CN1126693A - Unloading device of plate working machine and method for loading plate with same - Google Patents

Unloading device of plate working machine and method for loading plate with same Download PDF

Info

Publication number
CN1126693A
CN1126693A CN 95101524 CN95101524A CN1126693A CN 1126693 A CN1126693 A CN 1126693A CN 95101524 CN95101524 CN 95101524 CN 95101524 A CN95101524 A CN 95101524A CN 1126693 A CN1126693 A CN 1126693A
Authority
CN
China
Prior art keywords
sheet material
plate
running body
loaded
discharging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 95101524
Other languages
Chinese (zh)
Inventor
小木曾正一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Publication of CN1126693A publication Critical patent/CN1126693A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Discharge By Other Means (AREA)

Abstract

The present invention provides such an unloader of simple constitution that efficiently load a small-sized board material on a product carriage. An unloader is provided with a traveling body 55 having a gripper 13 for holding a board material and a product carriage 4 moving in the rectangular direction to its traveling direction. A plurality of stop points are set to the traveling body 55 and the product carriage 4 respectively. Combination of these stop points allows loading of board materials W to divide into a plurality of front/rear/left/right points of the product carriage. The traveling body is movably mounted on a stock conveyer and the stock conveyer is allowed to be mounted on the main body frame 51.

Description

The device for discharging of plate working machine and with this device loading plate method
The present invention relates to be attached on the plate working machines such as punch, shears, laser machine device for discharging and with the method for this device loading plate.
In the plate working machine of rotary type tower punch etc., to cut off a big plate sometimes and be processed into some undersized board product.When transporting this small size sheet material, must transport from the same discharge position on the estrade of plate working machine.
When being loaded into this small size sheet material on the product chassis with device for discharging, the method of Cai Yonging is before: all be loaded in a position on the product chassis, or between device for discharging and plate working machine, be provided with sheet material transport direction vertical to the sheet material position change device, be divided in the some positions on the product chassis.
But, in the above-mentioned method that all is loaded in a position on the product chassis, some blocks of sheet materials that cut off from raw material plate state are in an overlapping loading, so, the product chassis becomes fully laden easily, and the replacing frequency of the supporting plate on the product chassis is increased.Therefore, when night, nobody turned round, carry out supporting plate with needing automation and change, nobody turns round relatively more difficult, and the replacing of supporting plate also is to cause plate working machine to start one of reason of rate reduction.
In addition, in the above-mentioned method that sheet material location change mechanism is located in front of the device for discharging, equipment enlarging exists installation cost height, problem that the manufacturing line floor area is big.
In addition, the method that adopts in technology before is, accepted by the plate conveyer by the sheet material that device for discharging is extracted out, opens its conveyor surface panel material and drops on the product chassis.For loading plate fitly, must reduce the height of drop of sheet material as much as possible.For this reason, on the product chassis, bay-lift is set, so that the upper end elevation that makes loading plate is near below the plate conveyer.
But, in the time of on the bay-lift that sheet material is loaded into the product chassis, when sheet material during by inclined to one side the loading, because instability may produce and collapse.This partially cargo-carring situation, because the loading home position of sheet material is set near the bight of product chassis, cause under the little situation of board dimension often.But,, often need be set in the bight loading home position for the ease of transporting subsequent processing to.In addition, even loading plate partially not in that small size sheet material is loaded under the situation of De Gaogao, also will be considered the problem of collapsing.
The object of the present invention is to provide a kind ofly can be expeditiously be loaded on the product chassis and reduce the pallet-changing frequency device for discharging of simply constructed plate working machine and with the method for this device loading plate to small size sheet material.
Another object of the present invention provides device for discharging a kind of problem of not collapsing, that can stably be loaded into sheet material the plate working machine on the product chassis.
The invention provides a kind of device for discharging of plate working machine, have running body and product chassis; It is characterized in that: this running body has the mechanism of controlling sheet material and can stop at some positions that sheet material transports direction, and this product chassis can move on the direction that transports direction perpendicular to sheet material and can stop at some positions; By making up the stop position of above-mentioned running body and product chassis, sheet material is divided in some positions on the said goods chassis all around.
Purpose of the present invention can also following mode reach: the device for discharging of described plate working machine, it is characterized in that, above-mentioned running body can be arranged on the plate conveyer with walking, this plate conveyer can be provided with curtain shape roller platform to carry on the frame with keeping out of the way constitute from the conveyor surface position, and, above-mentioned plate conveyer liftably is arranged on the main body frame, during decline, directly drops to the following height near the loading plate on the product chassis of above-mentioned roller platform.
The present invention also provides a kind of method of device for discharging loading plate of described plate working machine, it is characterized in that, when the some positions that sheet material are loaded on the product chassis, change each piece or several " loaded " position successively, slightly be loaded into each position on the product chassis fifty-fifty.
To achieve these goals, the device for discharging of plate working machine of the present invention has running body and product chassis, by making up the stop position of this running body and product chassis, sheet material is divided in the some positions about front and back on the product chassis.Above-mentioned running body has the mechanism of controlling sheet material, and can stop in some positions that sheet material transports on the direction.The said goods chassis can move also and can stop in some positions on perpendicular to the direction that transports direction.
Above-mentioned running body can be arranged on the plate conveyer with walking, and also this plate conveyer liftably can be provided with on the main body frame, during decline, directly drops to the following height near cargo-carring sheet material on the product chassis that makes above-mentioned roller platform.The plate conveyer constitutes by being arranged on curtain shape roller platform to carry on the frame from the conveyor surface position with keeping out of the way.
The sheet material stowage of sheet material loading attachment of the present invention, it is method with above-mentioned unloader loading plate, when sheet material being loaded into above-mentioned some position of product chassis, one by one or several ground change " loaded " position successively, slightly be loaded in fifty-fifty on each position on the product chassis.
Effect of the present invention is: according to device for discharging of the present invention, stop position by combination running body and product chassis, can be divided in some positions on the product chassis to sheet material all around, so improved efficiency of loading, reduce the replacing frequency of product chassis supporting plate, and make that night, the operation of unmanned running became easy.
When the plate conveyer was made the liftable type, the action of height of drop was finished by the down maneuver of plate conveyer when reducing the sheet material loading.Therefore, compare with the situation shape that bay-lift is set, accept sheet material with the rising of this bay-lift on the product chassis, it is more stable to be loaded on the chassis sheet material at each position, when high the loading or biasing also be difficult for collapsing when loading.
In addition, Yi Bian stowage of the present invention is to change " loaded " position successively, Yi Bian sheet material slightly is loaded on the product chassis equably, so, can make that weight balancing ground is fine to be loaded, eliminated the problem of collapsing in the loading process.In addition, sheet material handle sturcture and plate conveyer etc. can not disturb with earlier cargo-carring sheet material, reduce the height of drop of plate as far as possible, and it is irregular that the horizontal changing of the relative positions in the time of can not falling because of sheet material causes, and can be assembled into neat state.
Fig. 1 is the side view of section of one embodiment of the invention device for discharging.
Fig. 2 is the planar view of this device for discharging of expression and plate working machine.
Fig. 3 is the instruction diagram of the interlinked mechanism theory structure in this device for discharging of expression.
Fig. 4 A is the planar view of this device for discharging, and Fig. 4 B is its lateral plan, and Fig. 4 C is the planar view of plate conveyer.
Fig. 5 A, Fig. 5 B, Fig. 5 C, Fig. 5 D are the lateral plans of expression device for discharging action.
Fig. 6 A, Fig. 6 B, Fig. 6 C, Fig. 6 D are the lateral plans of this device for discharging action of expression.
Fig. 7 A, Fig. 7 B are the planar views of expression device for discharging action.
Fig. 8 A, Fig. 8 B are the back pseudosections of expression device for discharging action.
Fig. 9 A is the lateral plan of the relation of display plate material conveyer frame and movable rail frame, and Fig. 9 B is the amplification profile of the running body relation of movable rail frame of expression and strap clamp pincers.
Figure 10 is the amplification side view of section that makes the interlinked mechanism of strap clamp pincers running body action.
Figure 11 is the amplification sectional plain-view drawing of this interlinked mechanism.
Figure 12 is that front elevation is analysed and observe in the part amplification of this device for discharging.
Figure 13 A, Figure 13 B are respectively that front elevation is analysed and observe in the different parts amplifications of analysing and observe the device for discharging at position with Figure 12 of expression.
Figure 14 is the side view of section of the clamp Zhou Biantu in this device for discharging of expression.
Figure 15 A is the amplification profile of discharging clamp, and Figure 15 B is its front elevation.
Figure 16 is the releasing operating mechanism block diagram of clamp.
Figure 17 is that this clamp is removed the operating mechanism planar view.
Figure 18 is the semi-sictional view back view of device for discharging.
Figure 19 A, Figure 19 B are the instruction diagrams that the sheet material of this discharging clamp of expression is controlled action.
Figure 20 A, Figure 20 B are the instruction diagrams of removing action of controlling of this discharging clamp of expression.
Figure 21 is the mode declaration pattern specification figure of this discharging clamp.
Figure 22 is the mode declaration pattern specification figure of another embodiment of interlinked mechanism of expression strap clamp pincers running body.
Among the figure, 1~plate working machine, 2~work stage, 3~device for discharging, 4~product chassis, 5~plate conveyer, 5a~conveying frame, 6~roller platform, 9~loop chain, 10~conveying roller, 13~clamp, 47~Workpiece holding device, 49~loading attachment, 51~main body frame, 51a~pillar, 52~deflector roll, 53~movable rail frame, 53a~guide track, 54~anvil roll, the running body of 55~strap clamp pincers, 57~limit platform, 60~lift drive mechanism, 61~hoist cable, 63~coiling belt pulley, 66~interlinked mechanism, 67~interlock belt pulley, 68,69,73~connection tool, 90~interlinked mechanism, LS1, LS2~chassis position detecting switch, Ma~Mc~motor, PA-supporting plate, P1-P4~" loaded " position, S1, S2~" loaded " position detecting sensor, V1~V3~belt, W~sheet material, Y0~reference position.
Below, with reference to the description of drawings one embodiment of the invention.Earlier in conjunction with the accompanying drawings behind 1~13 explanation unitary construction, more in conjunction with the accompanying drawings 14~21 explanations as the concrete structures of the discharging clamp of sheet material handle sturcture.
Fig. 2 be expression in the present embodiment device for discharging and the planar view of plate working machine relation.Plate working machine 1 is made of the rotary type tower punch, (Y direction) mobile work stage 2 and sheet material W and horizontal several mobile Workpiece holding devices 47 of (X-direction) of controlling on this work stage 2 before and after having.At the side of work stage 2, the end steady arm 48 that being provided with to dash forward establishes, this steady arm are used for locating when being transported into sheet material W.PC represents the punching center.Device for discharging 3 is arranged on the side of work stage 2 advanced potentials.Loading attachment 49 is arranged on the side of giving up the throne after the work stage, and adjacent with device for discharging 3.
Fig. 1 is the side view of section of device for discharging 3.Main body frame 51 is made of four jiaos of pillar 51a that the double guiding of lifting usefulness is set that in aspect are the upper frame 51b of rectangle.Plate conveyer 5 liftably is being provided with by deflector roll 52.Movable rail frame 53 can be bearing on the plate conveyer 5 by the anvil roll 54 as guiding parts with advancing and retreat.On movable rail frame 53, the running body 55 of the strap clamp pincers that can walk is being set along its advance and retreat direction.Several that arrange about the running body 55 of strap clamp pincers is provided with are controlled the clamp 13 of sheet material W.In the present embodiment, as described later, clamp 13 does not need special-purpose driven for opening and closing source, but can adopt the pattern by the drive source driven opening of cylinder etc. yet.Below plate conveyer 5, can on direction, can enter at the product chassis 4 that moves on the chassis rail 83 perpendicular to strap clamp pincers running body 55 direction of travel with coming in and going out, loading the sheet material W that will transport by supporting plate PA in the above.On main body frame 51, being installed with can be around the fulcrum 58 limit platform 57 of rotating opening downwards, and this limit platform 57 is adjacent with the work stage 2 of plate working machine 1.
Plate conveyer 5 is to constitute carrying the curtain shape roller platform 6 that setting can be kept out of the way on the frame 5a.Roller platform 6 is to connect some conveying rollers 10 and the curtain shape structure of formation between a pair of loop chain 9,9 (Fig. 4 C).Each loop chain 9,9 is mounted between the sprocket wheel 8 of front and back end, and this sprocket wheel 8 is located at the both sides of carrying frame 5a.Sprocket wheel 8 links to each other with motor Ma on being located at carriage 5a, and roller platform 6 transports the following side path of face position to can just reversely moving the upper path that becomes retreating position with loop chain 9 from formation under the driving of motor Ma.
The above-mentioned deflector roll 52 of directing plate material conveyer 5 liftings is carrying four jiaos of frame 5a several respectively are installed, and has inner face with each pillar 51a fore-and-aft direction to rotate to join, and also has the inner face with left and right directions to rotate (Fig. 8) that joins.The lifting drive 60 of plate conveyer 5 by hang a pair of hoist cable 61,61 of carrying frame 5a front and back end respectively, be located on the main body 51 and mount above-mentioned each hoist cable 61,61 front and back end mute pulley 62,62, the coiling belt pulley 63 of two hoist cables, 61,61 overlapping coilings and the lifting that coiling belt pulley 63 rotated by chain 64 are constituted with motor Mb.Hoist cable 61 is made belt of core etc. and is constituted by steel rope.The hoist cable 61,61 of front and back end etc. is located at the both sides of main body frame 51 respectively, and the coiling belt pulley 63 of both sides connects common transmitter shaft, is driven by same motor Mb.
Movable rail frame 53 shown in Fig. 4 A, is the frame shape of rectangle, and being configured to up and down as shown in Figure 1, each anvil roll 54 of 2 rows joins with the top and bottom rotation of these movable rail frame 53 both sides parts.These anvil rolls 54 are arranged on the both sides parts of conveying frame 5a of plate conveyer 5.The both sides parts of movable rail frame 53 constitute (Figure 12) by flute profile material inwardly, and its top flange becomes the guide track 53a of strap clamp pincers running body 55.Strap clamp pincers running body 55 at both endss have several walking rollers 65, and this walking roller 65 is clamped the guide track 53a of movable rail frame 53 up and down, and running body 55 is guiding walking freely by guide track 53a.Strap clamp pincers running body 55 and movable rail frame 53 are driven advance and retreat by interlinked mechanism 66 by same motor Mc.
Fig. 3 is the schematic diagram of interlinked mechanism 66.Interlinked mechanism 66 has movable rail frame driving belt V1 that each synchronous belt constitutes, fixedly belt V2, running body driving belt V3 and interlock usefulness belt pulley 67.Each belt V1~V3 respectively establishes about being a pair of.Movable rail frame driving belt V1 is annular, is mounted between the belt pulley 75,75 of plate conveyer 5a front and back end, in movable combined tool 68 combinations in rail frame 53 rear ends.The belt pulley 75 of rear end links to each other with motor Mc by chain 72.Fixedly the two ends of belt V2 carry the combined tool 69,69 in front and back end of frame 5a to fix at plate.Above-mentioned interlock is mounted on the fixedly pars intermedia of belt V2 with the outside sheave portion 67a of belt pulley 67 with the stretch pulley 70,70 that is positioned at front and back.These interlocks can be rotatably set in the rear end of movable rail frame 53 with belt pulley 67 and stretch pulley 70.Interlock is located on the outside sheave portion 67a and inboard sheave portion 67b common axis of rotation inside and outside with being positioned at movable rail frame 53 side members with belt pulley 67.The running body driving belt V3 of above-mentioned annular is mounted on the belt pulley 71 of inboard sheave portion 67b and movable rail frame 53 front ends (Fig. 9 B).This running body driving belt V3 is by being combined in conjunction with tool 73 on the strap clamp pincers running body 55.
Below, control system is described.In the present embodiment, as shown in Figure 4, be to be loaded in sheet material W on 4 " loaded " position P1~P4 on the product chassis 4.At the rear portion of plate conveyer 5, be provided with 2 " loaded " position detecting sensor S1, S2 that constitute by reflective photoelectric sensor.It is reflecting plate 74 that these sensors S1, S2 detect the detected portion that is located on the movable rail frame 53, and movable rail frame 53 is stopped.This sensor S1, S2 transport direction (direction of travel of strap clamp pincers running body 55) the " loaded " position P1 (P2) at rear portion with sheet material respectively and anterior " loaded " position P3 (P4) is disposing accordingly.
Other of movable rail frame 53 stop and decelerate position, are undertaken by each detector switch shown in Figure 9.Promptly, on movable rail frame 53, the detection head 76 that stretches out is set downwards, be provided with detect this detection head 76 respectively retreat end detector switch SW4, initial point decelerate position detector switch SW1, origin position detector switch SW0, preceding inlet side decelerate position detector switch SW2 and preceding inlet side detector switch SW3.Each detector switch SW0-SW4 is made of non-contact switch respectively.Above-mentioned detection head 76 is also used as the safety catch attachment.In the preceding inlet side of movable rail frame 53 and retreat end and each detection head 76 and engage and stop the block piece 78,77 (seeing Figure 13 B) that movable rail frame 53 moves and be located on the conveying frame 5a of plate conveyer 5.
As shown in Figure 8, the stop position of product chassis 4 is controlled by chassis position detecting switch LS1, LS2 with by the ground detection piece 79,80 that these switches LS1, LS2 detect.The chassis position detecting switch be installed in product chassis 4 below, constitute by limit switch.Detecting piece 79,80 is disposing corresponding to the " loaded " position P1 on the product chassis 4, P3 and chassis moving direction home position Y0 consistent location.
Below, the action of above-mentioned structure is described.Shown in Fig. 5 A, strap clamp pincers running body 55 waits for that in the origin position standby near plate working machine 1 work stage 2 processing of the sheet material W in the plate working machine 1 is over.Origin position is located on the position on the limit platform 57.After processing was over, product sheet material W was sent to the discharge position on the work stage 2, and at this moment, strap clamp pincers running body 55 advances with movable rail frame 53, and controlled sheet material W (Fig. 5 B) on the work stage 2 with clamp 13.Above-mentioned discharge position is the cooresponding directions X of end steady arm 48 (Fig. 2) position on sheet material end and the work stage 2, and is used as the said reference position Y0 (Fig. 7, Fig. 8) of Y direction.
The walking of strap clamp pincers running body 55 is carried out linkedly with movable rail frame 53 as following.That is, after the motor Mc of Fig. 1 made that movable rail frame driving belt V1 rotates, the movable rail frame 53 that combined tool 68 is combined on this belt V1 just moved (Fig. 3).Along with moving of movable rail frame 53, be bearing on this movable rail frame 53 and be mounted on interlock on the fixing belt V2 with belt pulley 67 rotations, be mounted on the running body driving belt V3 rotation on the inboard sheave portion 67b of this belt pulley 67.Because strap clamp pincers running body 55 combined tools 73 are combined on the running body driving belt V3, so this running body is along movable rail frame 53 walkings when rotating with belt V3.Like this, the driving of motor Mc is moved movable rail frame 53, therewith linkedly, and the walking on movable rail frame 53 of strap clamp pincers running body 55.Therefore, the speed of travel of strap clamp pincers running body 55 is that the moving velocity of movable rail frame 53 adds the speed of travel of strap clamp pincers running body 55 with respect to movable rail frame 53.
When the clamp 13 on the strap clamp pincers running body 55 was controlled sheet material W on the work stage 2, motor Mc reversed, and strap clamp pincers running body 55 retreats, and sheet material W is drawn on the roller platform 6 of plate conveyer 5.The " loaded " position P1 of past product chassis 4 goes up when loading, strap clamp pincers running body 55 retreat to the cooresponding position of " loaded " position P1 (Fig. 5 C), the reflecting plate 74 (Fig. 4) of movable rail frame 53 is detected by sensor S1, and motor Mc stops, and the walking of movable rail frame 53 and strap clamp pincers running body 55 just stops.
Then, the motor Mb hoist cable 61 that unrolls descends plate conveyer 5, stops during near the height of cargo-carring sheet material W on the product chassis 4 below its roller platform 6 (Fig. 5 D).This stops to move is to carry out when plate conveyer 5 following sheet material detecting sensor PS detect loading plate W by being located at.
Afterwards, the roller platform 6 of plate conveyer 5 rotates according to arrow b direction, keeps out of the way upper path (Fig. 6 A), is loaded in the sheet material W above it, under the state that the one end is being controlled by clamp 13, on the product chassis 4 that hangs on the cargo-carring sheet material W.At this state, roller platform 6 does not disturb mutually with loading plate W, and plate conveyer 5 is further descended (Fig. 6 B), and clamp 13 is arrived near the height above the loading plate W.Then, open clamp 13 moves back strap clamp pincers running body 55 after a while, just has been loaded on the cargo-carring sheet material W transporting sheet material W.
After such loading is finished, the plate conveyer is risen return former height,, make strap clamp pincers running body 55 return origin position (Fig. 5 A) with movable rail frame 53 with the make position that its roller platform 6 is got back to down side path.In addition, at this moment make product chassis side travel (Fig. 7 B, Fig. 8 B), prepare the loading of next sheet material W " loaded " position P2.Above-mentioned repeatedly in this wise action is loaded into " loaded " position P2 transporting sheet material W.
When carrying out the loading of next sheet material W, do not carry out the side travel of product chassis 4 toward " loaded " position P3, when strap clamp pincers running body 55 is pulled out next sheet material W, shown in Fig. 6 D, stop at the cooresponding position of " loaded " position P3 on.This stops action and carries out when detecting reflecting plate 74 at sensor S2 (Fig. 4).
Like this, by the stop position of assemblage zone clamp running body 55 and the traversing moving stop position of product chassis 4, just can be loaded on 4 " loaded " position P1~P4 on the product chassis 4 transporting sheet material.In this case, preferably be loaded on each " loaded " position P1~P4 one by one successively, each position balance ground loads on product chassis 4 like this, in addition, also can be when plate conveyer 5 descends, reduce the height of clamp 13, the horizontal changing of the relative positions in the time of can preventing that sheet material W from leaving clamp 13 apart from loading plate W.If increase the stop position of strap clamp pincers running body 55 and the stop position of product chassis 4, just can be divided in sheet material on the more " loaded " position.In addition, when sheet material W is a large-sized plate, also " loaded " position P1 can be loaded as benchmark, can be benchmark with the center of product chassis 4 also perhaps, loads to bilateral symmetry.
According to this device for discharging, the movable rail frame 53 with strap clamp pincers running body 55 guide track 53a is moved forward and backward, can make strap clamp pincers running body 55 cross limit platform 57 near plate working machine 1.Therefore, when opening limit platform 57 maintenance examination plate working machines 1 etc., movable rail frame 53 is drawn in main body frame 51 sides, just can guarantee operator's path.In addition, different machines according to plate working machine 1, adding man-hour,, can avoid the sheet material delivering mechanism and the device for discharging of work holder 41 grades of plate working machine 1 to disturb by strap clamp pincers running body 55 is drawn in main body frame 51 1 sides together with movable rail frame 53.Like this, in glitch-free top position guide track is set just can resembling in the prior art, therefore, simple structure.In addition, owing to make the walking on the movable rail frame 53 of advance and retreat of strap clamp pincers running body 55, so, can accelerate the actual speed of travel that strap clamp clamps running body 55, shorten dumping time.
In addition,, can save the bay-lift that on the product chassis, is provided with in the technology before by lifter plate material conveyer 5, so, even on product chassis 4, during loading plate W, also can stably load inclined to one side.Plate conveyer 5 is designed under the liftable situation, though can cause the interference problem of guide track 53a and main body frame 51, because the movable rail frame 53 that is located on the guide track 53a can be drawn in the plate conveyer 51, therefore, can not influence lifting.Therefore, for example just needn't the part of stretching out from main body frame 51 of guide track 53a and part branch in the plate conveyer 5 be arranged and be bearing on the ground, like this, structure is able to simple.In addition, because the advance and retreat of the walking of strap clamp pincers running body 55 and movable rail frame 53 are by interlinked mechanism 66 interlock mechanically, both can be driven by same motor Mc, reduce drive source quantity, also make simple structure.
Below, the detailed construction of clamp 13 and cancel system thereof is described.This clamp need not be controlled and be used drive source, but relies on wedging action to control, and its structure is simple.Figure 15 A, B are respectively its lateral plan and front elevation.The rearward end of the main body 14 of clamp 13 is connected by the fagging 16 of fulcrum 15 with strap clamp pincers running body 55 front ends, connects the pars intermedia of clamp body 14 and the front end of fagging 16 by extension spring 17, and like this, main body 14 can support around fulcrum with swinging up and down.This clamp body 14 is made of pair of right and left side plate 14a, 14b, and the upper end of side plate 14a is connected by the horizontal fulcrum 18 perpendicular to running body 55 advance and retreat directions, and the bottom is connected by the fixedly maxillary plate 19 that front end is blade-like.
On above-mentioned horizontal fulcrum 18,3 kinds of movable acia 20a, 20b, 20c in hanging rotationally, the end that these acias are held sheet material W up and down under the arm with fixing maxillary plate 19.It below each movable acia 20a~20c the arc-shaped bend face.The center of curvature of this plane of bending is to set like this; That is, for and fixedly above the sheet material W on the maxillary plate 19 between produce wedging action, connect axle center and the inclined abrasive angle α of the straight line between the sheet material W contact P (Figure 21) as the horizontal fulcrum 18 of pivot point.In addition, as shown in figure 15, the distance between the following and horizontal fulcrum 18 of each movable acia 20a~20c is inequality, can switch the movable acia 20a~20c that holds sheet material W under the arm according to the thickness of sheet material W like this.
Each movable acia 20a~20c is connected on side's side plate 14a of tong bodies 14 by extension spring 21a, the 21b, the 21c that apply the initial stage thrust pressure, and the trend of forwards rotating is arranged.Notch part 22b, the 22c of the movable last formation of acia 20b, 20c is used to avoid the connecting portion of extension spring 21a, 21b and movable acia 20a, 20b to disturb.
In the face side of side's side plate 14a of tong bodies 14, the pars intermedia of relieving rod 23 is installed on the above-mentioned horizontal fulcrum 18 swingably, and this relieving rod is to controlling of sheet material W movable acia 20a-20c rearward to be rotated in order to remove.In the bottom of relieving rod 23, prominent establishing removed pin 25, removes the pin 25 circular-arc long guide holes 24 (Figure 14) that run through on the side plate 14a, and be chimeric with embedded hole 26a, 26b, the 26c of each movable acia 20a~20c.These embedded holes 26a~26c is the circular-arc slotted hole along long guide hole 24.
Be used to be provided with the fagging 16 of tong bodies 14, be installed on the framework 12 that the aluminium section bar by running body 55 constitutes by screwed part 45 and joint fastener 46, this installation site can be in the direction adjusted perpendicular to direction of travel.
With respect to relieving rod 23, be provided with and make it toward the bar operating mechanism 27 (Figure 14) of removing the side rotating operation, bar operating mechanism 27 is made of the parallel linkage 29 on lifting bar 28 that is arranged on running body 55 sides and the conveying frame 5a that is arranged on plate conveyer 5.The midway location installation portion 30 of lifting bar 28 can be connected on the fagging 31 by fulcrum 32 with swinging up and down, and this fagging 31 is fixed on the running body frame section 12.The extension spring 33 that lifting bar 28 is connected installation portion 30 upper ends and fagging 31 rear ends side is upward exerted pressure.Touch roll 34 with relieving rod 23 upper ends below the lifting bar 28 of this state joins, and each movable acia 20a~20c of clamp 13 is restricted to sagging posture.At the front end of fagging 31, to dash forward and establishing stop pin 36, this stop pin 36 runs through the stop slotted hole 35 (Figure 15 A, Figure 15 B) of installation portion 30 bottom surfaces of lifting bar 28, like this, makes the flat-hand position of lifting bar 28 become the boundary of swing upward.
Parallel linkage 29 is made of down-pressed pole 37 and the pair of links parts 40,40 that the advance and retreat direction towards running body 55 disposes.The upper and lower side of linkage component 40 respectively rotationally be fixed on each fagging 38,39 of carrying on the frame 5a and be connected with down-pressed pole 37.The extension spring 41 that down-pressed pole 37 is connected between it and the fagging 38 is exerted pressure toward mentioning side, is limited it by stop pin 42 sagging from fagging 38 and mentions height.In this Limited height position, an end in contact roller 43 of the following and lifting bar 28 that is in flat-hand position of down-pressed pole 37 contacts.At the midway location of down-pressed pole 37, when the curtain shape roller platform 6 of plate conveyer 5 is kept out of the way the last siding track of endless chain 9, be equipped with this and keep out of the way the contact component 44 that roller platform 6 joins.Roller platform 6 pushings of this contact component 44 by being kept out of the way action, opposing extension spring 41, down-pressed pole 37 is depressed.
Below, the on-off action of clamp 13 is described.Shown in Fig. 5 B, when strap clamp pincers running body 55 moved to sheet material W end on the work stage 2, the movable acia 20a of clamp 13 was pushed away by sheet material W, and opposing extension spring 21a rearward rotates shown in Figure 19 A.Here, the thickness of sheet material W is than the lower end of movable acia 20b, 20c and fixedly the gap between maxillary plate 19 top is thin, than movable acia 20a and fixedly the gap between the maxillary plate 19 is thick.Therefore, movable acia 20b, 20c are not pushed away by sheet material W, are still keeping sagging posture.
At this moment, tong bodies 14 can swing up and down around fulcrum 15, and fixedly the front end of maxillary plate 19 forms blade-like, so, even the end of sheet material W is because of deadweight " sagging " or " warpage " etc., the sheet material W that also can not influence on the work stage 2 correctly passes in and out between the 20a of jaw up and down, 19 of clamp 13.Along with this action, the end of sheet material W enters movable acia 20a with fixedly between the maxillary plate 19, and jaw 20a, 19 clamps about being somebody's turn to do.
When sheet material detector switch (figure do not show) detects after sheet material W entered, strap clamp pincers running body 55 just responds this detection signal, begins to retreat with movable rail frame 53.Along with this backward movement, sheet material W again will be from deviating between the jaw 20a, 19 up and down, and therefore, shown in Figure 19 B arrow a, movable acia 20a is returned to sagging posture again from the position of rearward rotating.At this moment, owing between the lower surface of movable acia 20a and the sheet material W wedging action is arranged, therefore, sheet material W is clamped in up and down between the jaw 20a, 19 against friction force.Along with retreating of running body 55, sheet material W is pulled on the plate conveyer 5 from the workpiece 2 of Fig. 2.Because spring 21a gives and initial stage thrust pressure of movable acia 20a,, can not occur skidding, controlling bad etc. so above-mentioned wedging action is produced effectively.
Sheet material W is pulled to the desired location on the plate conveyer 5, and when unloader 7 stopped, roller platform 6 was kept out of the way (Fig. 6 A) to the last siding track of loop chain 9.Then, shown in Fig. 6 C, plate conveyer 5 drops to predetermined altitude, and roller platform 6 is kept out of the way, and shown in Figure 20 A, roller platform 6 joins with the contact component 44 of parallel linkage 29, and down-pressed pole 37 antagonistic springs 41 are pushed to the rear.Like this, down-pressed pole 37 is just from highly dropping to height shown in the dotted line shown in the solid line.Because this decline, lifting bar 28 are pressed down bar 37 and promote shown in Figure 20 B, swing downwards from flat-hand position opposing extension spring 33.Thereupon, relieving rod 23 swings of clamp 13 are removed pin 25 and are rearward moved in long guide hole 24.Its result, remove pin 25 and embedded hole 26a~26c chimeric movable acia 20a~20c rearward rotate, removed controlling of the upper jaw and the lower jaw plate 20a, 19 couples of sheet material W.Like this, sheet material W just falls.
When sheet material W was thicker slightly than above-mentioned sheet material, the longest movable acia 20a did not produce wedging action, and produced wedging action between the movable acia 20b of intermediate length and sheet material W, sheet material W can be controlled.If sheet material W is thicker again, then produce wedging action by the shortest movable acia 20c, sheet material W can be controlled.
This clamp 13 does not need to control to control with drive source and releasing uses drive source, but along with the grip plate material is controlled and removed in the action of plate conveyer 5.Therefore.Simple structure, and do not need to control the control signal that begins and control releasing, so control is also simple.
In addition, the down-pressed pole 37 of parallel linkage 29 is that fore-and-aft direction ground lengthwise is being provided with, and by this down-pressed pole 37 lifting bar 28 of strap clamp pincers running body 55 sides is depressed, so the stop position that the releasing action of clamp is not limited to running body 55 also can carry out.Therefore, during with respect to the center reference loading plate W of product chassis 4, also can carry out the loading of the sheet material W of various front and back width, in addition, when the sheet material branch being installed on the product chassis 4 some positions, also can carry out the switching of clamp 13 in desired location.And, because lifting bar 28 is the pole stocks that extend along perpendicular to running body 55 direction of travel, because lifting bar 28 is the pole stocks that extend along perpendicular to running body 55 direction of travel, so, can side by side carry out the releasing of several clamps 13, and, not only can remove action, and can remove action by the operation of relieving rod 23 by the installation site of regulating clamp 13.
Like this, can be arranged on strap clamp pincers running body 55 on the movable rail frame 53 by using, the clamp 13 that its interlinked mechanism 66 is set and is handled by wedging action has just formed that drive source is few, simple structure, device for discharging that cost is low with walking.
Figure 22 is another embodiment of the interlinked mechanism of movable rail frame 53 and strap clamp pincers running body 55.In this interlinked mechanism 90, but the miniature gears 93 that can be rotated to support on the movable rail frame 53 meshes with the carry-over bar 92 that is located at the stationary rack 91 on the plate conveying frame 5a and be located on the strap clamp pincers running body 55.Make the same of belt V1 that movable rail frame 53 moves and drive system and the foregoing description.When adopting this structure also with the foregoing description similarly, adopt a motor Mc that movable rail frame 53 and strap clamp pincers running body 55 are moved linkedly.
In addition, in the various embodiments described above, strap clamp pincers running body 55 is located on the movable rail frame 53, but also can clamp that conveying frame 5a that running body 55 can be set directly at plate conveyer 5 with walking goes up to strap clamp or main body frame 51 on.In addition, also can wait the clamp 13 that replaces running body 55 with magnet, vacuum suction seat.

Claims (3)

1, a kind of device for discharging of plate working machine has running body and product chassis; It is characterized in that: this running body has the mechanism of controlling sheet material and can stop at some positions that sheet material transports direction, and this product chassis can move on the direction that transports direction perpendicular to sheet material and can stop at some positions; By making up the stop position of above-mentioned running body and product chassis, sheet material is divided in some positions on the said goods chassis all around.
2, the device for discharging of plate working machine as claimed in claim 1, it is characterized in that, above-mentioned running body can be arranged on the plate conveyer with walking, this plate conveyer can be provided with curtain shape roller platform to carry on the frame with keeping out of the way constitute from the conveyor surface position, and, above-mentioned plate conveyer liftably is arranged on the main body frame, during decline, directly drops to the following height near the loading plate on the product chassis of above-mentioned roller platform.
3, use the method for the device for discharging loading plate of the described plate working machine of claim 1, it is characterized in that, when the some positions that sheet material are loaded on the product chassis, change each piece or several " loaded " position successively, slightly be loaded into each position on the product chassis fifty-fifty.
CN 95101524 1994-02-07 1995-02-07 Unloading device of plate working machine and method for loading plate with same Pending CN1126693A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP3545494A JPH07215557A (en) 1994-02-07 1994-02-07 Unloader for board material processor and board material loading method
JP35454/1994 1994-02-07

Publications (1)

Publication Number Publication Date
CN1126693A true CN1126693A (en) 1996-07-17

Family

ID=12442255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 95101524 Pending CN1126693A (en) 1994-02-07 1995-02-07 Unloading device of plate working machine and method for loading plate with same

Country Status (2)

Country Link
JP (1) JPH07215557A (en)
CN (1) CN1126693A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108256C (en) * 1999-09-09 2003-05-14 北新建材(集团)有限公司 Automatic packaging line for sheet materials
CN103878835A (en) * 2014-03-26 2014-06-25 泗阳县祥和木业有限公司 Material collecting device of wood flake board-splicing machine
CN104245176A (en) * 2012-04-18 2014-12-24 村田机械株式会社 Board conveyance apparatus and board processing system using same
CN105059993A (en) * 2015-07-27 2015-11-18 天津市顺通信荣科技有限公司 Automatic color plate stacking machine

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108256C (en) * 1999-09-09 2003-05-14 北新建材(集团)有限公司 Automatic packaging line for sheet materials
CN104245176A (en) * 2012-04-18 2014-12-24 村田机械株式会社 Board conveyance apparatus and board processing system using same
CN104245176B (en) * 2012-04-18 2016-02-03 村田机械株式会社 Sheet material transport device and employ its sheet processing system
CN103878835A (en) * 2014-03-26 2014-06-25 泗阳县祥和木业有限公司 Material collecting device of wood flake board-splicing machine
CN103878835B (en) * 2014-03-26 2016-02-24 泗阳县祥和木业有限公司 The material collecting device of wooden plane sheet plate joggling apparatus
CN105059993A (en) * 2015-07-27 2015-11-18 天津市顺通信荣科技有限公司 Automatic color plate stacking machine
CN105059993B (en) * 2015-07-27 2017-09-01 天津市新宇彩板有限公司 Color steel automatic piler

Also Published As

Publication number Publication date
JPH07215557A (en) 1995-08-15

Similar Documents

Publication Publication Date Title
CZ113093A3 (en) Device for transferring a workpiece from one machine to another one
US6695120B1 (en) Assembly for transporting material
CN111153206A (en) Feeding and discharging mechanical arm and tensioning wheel production line feeding and discharging device with same
CN112794112A (en) Intelligent loading system
CN1126693A (en) Unloading device of plate working machine and method for loading plate with same
KR101428134B1 (en) Equipment for assembly process of excavators
JP6282211B2 (en) Panel construction machine and panel construction method
JPH10203643A (en) Work accumulation device
TWI728747B (en) Inclined feeding pipe cutting machine
CN112045475B (en) Machining system and machining method for manufacturing automobile parts
KR101426581B1 (en) Equipment for assembly process of excavators using turn table
JP3167746B2 (en) Plate material transfer positioning device in plate material processing machine
JP3831025B2 (en) LASER PROCESSING METHOD AND DEVICE USED FOR THE PROCESSING METHOD
CN116536657B (en) Aluminum profile oxidation processing system
JPS61226449A (en) Pressed article loading device
JPH07227776A (en) Workpiece carrier device
JPH0742590Y2 (en) Clamp support device for plate processing machine
CN217647061U (en) Laser cleaning device for train wheels
CN110921554B (en) Roller loading and unloading lifting device and using method thereof
CN217050611U (en) Workpiece moving equipment for production line
CN220998139U (en) Pipe feeding device
JPH07155874A (en) Work feeding device in plate working machine
CN211283500U (en) Clean gantry crane
CN117023227B (en) Feeding device and feeding method of steel belt surface pickling equipment
JP4992137B1 (en) Equipment for handling plate-like materials

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication