting;Make
The mode of specific specification message is simulated with particular module, it is a large amount of for simulating although simple interactive operation can be carried out
The transmitting of device abnormal behaviour, special state set that number, there are certain difficulties for cooperating between device.
In recent years, although domestic automatization testing technique is also rapidly developing, such as Onlly, rich electricity, the test of bold and generous mainstream
Instrument manufacturer proposes the automatic test global solution respectively to secondary equipment of intelligent converting station also based on respective tester product
Certainly scheme.But the automatic test scheme that above-mentioned manufacturer both domestic and external is proposed all is only applicable to respective tester product, no
The tester of other compatible brands of energy, test case can not be suitable for different tester equipment.For different models of equipment
Intelligent test, the selectivity function of different tester interface etc. do not have the product support of systematization yet, do not have
General total solution.In the DianKeYuan in Chinese DianKeYuan, each province area, each secondary equipment of intelligent converting station supplier
In actually detected work, it is often necessary to often select different tester products to cooperate detection according to secondary device product characteristic,
Therefore there is an urgent need to a set of substation secondary device automatic detection schemes for being applicable to different testers.
Summary of the invention
To solve above-mentioned the technical problems existing in the prior art, the present invention provides a kind of based on general-purpose interface template
Substation secondary device automatic testing method creates a kind of control interface that all kinds of testers are general and template file standard,
General controls interface driver tester can be called to realize the functional test to substation secondary device when executing test assignment,
To realize that test case library is directed to the multi multiplexing of different tester equipment, testing cost is reduced, substation two is improved
The detection efficiency of secondary device.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of substation secondary device automatic testing method based on general-purpose interface template, specifically includes the following steps:
S1, each tester of load is provided according to the template file sample being pre-created or the interface model file of configuration, raw
At reusable in the test case library of a variety of testers;
S2, load test use-case, and start test assignment, call tester general controls interface driver tester to be checked
The substation secondary device of survey carries out functional test;
S3, the result information of functional test is subjected to specification simulation;
S4, the normal data of the result data of specification simulation and functional test is compared, the arbitration functions if consistent
Test result is qualified, otherwise that arbitration functions test result is unqualified, automatically generates the examining report of substation secondary device.
Further, the tester general controls interface driver tester, specifically:
Load the general controls interface model being pre-created;
It establishes and communicates to connect with current tester;
Listen to command information;
In response to command for stopping, stops functional test and otherwise then analyze the instruction and the control for being converted to current tester refers to
It enables, issues current tester and execute, then the implementing result of feedback reception tester, jump to the step of listening to command information.
Further, the general controls interface model being pre-created is a kind of COM access interface, including following two
Access interface:
Test and management interface for controlling starting, information exchange and the stopping of tester general controls interface, and then is realized
The creation and closing of tester general controls interface;
Functional test driving interface is acquired and is shown for driving tester to execute substation secondary device functional test
Real time information in test process, the test execution result that read test instrument returns.
Further, the interface model file in the step S1 is the configuration describing document of XML format, the interface mould
Configuration description information in plate file includes the data of the functional test for multiple substation secondary devices that tester is supported, each
Functional test is a description configuration unit, and each description configuration unit includes the following contents:
Metric data is tested, indicates that the metric data of the tester input/output of substation secondary device functional test is retouched
It states;
Test macro data indicate and examination instrument needed for equipment under test corresponding function in substation secondary device functional test
Configuration parameter data description;
Test result data indicates produced by triggering with equipment under test corresponding function in substation secondary device functional test
The expected feedback of tester result data description;
Test case library in the step S1 is the configuration describing document of multiple XML formats, and each test case is corresponding
One configuration describing document.
Further, the interface model file that each tester of load provides, generates reusable in a variety of testers
Test case library, specifically:
Load meets the interface model file of current tester, is required according to functional test, decomposes testing procedure;
The last test step of functional test is judged whether it is, if so, saving use-case information;If it is not, then setting is worked as
Tester control interface input parameter, target value and the differentiation logic of preceding step, and current procedures information is saved, then again
The secondary last test step for judging whether it is functional test.
Further, it is described to substation secondary device to be detected carry out functional test, specially comprising steps of
1) according to the type of general controls interface and current tester interface template file, tester object is created;
2) according to the function type to be detected of substation secondary device to be detected, test function object is created;
3) test function object and substation secondary device to be detected establish communication connection, obtain the ginseng of test function
Number;
4) test is executed;
5) information is returned the result;
6) stop test;
7) test function object is closed, judges whether to test next time, if so, jumping to according to power transformation to be detected
It stands the function type to be detected of secondary device, the step 2) of test function object is created, if it is not, then closing tester.
Further, the result information by functional test carries out specification simulation, specifically:
1) according to setting value Auto-matching protocol type;
2) configuration information and processing logic script of current protocol type are loaded;
3) it establishes and communicates to connect with the equipment of current tested, execute specification analog functuion;
4) output information of equipment under test is acquired;
5) it is ordered in response to terminating, communication close connection, terminates specification simulation and otherwise then jump to and current tested
Equipment establish communication connection, execute specification analog functuion step 3).
Further, in the step S3, the result information of functional test passes through IEC-103, IEC-104 or IEC-
61850 Standards Codes carry out specification simulation;The step S4 automatically generates the examining report of substation secondary device for recording
Substation secondary device needs project to be tested, testing procedure, the end value of each test item, target value and qualified or not
Test result, the target value is that preconfigured expected test result data, the end value are each in test case
The data value sent on equipment under test in test item implementation process.
A kind of server, comprising:
Test case configuration module, the interface model file provided for loading each tester generate reusable in a variety of
The test case library of tester;
Protection and observing and controlling function automatic detection module are used for load test use-case, and the result data that specification is simulated
It is compared with the normal data of functional test, arbitration functions test result is qualified if consistent, otherwise tests arbitration functions
As a result unqualified, and automatically generate the examining report of substation secondary device;
Tester interface module, for calling general controls interface driver tester;
Specification analog module, for the result information of functional test to be carried out specification simulation.
A kind of substation secondary device automatic checkout system based on general-purpose interface template, including substation secondary device,
Each tester, tester general controls interface, server as claimed in claim 9;Each tester is according to the mould being pre-created
Plate file sample provides or configures interface model file and is uploaded to server, server calls tester general controls interface pair
Substation secondary device carries out functional test.
Compared with prior art, the invention has the benefit that
1, the present invention provides a kind of automatic testing method for being suitable for different vendor's tester equipment, this method is created
A kind of control interface that all kinds of testers are general and template file standard;
2, the protection in the present invention and observing and controlling function automatic detection module can call tester when executing test assignment
The general controls interface driver tester that interface module provides realizes the functional test to substation secondary device, to realize certainly
The multi multiplexing for different tester equipment of the test case library of dynamic test macro;
3, the present invention can be simultaneously to types multiple in intelligent substation, different vendor's secondary device automatic test data flow
Behavior is simulated, and realizes the closed cycle simulation test to tested substation secondary device, has high real value;
4, the test report of customizable of the present invention improves the utilization rate and flexibility of test macro;
5, the present invention realizes one-touch starting test, improves user experience;
6, the present invention automatically generates test report and saves, substantially reduce to secondary equipment of intelligent converting station test when
Between, test complexity is reduced, labour cost is greatly saved, improves testing efficiency.
Detailed description of the invention
Fig. 1 is system schematic of the invention.
Fig. 2 is protection and observing and controlling function automatic detection module flow diagram of the invention.
Fig. 3 is use-case configuration module logical flow chart of the invention.
Fig. 4 is specification analog module logical flow chart of the invention.
Fig. 5 is tester interface module logic flow chart of the invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented
The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed
The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common
Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects
It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical",
The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do
Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without
It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not
It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage
Solution is indication or suggestion relative importance.
In addition, the terms such as term "horizontal", "vertical", " pendency " are not offered as requiring component abswolute level or pendency, and
It is that can be slightly tilted.It is not to indicate the structure if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical"
It has to fully horizontally, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ",
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary
It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
Embodiment 1:
As shown in Figure 1, a kind of substation secondary device automatic checkout system based on general-purpose interface template, including substation
Secondary device, each tester, tester general controls interface, server;Each tester is according to the template file sample being pre-created
Example provides or configures interface model file and is uploaded to server, and server calls tester general controls interface is to substation two
Secondary device carries out functional test.
Above-mentioned server, comprising:
Test case configuration module, the interface model file provided for loading each tester generate reusable in a variety of
The test case library of tester;
Protection and observing and controlling function automatic detection module are used for load test use-case, and the result data that specification is simulated
It is compared with the normal data of functional test, arbitration functions test result is qualified if consistent, otherwise tests arbitration functions
As a result unqualified, and automatically generate the examining report of substation secondary device, meanwhile, it also can be under tester general controls interface
Send out test case enabled instruction, and after test starting acquire substation secondary device be uploaded to specification analog module measurement and
Alarm event information;
Tester interface module, for calling general controls interface driver tester;
Specification analog module is specifically based on for the result information of functional test to be carried out specification simulation to be one
The TCP Client of IEC61850 communication protocol receives after automatic test starting from objects to be measured such as substation secondary devices
Upload measurement, alarm, the information such as action event, and extract and identification information relevant to current test case is fed back to automatically
Test test module.
Embodiment 2:
A kind of substation secondary device automatic testing method based on general-purpose interface template, includes the following steps:
S1, general controls interface mould is created to be currently adapted for all kinds of testers of secondary equipment of intelligent converting station detection
Plate;
S2, general interface model text is created to be currently adapted for all kinds of testers of secondary equipment of intelligent converting station detection
Part sample, each tester provide or configure corresponding interface model file according to template file sample;
S3, load test use-case, and start test assignment, call tester general controls interface driver tester to be checked
The substation secondary device of survey carries out functional test;Test case library is the configuration describing document of multiple XML formats, each test
Use-case corresponds to a configuration describing document, and the test macro that the test case library is detected by secondary equipment of intelligent converting station is matched
It sets management module to be created, browsed, modified and deleted, the configuration management module is by loading general tester interface mould
The corresponding test case of plate file generated can be multiplexed in different tester equipment;
S4, protection and observing and controlling function automatic detection module loading test case using secondary equipment of intelligent converting station, and
Start test assignment, and calls the general controls interface driver test of tester interface module in the test process of test assignment
The functional test of instrument progress secondary equipment of intelligent converting station;
The result information of functional test is passed through IEC-103, IEC-104 by S5, secondary equipment of intelligent converting station to be detected
Or IEC-61850 Standards Code is uploaded to the specification simulation mould of protection and observing and controlling function automatic detection Module Automatic Test System
Block;
S6, protection and observing and controlling function automatic detection module fed back according to tester interface module and specification analog module
Result data and the normal data of test output compare, and judging result is qualified if consistent, otherwise will judge it is unqualified, and
Automatically generate the examining report of secondary equipment of intelligent converting station.Wherein, examining report is for recording secondary equipment of intelligent converting station
Need project, testing procedure, the end value of each test item, target value and qualified or not test result to be tested, institute
Stating target value is the preconfigured expection in automatic load test use-case before protection and the operation of observing and controlling function automatic detection module
Test result data, the data value that the end value is sent in each test item implementation procedure on equipment under test in actual operation.
As shown in Fig. 2, the process of protection and observing and controlling function automatic detection module, specifically includes the following steps:
1) according to the type of general controls interface and the corresponding interface model file of current tester, tester pair is created
As;
2) according to the function type to be detected of substation secondary device to be detected, test function object is created;
3) test function object and substation secondary device to be detected establish communication connection, obtain the ginseng of test function
Number;
4) test is executed;
5) information is returned the result;
6) stop test;
Test function object is closed, judges whether to test next time, if so, going to step 2), if it is not, then
Close tester.
As shown in figure 3, the process of test case configuration module, specifically includes following steps;
1) start use-case configuration module;
2) load meets the corresponding interface model file of current tester;
3) it is required according to functional test, decomposes testing procedure;
4) last test step is judged whether it is, if so, saving use-case information;If it is not, current procedures are then arranged
Tester control interface inputs parameter, target value and differentiates logic, and saves current procedures information, and then judgement is again
No is last test step.
As shown in figure 4, the process of specification analog module, specifically includes the following steps:
1) start specification simulation program;
2) according to setting value Auto-matching protocol type;
3) configuration information and processing logic script of current protocol type are loaded;
4) it establishes and communicates to connect with the equipment of current tested, execute specification analog functuion;
5) output information for acquiring equipment under test, passes to the autotest program of protection and observing and controlling function;
6) the termination order for judging whether to receive the autotest program of protection and observing and controlling function, if so, communication close
Connection terminates specification simulation, if it is not, the step of then going to step 4), executing specification analog functuion.
As shown in figure 5, the process of tester interface module, specifically includes the following steps:
1) start tester interface module;Load general controls interface model;
2) it establishes and communicates to connect with protection and observing and controlling function automatic detection module;
3) it establishes and communicates to connect with current tester;
4) command information of protection and observing and controlling function automatic detection module is listened to;
5) judge whether to terminate order, if so, tester interface module is closed, if it is not, then analyzing the instruction and converting
It for current tester control instruction, issues current tester and executes, then the implementing result of feedback reception tester, result is transmitted
After protection and observing and controlling function automatic detection module, go to step 4).
Tester and its interface module, tester entity device and its matched interface module including various brands, respectively connect
Mouth mold block should provide the COM access interface for meeting general controls interface requirement.Each tester manufacturer also needs to provide standard compliant
Interface model file, interface model file is the configuration describing document of XML format, and the configuration in the interface model file is retouched
The experimental data that information includes the functional test for multiple secondary devices that corresponding tester is supported is stated, each functional test is one
A description configuration unit, each description configuration unit includes the following contents:
1) metric data is tested, indicates the metric data description of the tester input/output of secondary device functional test;
2) test macro data indicate to configure with examination instrument needed for equipment under test corresponding function in secondary device functional test
Supplemental characteristic description;
3) test result data indicates to survey with caused by equipment under test corresponding function triggering in secondary device functional test
Try the result data description of the expected feedback of the expected reception result data description examination instrument of instrument.
The general controls interface of above-mentioned all kinds of testers is the C++ language customized based on tester general-purpose interface template
The COM access interface of speech, mainly includes following two access interface:
1) test and management interface for controlling starting, information exchange and the stopping of tester interface module, and then is realized and is surveyed
It tries the creation and closing of mouth;
2) functional test driving interface is surveyed for driving tester to execute corresponding secondary equipment of intelligent converting station function
Examination acquires and shows the real time information in test process, the test execution result that read test instrument returns.
The application is referring to method, the process of equipment (system) and computer module product according to the embodiment of the present application
Figure and/or block diagram describe.It should be understood that can be by every one stream in computer mould block instruction implementation flow chart and/or block diagram
The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer modules
Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce
A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real
The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer mould block instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates,
Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or
The function of being specified in multiple boxes.
These computer mould block instructions also can be loaded onto a computer or other programmable data processing device, so that counting
Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or
The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one
The step of function of being specified in a box or multiple boxes.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent
Invention is explained in detail referring to above-described embodiment for pipe, it should be understood by those ordinary skilled in the art that: still
It can be with modifications or equivalent substitutions are made to specific embodiments of the invention, and without departing from any of spirit and scope of the invention
Modification or equivalent replacement, should all cover within the scope of the claims of the present invention.
Claims (10)
1. a kind of substation secondary device automatic testing method based on general-purpose interface template, which is characterized in that specifically include with
Lower step:
S1, each tester of load is provided according to the template file sample being pre-created or the interface model file of configuration, and generation can
It is multiplexed in the test case library of a variety of testers;
S2, load test use-case, and start test assignment, call tester general controls interface driver tester to be detected
Substation secondary device carries out functional test;
S3, the result information of functional test is subjected to specification simulation;
S4, the normal data of the result data of specification simulation and functional test is compared, arbitration functions are tested if consistent
As a result qualified, it is otherwise that arbitration functions test result is unqualified, automatically generate the examining report of substation secondary device.
2. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 1,
It is characterized in that: the tester general controls interface driver tester, specifically:
Load the general controls interface model being pre-created;
It establishes and communicates to connect with current tester;
Listen to command information;
In response to command for stopping, stops functional test and otherwise then analyzes the instruction and be converted to the control instruction of current tester,
It issues current tester to execute, then the implementing result of feedback reception tester, jumps to the step of listening to command information.
3. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 2,
Be characterized in that: the general controls interface model being pre-created is a kind of COM access interface, including following two access connects
Mouthful:
Test and management interface for controlling starting, information exchange and the stopping of tester general controls interface, and then realizes test
The creation and closing of instrument general controls interface;
Functional test driving interface acquires for driving tester to execute substation secondary device functional test and shows test
Real time information in the process, the test execution result that read test instrument returns.
4. a kind of substation secondary device based on tester general-purpose interface template according to claim 1 side of detection automatically
Method, it is characterised in that: the interface model file in the step S1 is the configuration describing document of XML format, the interface model
Configuration description information in file includes the data of the functional test for multiple substation secondary devices that tester is supported, Mei Gegong
It can test as a description configuration unit, each description configuration unit includes the following contents:
Metric data is tested, indicates the metric data description of the tester input/output of substation secondary device functional test;
Test macro data indicate to configure with examination instrument needed for equipment under test corresponding function in substation secondary device functional test
Supplemental characteristic description;
Test result data indicates to survey with caused by equipment under test corresponding function triggering in substation secondary device functional test
Try the result data description of the expected feedback of instrument;
Test case library in the step S1 is the configuration describing document of multiple XML formats, and each test case is one corresponding
Configuration describing document.
5. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 1,
Be characterized in that: the interface model file that each tester of load provides generates reusable in the test case of a variety of testers
Library, specifically:
Load meets the interface model file of current tester, is required according to functional test, decomposes testing procedure;
The last test step of functional test is judged whether it is, if so, saving use-case information;It is walked if it is not, then setting is current
Rapid tester control interface input parameter, target value and differentiation logic, and current procedures information is saved, then sentence again
It is disconnected whether be functional test last test step.
6. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 1,
Be characterized in that: it is described to substation secondary device to be detected carry out functional test, specially comprising steps of
1) according to the type of general controls interface and current tester interface template file, tester object is created;
2) according to the function type to be detected of substation secondary device to be detected, test function object is created;
3) test function object and substation secondary device to be detected establish communication connection, obtain the parameter of test function;
4) test is executed;
5) information is returned the result;
6) stop test;
7) test function object is closed, judges whether to test next time, if so, jumping to according to substation two to be detected
The function type to be detected of secondary device creates the step 2) of test function object, if it is not, then closing tester.
7. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 1,
Be characterized in that: the result information by functional test carries out specification simulation, specifically:
1) according to setting value Auto-matching protocol type;
2) configuration information and processing logic script of current protocol type are loaded;
3) it establishes and communicates to connect with the equipment of current tested, execute specification analog functuion;
4) output information of equipment under test is acquired;
5) it is ordered in response to terminating, communication close connection terminates specification simulation, otherwise, then jumps to and to set with current tested
It is standby to establish communication connection, execute the step 3) of specification analog functuion.
8. a kind of substation secondary device automatic testing method based on general-purpose interface template according to claim 1,
Be characterized in that: in the step S3, the result information of functional test is advised by IEC-103, IEC-104 or IEC-61850 standard
About carry out specification simulation;The examining report that the step S4 automatically generates substation secondary device is set for recording substation secondary
It is standby to need project, testing procedure, the end value of each test item, target value and qualified or not test result to be tested,
The target value is preconfigured expected test result data in test case, and the end value is that each test item was implemented
The data value sent on equipment under test in journey.
9. a kind of server, it is characterised in that: include:
Test case configuration module, the interface model file provided for loading each tester generate reusable in a variety of tests
The test case library of instrument;
Protection and observing and controlling function automatic detection module are used for load test use-case, and result data and function that specification is simulated
The normal data that can be tested compares, and arbitration functions test result is qualified if consistent, otherwise by arbitration functions test result
It is unqualified, and automatically generate the examining report of substation secondary device;
Tester interface module, for calling general controls interface driver tester;
Specification analog module, for the result information of functional test to be carried out specification simulation.
10. a kind of substation secondary device automatic checkout system based on general-purpose interface template, it is characterised in that: including substation
Secondary device, each tester, tester general controls interface, server as claimed in claim 9;Each tester is according to preparatory
The template file sample of creation provides or configures interface model file and is uploaded to server, the general control of server calls tester
Interface processed carries out functional test to substation secondary device.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910852978.3A CN110426589A (en) | 2019-09-10 | 2019-09-10 | A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910852978.3A CN110426589A (en) | 2019-09-10 | 2019-09-10 | A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110426589A true CN110426589A (en) | 2019-11-08 |
Family
ID=68418913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910852978.3A Pending CN110426589A (en) | 2019-09-10 | 2019-09-10 | A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110426589A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111697690A (en) * | 2020-05-20 | 2020-09-22 | 国网河北省电力有限公司电力科学研究院 | Function testing device for power distribution Internet of things low-voltage equipment |
CN112180897A (en) * | 2020-09-25 | 2021-01-05 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112630563A (en) * | 2020-12-07 | 2021-04-09 | 南京能云电力科技有限公司 | Intelligent test system and test method for power secondary equipment |
CN112800637A (en) * | 2021-04-12 | 2021-05-14 | 广东工业大学 | Intelligent substation simulation test device and method |
CN112903120A (en) * | 2020-09-15 | 2021-06-04 | 山东华科信息技术有限公司 | Detection system and detection method for detecting infrared temperature sensors in batches |
CN113341252A (en) * | 2021-06-02 | 2021-09-03 | 启晗电力建设集团有限公司 | Electric power transmission and transformation equipment early warning method and device |
CN113742222A (en) * | 2021-08-20 | 2021-12-03 | 许继集团有限公司 | Automatic generation method and test method for server communication test case |
CN115333985A (en) * | 2022-08-31 | 2022-11-11 | 中国电力科学研究院有限公司 | CMS client protocol testing method, system, equipment and storage medium |
CN115396352A (en) * | 2022-08-31 | 2022-11-25 | 中国电力科学研究院有限公司 | CMS server-side protocol testing method, system, equipment and storage medium |
CN116561014A (en) * | 2023-07-07 | 2023-08-08 | 国电南瑞科技股份有限公司 | Device and method for generating test case of electric power secondary equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN102821010A (en) * | 2012-08-23 | 2012-12-12 | 广东电网公司电力调度控制中心 | Simulator for protector |
CN104020374A (en) * | 2014-06-03 | 2014-09-03 | 河北省电力建设调整试验所 | Intelligent substation secondary equipment site-wide simulation test system |
CN104793076A (en) * | 2015-04-08 | 2015-07-22 | 南京能云电力科技有限公司 | Intelligent automatic test system and method |
CN106600138A (en) * | 2016-12-09 | 2017-04-26 | 贵州大学 | Secondary equipment risk assessment method |
CN107505520A (en) * | 2017-07-28 | 2017-12-22 | 南京能云电力科技有限公司 | Scene-type intelligence automatically testing platform and method |
CN109633345A (en) * | 2019-02-13 | 2019-04-16 | 国网陕西省电力公司延安供电公司 | A kind of secondary device on-line monitoring and analytical equipment |
-
2019
- 2019-09-10 CN CN201910852978.3A patent/CN110426589A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN102821010A (en) * | 2012-08-23 | 2012-12-12 | 广东电网公司电力调度控制中心 | Simulator for protector |
CN104020374A (en) * | 2014-06-03 | 2014-09-03 | 河北省电力建设调整试验所 | Intelligent substation secondary equipment site-wide simulation test system |
CN104793076A (en) * | 2015-04-08 | 2015-07-22 | 南京能云电力科技有限公司 | Intelligent automatic test system and method |
CN106600138A (en) * | 2016-12-09 | 2017-04-26 | 贵州大学 | Secondary equipment risk assessment method |
CN107505520A (en) * | 2017-07-28 | 2017-12-22 | 南京能云电力科技有限公司 | Scene-type intelligence automatically testing platform and method |
CN109633345A (en) * | 2019-02-13 | 2019-04-16 | 国网陕西省电力公司延安供电公司 | A kind of secondary device on-line monitoring and analytical equipment |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111697690A (en) * | 2020-05-20 | 2020-09-22 | 国网河北省电力有限公司电力科学研究院 | Function testing device for power distribution Internet of things low-voltage equipment |
CN111697690B (en) * | 2020-05-20 | 2021-11-12 | 国网河北省电力有限公司电力科学研究院 | Function testing device for power distribution Internet of things low-voltage equipment |
CN112903120A (en) * | 2020-09-15 | 2021-06-04 | 山东华科信息技术有限公司 | Detection system and detection method for detecting infrared temperature sensors in batches |
CN112903120B (en) * | 2020-09-15 | 2022-08-05 | 山东华科信息技术有限公司 | Detection system and detection method for detecting infrared temperature sensors in batches |
CN113029329A (en) * | 2020-09-15 | 2021-06-25 | 山东华科信息技术有限公司 | Detection system and detection method for batch detection of vibration sensors |
CN112180897A (en) * | 2020-09-25 | 2021-01-05 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112180897B (en) * | 2020-09-25 | 2021-12-17 | 国网湖南省电力有限公司 | Relay protection/measurement and control device automatic test system and method based on universal test template |
CN112630563A (en) * | 2020-12-07 | 2021-04-09 | 南京能云电力科技有限公司 | Intelligent test system and test method for power secondary equipment |
CN112800637B (en) * | 2021-04-12 | 2021-08-27 | 广东工业大学 | Intelligent substation simulation test device and method |
CN112800637A (en) * | 2021-04-12 | 2021-05-14 | 广东工业大学 | Intelligent substation simulation test device and method |
CN113341252A (en) * | 2021-06-02 | 2021-09-03 | 启晗电力建设集团有限公司 | Electric power transmission and transformation equipment early warning method and device |
CN113742222A (en) * | 2021-08-20 | 2021-12-03 | 许继集团有限公司 | Automatic generation method and test method for server communication test case |
CN113742222B (en) * | 2021-08-20 | 2024-04-09 | 河南源网荷储电气研究院有限公司 | Automatic generation method and test method for server communication test cases |
CN115333985A (en) * | 2022-08-31 | 2022-11-11 | 中国电力科学研究院有限公司 | CMS client protocol testing method, system, equipment and storage medium |
CN115396352A (en) * | 2022-08-31 | 2022-11-25 | 中国电力科学研究院有限公司 | CMS server-side protocol testing method, system, equipment and storage medium |
CN116561014A (en) * | 2023-07-07 | 2023-08-08 | 国电南瑞科技股份有限公司 | Device and method for generating test case of electric power secondary equipment |
CN116561014B (en) * | 2023-07-07 | 2023-09-29 | 国电南瑞科技股份有限公司 | Device and method for generating test case of electric power secondary equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110426589A (en) | A kind of substation secondary device automatic testing method, server and system based on general-purpose interface template | |
CN105785199B (en) | Multifunctional ligand electric terminals integrated test system and its working method | |
CN106019039B (en) | Standardize protective relaying device assembly line automatic checkout system and method | |
CN105824001B (en) | Method and system for testing IEC61850 conformance of digital electric energy meter | |
CN107505520B (en) | Scene type intelligent automatic test platform and method | |
CN105809260A (en) | Method for intelligently generating monitoring information point list of dispatching automation system | |
CN107515370A (en) | A kind of PCBA detection means and detection method | |
CN106707065B (en) | Battery management system standard DBC interfaces automatization test system and method | |
CN106405294B (en) | Portable power distribution product transmission calibrator and implementation test method thereof | |
CN104868599A (en) | Intelligent substation message simulation test and association analysis system, and simulation method | |
CN107102221B (en) | Rapid test platform for logic function of relay protection device | |
CN108845269A (en) | Battery testing method and battery test system | |
CN105158718A (en) | Fault indicator comprehensive testing method and testing system | |
CN109490769A (en) | A kind of chip protective relaying device, tester and its control method, connector | |
CN106291329B (en) | A kind of test macro with the automatic detection distant function of distribution terminal three | |
CN205229349U (en) | A test system and looped netowrk cabinet for looped netowrk cabinet | |
CN105207836B (en) | A kind of method of quick test PQDIF file consistences | |
CN103308808A (en) | System and method for testing secondary device of intelligent substation automatically | |
CN105117334A (en) | XML based test demand description and realization method | |
CN103344850A (en) | System and method of intelligent substation automatic testing based on test formwork technology | |
CN207557362U (en) | A kind of full production cycle automatic test device of distribution terminal | |
CN109254214A (en) | Valve base electronic device Auto-Test System and method | |
CN105470158A (en) | Wafer test probe station and testing method thereof | |
CN109683031A (en) | A kind of full production cycle automatic test device of distribution terminal and method | |
CN106019001A (en) | Automatic electromagnetic signal dynamic loading device and method for environmental adaptability tests |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191108 |
|
RJ01 | Rejection of invention patent application after publication |