CN112610224A - 陡壁隧道掏心洞施工工艺 - Google Patents
陡壁隧道掏心洞施工工艺 Download PDFInfo
- Publication number
- CN112610224A CN112610224A CN202110017571.6A CN202110017571A CN112610224A CN 112610224 A CN112610224 A CN 112610224A CN 202110017571 A CN202110017571 A CN 202110017571A CN 112610224 A CN112610224 A CN 112610224A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- construction
- hole
- core
- digging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/006—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/01—Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/18—Special adaptations of signalling or alarm devices
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
陡壁隧道掏心洞施工工艺,涉及道路桥梁施工,尤其是一种适用于山岭重丘区,简化施工工序,提高施工进度的陡壁隧道掏心洞施工工艺。本发明的陡壁隧道掏心洞施工工艺,其特征在于该施工工艺首先在掌子面开挖断面正中心先提前开挖一个掏心洞,之后再完成掌子面的施工。本发明可适用于各种隧道施工,大大降低了岩溶隧道的施工难度,不仅大大提高了隧道施工进度,使地形复杂的施工现场得于有效的快速施工,减少掌子面开挖断面也使隧道安全性更高;而且掏心洞的施工也给隧道围岩作了一个很好的检测和验证,在下一步施工中可有效地预防和避免;隧道的施工进度得到保障也使全线的施工进度得到有效控制。
Description
技术领域
本发明涉及道路桥梁施工,尤其是一种适用于山岭重丘区,简化施工工序,提高施工进度的陡壁隧道掏心洞施工工艺。
背景技术
近几年来随着经济的高速发展,交通行业显得尤为重要,工期也是不断的缩短,其中高速公路行业的发展也成为一个地区发展快慢的重要因素。高速公路又是由路桥隧几个关键部位组成,因为地理条件、人文等各种因素的影响,导致高速公路施工过程存在一定的难度。
其中,隧道成为大多数高速公路施工快慢的一大难题,所以不断提高和改进隧道的施工工艺成为一代又一代隧道人的使命。隧道是埋置于地层内的工程建筑物,是人类利用地下空间的一种形式。隧道可分为交通隧道、水工隧道、市政隧道、矿山隧道。1970年国际经济合作与发展组织召开的隧道会议综合了各种因素,对隧道所下的定义为:以某种用途、在地面下作用任何方法规定形状和尺寸修筑的断面积大于2平方米的洞室。
“掌子面”是坑道施工中的一个术语,即开挖坑道不断向前推进的工作面,不是一个固定的面,开挖面有掌子面、边墙面和拱顶面,确切地说是正对着的那个不断向前移动的工作面,就叫掌子面。掌子面就是已开挖和未开挖的岩层的分界面。
掌子面施工中常见的施工方法有:全断面开挖法、台阶开挖法、环形开挖预留核心土法、单侧壁导坑法、双侧壁导坑法、中隔壁法和交叉中隔壁法、中洞法、侧洞法、柱洞法、洞桩法、CRD法、CD法等方法。在施工中,选用哪种掌子面施工方法,主要是依据隧道断面形式及隧道地质条件来决定的。而在山岭重丘区,有些隧道进口仅有三四米的路基,往外则为断崖时,不具备正常进洞的条件。采用上述掌子面施工方法将会工序繁琐,施工进度缓慢,成本造价增加,材料浪费极大等。
发明内容
本发明所要解决的就是现有桥梁施工过程中,在山岭重丘区,隧道进口路基宽度窄,施工不便的问题,提供一种适用于山岭重丘区,简化施工工序,提高施工进度的陡壁隧道掏心洞施工工艺。
本发明的陡壁隧道掏心洞施工工艺,其特征在于该施工工艺首先在掌子面开挖断面正中心先提前开挖一个掏心洞,之后再完成掌子面的施工,具体步骤如下:
1)施工准备:对隧道围岩进行分析,选择适用的掏心洞施工工法,对掌子面场地进行平整:
2) 在隧道全断面上确定选择掏心洞位置,掏心洞的长、宽、高均为2.5m,掏心洞位于隧道全断面的中点;
3)钻孔放炮:采用钻孔台架配YT-28气腿式风动凿岩机,按照爆破设计进行钻孔,人工装药起爆,钻孔时先用短钻杆开孔,再换上长钻杆钻进,周边孔外插10-20角,炮孔相互平行,周边孔在断面轮廓线上开孔,周边孔对孔误差环向不大于5cm;掏槽孔对孔误差不大于3cm,其它孔开眼误差不大于10cm;
4)出渣排险:完成爆破后,首先利用装载机装渣,之后通过挖机清渣,最后通过人工用钢钎排险;
5)围岩分析:对围岩进行分析,包括整体性、稳定性、含水量以及是否含有毒气体;
6)沉降观测:在隧道内地表布设作为工作基点的水准点,以此水准点作为沉降观测的参照点;在隧道的拱顶具有沉降代表性的位置布设沉降观测标,用于隧道地表的沉降观测;利用水准仪或全站仪对沉降观测标位置的下沉量进行绝对下沉量测量;
7)进行掌子面的扩孔工序:隧道的掏心洞领先隧道全断面距离50m~100m后,进行隧道全断面施工;隧道全断面按正常施工方法进行施工,在全断面施工过程中,掏心洞作为隧道全断面的掏心炮眼;
8)循环上述步骤3)至步骤7),直至隧道贯通,施工完成。
本发明的陡壁隧道掏心洞施工工艺,施工工艺简单,可适用于各种隧道施工,大大降低了岩溶隧道的施工难度,不仅大大提高了隧道施工进度,使地形复杂的施工现场得于有效的快速施工,减少掌子面开挖断面也使隧道安全性更高;而且掏心洞的施工也给隧道围岩作了一个很好的检测和验证,在下一步施工中可有效地预防和避免;便于施工安全及工程事故等相关费用;隧道的施工进度得到保障也使全线的施工进度得到有效控制,所产生的经济效益十分可观。
附图说明
图1为本发明掏心洞位置示意图。
其中,隧道全断面1,掏心洞2。
具体实施方式
实施例1:一种陡壁隧道掏心洞施工工艺,该施工工艺首先在掌子面开挖断面正中心先提前开挖一个掏心洞,之后再完成掌子面的施工,具体步骤如下:
1)施工准备:对隧道围岩进行分析,选择适用的掏心洞施工工法,对掌子面场地进行平整:
2) 在隧道全断面上确定选择掏心洞位置,掏心洞的长、宽、高均为2.5m,掏心洞位于隧道全断面的中点;
3)钻孔放炮:采用钻孔台架配YT-28气腿式风动凿岩机,按照爆破设计进行钻孔,人工装药起爆,钻孔时先用短钻杆开孔,再换上长钻杆钻进,周边孔外插10-20角,炮孔相互平行,周边孔在断面轮廓线上开孔,周边孔对孔误差环向不大于5cm;掏槽孔对孔误差不大于3cm,其它孔开眼误差不大于10cm;
4)出渣排险:完成爆破后,首先利用装载机装渣,之后通过挖机清渣,最后通过人工用钢钎排险;
5)围岩分析:对围岩进行分析,包括整体性、稳定性、含水量以及是否含有毒气体;
6)沉降观测:在隧道内地表布设作为工作基点的水准点,以此水准点作为沉降观测的参照点;在隧道的拱顶具有沉降代表性的位置布设沉降观测标,用于隧道地表的沉降观测;利用水准仪或全站仪对沉降观测标位置的下沉量进行绝对下沉量测量;
7)进行掌子面的扩孔工序:隧道的掏心洞领先隧道全断面距离50m~100m后,进行隧道全断面施工;隧道全断面按正常施工方法进行施工,在全断面施工过程中,掏心洞作为隧道全断面的掏心炮眼;
8)循环上述步骤3)至步骤7),直至隧道贯通,施工完成。
Claims (1)
1.一种陡壁隧道掏心洞施工工艺,其特征在于该施工工艺首先在掌子面开挖断面正中心先提前开挖一个掏心洞,之后再完成掌子面的施工,具体步骤如下:
1)施工准备:对隧道围岩进行分析,选择适用的掏心洞施工工法,对掌子面场地进行平整:
2) 在隧道全断面上确定选择掏心洞位置,掏心洞的长、宽、高均为2.5m,掏心洞位于隧道全断面的中点;
3)钻孔放炮:采用钻孔台架配YT-28气腿式风动凿岩机,按照爆破设计进行钻孔,人工装药起爆,钻孔时先用短钻杆开孔,再换上长钻杆钻进,周边孔外插10-20角,炮孔相互平行,周边孔在断面轮廓线上开孔,周边孔对孔误差环向不大于5cm;掏槽孔对孔误差不大于3cm,其它孔开眼误差不大于10cm;
4)出渣排险:完成爆破后,首先利用装载机装渣,之后通过挖机清渣,最后通过人工用钢钎排险;
5)围岩分析:对围岩进行分析,包括整体性、稳定性、含水量以及是否含有毒气体;
6)沉降观测:在隧道内地表布设作为工作基点的水准点,以此水准点作为沉降观测的参照点;在隧道的拱顶具有沉降代表性的位置布设沉降观测标,用于隧道地表的沉降观测;利用水准仪或全站仪对沉降观测标位置的下沉量进行绝对下沉量测量;
7)进行掌子面的扩孔工序:隧道的掏心洞领先隧道全断面距离50m~100m后,进行隧道全断面施工;隧道全断面按正常施工方法进行施工,在全断面施工过程中,掏心洞作为隧道全断面的掏心炮眼;
8)循环上述步骤3)至步骤7),直至隧道贯通,施工完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110017571.6A CN112610224B (zh) | 2021-01-07 | 2021-01-07 | 陡壁隧道掏心洞施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110017571.6A CN112610224B (zh) | 2021-01-07 | 2021-01-07 | 陡壁隧道掏心洞施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112610224A true CN112610224A (zh) | 2021-04-06 |
CN112610224B CN112610224B (zh) | 2023-04-25 |
Family
ID=75254748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110017571.6A Active CN112610224B (zh) | 2021-01-07 | 2021-01-07 | 陡壁隧道掏心洞施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112610224B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175328A (zh) * | 2021-05-11 | 2021-07-27 | 蒲建莹 | 小入口大断面洞室开挖施工工艺 |
CN113586076A (zh) * | 2021-08-03 | 2021-11-02 | 武汉大学 | 隧洞硬岩非爆破开挖方法 |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2060543A5 (zh) * | 1969-07-11 | 1971-06-18 | Koenig Max | |
AU2003203880B1 (en) * | 2002-05-28 | 2005-12-08 | Australian Contract Mining Pty Ltd | Method and Apparatus for Excavating Raises |
KR20120005680A (ko) * | 2010-07-09 | 2012-01-17 | (주)한국투아치 | 파일럿 터널을 적용한 다단 굴착 방식의 터널 시공방법 |
CN103314183A (zh) * | 2010-12-21 | 2013-09-18 | Ltm公司 | 利用爆破保护架和货车的隧道掘进机挖掘和扩大爆破施工方法以及相关装置 |
CN104533428A (zh) * | 2014-11-28 | 2015-04-22 | 大连市市政设计研究院有限责任公司 | 一种陡峭悬崖隧道出洞工法 |
CN204327107U (zh) * | 2014-08-27 | 2015-05-13 | 中国电建集团华东勘测设计研究院有限公司 | 一种破碎岩体洞段的tbm掘进结构 |
CN109630135A (zh) * | 2019-01-16 | 2019-04-16 | 交通运输部公路科学研究所 | 一种系统支护的隧道施工方法 |
CN208996733U (zh) * | 2018-08-27 | 2019-06-18 | 中国电建集团华东勘测设计研究院有限公司 | 一种隧洞岩爆风险的应力解除结构 |
CN109945753A (zh) * | 2019-04-25 | 2019-06-28 | 中交路桥建设有限公司 | 一种高瓦斯隧道全断面一次爆破施工方法 |
CN110487138A (zh) * | 2019-09-16 | 2019-11-22 | 中国十九冶集团有限公司 | 高海拔小断面长陡斜坡隧道全断面光面爆破施工方法 |
CN210003292U (zh) * | 2019-03-20 | 2020-01-31 | 中国电建集团华东勘测设计研究院有限公司 | 高应力软岩隧洞大变形超前释放结构 |
CN110924974A (zh) * | 2019-11-28 | 2020-03-27 | 云南省建设投资控股集团有限公司 | 一种分岔隧道的施工方法 |
CN111365017A (zh) * | 2020-03-13 | 2020-07-03 | 中铁第四勘察设计院集团有限公司 | 一种地下互通隧道的施工方法 |
CN111663946A (zh) * | 2020-06-03 | 2020-09-15 | 中国水利水电第四工程局有限公司 | 一种洞室变径开挖方法 |
CN111810187A (zh) * | 2020-07-20 | 2020-10-23 | 中国路桥工程有限责任公司 | 一种城市无中导洞分岔隧道掉头施工方法 |
-
2021
- 2021-01-07 CN CN202110017571.6A patent/CN112610224B/zh active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2060543A5 (zh) * | 1969-07-11 | 1971-06-18 | Koenig Max | |
AU2003203880B1 (en) * | 2002-05-28 | 2005-12-08 | Australian Contract Mining Pty Ltd | Method and Apparatus for Excavating Raises |
KR20120005680A (ko) * | 2010-07-09 | 2012-01-17 | (주)한국투아치 | 파일럿 터널을 적용한 다단 굴착 방식의 터널 시공방법 |
CN103314183A (zh) * | 2010-12-21 | 2013-09-18 | Ltm公司 | 利用爆破保护架和货车的隧道掘进机挖掘和扩大爆破施工方法以及相关装置 |
CN204327107U (zh) * | 2014-08-27 | 2015-05-13 | 中国电建集团华东勘测设计研究院有限公司 | 一种破碎岩体洞段的tbm掘进结构 |
CN104533428A (zh) * | 2014-11-28 | 2015-04-22 | 大连市市政设计研究院有限责任公司 | 一种陡峭悬崖隧道出洞工法 |
CN208996733U (zh) * | 2018-08-27 | 2019-06-18 | 中国电建集团华东勘测设计研究院有限公司 | 一种隧洞岩爆风险的应力解除结构 |
CN109630135A (zh) * | 2019-01-16 | 2019-04-16 | 交通运输部公路科学研究所 | 一种系统支护的隧道施工方法 |
CN210003292U (zh) * | 2019-03-20 | 2020-01-31 | 中国电建集团华东勘测设计研究院有限公司 | 高应力软岩隧洞大变形超前释放结构 |
CN109945753A (zh) * | 2019-04-25 | 2019-06-28 | 中交路桥建设有限公司 | 一种高瓦斯隧道全断面一次爆破施工方法 |
CN110487138A (zh) * | 2019-09-16 | 2019-11-22 | 中国十九冶集团有限公司 | 高海拔小断面长陡斜坡隧道全断面光面爆破施工方法 |
CN110924974A (zh) * | 2019-11-28 | 2020-03-27 | 云南省建设投资控股集团有限公司 | 一种分岔隧道的施工方法 |
CN111365017A (zh) * | 2020-03-13 | 2020-07-03 | 中铁第四勘察设计院集团有限公司 | 一种地下互通隧道的施工方法 |
CN111663946A (zh) * | 2020-06-03 | 2020-09-15 | 中国水利水电第四工程局有限公司 | 一种洞室变径开挖方法 |
CN111810187A (zh) * | 2020-07-20 | 2020-10-23 | 中国路桥工程有限责任公司 | 一种城市无中导洞分岔隧道掉头施工方法 |
Non-Patent Citations (4)
Title |
---|
徐丙义;: "连拱隧道扩大单侧壁导坑的三导洞开挖施工技术" * |
杨中文等: "中小型断面长隧洞的施工实践", 《浙江水利科技》 * |
王亮;: "高原地区特大断面隧道开挖支护技术研究" * |
赵宝仁: "浅议水利水电工程爆破施工技术", 《民营科技》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175328A (zh) * | 2021-05-11 | 2021-07-27 | 蒲建莹 | 小入口大断面洞室开挖施工工艺 |
CN113586076A (zh) * | 2021-08-03 | 2021-11-02 | 武汉大学 | 隧洞硬岩非爆破开挖方法 |
Also Published As
Publication number | Publication date |
---|---|
CN112610224B (zh) | 2023-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109723443B (zh) | 隧道施工方法 | |
CN104847362B (zh) | 硬岩地层大跨地铁车站暗挖施工方法 | |
CN108843333A (zh) | 湿陷性黄土地区暗挖双连拱隧道穿越既有铁路的施工方法 | |
CN110259458A (zh) | 小净距隧道浅埋段双侧壁导坑开挖的施工方法 | |
CN112610224A (zh) | 陡壁隧道掏心洞施工工艺 | |
CN106812150A (zh) | 一种山区陡坡地段公路桥梁桩基施工方法 | |
CN111365020A (zh) | 一种适用于较差地质条件下偏压进洞的反压回填施工方法 | |
CN112576265A (zh) | 一种盾构下穿老旧村庄沉降控制方法 | |
CN110259490A (zh) | 一种地铁暗挖车站施工方法 | |
Torok et al. | Engineering geological problems associated with karst terrains: their investigation, monitoring, and mitigation and design of engineering structures on karst terrains | |
Wang et al. | Shield tunnel engineering: from theory to practice | |
CN214091881U (zh) | 一种适用于较差地质条件下偏压进洞的结构 | |
Edmonds | Karst and mining geohazards with particular reference to the Chalk outcrop, England | |
Wang | Tunnelling and technological progress in tunnelling in China | |
CN112145227A (zh) | 防止隧道突水涌泥设施及施工方法 | |
CN115012957A (zh) | 一种复杂条件下大断面特长隧道安全高效掘进施工工艺 | |
CN114483054A (zh) | 上软下硬地层导洞非爆开挖施工方法 | |
CN207554064U (zh) | 具有移动机构的箱涵中继顶推系统 | |
CN207554049U (zh) | 箱涵中继顶推系统 | |
El-Nahhas | Tunnelling and supported deep excavations in the Greater Cairo | |
Boon et al. | Protection of buildings and structures within the influence of tunnelling works | |
Pascu et al. | A Possible Tunnels Execution Technology on Subsection E2 of the Highway A1 | |
Tan et al. | Deep intervention shaft excavation in Kuala Lumpur limestone formation with pre-tunnelling construction method | |
Onoda | A History of Railway Tunnels in Japan | |
Singh et al. | Introduction to tunnels and tunneling operations in the Himalaya’s part of India |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |