CN112647435A - 一种改进型穿堤涵洞的封堵方法 - Google Patents
一种改进型穿堤涵洞的封堵方法 Download PDFInfo
- Publication number
- CN112647435A CN112647435A CN201910964848.9A CN201910964848A CN112647435A CN 112647435 A CN112647435 A CN 112647435A CN 201910964848 A CN201910964848 A CN 201910964848A CN 112647435 A CN112647435 A CN 112647435A
- Authority
- CN
- China
- Prior art keywords
- culvert
- filling
- pumping
- blowing
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
Abstract
本发明公开一种改进型穿堤涵洞的封堵方法,包括以下步骤:①在拟封堵涵洞的两端洞口浇筑封端墙体,浇筑在所述封端墙体内同时预埋压力注浆管,并在其中一所述封端墙体内预埋固结排水管以及泵送吹填砂管道的孔洞;②从所述泵送吹填砂管道的孔洞中穿插泵送吹填砂管道;③静置,待所述封端墙体达到设计强度后,利用动力泵通过所述泵送吹填砂管道向涵洞内逐步吹填砂,直至灌填密实,并通过所述固结排水管排水;④所述涵洞内的吹填砂固结后,所述涵洞顶部出现填充缝隙后,通过预埋所述压力注浆管向所述涵洞内灌注水泥浆或高聚物材料将所述缝隙填充密实。本申请的改进型穿堤涵洞的封堵方法可密实封堵涵洞,彻底消除安全隐患,确保防洪堤的防汛、防洪安全。
Description
技术领域
本发明涉及市政防洪工程和沿海圈围工程技术领域,更具体地说,是一种改进型穿堤涵洞的封堵方法。
背景技术
在城市防洪工程和沿海圈围工程中,为解决防洪堤内部引排水或防洪堤工程施工期的临时排水,需设置穿越防洪堤的穿堤涵闸作为永久引排水设施或临时排水设施。涵闸穿堤部分的主要建筑物为涵洞。当圩内水系规划发生调整或防洪堤工程施工结束后,穿堤涵闸引排水功能即可取消。为确保防洪堤的安全,需对废弃穿堤涵洞进行封堵,以消除堤身的渗漏隐患。
穿堤涵洞多为钢筋混凝土或浆砌块石等硬质结构,涵洞内腔封堵的密实程度及其外壁与周边堤身填筑土料结合的密实程度,直接影响防洪堤堤身渗透稳定和堤身结构安全。因此涵洞封堵成败的关键是涵洞内部封堵和涵洞外壁与堤身土体接触面封堵。涵洞外壁与堤身土体接触面可采用堤身灌浆、压密注浆或高聚物注浆技术等多种封堵方案。
目前涵洞内部封堵通常采用竖向堤身钻孔灌填混凝土技术和水平向动力吹填砂灌填技术。
第一种封堵方案需在现状堤身和涵洞顶板上钻孔,对堤身和涵洞自身结构有二次挠动破坏;由于混凝土流动性能差,灌填施工不仅难度大而且灌填难以密实;受混凝土干缩性的影响,即使灌填密实的混凝土在凝固后与洞内壁间仍然会存在明显缝隙,形成渗漏通道;采用混凝土填筑涵洞,洞身重量增加幅度大,易引起涵洞的二次沉降,造成涵洞外壁与堤身土体接触面缝隙进一步发展。
第二种封堵方案是先封堵涵洞一端,在另一端利用动力吹填砂将涵洞填筑密实;该方案施工工序少,施工工艺简单,对现有堤身和涵洞挠动影响小,吹填砂容重小于混凝土,有利于控制涵洞的二次沉降,但当填筑密实的吹填砂固结后,涵洞内仍会存在一道明显缝隙,形成渗漏通道。
因此,目前常用的涵洞封堵技术都存在一定缺陷,无法确保涵洞封堵后,消除防洪堤的安全隐患。
发明内容
由于现有技术存在着上述技术缺陷,本申请提出一种改进型穿堤涵洞的封堵方法,其目的在于解决现有常用的涵洞封堵技术无法确保完全封堵住涵洞,消除防洪堤安全隐患的问题。
为达到上述技术问题,本申请采用下述技术方案:
一种改进型穿堤涵洞的封堵方法,包括以下步骤:①在拟封堵涵洞的两端洞口浇筑封端墙体,浇筑在所述封端墙体内同时预埋压力注浆管,并在其中一所述封端墙体内预埋固结排水管以及泵送吹填砂管道的孔洞;②从所述泵送吹填砂管道的孔洞中穿插泵送吹填砂管道;③静置,待所述封端墙体达到设计强度后,利用动力泵通过所述泵送吹填砂管道向涵洞内逐步吹填砂,直至灌填密实,并通过所述固结排水管排水;④所述涵洞内的吹填砂固结后,所述涵洞顶部出现填充缝隙后,通过预埋所述压力注浆管向所述涵洞内灌注水泥浆或高聚物材料将所述缝隙填充密实。
较佳的是,在浇筑封端墙体前,先对所述拟封堵涵洞的两端部进行清基。
较佳的是,所述压力注浆管的两端分别预埋于所述两端部的封端墙体中,且所述压力注浆管的其中一端部伸出其对应的所述封端墙体后弯曲向上;所述压力注浆管上均匀分布冒浆孔;所述压力注浆管位于所述涵洞的顶部且处于所述泵送吹填砂管道上方。
较佳的是,所述排水管伸出所述封端墙的一端包覆有一反滤器。
由于采用了上述技术方案,本申请的改进型穿堤涵洞的封堵方法可密实封堵涵洞,彻底消除安全隐患,确保防洪堤的防汛、防洪安全。
附图说明
图1为本申请的施工示意图。
具体实施方式
下面通过实施例,并结合附图,对本发明的技术方案作进一步具体的说明。
参见图1所示,本申请的改进型穿堤涵洞的封堵方法,包括主要包括以下步骤。
第一步,对拟封堵涵洞1的两端洞口进行清基处理。然后在所述拟封堵涵洞的两端洞口浇筑封端墙体2。封端墙体2将所述拟封堵涵洞1两端堵起来。在浇筑封端墙体2的同时预埋压力注浆管3,如图1所示,所述压力注浆管的两端分别位于两端的封端墙体内,所述压力注浆管3的其中一端部伸出其对应的所述封端墙体21后弯曲向上,便于灌浆。所述压力注浆管3上均匀分布冒浆孔。同时,在其中一所述封端墙体21的底部预埋固结排水管4以及泵送吹填砂管道的孔洞5。所述排水管4伸出所述封端墙的一端包覆有一反滤器,防止砂子漏出。
第二步,从所述泵送吹填砂管道的孔洞5中穿插泵送吹填砂管道6。
第三步,静置,待所述封端墙体2达到设计强度后,利用动力泵通过所述泵送吹填砂管道6向涵洞内逐步吹填砂,直至灌填密实。泵送吹填砂管道6随着吹砂量增大,逐渐外外抽,致使完成抽出来后,墙体预留的孔洞采用混凝土封堵。在此过程中,被砂挤压出来的水通过所述固结排水管4排出涵洞内。
第四步,所述涵洞内的吹填砂7固结后,所述涵洞顶部会出现填充缝隙,然后通过预埋所述压力注浆管3向所述涵洞内灌注水泥浆或高聚物材料将所述缝隙填充密实。
本申请的主要是通过在涵洞顶部预埋注浆管道,待涵洞内填筑材料(砂)充分固结后,进行二次灌浆,来封堵涵洞内填筑材料固结后残存的缝隙。本申请可有效解决目前涵洞封堵技术条件下,涵洞封堵不密实的问题,彻底消除防洪堤的安全隐患,确保防洪堤的防汛、防洪安全。
以上所述的实施方式仅用于说明本发明而不用于限制本发明的范围。本领域技术人员对本发明所做的均等变化与修饰,皆应属于本发明所附的权利要求书的涵盖范围。
Claims (4)
1.一种改进型穿堤涵洞的封堵方法,其特征在于,包括以下步骤:
①在拟封堵涵洞的两端洞口浇筑封端墙体,浇筑在所述封端墙体内同时预埋压力注浆管,并在其中一所述封端墙体内预埋固结排水管以及泵送吹填砂管道的孔洞;
②从所述泵送吹填砂管道的孔洞中穿插泵送吹填砂管道;
③静置,待所述封端墙体达到设计强度后,利用动力泵通过所述泵送吹填砂管道向涵洞内逐步吹填砂,直至灌填密实,并通过所述固结排水管排水;
④所述涵洞内的吹填砂固结后,所述涵洞顶部出现填充缝隙后,通过预埋所述压力注浆管向所述涵洞内灌注水泥浆或高聚物材料将所述缝隙填充密实。
2.根据权利要求1所述的改进型穿堤涵洞的封堵方法,其特征在于,在浇筑封端墙体前,先对所述拟封堵涵洞的两端部进行清基。
3.根据权利要求1所述的改进型穿堤涵洞的封堵方法,其特征在于,所述压力注浆管的两端分别预埋于所述两端部的封端墙体中,且所述压力注浆管的其中一端部伸出其对应的所述封端墙体后弯曲向上;所述压力注浆管上均匀分布冒浆孔;所述压力注浆管位于所述涵洞的顶部且处于所述泵送吹填砂管道上方。
4.根据权利要求1所述的改进型穿堤涵洞的封堵方法,其特征在于,所述排水管伸出所述封端墙的一端包覆有一反滤器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910964848.9A CN112647435A (zh) | 2019-10-11 | 2019-10-11 | 一种改进型穿堤涵洞的封堵方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910964848.9A CN112647435A (zh) | 2019-10-11 | 2019-10-11 | 一种改进型穿堤涵洞的封堵方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112647435A true CN112647435A (zh) | 2021-04-13 |
Family
ID=75343434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910964848.9A Pending CN112647435A (zh) | 2019-10-11 | 2019-10-11 | 一种改进型穿堤涵洞的封堵方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112647435A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059458A (zh) * | 2021-11-16 | 2022-02-18 | 湖北省水利水电规划勘测设计院 | 穿堤箱涵度汛临时封堵方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2183230C1 (ru) * | 2001-02-13 | 2002-06-10 | Закрытое акционерное общество "Мост-бизнес-консалтинг" | Способ замены водопропускной трубы |
CN103821114A (zh) * | 2014-02-28 | 2014-05-28 | 安徽水安建设集团股份有限公司 | 一种在渗水压力作用下废弃的水库涵洞封堵方法 |
CN105442464A (zh) * | 2015-12-31 | 2016-03-30 | 长安大学 | 一种用波纹钢管和固结砂加固涵洞的方法 |
CN105672203A (zh) * | 2016-01-05 | 2016-06-15 | 广东省水利水电科学研究院 | 一种堤坝钢筋混凝土涵管的封堵施工方法 |
CN106013155A (zh) * | 2016-05-30 | 2016-10-12 | 中国铁建大桥工程局集团有限公司 | 一种填造覆盖层、注浆固结处理钻孔漏浆的方法 |
JP2017101539A (ja) * | 2015-11-20 | 2017-06-08 | 株式会社ホクコン | コンクリートブロックの連結装置構成用のカバー部材及びそれを用いるコンクリートブロックの連結装置並びにコンクリートブロックの連結工法 |
CN109371861A (zh) * | 2018-11-26 | 2019-02-22 | 中铁五局集团有限公司 | 一种钢筋混凝土涵洞沉降缝渗水处治方法及修复结构 |
CN110241825A (zh) * | 2019-07-05 | 2019-09-17 | 长江勘测规划设计研究有限责任公司 | 一种水库内衬管道回填灌浆施工方法和结构 |
-
2019
- 2019-10-11 CN CN201910964848.9A patent/CN112647435A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2183230C1 (ru) * | 2001-02-13 | 2002-06-10 | Закрытое акционерное общество "Мост-бизнес-консалтинг" | Способ замены водопропускной трубы |
CN103821114A (zh) * | 2014-02-28 | 2014-05-28 | 安徽水安建设集团股份有限公司 | 一种在渗水压力作用下废弃的水库涵洞封堵方法 |
JP2017101539A (ja) * | 2015-11-20 | 2017-06-08 | 株式会社ホクコン | コンクリートブロックの連結装置構成用のカバー部材及びそれを用いるコンクリートブロックの連結装置並びにコンクリートブロックの連結工法 |
CN105442464A (zh) * | 2015-12-31 | 2016-03-30 | 长安大学 | 一种用波纹钢管和固结砂加固涵洞的方法 |
CN105672203A (zh) * | 2016-01-05 | 2016-06-15 | 广东省水利水电科学研究院 | 一种堤坝钢筋混凝土涵管的封堵施工方法 |
CN106013155A (zh) * | 2016-05-30 | 2016-10-12 | 中国铁建大桥工程局集团有限公司 | 一种填造覆盖层、注浆固结处理钻孔漏浆的方法 |
CN109371861A (zh) * | 2018-11-26 | 2019-02-22 | 中铁五局集团有限公司 | 一种钢筋混凝土涵洞沉降缝渗水处治方法及修复结构 |
CN110241825A (zh) * | 2019-07-05 | 2019-09-17 | 长江勘测规划设计研究有限责任公司 | 一种水库内衬管道回填灌浆施工方法和结构 |
Non-Patent Citations (1)
Title |
---|
王飚: "浅谈小型病险水库涵洞封堵技术", 《湖南水利水电》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114059458A (zh) * | 2021-11-16 | 2022-02-18 | 湖北省水利水电规划勘测设计院 | 穿堤箱涵度汛临时封堵方法 |
CN114059458B (zh) * | 2021-11-16 | 2023-01-24 | 湖北省水利水电规划勘测设计院 | 穿堤箱涵度汛临时封堵方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109881694B (zh) | 一种针对基坑基底涌水涌砂进行封堵的施工结构及方法 | |
CN204343312U (zh) | 基坑内降水井的一种封堵装置 | |
CN102061710B (zh) | 一种地下连续墙接头及其制作方法 | |
CN109736340B (zh) | 一种基础底板预留降水井保证垫层完整性的降水装置与方法 | |
CN105714762A (zh) | 换填夯实改进软黏土电渗加固方法 | |
CN102839691B (zh) | 无砂水泥管深井降水井口快速封堵方法及其装置 | |
CN112900512A (zh) | 一种地下室底板冲裂加固修复施工方法 | |
CN113373962B (zh) | 一种深基坑组合堵漏施工方法 | |
CN102535518B (zh) | 一种地下连续墙大接缝的封堵方法 | |
CN105178342B (zh) | 一种降水井井管及其用于封堵基坑预留洞的方法 | |
CN112647435A (zh) | 一种改进型穿堤涵洞的封堵方法 | |
CN207659986U (zh) | 一种建筑物或构筑物地基加固托换墩 | |
WO2021088445A1 (zh) | 水下通道基坑沿水两岸的端头处的止水帷幕 | |
CN107700521A (zh) | 一种建(构)筑物地基加固托换墩及其施工方法 | |
CN104452664A (zh) | 排水减压井修复工艺 | |
CN1113136C (zh) | 灌注桩后压浆挡土止水二合一基坑支护方法及压浆装置 | |
CN215594079U (zh) | 一种施工期间防止地下室上浮的降水结构 | |
CN110965487B (zh) | 一种下穿通道大流量倒吸虹污水管及包封处理施工方法 | |
CN211498907U (zh) | 水下通道基坑沿水两岸的端头处的止水帷幕 | |
CN210684746U (zh) | 一种改进的降水井封堵装置 | |
CN204199324U (zh) | 地下连续墙施工中连接钢筋笼用工字钢 | |
CN206887996U (zh) | 一种排水管道基础充填防渗防塌结构 | |
CN2425952Y (zh) | 灌注桩后压浆挡土止水二合一基坑支护压浆装置 | |
CN112252281B (zh) | 一种土石堤坝穿坝涵管导排包封灌芯组合封堵结构及施工方法 | |
CN214005597U (zh) | 一种土石堤坝穿坝涵管导排包封灌芯组合封堵结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210413 |