CN104533428A - 一种陡峭悬崖隧道出洞工法 - Google Patents
一种陡峭悬崖隧道出洞工法 Download PDFInfo
- Publication number
- CN104533428A CN104533428A CN201410708082.5A CN201410708082A CN104533428A CN 104533428 A CN104533428 A CN 104533428A CN 201410708082 A CN201410708082 A CN 201410708082A CN 104533428 A CN104533428 A CN 104533428A
- Authority
- CN
- China
- Prior art keywords
- hole
- tunnel
- pilot tunnel
- medium
- advanced
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009412 basement excavation Methods 0.000 title claims abstract description 21
- 238000010276 construction Methods 0.000 title claims abstract description 17
- 238000000034 method Methods 0.000 claims abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 238000012407 engineering method Methods 0.000 claims description 15
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 9
- 238000005553 drilling Methods 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 abstract description 2
- 230000005641 tunneling Effects 0.000 abstract 4
- 239000011435 rock Substances 0.000 description 3
- 238000012876 topography Methods 0.000 description 3
- 239000000725 suspension Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/006—Lining anchored in the rock
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410708082.5A CN104533428B (zh) | 2014-11-28 | 2014-11-28 | 一种陡峭悬崖隧道出洞工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410708082.5A CN104533428B (zh) | 2014-11-28 | 2014-11-28 | 一种陡峭悬崖隧道出洞工法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104533428A true CN104533428A (zh) | 2015-04-22 |
CN104533428B CN104533428B (zh) | 2018-02-13 |
Family
ID=52849028
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410708082.5A Active CN104533428B (zh) | 2014-11-28 | 2014-11-28 | 一种陡峭悬崖隧道出洞工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104533428B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110030001A (zh) * | 2019-05-30 | 2019-07-19 | 广西大学 | 一种山岭隧道出洞的施工方法 |
CN110424460A (zh) * | 2019-08-22 | 2019-11-08 | 中铁隧道集团三处有限公司 | 一种隧道明挖施工工艺 |
CN111365072A (zh) * | 2020-03-10 | 2020-07-03 | 中铁第六勘察设计院集团有限公司 | 一种裂隙岩体巨型洞室的导洞勘察结构及方法 |
CN111561329A (zh) * | 2020-05-11 | 2020-08-21 | 中铁十八局集团有限公司 | 一种铁路隧道仰拱下方水库爆顶透水窟窿修补方法 |
CN112267899A (zh) * | 2020-10-12 | 2021-01-26 | 广东冠粤路桥有限公司 | 一种隧道出洞施工方法 |
CN112610224A (zh) * | 2021-01-07 | 2021-04-06 | 云南路桥股份有限公司 | 陡壁隧道掏心洞施工工艺 |
CN114233300A (zh) * | 2021-12-29 | 2022-03-25 | 广西路建工程集团有限公司 | 一种隧洞单向掘进在洞口附近贯通的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3665719A (en) * | 1969-05-28 | 1972-05-30 | Atlantic Richfield Co | Apparatus for counterstressing in situ rock for support of underground openings |
CN101725358A (zh) * | 2008-10-31 | 2010-06-09 | 中铁四局集团有限公司 | 隧道超浅埋不均匀风化地层开挖施工方法 |
CN101967977A (zh) * | 2010-08-31 | 2011-02-09 | 中国水电顾问集团华东勘测设计研究院 | 两头掘进深埋隧洞贯通过程中控制岩柱型岩爆的施工方法 |
CN102562099A (zh) * | 2012-03-15 | 2012-07-11 | 中铁二十三局集团第四工程有限公司 | 黄土隧道双排小导管快速进洞施工方法 |
CN203321555U (zh) * | 2013-03-11 | 2013-12-04 | 中铁二院工程集团有限责任公司 | 软弱地质环境大断面隧道施工支护体系 |
CN103775092A (zh) * | 2014-01-09 | 2014-05-07 | 长业建设集团有限公司 | 隧道浅埋暗挖预留核心土改良crd施工工法 |
-
2014
- 2014-11-28 CN CN201410708082.5A patent/CN104533428B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3665719A (en) * | 1969-05-28 | 1972-05-30 | Atlantic Richfield Co | Apparatus for counterstressing in situ rock for support of underground openings |
CN101725358A (zh) * | 2008-10-31 | 2010-06-09 | 中铁四局集团有限公司 | 隧道超浅埋不均匀风化地层开挖施工方法 |
CN101967977A (zh) * | 2010-08-31 | 2011-02-09 | 中国水电顾问集团华东勘测设计研究院 | 两头掘进深埋隧洞贯通过程中控制岩柱型岩爆的施工方法 |
CN102562099A (zh) * | 2012-03-15 | 2012-07-11 | 中铁二十三局集团第四工程有限公司 | 黄土隧道双排小导管快速进洞施工方法 |
CN203321555U (zh) * | 2013-03-11 | 2013-12-04 | 中铁二院工程集团有限责任公司 | 软弱地质环境大断面隧道施工支护体系 |
CN103775092A (zh) * | 2014-01-09 | 2014-05-07 | 长业建设集团有限公司 | 隧道浅埋暗挖预留核心土改良crd施工工法 |
Non-Patent Citations (2)
Title |
---|
李春生: "佛岭隧道洞口浅埋软弱围岩段施工方法研究", 《北京交通大学硕士学位论文》 * |
高峰: "隧道单向掘进出洞施工技术", 《市政技术》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110030001A (zh) * | 2019-05-30 | 2019-07-19 | 广西大学 | 一种山岭隧道出洞的施工方法 |
CN110030001B (zh) * | 2019-05-30 | 2020-06-30 | 广西大学 | 一种山岭隧道出洞的施工方法 |
CN110424460A (zh) * | 2019-08-22 | 2019-11-08 | 中铁隧道集团三处有限公司 | 一种隧道明挖施工工艺 |
CN111365072A (zh) * | 2020-03-10 | 2020-07-03 | 中铁第六勘察设计院集团有限公司 | 一种裂隙岩体巨型洞室的导洞勘察结构及方法 |
CN111365072B (zh) * | 2020-03-10 | 2022-02-15 | 中铁第六勘察设计院集团有限公司 | 一种裂隙岩体巨型洞室的导洞勘察结构及方法 |
CN111561329A (zh) * | 2020-05-11 | 2020-08-21 | 中铁十八局集团有限公司 | 一种铁路隧道仰拱下方水库爆顶透水窟窿修补方法 |
CN111561329B (zh) * | 2020-05-11 | 2022-03-15 | 中铁十八局集团有限公司 | 一种铁路隧道仰拱下方水库爆顶透水窟窿修补方法 |
CN112267899A (zh) * | 2020-10-12 | 2021-01-26 | 广东冠粤路桥有限公司 | 一种隧道出洞施工方法 |
CN112610224A (zh) * | 2021-01-07 | 2021-04-06 | 云南路桥股份有限公司 | 陡壁隧道掏心洞施工工艺 |
CN114233300A (zh) * | 2021-12-29 | 2022-03-25 | 广西路建工程集团有限公司 | 一种隧洞单向掘进在洞口附近贯通的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104533428B (zh) | 2018-02-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533428A (zh) | 一种陡峭悬崖隧道出洞工法 | |
JP7125550B2 (ja) | 逆アーチを備えた2段階高速閉鎖トンネルの支持構造及びその施工方法 | |
CN203756182U (zh) | 一种应用于软弱岩质区域浅埋公路隧道的支护结构 | |
CN110630283B (zh) | 一种适用于双连拱隧道的三层支护结构及施工方法 | |
CN104533446A (zh) | 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的施工方法及其结构 | |
CN112502723B (zh) | 一种单护盾tbm卡机脱困施工方法 | |
CN103306680A (zh) | 既有单线隧道扩建为多线隧道的施工方法 | |
CN111502696A (zh) | 暗挖隧道的密网式超前支护系统及施工方法 | |
CN112324442B (zh) | 大断面隧道的挖掘方法 | |
CN104929649A (zh) | 隧道横洞进主洞挑顶工法及挑顶结构 | |
CN110374657A (zh) | “先盾后井”的矿山法地铁区间风井及其施工方法 | |
CN104632227A (zh) | 单层梁拱结构的地铁车站开挖工艺 | |
CN105822329B (zh) | 一种支护架、支护结构及支护结构的施工方法 | |
CN109441480B (zh) | 一种连拱隧道后行洞掌子面临时支护施工工法 | |
CN104088646B (zh) | 一种马蹄形开敞式盾构机的施工方法 | |
CN205277460U (zh) | 隧道开挖临时支撑装置 | |
CN110966009B (zh) | 一种分岔段隧道的施工方法 | |
CN105909262A (zh) | 一种暗挖隧道掘进方法 | |
CN114718582B (zh) | 一种小净距水平节理页岩地质隧道洞口段的施工方法 | |
CN208578574U (zh) | 一种双侧壁导坑九部支护结构 | |
CN107816359B (zh) | 一种地下工程人工支柱的构筑方法 | |
CN110030001A (zh) | 一种山岭隧道出洞的施工方法 | |
CN109594993A (zh) | 一种不中断交通情况下的隧道扩建施工方法 | |
JPH1046978A (ja) | トンネル工法及びトンネル支保構造 | |
JP2009174185A (ja) | トンネルの拡幅部施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method of tunnel exit from steep cliff Effective date of registration: 20221031 Granted publication date: 20180213 Pledgee: Industrial Bank Limited by Share Ltd. Dalian branch Pledgor: DALIAN MUNICIPAL DESIGN & RESEARCH INSTITUTE Co.,Ltd. Registration number: Y2022980020373 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20180213 Pledgee: Industrial Bank Limited by Share Ltd. Dalian branch Pledgor: DALIAN MUNICIPAL DESIGN & RESEARCH INSTITUTE Co.,Ltd. Registration number: Y2022980020373 |
|