CN112554141A - Accident gate fixed winch type opening and closing machine room structure convenient to overhaul - Google Patents

Accident gate fixed winch type opening and closing machine room structure convenient to overhaul Download PDF

Info

Publication number
CN112554141A
CN112554141A CN202011359204.6A CN202011359204A CN112554141A CN 112554141 A CN112554141 A CN 112554141A CN 202011359204 A CN202011359204 A CN 202011359204A CN 112554141 A CN112554141 A CN 112554141A
Authority
CN
China
Prior art keywords
side wall
gate
steel
machine room
hoist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011359204.6A
Other languages
Chinese (zh)
Inventor
莫如军
罗乾坤
王波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN202011359204.6A priority Critical patent/CN112554141A/en
Publication of CN112554141A publication Critical patent/CN112554141A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/26Vertical-lift gates
    • E02B7/36Elevating mechanisms for vertical-lift gates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Abstract

The invention discloses an accident gate fixed winch type hoist engine room structure convenient to overhaul, belongs to the field of hydraulic and hydroelectric engineering, and provides an accident gate fixed winch type hoist engine room structure convenient to hoist and overhaul a fixed winch type hoist and a gate; the emergency gate comprises an emergency gate, a gate slot, a fixed winch hoist arranged above the gate slot, an upstream side bent frame, a downstream side bent frame and a machine room; the computer lab includes top cap, upstream side wall, downstream side wall, left side wall, right side wall and bottom plate, is provided with the logical groove that link up about corresponding with the gate passageway on the bottom plate, is provided with respectively on left side wall and right side wall and link up from top to bottom and detachable steel construction lateral wall with the width unanimity of gate passageway. The invention solves the hoisting problem in the installation, maintenance and replacement processes of the emergency gate and the fixed winch hoist, and has safe and reliable structure, convenient equipment maintenance and lower overall cost.

Description

Accident gate fixed winch type opening and closing machine room structure convenient to overhaul
Technical Field
The invention relates to the field of hydraulic and hydroelectric engineering, in particular to an accident gate fixed winch type hoist machine room structure convenient to overhaul.
Background
The accident gate of the water conservancy and hydropower engineering refers to a gate which can rapidly cut off water flow in flowing water so as to treat or restrain accidents occurring at the downstream of a water channel. For special requirements of quickly cutting off water flow, an accident gate generally requires a fixed winch hoist or a hydraulic hoist to be used as hoist equipment. However, since hydraulic hoist engines are expensive, owners generally prefer to use relatively inexpensive fixed hoist hoists. However, fixed hoist hoists are often placed in specially constructed hoist machine rooms. Usually, under the condition of small hoisting weight, the hoist machine room, the corresponding bent frames and the like can adopt steel structures which are convenient to disassemble and maintain; so as to be convenient for hanging out the fixed winch hoist, the gate and the like for maintenance through the travelling crane. However, under the condition of very large hoisting weight, the hoist machine room and the corresponding bent frame and other structures often have to adopt reinforced concrete structures to ensure the structural strength for supporting the fixed hoisting hoist, and at the moment, when the fixed hoisting hoist or the emergency gate needs to be integrally replaced or overhauled outdoors, the hoisting and transportation of the hoist and the gate are very difficult.
Disclosure of Invention
The invention solves the technical problem of providing an accident gate fixed winch hoist room structure which is convenient to overhaul and is convenient for hoisting and overhauling operation of a fixed winch hoist and a gate.
The technical scheme adopted by the invention for solving the technical problems is as follows: the fixed-winch type hoist machine room structure comprises an accident gate, a gate slot, a fixed-winch type hoist arranged above the gate slot, an upstream side bent frame, a downstream side bent frame and a machine room, wherein the fixed-winch type hoist is connected with the accident gate through a cable; the machine room is arranged on the upstream side bent frame and the downstream side bent frame and comprises a top cover, an upstream side wall, a downstream side wall, a left side wall, a right side wall and a bottom plate, wherein a left-right through groove corresponding to the gate channel is formed in the bottom plate; the fixed hoisting hoist is arranged on a bottom plate in the machine room.
Further, the method comprises the following steps: the through groove of the bottom plate is provided with a detachable steel cover plate.
Further, the method comprises the following steps: first embedded angle steel is arranged at the edge of the through groove of the bottom plate, and a step for installing the steel cover plate in an overlapping mode is formed through the first embedded angle steel.
Further, the method comprises the following steps: the upper stream side wall and the lower stream side wall which correspond to the edge parts of the left side and the right side of the gate channel are provided with detachable steel beams, and the upper stream side wall and the lower stream side wall are connected at two ends of the steel beams.
Further, the method comprises the following steps: at least one steel beam is arranged along the vertical direction at intervals.
Further, the method comprises the following steps: and two ends of the steel beam are respectively connected with steel embedded parts embedded in the upstream side wall and the downstream side wall through bolts.
Further, the method comprises the following steps: the upstream side wall and the downstream side wall are of reinforced concrete structures, the steel embedded part comprises an external steel member and embedded joint bars, the embedded joint bars are embedded in the corresponding reinforced concrete structures and connected with internal steel bars, and one end of each embedded joint bar is connected with the external steel member outside the reinforced concrete structures; the external steel member is connected with the end of the steel beam through a bolt.
Further, the method comprises the following steps: and second embedded angle steel is arranged on the left side wall and the right side wall at the edge corresponding to the steel structure side wall and is connected with the steel structure side wall through bolts.
Further, the method comprises the following steps: cantilever beams and first circles of beams are arranged at the tops of the upstream side bent frames and the downstream side bent frames, and the machine room is arranged on the first circles of beams.
Further, the method comprises the following steps: the top of the upstream side wall, the downstream side wall, the left side wall and the right side wall of the machine room are provided with second ring beams, and the top cover is arranged on the second ring beams; the top cover is a steel structural member.
The invention has the beneficial effects that: the invention provides a convenient-to-overhaul accident gate fixed winch hoist room structure, and provides a convenient-to-hoist operation scheme for a large-scale accident gate and a fixed winch hoist in hydraulic and hydro-power engineering. The invention solves the hoisting problem in the installation, maintenance and replacement processes of the emergency gate and the fixed winch hoist, and has safe and reliable structure, convenient equipment maintenance and lower overall cost.
Drawings
FIG. 1 is a schematic structural diagram of an accident gate;
FIG. 2 is a schematic perspective view of a bent and a machine room according to the present invention;
FIG. 3 is a side view of FIG. 2;
FIG. 4 is a view of the interior of a machine room according to the present invention;
FIG. 5 is a cross-sectional view of section A-A of FIG. 3;
FIG. 6 is a cross-sectional view of section B-B of FIG. 3;
FIG. 7 is an enlarged view of a portion C of FIG. 3;
FIG. 8 is an enlarged view of a portion D of FIG. 3;
labeled as: the emergency gate comprises an emergency gate 1, a gate slot 2, a fixed winch hoist 3, an upstream side bent frame 4, a downstream side bent frame 5, a machine room 6, a gate channel 7, a top cover 8, an upstream side wall 9, a downstream side wall 10, a left side wall 11, a right side wall 12, a bottom plate 13, a through slot 14, a steel structure side wall 15, a steel cover plate 16, first embedded angle steel 17, second embedded angle steel 18, a steel beam 19, a steel embedded part 20, an external steel part 21, embedded inserted bars 22, a cantilever beam 23, a first ring beam 24, an upper column 25, a brick wall 26, a second ring beam 27 and a traveling crane 28.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
It should be noted that, if there are directional indication terms, such as the terms of direction and orientation, above, below, left, right, front and back, in the present invention, for facilitating the description of the relative positional relationship between the components, the absolute position that is not the positional relationship between the related components and the components is specifically referred to, and is only used for explaining the relative positional relationship and the motion situation between the components in a specific posture, and if the specific posture is changed, the directional indication is changed accordingly. When the present invention relates to a number, such as "a plurality", "several", etc., two or more than two are specifically referred to.
As shown in fig. 1 to 8, the accident gate fixed hoist machine room structure convenient for maintenance according to the present invention includes an accident gate 1, a gate slot 2 and a fixed hoist 3 disposed above the gate slot 2, the fixed hoist 3 is connected to the accident gate 1 by a cable, and further includes an upstream side bent frame 4, a downstream side bent frame 5 and a machine room 6, the upstream side bent frame 4 is disposed above the gate slot 2 and is located at an upstream side of the gate slot 2, the downstream side bent frame 5 is disposed above the gate slot 2 and is located at a downstream side of the gate slot 2, and a gate passage 7 penetrating left and right is formed between the upstream side bent frame 4 and the downstream side bent frame 5; the machine room 6 is arranged on the upstream side bent frame 4 and the downstream side bent frame 5, the machine room 6 comprises a top cover 8, an upstream side wall 9, a downstream side wall 10, a left side wall 11, a right side wall 12 and a bottom plate 13, a left-right through groove 14 corresponding to the gate channel 7 is arranged on the bottom plate 13, a steel structure side wall 15 which is consistent with the width of the gate channel 7 and is through up and down and detachable is respectively arranged on the left side wall 11 and the right side wall 12, and the top cover 8 is detachably arranged at the tops of the upstream side wall 9, the downstream side wall 10, the left side wall 11 and the right side wall 12; the fixed hoisting hoist 3 is mounted on a bottom plate 13 in the machine room 6.
In the invention, after the top cover 8 is detached, the travelling crane 28 arranged above the machine room 6 in a crossing way can directly lower the corresponding lifting rope from the top of the machine room 6 so as to be used for hoisting and fixing the winch hoist 3, the accident gate 1 and the like, thereby facilitating the hoisting operation such as installation, maintenance, replacement and the like. Moreover, after the structures such as the steel structure side wall 15 and the like are further disassembled, the machine room 6 and the two sides of the whole building structure formed by the bent frames below can form a through hoisting channel, and then the fixed hoisting hoist 3 and the accident gate 1 can be hoisted in and out through the channel without hoisting the fixed hoisting hoist 3 and the accident gate 1 in and out from the top of the machine room 6, so that the maximum hoisting height of the crane 28 can be effectively reduced, the height of the crane 28 can be effectively reduced, and the cost is saved.
In addition, in order to facilitate the hoisting of the top cover 8, the top cover 8 is preferably arranged to be a steel structural member; the top cover 8 can be conveniently manufactured into an integrated structure, and is lighter and more convenient and convenient to construct relative to a reinforced concrete structure.
In addition, because the through groove 14 is formed in the bottom plate 13, when the hoisting operation is not performed, the detachable steel cover plate 16 is arranged at the corresponding gap position of the through groove 14 to cover the corresponding position of the through groove 14, so that a large-area hollow structure cannot be formed on the bottom plate 13, and the potential safety hazard is reduced. More specifically, a first embedded angle steel 17 may be disposed at an edge of the through groove 14 of the bottom plate 13, and a step for mounting the steel cover plate 16 in an overlapping manner is formed by the first embedded angle steel 17; therefore, the steel cover plate 16 can be directly lapped and installed on the corresponding first embedded angle steel 17, and the steel cover plate 16 only needs to be taken out upwards during disassembly.
In addition, in order to improve the structural strength and stability of the upstream side wall 9 and the downstream side wall 10, the present invention may further include detachable steel beams 19 provided on the upstream side wall 9 and the downstream side wall 10 corresponding to the left and right edge portions of the lock gate duct 7, and both ends of the steel beams 19 connect the upstream side wall 9 and the downstream side wall 10. Thus, when the hoisting operation is required, the corresponding steel beam 19 is also detached at the same time. Of course, the steel beams 19 may be of a construction such as i-steel, channel steel or steel box beams.
More specifically, the size, number, and the like of the steel beams 19 may be set appropriately according to actual conditions, and at least one steel beam 19 may be provided at intervals in the vertical direction at the edge portions of the left and right sides of the upstream side wall 9 and the downstream side wall 10. As shown in the attached drawings, two steel beams 19 are provided at intervals in the vertical direction; when the vertical heights of the upstream side wall 9 and the downstream side wall 10 are relatively high, a greater number of steel beams 19 may be provided at intervals.
In addition, for a specific installation structure of the steel beam 19, the present invention may be arranged such that both ends of the steel beam 19 are connected to steel embedments 20 embedded in the upstream side wall 9 and the downstream side wall 10, respectively, by bolts. The steel embedded parts 20 are embedded in the upstream side wall 9 and the downstream side wall 10 when the construction of the upstream side wall 9 and the downstream side wall 10 is performed. Specifically, the upstream side wall 9 and the downstream side wall 10 are of a reinforced concrete structure, the steel embedded part 20 includes an external steel member 21 and embedded steel bars 22, the embedded steel bars 22 are embedded in the corresponding reinforced concrete structure and connected with internal steel bars, and one end of each embedded steel bar 22 is welded to the external steel member 21 outside the reinforced concrete structure; the outer steel members 21 are connected to the ends of the steel beams 19 by bolts. During the construction of the upstream side wall 9 and the downstream side wall 10, the joint bars 22 are welded or bound to the corresponding reinforcing bars in the reinforced concrete, and then concrete pouring is performed to embed the joint bars 22 of the embedded steel parts 20 and connect the embedded steel parts with the steel beams 19 through the external steel parts 21. As shown in fig. 8, a plurality of bolt holes are respectively provided in the outer steel member 21 and the steel beam 19, and then are connected by bolts.
In addition, the steel structure side wall 15 is used for being installed on the left side wall 11 and the right side wall 12, and after the steel structure side wall 15 is disassembled and hung, corresponding channel structures which are consistent with the width of the gate channel 7 and run through up and down can be formed on the left side wall 11 and the right side wall 12, and therefore the hoisting hoist 3 and the emergency gate 1 can be conveniently hoisted and fixed to enter and exit from the side direction through the channels. More specifically, in order to improve the structural strength of the edge corresponding to the steel structure side wall 15 and facilitate the installation of the steel structure side wall 15, second embedded angle steels 18 are further arranged on the left side wall 11 and the right side wall 12 at the edge corresponding to the steel structure side wall 15, and the second embedded angle steels 18 can be connected with the steel structure side wall 15 through bolts, so that the steel structure side wall 15 can be conveniently disassembled and assembled.
In addition, the upstream side bent 4 and the downstream side bent 5 in the present invention mainly serve to bear the weight of the machine room 6 above and the fixed hoist 3 and the like. Correspondingly, the invention can be further provided with a cantilever beam 23 and a first ring beam 24 on the top of the upstream side bent frame 4 and the downstream side bent frame 5, and meanwhile, the machine room 6 is arranged on the first ring beam 24; this facilitates the machine room 6 to expand outwardly to increase the area of the floor 13 and improve the overall structural strength.
In addition, the machine room 6 of the present invention is used to enclose the fixed hoist 3 inside to perform a protection function. Specifically, the invention further provides that the upstream side wall 9, the downstream side wall 10, the left side wall 11 and the right side wall 12 of the machine room 6 are composed of upper columns 25 arranged at intervals and brick walls 26 arranged between the adjacent upper columns 25, and second ring beams 27 are arranged at the tops of the upstream side wall 9, the downstream side wall 10, the left side wall 11 and the right side wall 12 to improve the overall structural strength; while the top cover 8 is arranged on the second ring beam 27. Of course, the top cover 8 can be directly placed on the second ring beam 27, and a corresponding positioning structure can be arranged as required to perform positioning restriction and prevent the top cover 8 from sliding off. Wherein, the upper column 25 can adopt a reinforced concrete column to improve the structural strength.
The fixed winch hoist engine room structure of the accident gate convenient to overhaul can adopt a combination form of a reinforced concrete structure and a steel structure as a whole, and the fixed winch hoist 3 and the accident gate 1 can be hoisted conveniently by dismounting the corresponding steel structure; therefore, the problem that the hoisting operation of the fixed winch hoist 3 and the accident gate 1 is difficult can be effectively solved.

Claims (10)

1. Fixed hoist formula headstock gear room structure of accident gate convenient to overhaul, including accident gate (1), gate slot (2) and set up in fixed hoist formula headstock gear (3) of gate slot (2) top, fixed hoist formula headstock gear (3) are connected its characterized in that through the hawser with accident gate (1): the machine room is characterized by further comprising an upstream side bent frame (4), a downstream side bent frame (5) and a machine room (6), wherein the upstream side bent frame (4) is arranged above the door slot (2) and located on the upstream side of the door slot (2), the downstream side bent frame (5) is arranged above the door slot (2) and located on the downstream side of the door slot (2), and a gate channel (7) which is communicated with the left and the right is formed between the upstream side bent frame (4) and the downstream side bent frame (5); the machine room (6) is arranged on the upstream side bent frame (4) and the downstream side bent frame (5), the machine room (6) comprises a top cover (8), an upstream side wall (9), a downstream side wall (10), a left side wall (11), a right side wall (12) and a bottom plate (13), a left-right through groove (14) corresponding to the gate channel (7) is formed in the bottom plate (13), a steel structure side wall (15) which is consistent with the width of the gate channel (7) in a vertical through and detachable mode is respectively arranged on the left side wall (11) and the right side wall (12), and the top cover (8) can be detachably arranged at the tops of the upstream side wall (9), the downstream side wall (10), the left side wall (11) and the right side wall (12); the fixed hoisting hoist (3) is arranged on a bottom plate (13) in the machine room (6).
2. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 1, wherein: a detachable steel cover plate (16) is arranged at the through groove (14) of the bottom plate (13).
3. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 2, wherein: first embedded angle steel (17) are arranged at the edge of the through groove (14) of the bottom plate (13), and a step for installing the steel cover plate (16) in an overlapping mode is formed through the first embedded angle steel (17).
4. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 1, wherein: the upper stream side wall (9) and the lower stream side wall (10) corresponding to the edge parts of the left side and the right side of the gate channel (7) are provided with detachable steel beams (19), and the two ends of each steel beam (19) connect the upper stream side wall (9) with the lower stream side wall (10).
5. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 4, wherein: at least one steel beam (19) is arranged along the vertical direction at intervals.
6. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 4, wherein: and two ends of the steel beam (19) are respectively connected with steel embedded parts (20) embedded in the upstream side wall (9) and the downstream side wall (10) through bolts.
7. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 6, wherein: the upstream side wall (9) and the downstream side wall (10) are of reinforced concrete structures, the steel embedded part (20) comprises an external steel member (21) and embedded joint bars (22), the embedded joint bars (22) are embedded in the corresponding reinforced concrete structures and connected with internal steel bars, and one end of each embedded joint bar (22) is connected with the external steel member (21) located outside the reinforced concrete structures; the outer steel member (21) is connected to the end of the steel beam (19) by bolts.
8. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 1, wherein: and second embedded angle steel (18) is arranged on the left side wall (11) and the right side wall (12) at the edge corresponding to the steel structure side wall (15), and the second embedded angle steel (18) is connected with the steel structure side wall (15) through bolts.
9. The convenient-to-overhaul accident gate fixed winch type hoist/gate machine room structure as claimed in claim 1, wherein: cantilever beams (23) and first ring beams (24) are arranged at the tops of the upstream side bent frames (4) and the downstream side bent frames (5), and the machine room (6) is arranged on the first ring beams (24).
10. The convenient-to-overhaul accident-gate fixed-winch type hoist/gate machine room structure according to any one of claims 1 to 9, characterized in that: the machine room (6) is characterized in that an upstream side wall (9), a downstream side wall (10), a left side wall (11) and a right side wall (12) are composed of upper columns (25) arranged at intervals and brick walls (26) arranged between the adjacent upper columns (25), second ring beams (27) are arranged at the tops of the upstream side wall (9), the downstream side wall (10), the left side wall (11) and the right side wall (12), and the top cover (8) is arranged on the second ring beams (27); the top cover (8) is a steel structural member.
CN202011359204.6A 2020-11-27 2020-11-27 Accident gate fixed winch type opening and closing machine room structure convenient to overhaul Pending CN112554141A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011359204.6A CN112554141A (en) 2020-11-27 2020-11-27 Accident gate fixed winch type opening and closing machine room structure convenient to overhaul

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011359204.6A CN112554141A (en) 2020-11-27 2020-11-27 Accident gate fixed winch type opening and closing machine room structure convenient to overhaul

Publications (1)

Publication Number Publication Date
CN112554141A true CN112554141A (en) 2021-03-26

Family

ID=75046378

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011359204.6A Pending CN112554141A (en) 2020-11-27 2020-11-27 Accident gate fixed winch type opening and closing machine room structure convenient to overhaul

Country Status (1)

Country Link
CN (1) CN112554141A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201033565Y (en) * 2006-08-31 2008-03-12 中国南车集团株洲电力机车有限公司 Collapsible type driver's cab
CN206616899U (en) * 2017-02-27 2017-11-07 中国石油天然气股份有限公司 A kind of equipment room
US20170350113A1 (en) * 2014-09-23 2017-12-07 Dinamikpumpkin, Lda Modular system for fast connection of habitable modules
CN208105959U (en) * 2018-03-21 2018-11-16 北京舒文环保科技有限公司 Sound insulating house
CN109586177A (en) * 2018-12-24 2019-04-05 河南工信柜架有限公司 A kind of high-low pressure case change cabinet with safeguard function packaged type
CN209556440U (en) * 2018-11-07 2019-10-29 苏州岸肯电子科技有限公司 A kind of silent room
CN111622246A (en) * 2020-05-20 2020-09-04 郭洪清 Water conservancy construction cofferdam device
CN212000942U (en) * 2020-03-16 2020-11-24 中国电建集团贵阳勘测设计研究院有限公司 Structure convenient for fixed winch maintenance

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201033565Y (en) * 2006-08-31 2008-03-12 中国南车集团株洲电力机车有限公司 Collapsible type driver's cab
US20170350113A1 (en) * 2014-09-23 2017-12-07 Dinamikpumpkin, Lda Modular system for fast connection of habitable modules
CN206616899U (en) * 2017-02-27 2017-11-07 中国石油天然气股份有限公司 A kind of equipment room
CN208105959U (en) * 2018-03-21 2018-11-16 北京舒文环保科技有限公司 Sound insulating house
CN209556440U (en) * 2018-11-07 2019-10-29 苏州岸肯电子科技有限公司 A kind of silent room
CN109586177A (en) * 2018-12-24 2019-04-05 河南工信柜架有限公司 A kind of high-low pressure case change cabinet with safeguard function packaged type
CN212000942U (en) * 2020-03-16 2020-11-24 中国电建集团贵阳勘测设计研究院有限公司 Structure convenient for fixed winch maintenance
CN111622246A (en) * 2020-05-20 2020-09-04 郭洪清 Water conservancy construction cofferdam device

Similar Documents

Publication Publication Date Title
CN202706503U (en) Electric lifting discharging platform for main building construction
CN108360380A (en) A kind of bridge pier column construction operation platform and its construction method
CN107142954B (en) Steel hanging box lifting system for integral lifting and lifting method thereof
CN110409378A (en) Repair method of not cutting off the water for large channel
CN112177309A (en) Assembled protection platform used in building elevator shaft
CN112554141A (en) Accident gate fixed winch type opening and closing machine room structure convenient to overhaul
CN212359266U (en) A foldable maintenance platform for electric block
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN113605659A (en) Elevator shaft tool type safe operation platform and construction method thereof
CN209815472U (en) Prefabricated cabin hoisting structure
CN111910972A (en) A foldable maintenance platform for electric block
CN207406012U (en) Construction lift tool formula overhangs escape way
CN202781420U (en) Multifunctional operation platform for subsection jointing construction of concrete member
CN112030925A (en) Efficient disassembly and assembly device and method for suspender of vertical hydraulic hoist of large-sized working gate of vertical ship lift
KR200253551Y1 (en) A sheeting structure of iron frame using a chain block
KR100941955B1 (en) Traction machine structure for an elevator and cage assembly
CN213952921U (en) Assembled protection platform used in building elevator shaft
CN216664928U (en) Combined hanging rack suitable for construction and protection of building outer vertical face based on top mold
CN219011976U (en) Folding mechanism and system for segmental reinforcement cage assembly platform
CN215562766U (en) Assembled tower crane foundation steel platform
CN213448351U (en) Double-layer multifunctional on-off equipment maintenance platform
CN203569909U (en) Tower crane integral type steel frame aisle
CN219653537U (en) Assembled steel platform
CN216075040U (en) Anti-theft structure of jacket boarding system
CN218145518U (en) Construction elevator system attached to tower crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210326