CN112697093B - 一种盾构隧道内无轨测量吊柱长度及角度的计算方法 - Google Patents

一种盾构隧道内无轨测量吊柱长度及角度的计算方法 Download PDF

Info

Publication number
CN112697093B
CN112697093B CN202011524415.0A CN202011524415A CN112697093B CN 112697093 B CN112697093 B CN 112697093B CN 202011524415 A CN202011524415 A CN 202011524415A CN 112697093 B CN112697093 B CN 112697093B
Authority
CN
China
Prior art keywords
point
suspension
line
angle
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011524415.0A
Other languages
English (en)
Other versions
CN112697093A (zh
Inventor
魏晋楠
缪嘉杰
韩悌斌
辛东红
李蔚龙
白东晖
张�杰
刘金录
许凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Electrification Engineering Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, China Railway 12th Bureau Group Electrification Engineering Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202011524415.0A priority Critical patent/CN112697093B/zh
Publication of CN112697093A publication Critical patent/CN112697093A/zh
Application granted granted Critical
Publication of CN112697093B publication Critical patent/CN112697093B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/22Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/02Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring length, width, or thickness

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明属于地铁刚性接触网技术领域,具体是一种盾构隧道内无轨测量吊柱长度及角度的计算方法。包括以下步骤,S100~确定悬挂点的位置及净空高度;S200~确定盾构隧道顶悬挂点在隧道底部的对称点;S300~测量吊柱底板角度;S400~吊柱长度计算。本发明在刚性接触网施工中,相比较于传统施工测量计算,可操作性强,能大大减少施工周期,同时保证吊柱的计算精度,能够满足高速刚性接触网运行要求,具有很大的推广价值。

Description

一种盾构隧道内无轨测量吊柱长度及角度的计算方法
技术领域
本发明属于地铁刚性接触网技术领域,具体是一种盾构隧道内无轨测量吊柱长度及角度的计算方法。
背景技术
刚性接触网作为地铁牵引供电专业的关键及重难点专业,承担着为电力机车供电的重任。吊柱的安装是刚性接触网施工的重要组成部分之一,吊柱的生产周期长,若订货不及时影响到工期节点。若按常规的施工流程,等轨道敷设完毕后,再进场测量订货,无法按工期节点完成施工任务,这就要求土建洞通后就利用无轨测量技术及镜像原理确定位点的位置,总结出科学可行的计算方法,来满足吊柱计算完成提前订货的要求。
发明内容
本发明为了解决地铁刚性接触网施工工期紧,快速精确的完成吊柱订货,提出了一种盾构隧道内无轨测量吊柱长度及角度的计算方法。
本发明采取以下技术方案:一种盾构隧道内无轨测量吊柱长度及角度的计算方法,包括以下步骤,S100~确定悬挂点的位置及净空高度;S200~确定盾构隧道顶悬挂点在隧道底部的对称点;S300~测量吊柱底板角度;S400~吊柱长度计算。
步骤S100包括以下步骤,
S101~根据接触网平面布置图及支持悬挂安装图将悬挂点的坐标计算出来,以及轨道单位的调线调坡图将每个悬挂点的轨面标高算出来;
S102~确定悬挂点在隧道顶的位置,并标记出来;
S103~测出悬挂点的位置后,将悬挂点轨面标高输入全站仪,测量悬挂点净空高度H。
步骤S200包括以下步骤,
S201~将可调三脚架和多线激光仪架设在隧道底部,同时打开多线激光仪的水平激光线按钮和竖直激光线按钮;
S202~调整多线激光仪保持水平,同时使多线激光仪的水平线与垂直线的交点对准悬挂点,多线激光仪底部投影到隧道底的点就是隧道顶悬挂点在隧道底的对称点,并标记出来。
步骤S300包括以下步骤,
S301~将角度测量辅助板底面中心线对准隧道底的对称点;
S302~将电子角度测量仪放在角度测量辅助板上,测量出的角度,就是隧道顶部吊柱的角度。
步骤S400包括以下步骤,
S401~直线段:hx=0;hw=h+hx-h1=h-h1;吊柱长度:DL=H-Dh-h+h1+W;
S402~曲外段:hx=WL*sin(a+Δα)-WL*sin(a);hw=h’-h1;h’=h+hx;吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a+Δα)+WL*sin(a)+h1+W;
S403~曲内段:hx=WL*sin(a)-WL*sin(a-Δα);hw=h’-h1;h’=h-hx;吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a)+WL*sin(a-Δα)+h1+W。
其中,H:为悬挂点净空高度,Dh:为线路接触网导高;
△h:外轨超高;
h:悬挂点位于直线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A的距离;
h’:悬挂点位于曲线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A’的距离;
h1:腕臂旋转销钉孔中心A点距离腕臂下抱箍下边沿的距离;
hw:接触线地面距离腕臂抱箍下边沿的距离;
WL:腕臂计算有效长度,即接触线底面最低处O点距离腕臂旋转销钉孔中心A点距离;
α:直线一般中间定位柱腕臂的初始安装角,即腕臂有效长度与水平线的夹角;
Δα:外轨超高引起的角度;
W:吊柱外露长度;
hx:为保证腕臂水平腕臂底面与轨面平行,在曲线上安装时旋转腕臂引起的腕臂底座安装位置竖向尺寸变化。
与现有技术相比,本发明主要运用于地铁刚性接触网专业,为了克服工期紧,提出的一种盾构隧道内刚性接触网无轨测量水平悬吊安装形式吊柱计算方法。本发明在刚性接触网施工中,相比较于传统施工测量计算,可操作性强,能大大减少施工周期,同时保证吊柱的计算精度,能够满足高速刚性接触网运行要求,具有很大的推广价值。
附图说明
图1为利用CPIII控制点无轨测量确定悬挂点位置示意图;
图2为悬挂点投影点确定装置;
图3为利用镜像原理确认悬挂点在隧道底部投影点示意图;
图4为角度测量装置;
图5为利用角度测量装置测量悬挂点投影点处角度示意图;
图6为刚性接触网水平悬吊形式安装示意图;
图7为刚性接触网曲内安装时腕臂底座安装位置竖向尺寸变化示意图;
图8为刚性接触网曲外安装时腕臂底座安装位置竖向尺寸变化示意图;
图中1-多功能可调整三角架,2-多线激光仪,3-角度测量辅助板,4-电子角度测量仪,H:为悬挂点净空高度,Dh:为线路接触网导高;Δh:外轨超高;h:悬挂点位于直线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A的距离;h’:悬挂点位于曲线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A’的距离;hw:接触线底面最低处O点距离腕臂下抱箍下边沿的距离;h1:腕臂旋转销钉孔中心O’点距离腕臂下抱箍下边沿的距离;WL:腕臂计算有效长度,即接触线底面最低处O点距离腕臂旋转销钉孔中心A点距离;α:直线一般中间定位柱腕臂的初始安装角,即腕臂有效长度与水平线的夹角;Δα:外轨超高引起的角度;W:吊柱外露长度;hx:为保证腕臂水平腕臂底面与轨面平行,在曲线上安装时旋转腕臂引起的腕臂底座安装位置竖向尺寸变化。
具体实施方式
一种盾构隧道内无轨测量吊柱长度及角度的计算方法,包括以下步骤,以北京新机场线悬挂点Z14-20为例。
S100~确定悬挂点的位置及净空高度。
S101~根据接触网平面布置图及支持悬挂安装图将悬挂点的坐标计算出来,Z14-20的坐标为(282635.48,500844.52)根,据以及轨道单位的调线调坡图将每个悬挂点的轨面标高算出来,Z14-20轨面标高为12.045m。
S102~确定悬挂点在隧道顶的位置,并标记出来,在隧道壁标识Z14-20。
S103~测出悬挂点的位置后,将悬挂点轨面标高输入全站仪,测量悬挂点净空高度H,Z12-20悬挂点净空高度H为6.520m。
S200~确定盾构隧道顶悬挂点在隧道底部的对称点。
S201~将可调三脚架1和多线激光仪2架设在隧道底部,同时打开多线激光仪2的水平激光线按钮和竖直激光线按钮。
S202~调整多线激光仪2保持水平,同时使多线激光仪2的水平线与垂直线的交点对准悬挂点,多线激光仪2底部投影到隧道底的点就是隧道顶悬挂点在隧道底的对称点,并标记出来。
S300~测量吊柱底板角度。
S301~将角度测量辅助板3底面中心线对准隧道底的对称点。
S302~将电子角度测量仪4放在角度测量辅助板3上,测量出的角度,就是隧道顶部吊柱的角度,,测得Z14-20悬挂点吊柱角度为22°。
S400~吊柱长度计算。
根据平面图可知Z14-20悬挂点是在曲内安装。
S401~直线段:
hx=0;
hw=h+hx-h1=h-h1;
吊柱长度:DL=H-Dh-h+h1+W。
S402~曲外段:
hx=WL*sin(a+Δα)-WL*sin(a);
hw=h’-h1;
h’=h+hx;
吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a+Δα)+WL*sin(a)+h1+W。
S403~曲内段:
hx=WL*sin(a)-WL*sin(a-Δα)=1163.4*sin(24.8°)-1163.4*sin(24.8°-3.3°)
hx=61.6mm;
h’=h-hx=440-61.6=378.4mm;
hw=h’-h1=378.4-50=328.4.;
吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a)+WL*sin(a-Δα)+h1+W
DL=6520-5300-328.4+100=991.6mm。
其中,H:为悬挂点净空高度,Dh:为线路接触网导高;
△h:外轨超高;
h:悬挂点位于直线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A的距离;
h’:悬挂点位于曲线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A’的距离;
h1:腕臂旋转销钉孔中心A点距离腕臂下抱箍下边沿的距离;
hw:接触线地面距离腕臂抱箍下边沿的距离;
WL:腕臂计算有效长度,即接触线底面最低处O点距离腕臂旋转销钉孔中心A点距离;
α:直线一般中间定位柱腕臂的初始安装角,即腕臂有效长度与水平线的夹角;
Δα:外轨超高引起的角度;
W:吊柱外露长度;
hx:为保证腕臂水平腕臂底面与轨面平行,在曲线上安装时旋转腕臂引起的腕臂底座安装位置竖向尺寸变化。

Claims (1)

1.一种盾构隧道内无轨测量吊柱长度及角度的计算方法,其特征在于:包括以下步骤,
S100~确定悬挂点的位置及净空高度;
步骤S100包括以下步骤,
S101~根据接触网平面布置图及支持悬挂安装图将悬挂点的坐标计算出来,以及轨道单位的调线调坡图将每个悬挂点的轨面标高算出来;
S102~确定悬挂点在隧道顶的位置,并标记出来;
S103~测出悬挂点的位置后,将悬挂点轨面标高输入全站仪,测量悬挂点净空高度H;
S200~确定盾构隧道顶悬挂点在隧道底部的对称点;
S201~将可调三脚架(1)和多线激光仪(2)架设在隧道底部,同时打开多线激光仪(2)的水平激光线按钮和竖直激光线按钮;
S202~调整多线激光仪(2)保持水平,同时使多线激光仪(2)的水平线与垂直线的交点对准悬挂点,多线激光仪(2)底部投影到隧道底的点就是隧道顶悬挂点在隧道底的对称点,并标记出来;
S300~测量吊柱底板角度;
步骤S300包括以下步骤,
S301~将角度测量辅助板(3)底面中心线对准隧道底的对称点;
S302~将电子角度测量仪(4)放在角度测量辅助板(3)上,测量出的角度,就是隧道顶部吊柱的角度;
S400~吊柱长度计算:
步骤S400包括以下步骤,
S401~直线段:
hx=0;
hw=h+hx-h1=h-h1;
吊柱长度:DL=H-Dh-h+h1+W;
S402~曲外段:
hx=WL*sin(a+Δα)-WL*sin(a);
hw=h’-h1;
h’=h+hx;
吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a+Δα)+WL*sin(a)+h1+W;
S403~曲内段:
hx=WL*sin(a)-WL*sin(a-Δα);
hw=h’-h1;
h’=h-hx;
吊柱长度:DL=H-Dh-hw+W=H-Dh-h-WL*sin(a)+WL*sin(a-Δα)+h1+W;
其中,H:为悬挂点净空高度,Dh:为线路接触网导高;
△h:外轨超高;
h:悬挂点位于直线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A的距离;
h’:悬挂点位于曲线段时,接触线底面最低处O点距离腕臂旋转销钉孔中心A’的距离;
h1:腕臂旋转销钉孔中心A点距离腕臂下抱箍下边沿的距离;
hw:接触线地面距离腕臂抱箍下边沿的距离;
WL:腕臂计算有效长度,即接触线底面最低处O点距离腕臂旋转销钉孔中心A点距离;
α:直线一般中间定位柱腕臂的初始安装角,即腕臂有效长度与水平线的夹角;
Δα:外轨超高引起的角度;
W:吊柱外露长度;
hx:为保证腕臂水平腕臂底面与轨面平行,在曲线上安装时旋转腕臂引起的腕臂底座安装位置竖向尺寸变化。
CN202011524415.0A 2020-12-22 2020-12-22 一种盾构隧道内无轨测量吊柱长度及角度的计算方法 Active CN112697093B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011524415.0A CN112697093B (zh) 2020-12-22 2020-12-22 一种盾构隧道内无轨测量吊柱长度及角度的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011524415.0A CN112697093B (zh) 2020-12-22 2020-12-22 一种盾构隧道内无轨测量吊柱长度及角度的计算方法

Publications (2)

Publication Number Publication Date
CN112697093A CN112697093A (zh) 2021-04-23
CN112697093B true CN112697093B (zh) 2022-09-06

Family

ID=75509947

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011524415.0A Active CN112697093B (zh) 2020-12-22 2020-12-22 一种盾构隧道内无轨测量吊柱长度及角度的计算方法

Country Status (1)

Country Link
CN (1) CN112697093B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114030394B (zh) * 2021-11-29 2022-12-16 中铁十一局集团电务工程有限公司 一种地铁接触网全参数无轨测量施工方法
CN116379926B (zh) * 2023-05-31 2023-08-25 中国铁建电气化局集团第五工程有限公司 一种圆形盾构隧道接触网无轨测量方法、系统及电子设备

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100921250B1 (ko) * 2009-03-31 2009-10-13 주식회사 거원 도로용 표지장치
CN103983256A (zh) * 2014-05-31 2014-08-13 中铁二十局集团电气化工程有限公司 一种隧道内接触网下锚施工测量方法
KR20170082863A (ko) * 2016-01-07 2017-07-17 삼성전자주식회사 공기조화기
CN206756071U (zh) * 2017-05-24 2017-12-15 中铁建电气化局集团南方工程有限公司 隧道吊柱法兰角度测量工具
CN108955495A (zh) * 2017-05-24 2018-12-07 中铁建电气化局集团南方工程有限公司 隧道吊柱法兰角度测量工具及角度测量方法
CN109373988A (zh) * 2018-12-05 2019-02-22 中铁十二局集团有限公司 隧道内接触网无轨施工测量仪器及方法
CN209590272U (zh) * 2018-12-19 2019-11-05 中铁电气化局集团有限公司 测量仪
CN210622854U (zh) * 2019-08-08 2020-05-26 湖北鄂电德力电气有限公司 一种加强型隧道吊柱
CN112066948A (zh) * 2020-09-10 2020-12-11 济南蓝动激光技术有限公司 吊柱安装位置及固定底板倾斜角度自动测量装置和方法
CN112363178A (zh) * 2020-11-02 2021-02-12 广东中科如铁技术有限公司 一种接触网隧道吊柱的动态测量方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211452338U (zh) * 2020-03-02 2020-09-08 中铁十一局集团电务工程有限公司 轨道交通用无轨定点装置和无轨定点系统

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100921250B1 (ko) * 2009-03-31 2009-10-13 주식회사 거원 도로용 표지장치
CN103983256A (zh) * 2014-05-31 2014-08-13 中铁二十局集团电气化工程有限公司 一种隧道内接触网下锚施工测量方法
KR20170082863A (ko) * 2016-01-07 2017-07-17 삼성전자주식회사 공기조화기
CN206756071U (zh) * 2017-05-24 2017-12-15 中铁建电气化局集团南方工程有限公司 隧道吊柱法兰角度测量工具
CN108955495A (zh) * 2017-05-24 2018-12-07 中铁建电气化局集团南方工程有限公司 隧道吊柱法兰角度测量工具及角度测量方法
CN109373988A (zh) * 2018-12-05 2019-02-22 中铁十二局集团有限公司 隧道内接触网无轨施工测量仪器及方法
CN209590272U (zh) * 2018-12-19 2019-11-05 中铁电气化局集团有限公司 测量仪
CN210622854U (zh) * 2019-08-08 2020-05-26 湖北鄂电德力电气有限公司 一种加强型隧道吊柱
CN112066948A (zh) * 2020-09-10 2020-12-11 济南蓝动激光技术有限公司 吊柱安装位置及固定底板倾斜角度自动测量装置和方法
CN112363178A (zh) * 2020-11-02 2021-02-12 广东中科如铁技术有限公司 一种接触网隧道吊柱的动态测量方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
浅谈兰新客专隧道接触网吊柱长度计算及调整技术;吴磊;《科技创业月刊》;20150225;全文 *
电车接触网腕臂的计算;李艾;《时代农机》;20150428;全文 *

Also Published As

Publication number Publication date
CN112697093A (zh) 2021-04-23

Similar Documents

Publication Publication Date Title
CN112697093B (zh) 一种盾构隧道内无轨测量吊柱长度及角度的计算方法
CN109515252B (zh) 一种地铁接触网无轨测量施工方法
CN107339981B (zh) 一种工程测量电动三角架及快速对中整平方法
CN109373988B (zh) 隧道内接触网无轨施工测量仪器及方法
CN104260643A (zh) 一种防风型整体钢腕臂安装方法
CN110487258B (zh) 一种棱镜支架装置及其使用方法
CN109878380B (zh) 一种地铁车辆段柔性接触网无轨道施工方法
CN208419973U (zh) 一种轨道安装调整的测量工具
CN110318340B (zh) 一种悬臂施工挂篮模板快速定位装置及定位方法
CN114541264B (zh) 一种斜拉桥索导管一体化测量定位方法
CN110714621A (zh) 一种预制立柱吊装过程中的毫米级精准定位系统及其方法
WO2022088664A1 (zh) 一种高架桥预制盖梁安装方法
CN207395659U (zh) 一种接触网参数无轨测量平台
CN211473452U (zh) 一种预制立柱吊装过程中的毫米级精准定位系统
CN206818211U (zh) 一种建筑施工用垂直检测装置
CN104567841A (zh) 一种用于全站仪高空对中的方法
CN116837726A (zh) 一种斜拉桥主梁索导管的精确安装方法
CN112444230B (zh) 一种刚性接触网隧道吊柱底板角度无轨测量方法
CN104631488A (zh) 一种质子束流加速器预埋基板高精度安装技术
CN213274210U (zh) 一种转体梁施工用高差监测仪
CN113897821A (zh) 一种地铁轨道板精调系统及方法
CN110685306B (zh) 地铁明挖车站y型钢结构柱定位测量方法
CN209366194U (zh) 一种刚性接触网无轨测量辅助工具支架装置
CN106836009B (zh) 一种转体球铰及滑道骨架辅助安装工具及其施工方法
CN206815191U (zh) 一种满堂支架空间梁端索导管定位装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant