CN112744754A - High-rise building construction device - Google Patents

High-rise building construction device Download PDF

Info

Publication number
CN112744754A
CN112744754A CN202011630278.9A CN202011630278A CN112744754A CN 112744754 A CN112744754 A CN 112744754A CN 202011630278 A CN202011630278 A CN 202011630278A CN 112744754 A CN112744754 A CN 112744754A
Authority
CN
China
Prior art keywords
fixedly connected
plate
operation panel
supporting leg
construction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011630278.9A
Other languages
Chinese (zh)
Inventor
马淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011630278.9A priority Critical patent/CN112744754A/en
Publication of CN112744754A publication Critical patent/CN112744754A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F13/00Common constructional features or accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F17/00Safety devices, e.g. for limiting or indicating lifting force
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/022Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using dampers and springs in combination
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/023Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using fluid means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/04Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means
    • F16F15/06Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means with metal springs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a high-rise building construction device which comprises supporting legs, wherein a lifting plate is fixedly connected between two sides of each supporting leg, the bottom of the lifting plate is fixedly connected with the supporting legs through inclined supporting plates, the top of the lifting plate is fixedly connected with an operating platform through an oil cylinder, one side of each supporting leg is fixedly connected with a limiting sleeve through a connecting rod, a counterweight column is arranged inside each limiting sleeve, and a pulley is arranged at the top of each limiting sleeve. This high-rise construction device of building has reached the purpose that increases the firm degree when the device is fixed, can avoid being promoted the work that influences constructor by field crew, has eliminated the potential safety hazard in the time of the eminence construction, has reduced the influence of visual angle blind area, can avoid the in-process that the operation panel descends to collide the staff of operation panel below, possesses warning function, can remind personnel around the job site to avoid the operation panel that descends.

Description

High-rise building construction device
Technical Field
The invention relates to the technical field of building construction, in particular to a high-rise building construction device.
Background
The building construction refers to production activities in the construction implementation stage of engineering construction, is the construction process of various buildings, and also can be a process of changing various lines on design drawings into real objects at specified places, and comprises basic engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, wherein the construction operation place is called as a building construction site or a construction site, and the lifting construction refers to the lifting aspect during construction and is used for carrying constructors, materials needed to be used and the like.
But current high-rise portable construction device is fixed firm degree lower, is promoted the work that influences constructor easily by field personnel, has great potential safety hazard, has the visual angle blind area among the lift process, collides the personnel of operation panel below easily, does not possess the warning function, can't remind the operation panel that personnel around the job site dodge and descend.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a building high-rise construction device, which solves the problems that the existing high-rise movable construction device is low in fixing firmness degree, is easy to be pushed by field personnel to influence the work of constructors and has larger potential safety hazard, reduces the influence of a visual angle blind area, can avoid the condition that an operation table collides with the workers below the operation table in the descending process, has a warning function, and can remind the personnel around the construction field to avoid the descending operation table.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: a high-rise construction device for buildings comprises supporting legs, wherein a lifting plate is fixedly connected between two sides of each supporting leg, the bottom of the lifting plate is fixedly connected with the supporting legs through inclined support plates, the top of the lifting plate is fixedly connected with an operation platform through an oil cylinder, one side of each supporting leg is fixedly connected with a limiting sleeve through a connecting rod, a counterweight column is arranged in each limiting sleeve, a pulley is arranged at the top of each limiting sleeve, a lifting rod is fixedly connected with the bottom of the operation platform, the bottom of each lifting rod is fixedly connected with the counterweight column through a traction rope, the operation platform is driven to rise after the oil cylinder is started, the counterweight column is driven to rise to be separated from the ground, the supporting legs and the rollers are pushed to enable the operation platform to move to a construction position, the oil cylinder is controlled to fall, the counterweight column is in contact with the ground to fix the operation platform, and the weight, the degree of difficulty that the high-speed rail transit construction device removed is improved, has increased construction equipment's stability, can only be moved by the hydro-cylinder control operation panel in the operation panel top simultaneously, has avoided the operation panel to be bumped the problem that promotes constructor's work by site personnel mistake, has reduceed the potential work hazard of high-rise construction, protector is installed to the bottom of lifter, the deep bead is all installed to the both sides of lifter, warning device is installed at the top of deep bead, the gyro wheel is installed to the bottom of supporting leg.
Preferably, the bottom of the counterweight column is uniformly provided with an anti-sliding frame, and the bottom of the anti-sliding frame is provided with an anti-sliding groove.
Preferably, the protection device comprises a buffer plate, the buffer plate is rotatably connected with the lifting rod, and the top of the buffer plate is fixedly connected with the lifting rod through a protection spring.
Preferably, the relief groove has been seted up to the bottom of buffer board, the internally mounted of relief groove has the decompression gasbag, be located the below fixedly connected with rubber slab of decompression gasbag between the inner wall both sides of relief groove, buffer board extrusion protection spring cushions, and the rubber slab is sunken with constructor collision back, increase with constructor's area of contact, reduce the pressure that constructor received by collision back body surface, then the extrusion decompression gasbag cushions, reduced the injury that causes constructor when colliding with operation panel below personnel, reduced the influence of visual angle blind area, can avoid the in-process collision that the operation panel descends to damage the staff of operation panel below.
Preferably, the warning device includes the jump bit, inner wall one side of jump bit rotates and is connected with reciprocating plate, reciprocating plate extends to the outside one side of jump bit and installs the jump bit, the position fixedly connected with tubular metal resonator that one side of deep bead is close to the jump bit.
Preferably, reciprocal board extends to the outside one side fixedly connected with extension board of jump bit, one side fixedly connected with rubber soft board of extension board, the jump bit is installed in one side of rubber soft board, one side of deep bead is located the position fixedly connected with limiting plate between jump bit and the tubular metal resonator, spacing hole has been seted up to one side of limiting plate, rubber soft board and spacing hole sliding connection, the action table drives the lifter decline when descending, and the air of deep bead extrusion below downwards, reciprocal board are upwards promoted by the reaction force of air, and jump bit striking tubular metal resonator sends sound and warns, can increase warning function when the action table descends, reminds the staff of action table below to avoid the collision with the action table.
Preferably, the drainage groove has all been seted up to the below that the both sides of lifter are located the deep bead, the air exit has been seted up at the top of drainage groove.
Preferably, the following components: the top fixedly connected with arris platform piece of supporting leg, the retarded groove with arris platform piece looks adaptation is seted up to the bottom of operation panel, metal shrapnel and operation panel fixed connection are passed through at the top of connecting rod, and the operation panel cushions metal shrapnel extrusion bending, and the arris platform piece gets into the inside in retarded groove, and along with the dynamics that the decline arris platform piece of operation panel extrudeed retarded inslot wall increases gradually, stability when having increased the inside removal of construction equipment, the production is rocked when can avoiding the device motion.
(III) advantageous effects
The invention provides a high-rise building construction device. The method has the following beneficial effects:
(I), this high-rise construction equipment of building, it risees to drive the operation panel after starting through the hydro-cylinder, the counter weight post is driven to rise and breaks away from ground, promote supporting leg and gyro wheel and make the operation panel remove the construction position, the control hydro-cylinder descends, counter weight post and ground contact fixed operation panel, utilize the great counter weight post of quality to increase the holistic weight of construction equipment, the degree of difficulty that the improvement device removed, construction equipment's stability has been increased, can only be moved above the operation panel through hydro-cylinder control operation panel simultaneously, avoided the operation panel to be bumped the problem that promotes constructor's work by site personnel mistake, the work hidden danger of high-rise construction has been reduceed.
The high-rise construction device of the building increases the friction coefficient of the bottom of the operation platform through the anti-skid groove at the bottom of the anti-skid frame, and improves the anti-skid degree of the operation platform.
(III), this high-rise construction equipment of building, cushion through buffer plate extrusion protection spring, the rubber slab is sunken with constructor collision back, increase with constructor's area of contact, reduce the pressure that constructor received by collision back body surface, then the extrusion decompression gasbag cushions, the injury that causes constructor when having reduced with operation panel below personnel collision, the influence of visual angle blind area has been reduced, the in-process collision that can avoid the operation panel to descend damages the staff of operation panel below.
(IV) this high-rise construction device of building drives the lifter to descend through the operation panel when descending, and the air baffle extrudees the air of below downwards, and reciprocal board is upwards promoted by the reaction force of air, and the jump bit striking tubular metal resonator sound warns, can increase warning function when the operation panel descends, reminds the staff of operation panel below to avoid the collision with the operation panel.
(five), this high-rise construction device of building cushions metal shrapnel extrusion bending through the operation panel, and the inside in terrace with edge piece entering slow groove increases gradually along with the dynamics of the decline terrace with edge piece extrusion slow inslot wall of operation panel, has increased the stability when construction device is inside to be removed, produces when can avoiding the device motion and rocks.
Drawings
FIG. 1 is a schematic structural view of the present invention as a whole;
FIG. 2 is a schematic view of the bottom of the operation table according to the present invention;
FIG. 3 is a schematic view of the lifter of the present invention;
FIG. 4 is a schematic view of the structure of the protection device of the present invention;
fig. 5 is a schematic structural diagram of the warning device of the present invention.
In the figure: 1-supporting leg, 2-lifting plate, 3-inclined support plate, 4-oil cylinder, 5-operation table, 6-connecting rod, 7-limiting sleeve, 8-counterweight column, 9-pulley, 10-lifting rod, 11-traction rope, 12-protective device, 121-buffer plate, 122-protective spring, 123-decompression groove, 124-decompression air bag, 125-rubber plate, 13-wind shield, 14-warning device, 141-impact hole, 142-reciprocating plate, 143-impact hammer, 144-metal tube, 15-roller, 16-anti-sliding frame, 17-anti-sliding groove, 18-extension plate, 19-rubber soft plate, 20-limiting plate, 21-limiting hole, 22-drainage groove, 23-air outlet, 24-prismatic table blocks, 25-retarding grooves and 26-metal elastic sheets.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1-2, the present invention provides a technical solution: the utility model provides a high-rise construction equipment of building, including supporting leg 1, fixedly connected with lifts board 2 between supporting leg 1's the both sides, slope extension board 3 and supporting leg 1 fixed connection are passed through to lifting board 2's bottom, 4 fixedly connected with operation panel 5 are passed through at hydro-cylinder 4 at the top of lifting board 2, connecting rod 6 fixedly connected with spacing sleeve 7 is passed through to one side of supporting leg 1, the internally mounted of spacing sleeve 7 has counter weight post 8, pulley 9 is installed at spacing sleeve 7's top, the bottom fixedly connected with lifter 10 of operation panel 5, haulage rope 11 and counter weight post 8 fixed connection are passed through to the bottom of lifter 10, gyro wheel 15 is installed to supporting leg 1's bottom.
The bottom of the counterweight column 8 is uniformly provided with an anti-sliding frame 16, and the bottom of the anti-sliding frame 16 is provided with an anti-sliding groove 17.
During the use, the hydro-cylinder 4 drives the operation panel 5 after starting and risees, the counter weight post 8 is driven to rise and breaks away from ground, promote supporting leg 1 and gyro wheel 15 and make operation panel 5 remove to the construction position, control hydro-cylinder 4 descends, counter weight post 8 and ground contact fixed operation panel 5, utilize the great counter weight post of quality to increase the holistic weight of construction equipment, the degree of difficulty that the improvement device removed, construction equipment's stability has been increased, can only be moved through hydro-cylinder control operation panel in the operation panel top simultaneously, avoided the operation panel to be bumped the problem that promotes constructor's work by site personnel mistake, the potential work hazard of high-rise construction has been reduceed.
Example two
Referring to fig. 1-4, the present invention provides a technical solution: on the basis of the first embodiment, the protection device 12 is installed at the bottom of the lifting rod 10, the protection device 12 includes a buffer plate 121, the buffer plate 121 is rotatably connected with the lifting rod 10, and the top of the buffer plate 121 is fixedly connected with the lifting rod 10 through a protection spring 122.
A decompression groove 123 is formed in the bottom of the buffer plate 121, a decompression air bag 124 is installed in the decompression groove 123, and a rubber plate 125 is fixedly connected below the decompression air bag 124 between two sides of the inner wall of the decompression groove 123.
During the use, hydro-cylinder 4 control operation panel 5 descends, lifter 10 descends along with the operation panel, when there is constructor operating panel 5 below, buffer board 121 that descends at first collides with the constructor contact, buffer board 121 extrusion protective spring 122 cushions, rubber slab 125 is sunken after colliding with the constructor, increase with constructor's area of contact, reduce the pressure that constructor received by the body surface after colliding, then extrusion decompression gasbag 124 cushions, the injury that causes the constructor when having reduced and operating panel below personnel collision, the influence of visual angle blind area has been reduced, can avoid the in-process collision that the operation panel descends to harm the staff of operation panel below.
EXAMPLE III
Referring to fig. 1-5, the present invention provides a technical solution: on the basis of the first embodiment, the wind shields 13 are installed on both sides of the lifting rod 10, the warning device 14 is installed on the top of the wind shield 13, the warning device 14 includes the impact hole 141, the reciprocating plate 142 is rotatably connected to one side of the inner wall of the impact hole 141, the impact hammer 143 is installed on one side of the reciprocating plate 142 extending to the outside of the impact hole 141, and the metal pipe 144 is fixedly connected to one side of the wind shield 13 close to the position of the impact hammer 143.
The reciprocating plate 142 is fixedly connected with an extending plate 18 at one side extending to the outside of the impact hole 141, a rubber soft plate 19 is fixedly connected with one side of the extending plate 18, the impact hammer 143 is installed at one side of the rubber soft plate 19, a position, between the impact hole 141 and the metal pipe 144, of one side of the wind shield 13 is fixedly connected with a limiting plate 20, a limiting hole 21 is formed in one side of the limiting plate 20, and the rubber soft plate 19 is in sliding connection with the limiting hole 21.
When the collision warning device is used, the lifting rod 10 is driven to descend when the operating platform 5 descends, the wind shield 13 downwards extrudes air below the reciprocating plate 142, the reciprocating plate 142 is upwards pushed by the reaction force of the air, the impact hammer 143 impacts the metal pipe 144 to make a sound to warn, the warning function can be added when the operating platform 5 descends to remind a worker below the operating platform to avoid collision with the operating platform, and the elastic force of the soft rubber plate 19 pushes the reciprocating plate 142 to rotate to the initial position to conveniently warn collision of the next time.
Example four
Referring to fig. 1-5, the present invention provides a technical solution: on the basis of the first embodiment, the two sides of the lifting rod 10 are both provided with the drainage grooves 22 below the wind shield 13, and the tops of the drainage grooves 22 are provided with the air outlets 23.
Supporting leg 1's top fixedly connected with terrace with edge piece 24, the slow groove 25 with terrace with edge piece 24 looks adaptation is seted up to the bottom of operation panel 5, and metal shrapnel 26 and operation panel 5 fixed connection are passed through at the top of connecting rod 6.
During the use, hydro-cylinder 4 drives operation panel 5 and descends, and operation panel 5 cushions metal shrapnel 26 extrusion bending, and arris platform piece 24 gets into the inside of slowing down groove 25, and along with the dynamics of the descending arris platform piece 24 extrusion slow groove 25 inner wall of operation panel 5 increases gradually, stability when having increased the inside removal of construction equipment, produces when can avoiding the device motion and rocks.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. The term "comprising", without further limitation, means that the element so defined is not excluded from the group consisting of additional identical elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. A high-rise construction device of a building comprises a supporting leg (1), and is characterized in that: the lifting device is characterized in that a lifting plate (2) is fixedly connected between two sides of the supporting leg (1), the bottom of the lifting plate (2) is fixedly connected with the supporting leg (1) through an inclined support plate (3), the top of the lifting plate (2) is fixedly connected with an operating platform (5) through an oil cylinder (4), one side of the supporting leg (1) is fixedly connected with a limiting sleeve (7) through a connecting rod (6), a counterweight column (8) is installed inside the limiting sleeve (7), a pulley (9) is installed at the top of the limiting sleeve (7), a lifting rod (10) is fixedly connected with the bottom of the operating platform (5), the bottom of the lifting rod (10) is fixedly connected with the counterweight column (8) through a traction rope (11), a protective device (12) is installed at the bottom of the lifting rod (10), and wind shields (13) are installed on two sides of the lifting rod (10), warning device (14) are installed at the top of deep bead (13), gyro wheel (15) are installed to the bottom of supporting leg (1).
2. The high-rise construction device of a building according to claim 1, wherein: the bottom of the counterweight column (8) is uniformly provided with an anti-sliding frame (16), and the bottom of the anti-sliding frame (16) is provided with an anti-sliding groove (17).
3. The high-rise construction device of a building according to claim 1, wherein: the protection device (12) comprises a buffer plate (121), the buffer plate (121) is rotatably connected with the lifting rod (10), and the top of the buffer plate (121) is fixedly connected with the lifting rod (10) through a protection spring (122).
4. A high-rise construction apparatus for a building according to claim 3, wherein: decompression groove (123) have been seted up to the bottom of buffer board (121), the internally mounted of decompression groove (123) has decompression gasbag (124), be located below fixedly connected with rubber slab (125) of decompression gasbag (124) between the inner wall both sides of decompression groove (123).
5. The high-rise construction device of a building according to claim 1, wherein: the warning device (14) comprises an impact hole (141), one side of the inner wall of the impact hole (141) is rotatably connected with a reciprocating plate (142), the reciprocating plate (142) extends to one side of the outer portion of the impact hole (141) and is provided with an impact hammer (143), and one side of the wind shield (13) is close to the position of the impact hammer (143) and is fixedly connected with a metal pipe (144).
6. The high-rise construction device of a building according to claim 5, wherein: reciprocating plate (142) extend to the outside one side fixedly connected with extension board (18) of impingement hole (141), one side fixedly connected with rubber soft board (19) of extension board (18), install the one side at rubber soft board (19) impact hammer (143), one side of deep bead (13) is located position fixedly connected with limiting plate (20) between impingement hole (141) and tubular metal resonator (144), spacing hole (21) have been seted up to one side of limiting plate (20), rubber soft board (19) and spacing hole (21) sliding connection.
7. The high-rise construction device of a building according to claim 1, wherein: drainage grooves (22) are formed in the positions, located below the wind shield (13), of the two sides of the lifting rod (10), and air outlets (23) are formed in the tops of the drainage grooves (22).
8. The high-rise construction device of a building according to claim 1, wherein: the top fixedly connected with terrace with edge piece (24) of supporting leg (1), slow groove (25) with terrace with edge piece (24) looks adaptation is seted up to the bottom of operation panel (5), metal shrapnel (26) and operation panel (5) fixed connection are passed through at the top of connecting rod (6).
CN202011630278.9A 2020-12-31 2020-12-31 High-rise building construction device Withdrawn CN112744754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011630278.9A CN112744754A (en) 2020-12-31 2020-12-31 High-rise building construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011630278.9A CN112744754A (en) 2020-12-31 2020-12-31 High-rise building construction device

Publications (1)

Publication Number Publication Date
CN112744754A true CN112744754A (en) 2021-05-04

Family

ID=75650756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011630278.9A Withdrawn CN112744754A (en) 2020-12-31 2020-12-31 High-rise building construction device

Country Status (1)

Country Link
CN (1) CN112744754A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113803606A (en) * 2021-10-11 2021-12-17 深圳市宝建投智能科技有限公司 Data acquisition device and data acquisition system based on industrial internet operation
CN114051992A (en) * 2021-11-03 2022-02-18 于都丰盈水稻农民专业合作社 Walking pesticide spraying equipment for rice planting
CN114412151A (en) * 2022-02-26 2022-04-29 姜玉海 Safety protection supporting platform for municipal engineering construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113803606A (en) * 2021-10-11 2021-12-17 深圳市宝建投智能科技有限公司 Data acquisition device and data acquisition system based on industrial internet operation
CN114051992A (en) * 2021-11-03 2022-02-18 于都丰盈水稻农民专业合作社 Walking pesticide spraying equipment for rice planting
CN114051992B (en) * 2021-11-03 2023-08-18 于都丰盈水稻农民专业合作社 Walking type pesticide spraying equipment for rice planting
CN114412151A (en) * 2022-02-26 2022-04-29 姜玉海 Safety protection supporting platform for municipal engineering construction

Similar Documents

Publication Publication Date Title
CN112744754A (en) High-rise building construction device
CN104721975A (en) Telescopic box-type high-rise building escape-rescue device
CN108193867B (en) Safe and durable building construction platform
CN209703967U (en) A kind of Multifunctional decoration construction bracket
CN219622220U (en) Elevator installation auxiliary device
CN210316460U (en) Attached lifting support device
CN218406396U (en) Movable hanging basket for construction of building structure outer vertical face
CN212425367U (en) Hydraulic lifting platform with damping function
CN112431400B (en) Engineering project construction protection device
CN114016724A (en) Protection device and protection method for building construction
CN214195835U (en) Construction elevator guardrail connecting device
CN211366866U (en) Safe and environment-friendly automatic lifting device for scaffold steel pipe
CN211775619U (en) Hanging basket for constructional engineering
CN209799332U (en) Building outer wall construction equipment
CN209129340U (en) A kind of Multifunctional decoration scaffold
CN211169700U (en) Support for house building engineering
CN209721511U (en) A kind of adjustable high-altitude working safety protective device of protective fence
CN206617182U (en) Constructing tunnel Terrace prevention device
CN215291324U (en) High altitude construction is with slowly falling equipment
CN212334330U (en) Elevator protection door for production workshop
CN204522038U (en) Scalable box skyscraper escape rescue device
CN214531797U (en) Climbing type building construction operation platform outside building
CN217151386U (en) Simple manual self-descending type chimney dismantling device
CN212562384U (en) Noise reduction type building construction platform
CN213508061U (en) Construction equipment for bridge engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210504

WW01 Invention patent application withdrawn after publication