CN112554447A - Roof waterproof coiled material construction process applied to assembly type building construction - Google Patents

Roof waterproof coiled material construction process applied to assembly type building construction Download PDF

Info

Publication number
CN112554447A
CN112554447A CN202011341014.1A CN202011341014A CN112554447A CN 112554447 A CN112554447 A CN 112554447A CN 202011341014 A CN202011341014 A CN 202011341014A CN 112554447 A CN112554447 A CN 112554447A
Authority
CN
China
Prior art keywords
coiled material
roof
waterproof coiled
construction
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011341014.1A
Other languages
Chinese (zh)
Inventor
谢陶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Sizhi Design Co ltd
Original Assignee
Wuhu Sizhi Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Sizhi Design Co ltd filed Critical Wuhu Sizhi Design Co ltd
Priority to CN202011341014.1A priority Critical patent/CN112554447A/en
Publication of CN112554447A publication Critical patent/CN112554447A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/10Roof covering by making use of flexible material, e.g. supplied in roll form by making use of compounded or laminated materials, e.g. metal foils or plastic films coated with bitumen
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J11/00Features of adhesives not provided for in group C09J9/00, e.g. additives
    • C09J11/08Macromolecular additives
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J4/00Adhesives based on organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond ; adhesives, based on monomers of macromolecular compounds of groups C09J183/00 - C09J183/16
    • C09J4/06Organic non-macromolecular compounds having at least one polymerisable carbon-to-carbon unsaturated bond in combination with a macromolecular compound other than an unsaturated polymer of groups C09J159/00 - C09J187/00
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D15/00Apparatus or tools for roof working
    • E04D15/06Apparatus or tools for roof working for handling roofing or sealing material in roll form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/14Fastening means therefor
    • E04D5/141Fastening means therefor characterised by the location of the fastening means
    • E04D5/142Fastening means therefor characterised by the location of the fastening means along the edge of the flexible material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D5/00Roof covering by making use of flexible material, e.g. supplied in roll form
    • E04D5/14Fastening means therefor
    • E04D5/148Fastening means therefor fastening by gluing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention discloses a roof waterproof coiled material construction process applied to fabricated building construction, which comprises the following steps of S1, a pre-use tool, a brushing and sanding tool, a leveling and rolling tool, a cutting tool and the like. S2, cleaning the assembled building roof, leveling the roof by using cement mortar, uniformly coating the cement mortar on the roof, ensuring the smoothness of the upper layer of the roof, and simultaneously realizing the establishment, standing and drying of a roof protective layer. The roof base layer is cleaned, so that the tidiness of the roof base layer is guaranteed, and the roof base layer must be kept clean. This be applied to roofing waterproofing membrane construction process of assembly type construction utilizes the rubber sealing strip that the fixed length was tailor, can level and smooth waterproofing membrane, avoids waterproofing membrane fold phenomenon to appear at the in-process of laying to the staff of being convenient for directly carries out tensile exhibition to waterproofing membrane, avoids rolling the exhibition limit and lays and cause fold and swell phenomenon, guarantees the planarization that waterproofing membrane laid.

Description

Roof waterproof coiled material construction process applied to assembly type building construction
Technical Field
The invention relates to the technical field of assembly type building construction, in particular to a roof waterproof coiled material construction process applied to assembly type building construction.
Background
The prefabricated building is built and assembled by comprehensively utilizing prefabricated components, mainly comprises a prefabricated concrete structure, a steel structure, a modern wood structure building and the like, has the characteristics of energy conservation, environmental protection, short construction period and the like, along with the development of modern industrial technology, the prefabricated building gradually rises, the building speed is faster and faster, the building is started to be manufactured in batches and in a complete set, people need to live in the house comfortably, water is required to be prevented from being carried out on the roof of the prefabricated building, a roof waterproof coiled material is laid to the roof, the roof is subjected to waterproof construction, but the existing roof waterproof coiled material construction process has certain defects, just such as:
the construction method of the polyvinyl chloride root-prick-resistant waterproof roll material for the basement roof with the publication number of CN104695486B is characterized in that a polyvinyl chloride root-prick-resistant waterproof roll material additional layer is manufactured, root pricks and waterproof effects at nodes are improved, and the hidden danger of leakage of subsequent nodes of the basement roof is eliminated.
Therefore, we propose a construction process of a roof waterproof roll applied to fabricated building construction to solve the above-mentioned problems.
Disclosure of Invention
The invention aims to provide a roof waterproof coiled material construction process applied to assembly type building construction, and aims to solve the problems that the tightness between the laying gaps of the waterproof coiled material cannot be enhanced, the waterproof performance between the laying gaps of the waterproof coiled material is weak, the flatness of the laid waterproof coiled material cannot be ensured, and the phenomena of wrinkles, bulges and the like are easy to occur in the construction process of the roof waterproof coiled material in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a roof waterproof roll construction process applied to fabricated building construction comprises the following steps:
s1, preparation tool
Brushing tools, brushing and sanding tools, leveling and rolling tools, cutting tools, and the like.
S2 cleaning of assembled building roof
(1) The cement mortar is utilized to level the roof, the cement mortar is uniformly coated on the roof, the smoothness of the upper layer of the roof is ensured, and meanwhile, the building, standing and drying of a roof protective layer are realized.
(2) The cleaning method has the advantages that the roof base layer is cleaned, the cleanness of the roof base layer is guaranteed, the roof base layer needs to be kept clean and does not contain any impurities, dust existing in gaps and internal corners after cleaning is blown clean by compressed air, oil dirt pollution, welding stains, rust spots and the like need to be cleaned and sanded, and the surface is kept clean.
S3 drying roof of prefabricated building
The fabricated building roof is dried by using a construction drying machine or a natural air drying mode, the moisture content of the roof base layer is preferably not more than 3% -6%, and the moisture content can be measured by using an instrument to ensure that the roof base layer meets the drying requirement.
S4 preparation of glue solution special for waterproof coiled material construction
(1) The weight ratio of cyclodextrin, starch and water is 5: 2: 10, carrying out gelatinization treatment on the cyclodextrin, the starch and the water to prepare a paste, wherein the mixing gelatinization treatment temperature is 50-70 ℃, and the treatment time is preferably 3-7 h.
(2) Performing ultrasonic oscillation on the paste, polyethylene glycol, cellulose compounds, ethyl acetate and gasoline for 30-40min to obtain a special glue solution for waterproof coiled material construction, wherein the weight ratio of the paste, the polyethylene glycol, the cellulose compounds, the ethyl acetate and the gasoline is 20: 15: 0.3: 0.06: 0.2.
s5 pretreatment of waterproof coiled material
(1) Rubber seal strip is tailor according to the length of tiling roofing, with waterproofing membrane's flattening gradually, will scribble the rubber seal strip of the special glue solution of waterproofing membrane construction simultaneously and hug closely waterproofing membrane's limit portion and bond, realize rubber seal strip and waterproofing membrane's being connected, utilize rubber seal strip to measure waterproofing membrane's the length that utilizes, use the instrument of tailorring to tailor waterproofing membrane.
(2) And uniformly coating the side surface of the waterproof coiled material which is not bonded with the rubber sealing strip with the special glue solution for waterproof coiled material construction, stretching the waterproof coiled material, wherein one side coated with the special glue solution for waterproof coiled material construction is opposite to the roof base layer.
S6 laying waterproof roll
(1) Fully stretch waterproofing membrane's tip to guarantee that waterproofing membrane's tip is located the relative end that the roofing was laid, laminate each other with roofing basic unit gradually, and adapted flattening roll-in instrument carries out the pressfitting flattening to waterproofing membrane, extrudes the tympanic bulla from the waterproofing membrane side, and rubber seal strip can guarantee that waterproofing membrane can not take place the fold.
(2) Paste waterproofing membrane in proper order, the waterproofing membrane of adjacent laying passes through the rubber sealing strip and closely laminates, and the mutual unsmooth cooperation of rubber sealing strip increases the compactness in waterproofing membrane laminating gap.
S7, follow-up examination of waterproof coiled material construction
(1) The surface inspection is carried out on the laid waterproof coiled material, the phenomena of damage and corner edge upwarp occur, and the waterproof coiled material needs to be repaired in time.
(2) Repairing the damage of the waterproof coiled material by using a laminated laying mode, and simultaneously performing multilayer strengthening treatment on the damaged position by using a double-faced butyl lapping tape, a sand lapping tape and special joint sealing paste.
(3) Coating special glue solution for waterproof coiled material construction on the raised corner edge of the waterproof coiled material, adhering the raised corner edge of the waterproof coiled material to the roof base layer by pressing, and coating sealing paste on the corner edge for sealing.
S8, subsequent strengthening treatment of waterproof coiled material construction
The waterproof coating is evenly and flatly coated on the joints between the rubber sealing strips by using a coating tool, so that the waterproof performance of the laying gap of the waterproof coiled material is further enhanced.
S9 treatment of protruding buildings such as roof pipelines and piles
(1) The waterproof coiled material extends by 30mm-80mm, meets the shape characteristics of the protruding buildings such as roof pipelines, piles and the like, is cut, ensures that the waterproof coiled material wraps the appropriate areas of the protruding buildings such as the roof pipelines, the piles and the like for bonding, and uses double-faced butyl lapping adhesive tapes, sand lapping adhesive tapes and special joint sealing pastes for multi-layer reinforcement treatment.
(2) The joints of the waterproof coiled material and the parts protruding out of the building, such as the roof pipeline, the pile and the like, are tightly filled with cement mortar, the waterproof coiled material is kept stand until the cement mortar is dried, and sealing paste is coated at the joints for reinforcement.
Preferably, the drying suitability of the fabricated building roof can be detected by a manual detection method, and when the scratch speed is fast, the scratch has a hard feeling, the wire groove is shallow, and the cross line is white, the drying requirement is met.
Preferably, the width of the rubber sealing strip is 30mm-70mm, the height of the rubber sealing strip is 10mm, and the length of the rubber sealing strip is cut in sections according to the laying length of the roof waterproof roll.
Preferably, the construction time of the waterproof coiled material is strictly forbidden in rainy days, the construction at the temperature lower than 0 ℃ is not suitable, and the construction in high-temperature burning days is avoided in summer.
Compared with the prior art, the invention has the beneficial effects that: the roof waterproof coiled material construction process applied to the assembly type building construction;
1. the waterproof roll can be leveled by utilizing the rubber sealing strip cut at a fixed length, so that the phenomenon of wrinkles of the waterproof roll in the laying process is avoided, workers can conveniently and directly stretch and flatten the waterproof roll, the phenomenon of wrinkles and bulges caused by laying while rolling and stretching is avoided, and the laying smoothness of the waterproof roll is ensured;
2. utilize unsmooth complex rubber sealing strip, can strengthen the compactness between the adjacent waterproofing membrane of laying, use the coating instrument with the coating at the rubber sealing strip department of pasting mutually, parcel rubber sealing strip further strengthens waterproof nature between the adjacent waterproofing membrane of laying to follow-up water-proof effects of roofing water-proof construction is strengthened to corner gap department.
Detailed Description
Technical solutions in the embodiments of the present invention are clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a technical scheme that: a roof waterproof roll construction process applied to fabricated building construction comprises the following steps:
s1, preparation tool
Brushing tools, brushing and sanding tools, leveling and rolling tools, cutting tools, and the like.
S2 cleaning of assembled building roof
(1) The cement mortar is utilized to level the roof, the cement mortar is uniformly coated on the roof, the smoothness of the upper layer of the roof is ensured, and meanwhile, the building, standing and drying of a roof protective layer are realized.
(2) The cleaning method has the advantages that the roof base layer is cleaned, the cleanness of the roof base layer is guaranteed, the roof base layer needs to be kept clean and does not contain any impurities, dust existing in gaps and internal corners after cleaning is blown clean by compressed air, oil dirt pollution, welding stains, rust spots and the like need to be cleaned and sanded, and the surface is kept clean.
S3 drying roof of prefabricated building
The fabricated building roof is dried by using a construction drying machine or a natural air drying mode, the moisture content of the roof base layer is preferably not more than 3% -6%, and the moisture content can be measured by using an instrument to ensure that the roof base layer meets the drying requirement.
S4 preparation of glue solution special for waterproof coiled material construction
(1) The weight ratio of cyclodextrin, starch and water is 5: 2: 10, carrying out gelatinization treatment on the cyclodextrin, the starch and the water to prepare a paste, wherein the mixing gelatinization treatment temperature is 50-70 ℃, and the treatment time is preferably 3-7 h.
(2) Performing ultrasonic oscillation on the paste, polyethylene glycol, cellulose compounds, ethyl acetate and gasoline for 30-40min to obtain a special glue solution for waterproof coiled material construction, wherein the weight ratio of the paste, the polyethylene glycol, the cellulose compounds, the ethyl acetate and the gasoline is 20: 15: 0.3: 0.06: 0.2.
s5 pretreatment of waterproof coiled material
(1) Rubber seal strip is tailor according to the length of tiling roofing, with waterproofing membrane's flattening gradually, will scribble the rubber seal strip of the special glue solution of waterproofing membrane construction simultaneously and hug closely waterproofing membrane's limit portion and bond, realize rubber seal strip and waterproofing membrane's being connected, utilize rubber seal strip to measure waterproofing membrane's the length that utilizes, use the instrument of tailorring to tailor waterproofing membrane.
(2) And uniformly coating the side surface of the waterproof coiled material which is not bonded with the rubber sealing strip with the special glue solution for waterproof coiled material construction, stretching the waterproof coiled material, wherein one side coated with the special glue solution for waterproof coiled material construction is opposite to the roof base layer.
S6 laying waterproof roll
(1) Fully stretch waterproofing membrane's tip to guarantee that waterproofing membrane's tip is located the relative end that the roofing was laid, laminate each other with roofing basic unit gradually, and adapted flattening roll-in instrument carries out the pressfitting flattening to waterproofing membrane, extrudes the tympanic bulla from the waterproofing membrane side, and rubber seal strip can guarantee that waterproofing membrane can not take place the fold.
(2) Paste waterproofing membrane in proper order, the waterproofing membrane of adjacent laying passes through the rubber sealing strip and closely laminates, and the mutual unsmooth cooperation of rubber sealing strip increases the compactness in waterproofing membrane laminating gap.
S7, follow-up examination of waterproof coiled material construction
(1) The surface inspection is carried out on the laid waterproof coiled material, the phenomena of damage and corner edge upwarp occur, and the waterproof coiled material needs to be repaired in time.
(2) Repairing the damage of the waterproof coiled material by using a laminated laying mode, and simultaneously performing multilayer strengthening treatment on the damaged position by using a double-faced butyl lapping tape, a sand lapping tape and special joint sealing paste.
(3) Coating special glue solution for waterproof coiled material construction on the raised corner edge of the waterproof coiled material, adhering the raised corner edge of the waterproof coiled material to the roof base layer by pressing, and coating sealing paste on the corner edge for sealing.
S8, subsequent strengthening treatment of waterproof coiled material construction
The waterproof coating is evenly and flatly coated on the joints between the rubber sealing strips by using a coating tool, so that the waterproof performance of the laying gap of the waterproof coiled material is further enhanced.
S9 treatment of protruding buildings such as roof pipelines and piles
(1) The waterproof coiled material extends by 30mm-80mm, meets the shape characteristics of the protruding buildings such as roof pipelines, piles and the like, is cut, ensures that the waterproof coiled material wraps the appropriate areas of the protruding buildings such as the roof pipelines, the piles and the like for bonding, and uses double-faced butyl lapping adhesive tapes, sand lapping adhesive tapes and special joint sealing pastes for multi-layer reinforcement treatment.
(2) The joints of the waterproof coiled material and the parts protruding out of the building, such as the roof pipeline, the pile and the like, are tightly filled with cement mortar, the waterproof coiled material is kept stand until the cement mortar is dried, and sealing paste is coated at the joints for reinforcement.
The drying suitability of the roof of the fabricated building can be detected by a manual detection method, and when the scratch speed is fast, the scratch has a hard feeling, the wire groove is shallow, and the transverse line is white, the drying requirement is met.
The width of the rubber sealing strip is 30mm-70mm, the height is 10mm, and the length of the rubber sealing strip is cut in sections according to the laying length of the roof waterproof coiled material.
The construction time of the waterproof coiled material is strictly forbidden in rainy days, the construction at the temperature lower than 0 ℃ is not suitable, and the construction in high-temperature burning days is avoided in summer.
Those not described in detail in this specification are within the skill of the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a roofing waterproofing membrane construction technology for assembly type building construction which characterized in that: the method comprises the following steps:
s1, preparation tool
Brushing tools, brushing and sanding tools, leveling and rolling tools, cutting tools and the like;
s2 cleaning of assembled building roof
(1) Leveling the roof by using cement mortar, uniformly coating the cement mortar on the roof, ensuring the smoothness of the upper layer of the roof, and simultaneously realizing the establishment, standing and drying of a roof protective layer;
(2) cleaning the roof base layer to ensure the tidiness of the roof base layer, wherein the roof base layer must be kept clean and does not contain any impurity, dust existing in gaps and internal corners after cleaning is blown clean by compressed air, and oil dirt pollution, welding stains, rust spots and the like are cleaned by washing and sanding to keep the surface clean;
s3 drying roof of prefabricated building
Drying the fabricated building roof by using a construction drying machine or a natural air drying mode, wherein the water content of the roof base layer is preferably not more than 3% -6%, and the water content can be measured by using an instrument to ensure that the roof base layer meets the drying requirement;
s4 preparation of glue solution special for waterproof coiled material construction
(1) The weight ratio of cyclodextrin, starch and water is 5: 2: 10, carrying out gelatinization treatment on cyclodextrin, starch and water to prepare a paste, wherein the mixing gelatinization treatment temperature is 50-70 ℃, and the treatment time is preferably 3-7 h;
(2) performing ultrasonic oscillation on the paste, polyethylene glycol, cellulose compounds, ethyl acetate and gasoline for 30-40min to obtain a special glue solution for waterproof coiled material construction, wherein the weight ratio of the paste, the polyethylene glycol, the cellulose compounds, the ethyl acetate and the gasoline is 20: 15: 0.3: 0.06: 0.2;
s5 pretreatment of waterproof coiled material
(1) Cutting the rubber sealing strip according to the length of the tiled roof, gradually flattening the waterproof coiled material, simultaneously adhering the rubber sealing strip coated with the special glue solution for waterproof coiled material construction to the edge of the waterproof coiled material to realize the connection of the rubber sealing strip and the waterproof coiled material, measuring the utilization length of the waterproof coiled material by using the rubber sealing strip, and cutting the waterproof coiled material by using a cutting tool;
(2) uniformly coating the side surface of the waterproof coiled material which is not bonded with the rubber sealing strip with the special glue solution for waterproof coiled material construction, stretching the waterproof coiled material, wherein one side coated with the special glue solution for waterproof coiled material construction is opposite to the roof base layer;
s6 laying waterproof roll
(1) Fully stretching the end part of the waterproof coiled material, ensuring that the end part of the waterproof coiled material is positioned at the opposite tail end of the laid roof, gradually attaching the end part of the waterproof coiled material to a roof base layer, matching with a leveling and rolling tool, performing press-fitting leveling on the waterproof coiled material, extruding bubbles from the side edge of the waterproof coiled material, and ensuring that the waterproof coiled material cannot be wrinkled by using a rubber sealing strip;
(2) the waterproof coiled materials are sequentially pasted, the adjacent waterproof coiled materials are tightly pasted through the rubber sealing strips, and the rubber sealing strips are matched with each other in a concave-convex mode, so that the tightness of the pasting gaps of the waterproof coiled materials is improved;
s7, follow-up examination of waterproof coiled material construction
(1) The surface inspection is carried out on the laid waterproof coiled material, the phenomena of damage and corner edge upwarp occur, and the waterproof coiled material needs to be repaired in time;
(2) repairing the damage of the waterproof coiled material by using a laminated laying mode, and simultaneously performing multilayer strengthening treatment on the damaged position by using a double-faced butyl lapping tape, a sand lapping tape and special node sealing paste;
(3) coating special glue solution for waterproof coiled material construction on the raised corner edge of the waterproof coiled material, adhering the raised corner edge of the waterproof coiled material to the roof base layer by pressing, and coating sealing paste on the corner edge for sealing;
s8, subsequent strengthening treatment of waterproof coiled material construction
The waterproof coating is evenly and flatly coated on the joints between the rubber sealing strips by using a coating tool, so that the waterproof performance of the laying gap of the waterproof coiled material is further enhanced;
s9 treatment of protruding buildings such as roof pipelines and piles
(1) The waterproof coiled material extends by 30mm-80mm, is cut according with the shape characteristics of the protruding buildings such as roof pipelines, piles and the like, ensures that the waterproof coiled material wraps the appropriate areas of the protruding buildings such as the roof pipelines, the piles and the like for bonding, and carries out multilayer reinforcement treatment by using double-faced butyl lapping adhesive tapes, sand lapping adhesive tapes and special joint sealing pastes;
(2) the joints of the waterproof coiled material and the parts protruding out of the building, such as the roof pipeline, the pile and the like, are tightly filled with cement mortar, the waterproof coiled material is kept stand until the cement mortar is dried, and sealing paste is coated at the joints for reinforcement.
2. The roof waterproof roll construction process applied to fabricated building construction according to claim 1, characterized in that: the fabricated building roof drying suitability can be detected by a manual detection method, and when the scratch speed is fast, the scratch has a hard feeling, the wire groove is shallow, and the cross line is white, the drying requirement is met.
3. The roof waterproof roll construction process applied to fabricated building construction according to claim 1, characterized in that: the width of the rubber sealing strip is 30mm-70mm, the height is 10mm, and the length of the rubber sealing strip is cut in sections according to the laying length of the roof waterproof roll.
4. The roof waterproof roll construction process applied to fabricated building construction according to claim 1, characterized in that: the construction time of the waterproof coiled material is strictly forbidden in rainy days, the construction at the temperature lower than 0 ℃ is not suitable, and the construction in high-temperature burning days is avoided in summer.
CN202011341014.1A 2020-11-25 2020-11-25 Roof waterproof coiled material construction process applied to assembly type building construction Pending CN112554447A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011341014.1A CN112554447A (en) 2020-11-25 2020-11-25 Roof waterproof coiled material construction process applied to assembly type building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011341014.1A CN112554447A (en) 2020-11-25 2020-11-25 Roof waterproof coiled material construction process applied to assembly type building construction

Publications (1)

Publication Number Publication Date
CN112554447A true CN112554447A (en) 2021-03-26

Family

ID=75043666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011341014.1A Pending CN112554447A (en) 2020-11-25 2020-11-25 Roof waterproof coiled material construction process applied to assembly type building construction

Country Status (1)

Country Link
CN (1) CN112554447A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341783A (en) * 2022-07-21 2022-11-15 黄建洲 Building surface waterproof SBS coiled material seepage repair car

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201635194U (en) * 2010-03-30 2010-11-17 彭真遇 Waterproof coiled material with sealing strips
CN203007763U (en) * 2012-11-14 2013-06-19 李建国 Waterproof roll with sealing function
US20140072751A1 (en) * 2012-09-13 2014-03-13 Seaman Corporation Waterproof membranes
CN104695486A (en) * 2013-12-04 2015-06-10 五冶集团上海有限公司 Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll
CN109337593A (en) * 2018-10-09 2019-02-15 芜湖融汇化工有限公司 Two-sided composite of water-proof coiled material construction glue of polyvinyl chloride and preparation method thereof
CN210195056U (en) * 2018-11-23 2020-03-27 彭鑫哲 Detail processing waterproof coiled material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201635194U (en) * 2010-03-30 2010-11-17 彭真遇 Waterproof coiled material with sealing strips
US20140072751A1 (en) * 2012-09-13 2014-03-13 Seaman Corporation Waterproof membranes
CN203007763U (en) * 2012-11-14 2013-06-19 李建国 Waterproof roll with sealing function
CN104695486A (en) * 2013-12-04 2015-06-10 五冶集团上海有限公司 Construction method of basement roof polyvinyl chloride root thorn resistance waterproof roll
CN109337593A (en) * 2018-10-09 2019-02-15 芜湖融汇化工有限公司 Two-sided composite of water-proof coiled material construction glue of polyvinyl chloride and preparation method thereof
CN210195056U (en) * 2018-11-23 2020-03-27 彭鑫哲 Detail processing waterproof coiled material

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341783A (en) * 2022-07-21 2022-11-15 黄建洲 Building surface waterproof SBS coiled material seepage repair car
CN115341783B (en) * 2022-07-21 2024-01-26 广东中孚建设有限公司 Building surface waterproof SBS coiled material leakage repairing vehicle

Similar Documents

Publication Publication Date Title
CN101158213B (en) Exterior outer-insulating system construction method for using direct-compress EPS inorganic clad plate
CN109779162B (en) Passive building flat roof heat-insulating waterproof system and partition type dry operation construction method
CN102797297A (en) Solar power generation composite waterproof self-adhesive coiled material and construction method thereof
CN201474265U (en) EPS decorative strip structure
CN112081146A (en) Construction method of polymer self-adhesive film waterproof coiled material capable of being constructed in rainy season
CN101250928A (en) Roof covering water-proof structure and manufacturing method thereof
KR102261398B1 (en) manufacturing method of Complex waterproofing layer
CN104251042A (en) Roof waterproof construction method
CN112554447A (en) Roof waterproof coiled material construction process applied to assembly type building construction
CN104612254A (en) Reaction joining waterproof roll paving waterproof construction method
CN112112369A (en) Thermal-insulating waterproof layer for roof and its dry construction method
CN111173284A (en) Seepage-proofing construction method for cast-in-situ outer wall of basement
CN104762999A (en) Self-adhesion coiled material underground waterproof construction method
CN203080724U (en) Building outer wall outer waterproof structure
CN111441391A (en) CBF reaction bonding macromolecule waterproof coiled material construction method
CN109723475B (en) Waterproof single-layer lining spraying waterproof construction process for hard rock tunnel and application of waterproof single-layer lining spraying waterproof construction process
KR101571999B1 (en) Construction Method Of Wallpaper Using Lining Paper
CN111287347A (en) External wall heat insulation construction method
CN201128995Y (en) Direct applying type ESP composite board and exterior wall external insulation system thereof
CN216740110U (en) Be used for waterproofing membrane reentrant corner additional layer structure
CN211974089U (en) Upright steel roof waterproof structure
JP4046410B2 (en) Waterproof repair method for building rooftops
CN109898758A (en) Cement mortar pastes the construction method that BAC waterproof roll elder generation screed-coat does waterproof layer again
US20210207337A1 (en) Below grade, blind side, waterproofing sheet membrane with adhesive and high reflectivity granular particle layer to fully bond to concrete/shotcrete, and a method of making, and using same
CN112267788A (en) Construction method of waterproof and steam-proof film on inner side of door and window frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210326