CN101250928A - Roof covering water-proof structure and manufacturing method thereof - Google Patents

Roof covering water-proof structure and manufacturing method thereof Download PDF

Info

Publication number
CN101250928A
CN101250928A CNA2008100357935A CN200810035793A CN101250928A CN 101250928 A CN101250928 A CN 101250928A CN A2008100357935 A CNA2008100357935 A CN A2008100357935A CN 200810035793 A CN200810035793 A CN 200810035793A CN 101250928 A CN101250928 A CN 101250928A
Authority
CN
China
Prior art keywords
coiled material
waterproofing course
layer
roof
waterproof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100357935A
Other languages
Chinese (zh)
Inventor
李德生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANGSHAN DESHENG WATER-PROOFING MATERIAL Co Ltd
Original Assignee
TANGSHAN DESHENG WATER-PROOFING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANGSHAN DESHENG WATER-PROOFING MATERIAL Co Ltd filed Critical TANGSHAN DESHENG WATER-PROOFING MATERIAL Co Ltd
Priority to CNA2008100357935A priority Critical patent/CN101250928A/en
Publication of CN101250928A publication Critical patent/CN101250928A/en
Pending legal-status Critical Current

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention provides a roof waterproof structure and a manufacturing method thereof, i.e. a roof waterproof structure with double defence and a manufacturing method thereof. In order to solve the problem of roof water resistance, the roof waterproof structure adopts a waterproof structure form with double defence. Moreover, the roof waterproof structure comprises a roof panel substrate, an insulation layer, a leveling layer and a waterproof layer, wherein a bottom waterproof layer is laid down on the roof panel substrate; the insulation layer is arranged on the bottom waterproof layer; the leveling layer is arranged on the insulation layer and then a surface layer waterproof layer is laid down on the insulation layer. The manufacturing method adopts a 'dry laying method' or a 'wet laying method'. The roof waterproof structure and the manufacturing method thereof solve the waterproof problem of a thermal-insulation roof and eliminate the common fault of the prior waterproof technology.

Description

Roof covering water-proof structure and manufacture method thereof
Technical field
The present invention relates to a kind of roof covering water-proof structure and manufacture method thereof, particularly relate to roof covering water-proof structure and manufacture method thereof that a kind of two pass is set up defences.
Background technology
Roof leakage is the generality persistent ailment on puzzlement building circle, government, industry and broad masses relatively pay close attention at present, each R﹠D institution and China and foreign countries producer have also developed many waterproof materials, and the method for multiplexing has perhaps also been summed up by relevant unit, department, but does not all stop leakage problems fully.There is the waterproofing course in the roofworks system of insulation layer to divide positively fixed type and inversion type now; Material has macromolecule coiled material, modified asphalt waterproof coiled material, self-adhering rubber class coiled material, water-repellent paint etc.; Worker's method branch: coiled material class cold bonding method, hot sticky method, wet shop method, hot melt, mechanical Fixing Method, empty shop method etc.; Coating mainly is to brush and spraying.Its significant advantage is all arranged, but its fatal shortcoming is also arranged.Reason is quite complicated: existing structure designs irrational reason, and the reason of material, worker's law limitation is also arranged.Causing in the present new construction maximum also is the common fault of difficult smelting.The positively fixed type structural roofing waterproof system is to do waterproof on insulation layer, and structure is top board-insulation layer-leveling layer-waterproofing course; If any one seepage is arranged, water can be directly the arrival insulation layer, water can be scurried any position to the roof, and flows to cracks on floor slab and leak down, and causes seepage; Not only be difficult to find leak source, and insulation layer soaks and can cause insulation failure.Inverted roof waterproof system is promptly done waterproof under insulation layer, structure is top board basic unit-leveling layer-waterproofing course-insulation layer-topping successively; Topping on the insulation layer waterproof effect that is equal to nothing in fact, in case cracking, water will bulk deposition in insulation layer; Even waterproofing course is effectively non-leakage, insulation layer had also thoroughly lost efficacy.
Summary of the invention
The purpose of this invention is to provide a kind of roof covering water-proof structure, the roof covering water-proof structure that just provides a kind of two pass to set up defences.In order to solve the problem of roof waterproof, the waterproof construction form that roof covering water-proof structure of the present invention adopts two pass to set up defences.
The invention solves the problem of waterproofing and thermal insulation of roofing, remedied the deficiency of prior art waterproof effect difference.
A kind of roof covering water-proof structure of the present invention comprises roof panel basic unit, insulation layer, leveling layer and waterproofing course, lays the bottom waterproofing course in the described roof panel basic unit, and insulation layer places on the bottom waterproofing course, is leveling layer on the insulation layer, and then lays the surface layer waterproofing course.
As optimized technical scheme:
Aforesaid a kind of roof covering water-proof structure, wherein, described roof panel basic unit can be prefabricated room panel, cast in place concrete plate, metal sheet or layer of wood panel.
Aforesaid a kind of roof covering water-proof structure, wherein, described bottom waterproofing course is a PVC self-adhesive coiled material waterproofing course.
Aforesaid a kind of roof covering water-proof structure, wherein, described surface layer waterproofing course is TPO or increases ageing-resistant PVC self-adhesive coiled material waterproofing course that described surface layer waterproofing course is shallow white or colour.
Aforesaid a kind of roof covering water-proof structure, wherein, described leveling layer has the steam discharge ditch, 2-5 centimetre of steam discharge furrow width, transverse row channeling spacing 4-6 rice is communicated with by a vertical steam discharge ditch, to exhaust ditch infall gland steam exhauster is being set in length and breadth.
Another object of the present invention provides a kind of manufacture method of roof covering water-proof structure, and the manufacture method of the roof covering water-proof structure that a kind of two pass sets up defences just is provided.
A kind of manufacture method of roof covering water-proof structure is called for short " doing the shop method ", may further comprise the steps:
(1) roof panel base treatment;
(2) smear leveling layer;
(3) position of joints is done double-sided self-adhesive coiled material extra play;
(4) coiled material location;
(5) lay big face coiled material, open barrier paper, alignment fiducials line shop is sticking, the Bian Pu limit with pressure roller from the centre to the both sides exhaust air, bonding is firmly;
(6) coiled material overlap joint;
(7) position of joints is done and is strengthened handling;
(8) receive the sealing of head position;
(9) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(10) go up insulation layer;
(11) smear leveling layer;
(12) do the surface layer waterproofing course, repeat (3)-(9) step.
The present invention also provides the manufacture method of another kind of roof covering water-proof structure, is called for short " wet shop method ", may further comprise the steps:
(1) roof panel base treatment, basic unit should be solid, clean, moistening, no open fire;
(2) coiled material location;
(3) scrape and smear lean concrete grout, thickness 3-15mm;
(4) the sticking coiled material in shop adopts the shop method of rolling, and air between coiled material and the cement paste is discharged with trowel or scraper plate in the Bian Pu limit
(5) coiled material overlap joint;
(6) position of joints is strengthened handling;
(7) receive the sealing of head position;
(8) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(9) go up insulation layer;
(10) smear leveling layer;
(11) do the surface layer waterproofing course, repeat (2)-(8) step.
Foregoing two kinds of methods, wherein, described coiled material overlap joint can be selected rendezvous method or splicing processes for use.Rendezvous method: the sticking duration minor face in coiled material shop all adopts docking mode, the docking site can adopt the self-adhesive layer of double-sided self-adhesive weather strip and self-adhesive coiled material bonding, the technology of seam crossing brushing sealing compound also can select for use general T PO, the PVC coiled material bar of not being with the self-adhesion glue-line to weld with two width of cloth coiled materials respectively.Splicing processes is promptly selected for use and is reserved self-adhesion TPO, the PVC coiled material that 10CM does not have self-adhesive.Adopt the hot blast welding procedure, will long edge lap layer welded together, the coiled material minor face adopts the docking mode construction.
Foregoing two kinds of methods, wherein, described receipts head position sealing be meant waterproof roll receive the head place with metal bead add steel nail, the screw mechanical Fixing Method is fixed, the sealing compound edge sealing.
Foregoing two kinds of methods, wherein, described bottom waterproof is stretched out between roofing position and the upper strata waterproofing course and is bonded together, and makes and forms an integral body between the levels waterproof.
The present invention proposes a kind of two pass sets up defences, one exposes a built-in roof covering water-proof structure system.Employing integrates self-adhering rubber macromolecule (TPO, the PVC) waterproof roll of high score subclass coiled material and self-adhering rubber class coiled material advantage, high score subclass coiled material mechanical fixation, welding procedure had both been absorbed, the self-adhering rubber coiled material is done the waterproof system and the job practices of shop, the advanced worker's method of wet shop method advantage, has solved following several roads waterproof difficult problem:
1. waterproof is damaged if waterproofing course solves positively fixed type roofing top layer utilize to increase bottom (on the top board, under the insulation layer), and water leaks to cause to the insulation layer scurries water, is difficult for seeking the difficult problem of leakage point.
2. utilize to increase the bottom waterproofing course and solve in the rainy season construction of positively fixed type roofing, in case it is too high and the duration does not allow holder to prolong to meet rain insulation layer moisture content, the long-term seepage difficult problem that causes of waterproof construction by force.
3. utilization increases the moisture in the bottom waterproofing course isolating chamber, solves indoor moisture and arrives in the insulation layer by the top board slit, leaks an into indoor difficult problem in case the chance cold day condenses into the water reverse osmosis.
4. utilize the two pass of the present invention system that sets up defences to solve the inverted roof rainwater and be stored in a large number in the insulation layer easily, causing increases a roofing load and an insulation layer inefficacy difficult problem.
5. utilize the self-adhesive rubber asphalt material behavior of self-adhesion TPO or self-adhesion PVC waterproof roll: promptly high extension, self-healing property and creep properties solve full bonding waterproofing course " zero " when building cracks (basic unit's drying shrinkage seam, settlement crack, temperature deformation seam etc.) occurring and extend the leakage problems that occurs.
6. the self-adhering rubber layer self-healing property that utilizes self-adhesion TPO, PVC waterproof roll in conjunction with self-adhesive coiled material do that shop, wet lay-up technique solve that traditional empty shop method, bar are sticking, in case the unreal waterproofing course that causes of bonding is scurried the shipwreck topic by what accidental damage caused during the sticking method of point.
7. utilize high-strength, high-elastic, the endurable thorn of TPO, PVC, corrosion-resistant, anti-aging (the TPO raw material of TPO employing Dupont, plasticizer-containing not, do not have plasticizing agent delay, ooze out problem of aging, being known as by the anti-hydrosphere in the world can be anti-aging more than 50 years, the PVC exposed conveying appliance can be anti-aging more than 20 years after having added age resister) etc. characteristic solve difficult problem service life of waterproofing materials.
8. utilize the plastics class waterproof roll characteristic of bottom self-adhesion TPO or PVC coiled material: promptly plastics are embedded in underground 100 years and also do not decompose aging characteristics, reach the permanent waterproof effect.
9. utilize the heat sealable welding characteristic of TPO, PVC waterproof roll, adopt hot blast automatic welding machine welding scrap (bridge) technology and facade or sealing machine technique for fixing, whole waterproofing course is connected as a single entity, solve the globality difference difficult problem of waterproofing course.
10. utilize TPO or PVC coiled material can make shallow white or color characteristic, solve energy-conservation purpose or polychromy purpose that roofing flashes back the sunlight.
The present invention is the aspect waterproof scheme that the two pass of waterproofing course is set up defences with self-adhesion TPO, PVC waterproof roll, on roof panel, do non-exposed conveying appliance single side self PVC coil waterproof layer, being insulation layer, leveling layer above, is exposed conveying appliance single side self TPO or PVC coil waterproof layer at last.Form the perfect waterproof system that two pass is set up defences.The described non-self-adhering rubber PVC coiled material that exposes is not for adding the coiled material of anti-aging function.Mainly be to consider cost performance, to be embedded in underground 100 years also aging for the plastics based sheet as everybody knows, so need not anti-aging function.Insulation layer can be all heat insulating materials of existing compliant.To expose waterproofing course be single side self TPO coiled material or increase ageing-resistant self-adhesion PVC coiled material.Self-adhesion TPO, PVC coiled material can be reserved the overlap edge that 10CM does not have the self-adhesion bed of material, with the welding of hot gas welding connection; Can not stay yet, bonding with the double-sided self-adhesive sealing joint strip in bottom.Exposing waterproofing course can be shallow white or colored self-adhesion TPO or PVC coiled material.All need to do double-sided self-adhesive at position of joints during construction of waterproof layer that two pass is set up defences tire or Padless coiled material extra play are arranged.Expose and need not to do topping on the waterproofing course.Roof system can be bonding up and down with the PVC waterproof roll of double-sided belt self-adhesion glue-line if when making accessible roof, and crack-resistant layer is all arranged up and down.Roof system is applicable to the Roof system of band insulation layer.Roof system need adopt the steam discharge roof structure.
The invention has the beneficial effects as follows:
1. waterproof roll firm (TPO, PVC) gentle (creep type, rubber self adhesive material) helps mutually.It is high-elastic, high-strength, ageing-resistant to have absorbed high score subclass coiled material (TPO, PVC) fully, and advantage and rubber asphalt self-adhesive coiled material that endurable thorn, corrosion-resistant weldable connect highly extend, crack resistance is strong, the advantage of self-healing property, easy construction.Avoided the intensity of the bonding difficult problem of macromolecule coiled material and self-adhesive coiled material low, shrinkage is big, the shortcoming of anti-puncture ability.
2. of the present inventionly expose self-adhesion TPO or PVC waterproof roll layer need not to do topping, can make shallow white or colour.It is energy-saving and cost-reducing that shallow white energy reflection and heat insulation is stopped the roofing heat island effect; The colored effect that can play the decoration roofing.
3. the present invention is in the upper and lower two-layer theory of setting up defences of insulation layer, thoroughly solved the persistent ailment in the roofing system of traditional band insulation layer.Bottom waterproofing course of the present invention be waterproofing course also be vapour barrier, can stop within doors moisture to enter roofing system by top board.In case outside air temperature is extremely low, steam can condense into the globule or freeze, and can leak into indoor by reverse osmosis in the course of time.
4. the present invention can effect a radical cure in the rainy season construction, and insulation layer is met rainy day ponding, and must do the problem of waterproofing course in order to try to meet the deadline for the project.In the reality roofing at last insulation layer, smear leveling layer during, seldom can not meet the rainy day.In a single day and meet rain, the water in the insulation layer, some months are not done yet, the strange phenomenon that does not usually rain and leak yet.The bottom waterproofing course can thoroughly be blocked from water and moisture up and down.Even meeting rain, is not afraid of roofing heat-insulating layer yet.Roofing generally all is the steam discharge roofing now, and the water of insulation layer can slowly be vaporized and be drained.The construction difficult problem of puzzlement building circle's centuries is readily solved.
5. bottom waterproof of the present invention adopts PVC or TPO coiled material, all belongs to high molecule plastic class coiled material.The plastics class coiled material that everybody generally acknowledges is embedded in underground 100 years and also can wear out, decomposes.And the self-adhering rubber layer has extremely strong creep self-healing adhesive property, can resist and heal from the crack of basic unit.Just on the building insurance, can reach and the same life-span of building.
6. the present invention recommends bottom to adopt self-adhesion PVC from the cost performance angle, and surface layer (outlier) adopts the TPO coiled material.The TPO coiled material is in all high score subclass coiled materials, universally acknowledged best anti-aging kind, and the anti-aging time limit is more than 50 years.And adopt the hot gas welding connection technology, whole roofing can be formed an integral body.
Description of drawings
Fig. 1 is the schematic diagram of a kind of roof covering water-proof structure of the present invention
Wherein 1 is that surface layer waterproofing course 2 is insulation layer for leveling layer 3
4 is that bottom waterproofing course 5 is roof panel basic unit
The specific embodiment
Below in conjunction with the specific embodiment, further set forth the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
Embodiment one:
As shown in Figure 1, a kind of roof covering water-proof structure of the present invention, the roof covering water-proof structure that just a kind of two pass is set up defences, comprise roof panel basic unit 5, insulation layer 3, leveling layer 2 and waterproofing course 4, lay bottom waterproofing course 4 in the described roof panel basic unit 5, insulation layer 3 places on the bottom waterproofing course 4, is leveling layer 2 on the insulation layer 3, and then lays surface layer waterproofing course 1; Roof panel basic unit 5 is cast in place concrete plate, bottom waterproofing course 4 is PVC self-adhesive coiled material waterproofing courses, surface layer waterproofing course 1 is a TPO self-adhesive coiled material waterproofing course, surface layer waterproofing course 1 is shallow white, leveling layer 2 has the steam discharge ditch, 2 centimetres of steam discharge furrow widths, 4 meters of transverse row channeling spacings, be communicated with by a vertical steam discharge ditch, to exhaust ditch infall gland steam exhauster be set in length and breadth.
A kind of manufacture method of roof covering water-proof structure just provides the manufacture method of the roof covering water-proof structure that a kind of two pass sets up defences, and is called for short " doing the shop method ", may further comprise the steps:
(1) roof panel basic unit 5 handles;
(2) smear leveling layer 2;
(3) position of joints is done double-sided self-adhesive coiled material extra play;
(4) coiled material location;
(5) lay big face coiled material, open barrier paper, alignment fiducials line shop is sticking, the Bian Pu limit with pressure roller from the centre to the both sides exhaust air, bonding is firmly;
(6) coiled material overlaps with rendezvous method;
(7) position of joints is done and is strengthened handling;
(8) receive the sealing of head position;
(9) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(10) go up insulation layer 3;
(11) smear leveling layer 2;
(12) do surface layer waterproofing course 1, repeat (3)-(9) step.
Receive the sealing of head position be meant waterproof roll receive the head place with metal bead add steel nail, the screw mechanical Fixing Method is fixed, the sealing compound edge sealing, the bottom waterproof is stretched out between roofing position and the upper strata waterproofing course and is bonded together, and makes and forms an integral body between the levels waterproof.
Embodiment two:
As shown in Figure 1, a kind of roof covering water-proof structure of the present invention, the roof covering water-proof structure that just a kind of two pass is set up defences, comprise roof panel basic unit 5, insulation layer 3, leveling layer 2 and waterproofing course 4, lay bottom waterproofing course 4 in the described roof panel basic unit 5, insulation layer 3 places on the bottom waterproofing course 4, is leveling layer 2 on the insulation layer 3, and then lays surface layer waterproofing course 1; Roof panel basic unit 5 is cast in place concrete plate, bottom waterproofing course 4 is PVC self-adhesive coiled material waterproofing courses, surface layer waterproofing course 1 is for increasing ageing-resistant PVC self-adhesive coiled material waterproofing course, surface layer waterproofing course 1 is colored, leveling layer 2 has the steam discharge ditch, 5 centimetres of steam discharge furrow widths, 6 meters of transverse row channeling spacings, be communicated with by a vertical steam discharge ditch, to exhaust ditch infall gland steam exhauster be set in length and breadth.
The present invention also provides the manufacture method of another kind of roof covering water-proof structure, is called for short " wet shop method ", may further comprise the steps:
(1) roof panel basic unit 5 handles, and basic unit should be solid, clean, moistening, no open fire;
(2) coiled material location;
(3) scrape and smear lean concrete grout, thickness 10mm;
(4) the sticking coiled material in shop adopts the shop method of rolling, and air between coiled material and the cement paste is discharged with trowel or scraper plate in the Bian Pu limit
(5) coiled material overlaps with splicing processes;
(6) position of joints is strengthened handling;
(7) receive the sealing of head position;
(8) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(9) go up insulation layer 3;
(10) smear leveling layer 2;
(11) do surface layer waterproofing course 1, repeat (2)-(8) step.
Receive the sealing of head position be meant waterproof roll receive the head place with metal bead add steel nail, the screw mechanical Fixing Method is fixed, the sealing compound edge sealing, the bottom waterproof is stretched out between roofing position and the upper strata waterproofing course and is bonded together, and makes and forms an integral body between the levels waterproof.
Through evidence, the roof covering water-proof structure that the present invention has adopted two pass to set up defences, rational in infrastructure, manufacture method is simple and easy to do.The invention solves the problem of waterproofing and thermal insulation of roofing, remedied the deficiency of prior art waterproof effect difference.The present invention proposes a kind of two pass sets up defences, one exposes a built-in roof covering water-proof structure system.Employing integrates self-adhering rubber macromolecule (TP0, the PVC) waterproof roll of high score subclass coiled material and self-adhering rubber class coiled material advantage, high score subclass coiled material mechanical fixation, welding procedure had both been absorbed, the self-adhering rubber coiled material is done the waterproof system and the job practices of shop, the advanced worker's method of wet shop method advantage, has solved a waterproof difficult problem.

Claims (10)

1. roof covering water-proof structure, comprise roof panel basic unit, insulation layer, leveling layer and waterproofing course, it is characterized in that: lay the bottom waterproofing course in the described roof panel basic unit, insulation layer places on the bottom waterproofing course, be leveling layer on the insulation layer, and then lay the surface layer waterproofing course.
2. a kind of roof covering water-proof structure as claimed in claim 1 is characterized in that, described roof panel basic unit can be prefabricated room panel, cast in place concrete plate, metal sheet or wooden roof panel.
3. a kind of roof covering water-proof structure as claimed in claim 1 is characterized in that, described bottom waterproofing course is a PVC self-adhesive coiled material waterproofing course.
4. a kind of roof covering water-proof structure as claimed in claim 1 is characterized in that, described surface layer waterproofing course is TPO or increases ageing-resistant PVC self-adhesive coiled material waterproofing course that described surface layer waterproofing course is shallow white or colour.
5. a kind of roof covering water-proof structure as claimed in claim 1 is characterized in that described leveling layer has the steam discharge ditch, 2-5 centimetre of steam discharge furrow width, and laterally steam discharge ditch spacing 4-6 rice is communicated with by a vertical steam discharge ditch, to exhaust ditch infall gland steam exhauster is being set in length and breadth.
6. the manufacture method of a roof covering water-proof structure (do shop method) may further comprise the steps:
(1) roof panel base treatment;
(2) smear leveling layer;
(3) position of joints is done double-sided self-adhesive coiled material extra play;
(4) coiled material location;
(5) lay big face coiled material, open barrier paper, alignment fiducials line shop is sticking, the Bian Pu limit with pressure roller from the centre to the both sides exhaust air, bonding is firmly;
(6) coiled material overlap joint;
(7) position of joints is done and is strengthened handling;
(8) receive the sealing of head position;
(9) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(10) go up insulation layer;
(11) smear leveling layer;
(12) do the surface layer waterproofing course, repeat (3)-(9) step.
7. the manufacture method of a roof covering water-proof structure may further comprise the steps:
(1) roof panel base treatment;
(2) coiled material location;
(3) scrape and smear lean concrete grout, thickness 3-15mm;
(4) the sticking coiled material in shop adopts the shop method of rolling, and air between coiled material and the cement paste is discharged with trowel or scraper plate in the Bian Pu limit;
(5) coiled material overlap joint;
(6) position of joints is strengthened handling;
(7) receive the sealing of head position;
(8) check and accept, keep away water test, 24h is non-leakage to be qualified, then water is discharged;
(9) go up insulation layer;
(10) smear leveling layer;
(11) do the surface layer waterproofing course, repeat (2)-(8) step.
8. as claim 6 or 7 described methods, it is characterized in that: described coiled material overlap joint can be selected rendezvous method or splicing processes for use.
9. as claim 6 or 7 described methods, it is characterized in that: described receipts head position sealing be meant waterproof roll receive the head place with metal bead add steel nail, the screw mechanical Fixing Method is fixed, the sealing compound edge sealing.
10. as claim 6 or 7 described methods, it is characterized in that: described bottom waterproof is stretched out between roofing position and the upper strata waterproofing course and is bonded together, and makes and forms an integral body between the levels waterproof.
CNA2008100357935A 2008-04-09 2008-04-09 Roof covering water-proof structure and manufacturing method thereof Pending CN101250928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100357935A CN101250928A (en) 2008-04-09 2008-04-09 Roof covering water-proof structure and manufacturing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100357935A CN101250928A (en) 2008-04-09 2008-04-09 Roof covering water-proof structure and manufacturing method thereof

Publications (1)

Publication Number Publication Date
CN101250928A true CN101250928A (en) 2008-08-27

Family

ID=39954507

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100357935A Pending CN101250928A (en) 2008-04-09 2008-04-09 Roof covering water-proof structure and manufacturing method thereof

Country Status (1)

Country Link
CN (1) CN101250928A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831994A (en) * 2010-04-30 2010-09-15 唐山德生防水材料有限公司 Double-layer waterproof and double-layer water exhaust structure of heat insulation house surface and construction method thereof
CN103184784A (en) * 2011-12-30 2013-07-03 五冶集团上海有限公司 Method for paving roof asphalt felt tiles
CN103276857A (en) * 2013-05-14 2013-09-04 中天建设集团有限公司 Secondary water repellent treatment technology of metal roof
CN103806609A (en) * 2012-11-06 2014-05-21 成军 Construction method of double-faced self-adhesion waterproof roll
CN103866926A (en) * 2012-12-17 2014-06-18 上海建工五建集团有限公司 Building roof heat insulation structure
CN104295009A (en) * 2014-10-15 2015-01-21 苏州工业园区设计研究院股份有限公司 Deformation joint structure of planted roof
CN106436928A (en) * 2016-11-16 2017-02-22 中冶建筑研究总院有限公司 Waterproof construction method for plastic stone rockery and waterproof structure
CN108979017A (en) * 2018-06-12 2018-12-11 江苏兴厦建设工程集团有限公司 A kind of concave curved surface roof covering water-proof structure and its building technology
CN109184211A (en) * 2018-10-16 2019-01-11 安增麦 A kind of roof construction method of polyethylene polypropylene fiber waterproof coiled material
CN109208798A (en) * 2018-10-12 2019-01-15 中国建筑第四工程局有限公司 A kind of the heat insulating and sound insulating anti-seepage construction method and structure of floor
CN111058573A (en) * 2019-12-10 2020-04-24 杭州宝力体育设施工程有限公司 Waterproof roof and construction method thereof
CN113597983A (en) * 2021-07-15 2021-11-05 南通木易永华景观工程有限公司 Three-dimensional greening method for building slope on roof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831994A (en) * 2010-04-30 2010-09-15 唐山德生防水材料有限公司 Double-layer waterproof and double-layer water exhaust structure of heat insulation house surface and construction method thereof
CN101831994B (en) * 2010-04-30 2013-04-10 唐山德生防水股份有限公司 Double-layer waterproof and double-layer water exhaust structure of heat insulation house surface and construction method thereof
CN103184784A (en) * 2011-12-30 2013-07-03 五冶集团上海有限公司 Method for paving roof asphalt felt tiles
CN103806609A (en) * 2012-11-06 2014-05-21 成军 Construction method of double-faced self-adhesion waterproof roll
CN103866926A (en) * 2012-12-17 2014-06-18 上海建工五建集团有限公司 Building roof heat insulation structure
CN103276857A (en) * 2013-05-14 2013-09-04 中天建设集团有限公司 Secondary water repellent treatment technology of metal roof
CN104295009A (en) * 2014-10-15 2015-01-21 苏州工业园区设计研究院股份有限公司 Deformation joint structure of planted roof
CN106436928A (en) * 2016-11-16 2017-02-22 中冶建筑研究总院有限公司 Waterproof construction method for plastic stone rockery and waterproof structure
CN108979017A (en) * 2018-06-12 2018-12-11 江苏兴厦建设工程集团有限公司 A kind of concave curved surface roof covering water-proof structure and its building technology
CN109208798A (en) * 2018-10-12 2019-01-15 中国建筑第四工程局有限公司 A kind of the heat insulating and sound insulating anti-seepage construction method and structure of floor
CN109184211A (en) * 2018-10-16 2019-01-11 安增麦 A kind of roof construction method of polyethylene polypropylene fiber waterproof coiled material
CN111058573A (en) * 2019-12-10 2020-04-24 杭州宝力体育设施工程有限公司 Waterproof roof and construction method thereof
CN113597983A (en) * 2021-07-15 2021-11-05 南通木易永华景观工程有限公司 Three-dimensional greening method for building slope on roof

Similar Documents

Publication Publication Date Title
CN101250928A (en) Roof covering water-proof structure and manufacturing method thereof
CN101994399B (en) Method for repairing leaked coiled-material water-proof roof
CN201695580U (en) Inverted roof structure
US9719247B2 (en) Reinforced water-resistant board with traffic coat
CN205399843U (en) Roofing system structure
CN104264717A (en) Basement rigid material and flexible material combined waterproof construction method
CN106988489A (en) A kind of implementation method of roofing system structure
CN102003190B (en) Construction method for pre-laying tunnel waterproof coiled material
CN1821503A (en) Water leak-proof structure for building floor or roof deformation seam
CN110130518A (en) A kind of passive type building basement exterior wall heat-preserving construction method
CN107338967A (en) A kind of new technology and new material of aging blocks outdoor tile facing renewal and reform
CN108915163A (en) A kind of roof heat insulation system structure
CN101761194B (en) Roof waterproof structure and manufacture method thereof
CN112112369A (en) Thermal-insulating waterproof layer for roof and its dry construction method
CN2876207Y (en) Water leakage proof structure of floor surface or roof surface deformed seam
CN112695959A (en) Passive heat-bridge-free slope roof 300 mm-thick heat-insulation and decoration integrated construction process
CN201826858U (en) Reaction bonding type sealing waterproof roll material for tunnel pre-paving
CN208396162U (en) A kind of thermal isolation by water storage roofing
CN108894436A (en) A kind of composite heat-insulation roof structure and its implementation
CN207776290U (en) A kind of horizontal type water for flat roof waterproof system falls mouth structure
CN208733944U (en) A kind of metal roofing structure
US20190390456A1 (en) Reinforced water-resistant board with traffic coat
RU2728045C1 (en) Method of overhaul of flat roofing by covering with panels
CN111456333A (en) Construction process of small green tile roof with wood base layer
CN201695527U (en) Wet felting elastomer modified asphalt waterproof coiled material

Legal Events

Date Code Title Description
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Teng Xue

Document name: Notification of Passing Preliminary Examination of the Application for Invention

C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080827