CN108663581A CN201711129637.0A CN201711129637A CN108663581A CN 108663581 A CN108663581 A CN 108663581A CN 201711129637 A CN201711129637 A CN 201711129637A CN 108663581 A CN108663581 A CN 108663581A
Authority
CN
China
Prior art keywords
equipment
library
peace
secondary device
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711129637.0A
Other languages
Chinese (zh)
Inventor
张可
马恩宁
田暤
赵宇
张凌
陆蔚琳
杨凯江
段晓雪
李宏斌
袁蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Original Assignee
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dali Power Supply Bureau of Yunnan Power Grid Co Ltd filed Critical Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201711129637.0A priority Critical patent/CN108663581A/en
Publication of CN108663581A publication Critical patent/CN108663581A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of secondary equipment of intelligent converting station test methods, it is exported to secondary device instead of mutual inductor with testing system output, it reads the SCD file of substation and is parsed, generate the layer of structure figure of intelligent substation, parse monitoring of the message realization of different operating modes to secondary device operating status, equipment fault is positioned, failure is overhauled automatically, and the function association library for finally establishing related substation instantiates model.Using the present invention, may be implemented to meet high security, stiff stability, the secondary equipment of intelligent converting station test with high integrity.

Description

A kind of secondary equipment of intelligent converting station test method
Technical field
The invention belongs to intelligent substation technical field of measurement and test, more specifically, are related to a kind of intelligent substation secondary Apparatus testing method.
Background technology
In the modern times that science and technology is showing improvement or progress day by day, electric power resource has become the indispensable promotion resource of modern social development.Together Sample is with the raising of production level, and increasingly branch is unable to hold out social productive forces change to electric power for the electric system of present level Resource and the increasing huge demand of powered stable reliability, therefore the clean intelligent grid of strong self-healing becomes a new generation's electricity Net the important trend of development.In past nearly 100 years, traditional electric system has evolved into centralized power generation long distance Large-Scale Interconnected network system from Transmission Mode.But under current world economic situation, since the energy, environment etc. are multi-party The influence of face whole world sexual factor, traditional electric system will welcome primary deep technological change --- intelligent grid.And conduct The centrostigma of transmission and disttrbution, the core component of intelligent grid --- intelligent substation comes into being.Intelligent substation with Whole station information digitalization, communications platform networking, information sharing are standardized as basic demand, and the substation that discards tradition is with digital electricity Cable be medium transmit electric signal data-transmission mode, transmitted by the way of optical fiber and digital transforming plant primary equipment and The operation information of secondary device.Under comparing with traditional substation, intelligent substation by electronic mutual inductor, combining unit and The novel intelligents equipment such as data switching exchane is included in construction range, the information tissue and distribution to substation and follow-up efficient letter Breath processing brings abundant flexibility.These smart machines effectively prevent the repetition configuration i.e. " information of signal pickup assembly The appearance of isolated island ", while improving the information exchange inside substation and processing capacity.In addition to this also it is that intelligent substation is complete Condition is created at the function of information collection, measurement, control, protection, metering and detection.
Under current situation, the development of intelligent substation is still in the starting stage;But intelligent substation is relative to traditional power transformation The advantage stood is fairly obvious.Simultaneously because the management mode of existing tradition substation automates, the level of informatization is relatively low, lead Cause the safety and stability of traditional substation operation management service to relatively low, for catastrophic failure or other emergencies The risk of conventional process pattern is also relatively high, and traditional substation's maintenance mode can no longer meet the need of intelligent substation It wants, is badly in need of new test method and means.
For secondary device, relative to traditional substation management service mode at this stage, intelligent substation secondary is set Standby functional completeness is analyzed mainly for protective relaying device:When protective relaying device has maintenance needs, it is only necessary to use Analog signal replaces the input signal of the current-voltage transformer of primary equipment side, the signal for being accessed protective relaying device defeated Enter end can be completed.But generally speaking for intelligent substation, although the functional analysis to protective relaying device can be completed, But because the device examined does not include the input of MU signals and network data exchange machine, therefore test and do not have integrality.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of secondary equipment of intelligent converting station test sides Method is realized and meets high security, stiff stability, the secondary device test with high integrity.
For achieving the above object, secondary equipment of intelligent converting station test method of the present invention, includes the following steps:
S1:The mutual inductor part of primary system and combining unit are disconnected, exported instead of mutual inductor with testing system output;
S2:It reads the SCD file of substation and is parsed, obtain the configuration information of intelligent substation;
S3:It reads in the configuration information analytically obtained and is closed at the required information of figure, including device coordinate, port connection System, present port information and link information stream, generate the layer of structure figure of intelligent substation, are patterned to intelligent substation Displaying;
S4:The involved secondary device of substation operation monitoring includes combining unit, protection location, measurement and control unit, intelligence Energy terminal closes intelligence integrated device, protects and survey six classifications of integrated device, the operating status of secondary device is divided into operation, function is touched Four kinds of hair, failure, maintenance operating modes, according to different operating modes, in MMS messages and GOOSE message caused by different secondary devices Hold different, the monitoring by the parsing realization to corresponding message to secondary device operating status;
S5:Parse GOOSE message and SV messages;
S6:Equipment fault is positioned, including secondary device damage degree is analyzed and returned according to the processing of network message As a result positioning device fault point, wherein secondary device damage degree analysis specific steps include:
S6.1.1:Secondary device function library is established, determines the specific object of secondary device damage degree analysis;
S6.1.2:Electrical secondary system functional conditions library is established, determines the factor for influencing secondary device and electrical secondary system function;
S6.1.3:Establish secondary device logic matrix, by logic matrix formed secondary device and electrical secondary system function and The logical expression of its condition;
S6.1.4:It is taken a picture by secondary device and the timing of electrical secondary system functional conditions library or triggering photograph obtains secondary device Functional conditions state;
S6.1.5:Secondary device work(is analyzed according to the functional conditions state and logical expression of secondary device and electrical secondary system It can operating status;
S6.1.6:According to evaluation of running status secondary device function damage degree;
The specific steps of secondary device fault location include:
S6.2.1:According to alarm or failure message positioning failure host equipment;
S6.2.2:Possible cause is positioned according to host equipment outputting alarm or the decision condition of failure;
S6.2.3:According to possible factor and host equipment and its associate device positioning failure region;
S7:Process layer message based on back production on-the-spot test and station level message, reasoning from logic field device behavior are dynamic Make relationship, Wrong localization source is compared with the correct action rules of electrical secondary system equipment in expert system, electrical secondary system is set Standby correct action rules include monomer and network action behavior, in test, according to the appearance of practical message sequence, with expert Sequence diagram in library compares one by one, and missing link is then to realize that failure is overhauled automatically at failure;
S8:The function association library of each secondary device is instantiated according to SCD file, establishes the work(of related substation Can correlation database instantiate model, including once with the incidence relation of secondary component, the connecting relation of secondary device, function event Information association relationship, information are associated with device port.
Secondary equipment of intelligent converting station test method of the present invention is exported to secondary with to test system output instead of mutual inductor and is set It is standby, it reads the SCD file of substation and is parsed, generate the layer of structure figure of intelligent substation, parse the report of different operating modes Text realizes the monitoring to secondary device operating status, is positioned to equipment fault, and failure is overhauled automatically, finally establishes related become The function association library in power station instantiates model.Using the present invention, it may be implemented to meet high security, stiff stability, there is height The secondary equipment of intelligent converting station of integrality is tested.
Description of the drawings
Fig. 1 is the specific implementation mode flow chart of secondary equipment of intelligent converting station test method of the present invention;
Fig. 2 is the exemplary plot of intelligent substation;
Fig. 3 is buffering queue schematic diagram during packet parsing;
Fig. 4 is that Organization Chart is realized in the evaluation of secondary device damage degree;
Fig. 5 is the flow chart for the method that faulty equipment maintenance safety measure is automatically generated in the present embodiment.
Specific implementation mode
The specific implementation mode of the present invention is described below in conjunction with the accompanying drawings, preferably so as to those skilled in the art Understand the present invention.Requiring particular attention is that in the following description, when known function and the detailed description of design perhaps When can desalinate the main contents of the present invention, these descriptions will be ignored herein.
Embodiment
Fig. 1 is the specific implementation mode flow chart of secondary equipment of intelligent converting station test method of the present invention.As shown in Figure 1, The specific steps of secondary equipment of intelligent converting station test method of the present invention include:
S101:Configuration testing system:
The present invention needs the integrated testability completed to secondary equipment of intelligent converting station not change it to keep integrality Wiring, but regarded as the measurand of an entirety.Fig. 2 is the exemplary plot of intelligent substation.As shown in Fig. 2, intelligence becomes The mutual inductor of the primary system of electric appliance is exported between the combining unit of electrical secondary system, therefore in configuration testing system, is needed The mutual inductor part of primary system and combining unit are disconnected, exported instead of mutual inductor with testing system output.
S102:SCD model analyzings:
Read SCD (Substation ConfigurationDescription, the substation configuration description) texts of substation Part is simultaneously parsed, and the configuration information of intelligent substation is obtained.The standard that SCD file is based at present is IEC 61850, SCD The parsing basis of file is the ACSI models mapping in the standard.
S103:Generating structure hierarchy chart:
Read in the configuration information analytically obtained at scheming required information, including device coordinate, port connection relationship, Present port information and link information stream, generate the layer of structure figure of intelligent substation, and exhibition is patterned to intelligent substation Show.
S104:Secondary device status monitoring:
The involved secondary device of substation operation monitoring includes combining unit, protection location, measurement and control unit, intelligently end End closes intelligence integrated device, protects and survey six classifications of integrated device.For ease of dividing, the present invention divides the operating status of secondary device For four kinds of operation, function triggering, failure, maintenance operating modes.According to different operating modes, MMS messages caused by different secondary devices It is different with GOOSE message content;The monitoring to secondary device operating status can be completed according to the parsing of corresponding message.
Fig. 3 is buffering queue schematic diagram during packet parsing.As shown in figure 3, packet parsing uses producer consumer Buffering queue is arranged in pattern in reception process.Hardware platform obtains the data of the network message second layer from trawl performance interface The data of media access control sublayer in link layer;Receive thread and message packet is put into queue, according to the first in first out of queue, parsing Thread is taken message packet away while being parsed from queue, then writes data into model file.Process layer is believed with station level in order to prevent Breath overlapping, the buffering queue of different levels are independently arranged.It parses thread and is directed to MMS messages according to the IP of secondary device using multi-thread Journey mode is handled, and improves packet parsing speed.Analysis result is the effective information in message, and in corresponding IED models Value is relatively later updated data.
S105:Communication message parses:
It receives the GOOSE message and SV messages under malfunction and parses.The format of GOOSE message frame include heading, APDU and Frame Check Sequence, SV messages include heading part and the parts SavPDU.
S106:Equipment fault positions:
Equipment fault positioning includes that secondary device damage degree is analyzed and returns the result positioning according to the processing of network message and set Standby fault point.
The analysis of secondary device damage degree establishes " function item using process layer and station level network message as basic data source Part library " is used as filter condition, establishes the functional completeness that " function logic matrix " evaluates secondary device as operational factor.
Fig. 4 is that Organization Chart is realized in the evaluation of secondary device damage degree.As shown in figure 4, the evaluation of secondary device damage degree is specific Step includes:
S6.1.1:Secondary device function library is established, determines the specific object of secondary device damage degree analysis;
S6.1.2:Electrical secondary system functional conditions library is established, determines the factor for influencing secondary device and electrical secondary system function;
S6.1.3:Establish secondary device logic matrix, by logic matrix formed secondary device and electrical secondary system function and The logical expression of its condition;
S6.1.4:It is taken a picture by secondary device and the timing of electrical secondary system functional conditions library or triggering photograph obtains secondary device Functional conditions state;
S6.1.5:Secondary device work(is analyzed according to the functional conditions state and logical expression of secondary device and electrical secondary system It can operating status;
S6.1.6:According to evaluation of running status secondary device function damage degree.
The specific steps of secondary device fault location include:
S6.2.1:According to alarm or failure message positioning failure host equipment;
S6.2.2:Possible cause is positioned according to host equipment outputting alarm or the decision condition of failure;
S6.2.3:According to possible factor and host equipment and its associate device positioning failure region.
S107:Failure is overhauled automatically:
Process layer message based on back production on-the-spot test and station level message, reasoning from logic field device behavior act close System, is compared Wrong localization source, electrical secondary system equipment is just with the correct action rules of electrical secondary system equipment in expert system True action rules include monomer and network action behavior, in test, according to the appearance of practical message sequence, and in experts database Sequence diagram compare one by one, missing link then be failure at, realize failure overhaul automatically,.
In order to improve the efficiency for generating peace and arranging.One kind is proposed in the present embodiment automatically generate faulty equipment maintenance safety arrange The method applied.First to overhaul/accompany stop library, single devices peace arrange library and peace arrange the definition in filtering rule library to illustrate.
It overhauls/accompanies and stop library for describing to need the equipment overhauled and accordingly accompanying the incidence relation between stopping equipment, mainly wrap Combining unit is contained, intelligent terminal, protective device, measure and control device, has closed intelligence integrated device, protects and survey integrated device, process layer exchange The secondary devices such as machine and circuit, busbar, main transformer, ECVT (Current Voltage combined electronic transformer), ECT (electronic currents Mutual inductor), EVT (electronic type voltage transformer), switch, disconnecting link, the primary equipments such as earthing knife-switch.
Single devices peace is arranged library to describe the optional peace that each secondary device is included and is arranged, and containing may in transformer substation system All devices in inspecting state, including electronic transformer collector surface units, combining unit, protective device, observing and controlling Device, intelligent terminal, protect survey integrated device, close intelligence integrated device and switch, disconnecting link, earthing knife-switch, circuit, busbar, main transformer, ECVT, ECT, electromagnetic current transducer and voltage transformer.It includes overhauling hard pressing plate, work(to pacify optional safety measure item in arranging library The soft pressing plate of energy, the soft pressing plate in outlet, the soft pressing plate of input, primary equipment peace are arranged, electrical isolation peace is arranged.
Peace arranges peace in filtering rule library description " single devices peace arrange library " to arrange the rule of choosing of item, including general rule and spy Different rule.The general rule of foundation includes establishing the rule on maintenance boundary, intelligent substation repair apparatus classifying rules, executing peace The rule of full measure sequence, keeps information at the rule that same type equipment sequence is shown in upkeep operation in repair apparatus group Rule, the rule of filtering safe measure of interaction integrality.
Fig. 5 is the flow chart for the method that faulty equipment maintenance safety measure is automatically generated in the present embodiment.As shown in figure 5, The specific steps that the method for faulty equipment maintenance safety measure is automatically generated in the present embodiment include:
S501:Preprocessing function library:
Foundation overhaul/accompany stop template library, single devices peace arranges library, peace to arrange and three, filtering rule library base library and set maintenance Standby, associate device accompanies and stops equipment and be stored in the variable of QStringList types, and mark is respectively provided with before each device name Device type is distinguished, such as repair apparatus is M, associate device is C, accompanies that stop equipment be A.
S502:Import SCD file:
Information association relationship between smart substation equipment is established using SCD file and secondary file.
S503:Instantiate function library:
Complete to overhaul/accompany using SCD file and secondary file stop Kuku, single devices peace arranges the instantiation in library, instantiation Content includes device interval information, scheduling number, physical port and pressing plate relationship, pressing plate and data set relationship.
S504:Select Awaiting Overhaul equipment:
It is original substantially to arrange, keep between repair apparatus information integrity in " maintenance boundary " arrangement dual maintenance peace Then, it filters out " repair apparatus " in arranging filtering rule library to arrange library from the single devices of instantiation peace using monomer peace and " is associated with fortune Maintenance safety measure between row equipment group " forms maintenance peace and arranges ticket.
S505:Graphical representation:
It shows that maintenance peace is arranged to upkeep operation personnel in a manner of figure+verbal description, maintenance peace is confirmed by operation maintenance personnel The integrality of full measure.
Graphical representation in the present embodiment uses layered mode, first layer displaying upkeep operation risk point and maintenance peace to arrange Position, the displaying of second layer figure arrange relevant detailed information, including the information connection relation of equipment room, pressing plate to control with maintenance peace Relationship, connectivity port etc..
S506:Supervision peace arranges execution:
It is read from component library and overhauls peace and arrange the status information in relation to secondary device, obtain equipment related with upkeep operation Original state.Network message is intercepted, the message information of identification and maintenance safety measure associate device is shown with patterned way and pacified Arrange executive condition.It arranges execution information to arrange ticket project and order to compare with peace peace, warning is provided when there is inconsistent situation Prompt message.After listening to " maintenance pressing plate " input message, the position " test " situation of change in association message is checked.For can not be from The maintenance peace that status information is obtained on network is arranged, and overhaul secure operation personnel are reminded in the form of highlighted words.
S107:Establish intelligent expert diagnostics library:
The function association library of each secondary device is instantiated according to SCD file, establishes the function of related substation Correlation database instantiate model, including once with the incidence relation of secondary component, the letter of the connecting relation of secondary device, function event Breath incidence relation, information are associated with device port.
In the present embodiment, instantiation process includes two aspects:
1. all function association libraries information needed is associated;
2. the abstracted information in function association template library is matched with SCD file.
The first step is mainly associated with device name, such as PL2201A, CT2202A, and class name is as keyword according to this Related information is combined and forms unified model.The matching process of second step includes two steps:
1. the matching of information model:There is its fixed indices for each information in SCD file.Its canonical form is: Implementor name+logical device name+logical node name+data object name+data attribute name.Therefore, associated equipment is removed, remaining Item is marked using the standard in IEC61850 in template library, and instantiation process can carry out precise search to these titles.It is right In the difference configuration of different manufacturers, it is also necessary to carry out fuzzy matching to template library.
2. the fuzzy matching of information word:Fuzzy matching key is the identification accuracy of natural language, therefore in template To the description of information using the three-stage of standard, i.e. functional domain, action scope, qualifications in library, using most in matching algorithm Big weighted registration method.Under the premise of relevant device has been found in fuzzy matching, system can in data set matching feature domain Word, then matching effect domain and qualifications successively from result, to be exactly found corresponding equipment.In order to accelerate matching speed Degree, virtual terminator list is preferentially retrieved for process layer information;For station level information, can further specify search in a template Dataset name;Information under oper nodes is looked only for for remote information.
Although the illustrative specific implementation mode of the present invention is described above, in order to the technology of the art Personnel understand the present invention, it should be apparent that the present invention is not limited to the range of specific implementation mode, to the common skill of the art For art personnel, if various change the attached claims limit and determine the spirit and scope of the present invention in, these Variation is it will be apparent that all utilize the innovation and creation of present inventive concept in the row of protection.

Claims (2)

1. a kind of secondary equipment of intelligent converting station test method, which is characterized in that include the following steps:
S1:The mutual inductor part of primary system and combining unit are disconnected, exported instead of mutual inductor with testing system output;
S2:It reads the SCD file of substation and is parsed, obtain the configuration information of intelligent substation;
S3:Read in the configuration information analytically obtained at scheming required information, including device coordinate, port connection relationship, Present port information and link information stream, generate the layer of structure figure of intelligent substation, and exhibition is patterned to intelligent substation Show;
S4:The involved secondary device of substation operation monitoring includes combining unit, protection location, measurement and control unit, intelligently end It holds, close intelligence integrated device, protect and survey six classifications of integrated device, the operating status of secondary device is divided into operation, function triggering, event Four kinds of barrier, maintenance operating modes, according to different operating modes, MMS messages and GOOSE message content caused by different secondary devices are not Together, by realizing the monitoring to secondary device operating status to the parsing of corresponding message;
S5:Parse the GOOSE message and SV messages under malfunction;
S6:Equipment fault is positioned, including secondary device damage degree is analyzed and returned the result according to the processing of network message Positioning device fault point, wherein secondary device damage degree analysis specific steps include:
S6.1.1:Secondary device function library is established, determines the specific object of secondary device damage degree analysis;
S6.1.2:Electrical secondary system functional conditions library is established, determines the factor for influencing secondary device and electrical secondary system function;
S6.1.3:Secondary device logic matrix is established, secondary device and electrical secondary system function and its item are formed by logic matrix The logical expression of part;
S6.1.4:It is taken a picture by secondary device and the timing of electrical secondary system functional conditions library or triggering photograph obtains secondary device function Cond;
S6.1.5:Secondary device function fortune is analyzed according to the functional conditions state and logical expression of secondary device and electrical secondary system Row state;
S6.1.6:According to evaluation of running status secondary device function damage degree;
The specific steps of secondary device fault location include:
S6.2.1:According to alarm or failure message positioning failure host equipment;
S6.2.2:Possible cause is positioned according to host equipment outputting alarm or the decision condition of failure;
S6.2.3:According to possible factor and host equipment and its associate device positioning failure region;
S7:Process layer message based on back production on-the-spot test and station level message, reasoning from logic field device behavior act close System, is compared Wrong localization source, electrical secondary system equipment is just with the correct action rules of electrical secondary system equipment in expert system True action rules include monomer and network action behavior, in test, according to the appearance of practical message sequence, and in experts database Sequence diagram compare one by one, missing link then be failure at, realize failure overhaul automatically;
S8:The function association library of each secondary device is instantiated according to SCD file, the function of establishing related substation is closed Join library and instantiates model, including the once information with the incidence relation of secondary component, the connecting relation of secondary device, function event Incidence relation, information are associated with device port.
2. secondary equipment of intelligent converting station test method according to claim 1, which is characterized in that in the step S7, Further include generating faulty equipment maintenance safety measure, specific steps include:
S7.1:Foundation overhaul/accompany stop template library, single devices peace arrange library, peace arrange three, filtering rule library base library and will maintenance Equipment, associate device accompany and stop equipment and be stored in the variable of QStringList types, and mark is respectively provided with before each device name Know to distinguish device type;
S7.2:Information association relationship between smart substation equipment is established using SCD file and secondary file;
S7.3:Complete to overhaul/accompany using SCD file and secondary file stop Kuku, single devices peace arranges the instantiation in library, instantiation Content includes device interval information, scheduling number, physical port and pressing plate relationship, pressing plate and data set relationship;
S7.4:It is original substantially to arrange, keep between repair apparatus information integrity in " maintenance boundary " arrangement dual maintenance peace Then, it filters out " repair apparatus " in arranging filtering rule library to arrange library from the single devices of instantiation peace using monomer peace and " is associated with fortune Maintenance safety measure between row equipment group " forms maintenance peace and arranges ticket;
S7.5:It shows that maintenance peace is arranged to upkeep operation personnel in a manner of figure+verbal description, maintenance peace is confirmed by operation maintenance personnel The integrality of full measure;
S7.6:It is read from component library and overhauls peace and arrange the status information in relation to secondary device, obtain equipment related with upkeep operation Original state;Network message is intercepted, the message information of identification and maintenance safety measure associate device is shown with patterned way Peace arranges executive condition;Execution information is arranged to arrange ticket project and order to compare with peace peace, when there is inconsistent situation to responding Accuse prompt message;After listening to " maintenance pressing plate " input message, the position " test " situation of change in association message is checked.For can not The maintenance peace that status information is obtained from network is arranged, and overhaul secure operation personnel are reminded in the form of highlighted words.
CN201711129637.0A 2017-11-15 2017-11-15 A kind of secondary equipment of intelligent converting station test method Pending CN108663581A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711129637.0A CN108663581A (en) 2017-11-15 2017-11-15 A kind of secondary equipment of intelligent converting station test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711129637.0A CN108663581A (en) 2017-11-15 2017-11-15 A kind of secondary equipment of intelligent converting station test method

Publications (1)

Publication Number Publication Date
CN108663581A true CN108663581A (en) 2018-10-16

Family

ID=63783860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711129637.0A Pending CN108663581A (en) 2017-11-15 2017-11-15 A kind of secondary equipment of intelligent converting station test method

Country Status (1)

Country Link
CN (1) CN108663581A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110412381A (en) * 2019-08-06 2019-11-05 国网四川省电力公司电力科学研究院 Secondary equipment of intelligent converting station defect diagonsis system and method based on information driving
CN111131274A (en) * 2019-12-27 2020-05-08 国网四川省电力公司电力科学研究院 Non-invasive intelligent substation vulnerability detection method
CN111131249A (en) * 2019-12-24 2020-05-08 国网北京市电力公司 Data processing method and device
CN111507862A (en) * 2020-04-08 2020-08-07 国网湖南省电力有限公司 State fault analysis method for extra-high voltage important secondary data stream
CN112019370A (en) * 2019-05-31 2020-12-01 烽火通信科技股份有限公司 Equipment fault processing method and system
CN112800637A (en) * 2021-04-12 2021-05-14 广东工业大学 Intelligent substation simulation test device and method
CN113743139A (en) * 2021-08-03 2021-12-03 国网福建省电力有限公司检修分公司 RFID-based overlapping safety measure judging method and terminal
CN114170878A (en) * 2021-11-12 2022-03-11 安徽继远软件有限公司 Equipment maintenance test system and method for novel intelligent substation
CN115118509A (en) * 2022-06-29 2022-09-27 国网河南省电力公司电力科学研究院 Substation secondary equipment debugging file permission detection method and security control device
CN117148018A (en) * 2023-10-27 2023-12-01 南方电网数字电网研究院有限公司 Function test system and method for power distribution module

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001328A (en) * 2012-11-19 2013-03-27 山东大学 Fault diagnosis and assessment method of intelligent substation
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN104994061A (en) * 2015-05-19 2015-10-21 中国南方电网有限责任公司 Intelligent transformer station process layer switch MMS safety communication device and method
CN105117532A (en) * 2015-08-06 2015-12-02 中国电力科学研究院 Modeling method for intelligent substation secondary equipment interval information model
CN105871071A (en) * 2016-06-08 2016-08-17 上海南华兰陵电气有限公司 Open type digital integrated automation system applied to transformer substation
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106529824A (en) * 2016-11-21 2017-03-22 国网四川省电力公司电力科学研究院 Method for analyzing functional damage degrees of secondary equipment and secondary system of intelligent substation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001328A (en) * 2012-11-19 2013-03-27 山东大学 Fault diagnosis and assessment method of intelligent substation
CN103150426A (en) * 2013-02-09 2013-06-12 国家电网公司 Unified modeling method for regulation and control integrated simulation of primary grid equipment and secondary grid equipment
CN104994061A (en) * 2015-05-19 2015-10-21 中国南方电网有限责任公司 Intelligent transformer station process layer switch MMS safety communication device and method
CN105117532A (en) * 2015-08-06 2015-12-02 中国电力科学研究院 Modeling method for intelligent substation secondary equipment interval information model
CN105871071A (en) * 2016-06-08 2016-08-17 上海南华兰陵电气有限公司 Open type digital integrated automation system applied to transformer substation
CN106159759A (en) * 2016-07-13 2016-11-23 国网四川省电力公司电力科学研究院 A kind of method automatically generating secondary system of intelligent substation maintenance safety measure
CN106529824A (en) * 2016-11-21 2017-03-22 国网四川省电力公司电力科学研究院 Method for analyzing functional damage degrees of secondary equipment and secondary system of intelligent substation

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112019370B (en) * 2019-05-31 2022-07-15 烽火通信科技股份有限公司 Equipment fault processing method and system
CN112019370A (en) * 2019-05-31 2020-12-01 烽火通信科技股份有限公司 Equipment fault processing method and system
CN110412381A (en) * 2019-08-06 2019-11-05 国网四川省电力公司电力科学研究院 Secondary equipment of intelligent converting station defect diagonsis system and method based on information driving
CN111131249A (en) * 2019-12-24 2020-05-08 国网北京市电力公司 Data processing method and device
CN111131249B (en) * 2019-12-24 2022-08-12 国网北京市电力公司 Data processing method and device
CN111131274A (en) * 2019-12-27 2020-05-08 国网四川省电力公司电力科学研究院 Non-invasive intelligent substation vulnerability detection method
CN111507862A (en) * 2020-04-08 2020-08-07 国网湖南省电力有限公司 State fault analysis method for extra-high voltage important secondary data stream
CN111507862B (en) * 2020-04-08 2023-08-15 国网湖南省电力有限公司 State fault analysis method for extra-high voltage important secondary data stream
CN112800637B (en) * 2021-04-12 2021-08-27 广东工业大学 Intelligent substation simulation test device and method
CN112800637A (en) * 2021-04-12 2021-05-14 广东工业大学 Intelligent substation simulation test device and method
CN113743139A (en) * 2021-08-03 2021-12-03 国网福建省电力有限公司检修分公司 RFID-based overlapping safety measure judging method and terminal
CN114170878A (en) * 2021-11-12 2022-03-11 安徽继远软件有限公司 Equipment maintenance test system and method for novel intelligent substation
CN115118509A (en) * 2022-06-29 2022-09-27 国网河南省电力公司电力科学研究院 Substation secondary equipment debugging file permission detection method and security control device
CN117148018A (en) * 2023-10-27 2023-12-01 南方电网数字电网研究院有限公司 Function test system and method for power distribution module
CN117148018B (en) * 2023-10-27 2024-03-26 南方电网数字电网研究院有限公司 Function test system and method for power distribution module

Similar Documents

Publication Publication Date Title
CN108663581A (en) A kind of secondary equipment of intelligent converting station test method
CN102901881B (en) On-site debugging method for digital substation
CN112910089A (en) Transformer substation secondary equipment fault logic visualization method and system
CN102142716B (en) Power grid online fault diagnosis method based on three-state data multidimensional cooperative processing
CN106908690A (en) Distributed intelligence warning system and its method for diagnosing faults between boss station
CN108549650A (en) A kind of intelligent substation anti-misoperation locking logic rules source configuration method and system
CN101989938A (en) Filtration system and method of mis-telecommand scheduling end of transformer substation
CN111884347B (en) Power data centralized control system for multi-source power information fusion
CN107786000A (en) The intelligent generation method of digital relay protection tester configuration file
CN105093017B (en) Intelligent substation GOOSE integrated testabilities device and its method of testing
CN108268706A (en) The closed loop test system and method applied towards integrated monitoring system intelligent alarm
CN110493079A (en) The production automation test method of industrial ethernet switch
CN108270640A (en) A kind of intelligence battalion is with information integrated system Information Interoperability conformance test method
CN114138982A (en) Construction method of knowledge graph for dry-type transformer fault diagnosis
CN106843041A (en) Automatic generation system and method for anti-error logic formula of electrical equipment
CN107995050A (en) Secondary system of intelligent substation process layer communication failure diagnostic system and method
CN110361609A (en) Extra-high voltage equipment monitors system and method
CN111327474B (en) Power system fault diagnosis method based on topology analysis
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN112054511A (en) Correlation generation method for accident handling measures and standard tickets of power system
CN104408665B (en) Based on the event-oriented noisy data processing system of SCD models
CN108304947A (en) The safety-optimized method and system of secondary device based on SCD file object model
CN103001318A (en) 61850-based intelligent transformer substation topology five-prevention implementing method
CN105785149A (en) Network tester for undercurrent grounding line selection apparatus of smart substation and network testing method therefor
CN106841842A (en) The method of testing and device in the empty loop of secondary device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181016