CN207406012U - Construction lift tool formula overhangs escape way - Google Patents

Construction lift tool formula overhangs escape way Download PDF

Info

Publication number
CN207406012U
CN207406012U CN201721090640.1U CN201721090640U CN207406012U CN 207406012 U CN207406012 U CN 207406012U CN 201721090640 U CN201721090640 U CN 201721090640U CN 207406012 U CN207406012 U CN 207406012U
Authority
CN
China
Prior art keywords
slot
enclosing
grafting
secondary beam
cantilever beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721090640.1U
Other languages
Chinese (zh)
Inventor
文成钦
敖俊
卢坤林
严忠勇
郭恒足
龚登峰
李茂平
涂学成
黄瑾
邓媚方
袁志
李毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NO15 CONSTRUCTION Co OF SICHUAN PROVINCE
Original Assignee
NO15 CONSTRUCTION Co OF SICHUAN PROVINCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NO15 CONSTRUCTION Co OF SICHUAN PROVINCE filed Critical NO15 CONSTRUCTION Co OF SICHUAN PROVINCE
Priority to CN201721090640.1U priority Critical patent/CN207406012U/en
Application granted granted Critical
Publication of CN207406012U publication Critical patent/CN207406012U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction lift tool formula overhanging escape way, it is characterised in that:Horizontal supporting system is bolted into horizontally-supported by several Cantilever Beams 5 with architecture storey side structural elements, pass through rectangle card column or card slot grafting in Cantilever Beams and secondary beam 6, landing slab 7 is equipped on secondary beam, upper enclosing 1 and gusset gear 2 pass through plug and slot grafting, pin hole in the two passes through latch locking, gusset gear passes through bottom rectangle card column or card slot and rectangle card slot or card column grafting on Cantilever Beams, it fills enclosing 3 and passes through its upper part and bottom rectangle slot or inserting column and upper enclosing and secondary beam grafting, current open and close system 4 is socketed by the bearing block in shaft and upper enclosing and secondary beam.This construction lift tool formula overhangs escape way in addition to Cantilever Beams are connected by screw bolts, and the modes such as other all means of structural connection are card slot, the connection of socket joint, bolt can be realized and quickly pacify, tear open.Quality, safe and reliable, energy conservation and environmental protection.

Description

Construction lift tool formula overhangs escape way
Technical field
The utility model is related to a kind of construction safety passage, particularly a kind of construction lift tool formula overhanging peace Full tunnel.
Background technology
In recent years, as society and science and technology are into, rapid economic development, skyscraper is more and more, in high-building construction Field, material elevator, people's goods construction elevator all need access platform to architecture storey conveying goods and materials and construction personnel's disengaging, tradition Access platform generally continuously set up to roof from ground using steel pipe scaffold.It is such set up mode taken for skyscraper, The height torn open is greatly, the material of transmission is more, efficiency is low, and normalization, security are poor.It is general that 3-5 people is wanted to coordinate completion platform Set up, attachment point demand is more, installation it is lack of standardization;Periphery external scaffolding has been removed when later stage removes the platform, safety management and Enforcement difficulty is big.
Utility model content
The purpose of the utility model is to overcome problem existing in the prior art, providing one kind can quickly and easily The passage pacify, torn open is provided simultaneously with safe, beautiful, energy-saving and environment-friendly construction lift tool formula overhanging escape way.To realize Above-mentioned purpose, the technical solution adopted in the utility model are:A kind of construction lift tool formula overhangs escape way, including water Flat support system, peripheral protective guard system, current open and close system, it is characterised in that:Horizontal supporting system by several Cantilever Beams with Architecture storey side structural elements be bolted into it is horizontally-supported, on Cantilever Beams by rectangle card slot or card column on secondary beam The rectangle card column of opposite position or card slot grafting are equipped with landing slab on secondary beam;The peripheral protective guard system, including upper Enclosing, gusset gear and filling enclosing, upper enclosing and gusset, which are kept off, passes through plug and slot grafting, and the pin hole in the two, which passes through, to be inserted Lock is determined, and gusset gear passes through bottom rectangle card column or card slot and the rectangle card slot of opposite position or card column grafting on Cantilever Beams, Fill enclosing by its upper part and bottom rectangle slot or inserting column and the rectangular slot of opposite position on upper enclosing and secondary beam or Inserting column grafting, the open and close system that passes through are socketed by the bearing block in shaft and upper enclosing and secondary beam, above enclose a grade lower outer and be equipped with Baffle forms fixed opening and closing direction and current mode.
Plug that described upper enclosing is blocked with gusset, slot are wedge shape plug and wedge-shaped socket.
Described enclosing rectangular frame made of metallic rod is welded with metal mesh in rectangular frame.
Compared with prior art, the utility model has the advantage of:This architecture storey side overhanging tool-type access platform peace, It tears open easy to operate;Every layer independently installed, and bearing capacity is safe and reliable;Entire access platform is gone along with sb. to guard him tightly, it is ensured that personnel and platform make With safety.In addition to Cantilever Beams and building structure are bolted, other connection modes have the utility model:Card slot, socket joint, bolt connect The modes such as connect, realization is quickly pacified, tears open.
Description of the drawings
Fig. 1 is the positive facade structure diagram of the utility model;
The partial enlargement structural representation of Fig. 2 positions the utility model;
Fig. 3 is the side elevation structure diagram of the utility model.
In figure:1st, upper enclosing;2nd, gusset is kept off;3rd, enclosing is filled;4th, passage switching system;5th, Cantilever Beams;6th, secondary beam;7th, put down Platen;8th, bearing plate;9th, slot;10th, bolt.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.As shown in Figure 1, 2, 3, the utility model is built Floor side tool-type overhanging access platform is built, including horizontal supporting system by several Cantilever Beams 5 and architecture storey side structural elements It is bolted into horizontally-supported, passes through rectangle card slot or card column and the square of the opposite position on secondary beam 6 on Cantilever Beams Shape card column or card slot grafting are equipped with landing slab 7 on secondary beam;Upper enclosing 1 is connected by plug number with slot with gusset gear 2, on State enclosing with filling enclosing 3 form peripheral protective guard system, upper enclosing and gusset gear by both opposite position plug and Slot grafting, the pin hole in the two and by latch locking or by positioning support plate 8, slot 9 are connected with plug, institute The plug and slot stated can be tubular socket or wedge-shaped slot and wedge shape plug, i.e. slot and plug for it is upper greatly under Small, gusset, which is kept off, passes through bottom rectangle card column or card slot and rectangle card slot or card column grafting on Cantilever Beams 5, on rectangle card slot and card column Pin hole locked by bolt 10, filling enclosing pass through its upper part and bottom rectangle slot or inserting column on upper enclosing and secondary beam The rectangular slot of opposite position or inserting column grafting, the open and close system 4 that passes through pass through the bearing block in shaft and upper enclosing and secondary beam Socket, with current open and close system it is adjacent on enclose grade lower outer equipped with baffle, form fixed opening and closing direction and current side Formula.Horizontal supporting system can set up the length and width of platform according to actual needs;Peripheral protecting system front and side enclosing height and width It spends adjustable;Passage switching device is arranged on front, and opening and closing direction is fixed.And single, multiple opening and closing devices can be arranged as required to. By above-mentioned description, the relevant staff of this field without departing from the scope of the technological thought of the present invention', carries out The cantilever span and width of platform, enclosing width and height, the number of passage switching device and width, which are modified, belongs to this Apply for protection domain.

Claims (3)

1. a kind of construction lift tool formula overhangs escape way, including horizontal supporting system, peripheral protective guard system passes through Open and close system, it is characterised in that:Horizontal supporting system is by several Cantilever Beams(5)Connected with architecture storey side structural elements by bolt It is connected into horizontally-supported, passes through rectangle card slot or card column and secondary beam on Cantilever Beams(6)On rectangle card column or card slot grafting, secondary beam On be equipped with landing slab(7);The peripheral protective guard system, including upper enclosing(1), gusset gear(2)With filling enclosing(3), Upper enclosing and gusset gear pass through plug and slot(9)Grafting, for the pin hole in the two by latch locking, gusset gear passes through bottom Rectangle card column or card slot and rectangle card slot or card column grafting on Cantilever Beams, filling enclosing by its upper part and bottom rectangle slot or Inserting column and rectangular slot or inserting column grafting on upper enclosing and secondary beam, pass through open and close system(4)Pass through shaft and upper enclosing and secondary beam On bearing block socket, above enclose grade lower outer equipped with baffle, form fixed opening and closing direction and current mode.
2. construction lift tool formula according to claim 1 overhangs escape way, it is characterised in that:It is enclosed on described The plug blocked with gusset, slot are kept off as wedge shape plug and wedge-shaped slot.
3. construction lift tool formula according to claim 1 overhangs escape way, it is characterised in that:Described enclosing The rectangular frame made of metallic rod is welded with metal mesh in rectangular frame.
CN201721090640.1U 2017-08-29 2017-08-29 Construction lift tool formula overhangs escape way Active CN207406012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721090640.1U CN207406012U (en) 2017-08-29 2017-08-29 Construction lift tool formula overhangs escape way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721090640.1U CN207406012U (en) 2017-08-29 2017-08-29 Construction lift tool formula overhangs escape way

Publications (1)

Publication Number Publication Date
CN207406012U true CN207406012U (en) 2018-05-25

Family

ID=62323247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721090640.1U Active CN207406012U (en) 2017-08-29 2017-08-29 Construction lift tool formula overhangs escape way

Country Status (1)

Country Link
CN (1) CN207406012U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386662A (en) * 2017-08-29 2017-11-24 四川省第十五建筑有限公司 Construction lift tool formula is encorbelmented escape way

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386662A (en) * 2017-08-29 2017-11-24 四川省第十五建筑有限公司 Construction lift tool formula is encorbelmented escape way

Similar Documents

Publication Publication Date Title
CN205591231U (en) Steel shotcrete dropout prevention means
CN103397782B (en) Frame type steel work is installed construction method and the construction equipment of tie-beam
CN207406012U (en) Construction lift tool formula overhangs escape way
CN202785351U (en) Tower cranes attached operating platform
CN105776092B (en) A kind of extended position nacelle device
CN207776405U (en) Prefabricated outer wall panel safety protection frame
CN207863441U (en) A kind of assembled overhanging scaffold pedestal
CN105909006B (en) A kind of precast assembly prefabricated substation
CN203499259U (en) Tool type cantilevered unloading platform
CN105781610A (en) Safety cabin for manual hole digging operation
CN107386662A (en) Construction lift tool formula is encorbelmented escape way
CN208534392U (en) A kind of basic safety climbing ladder of appearing for electric power pylon height
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN107543735A (en) For lift flood airtight blast door steel construction test platform
CN203487802U (en) Slant self-climbing protection screen unit system
Li et al. Study on construction technology of hydraulic climbing formwork for super high-rise building under aluminum formwork system
CN202672694U (en) Shaft construction circulation operating platform
CN206987431U (en) One kind enters to cheat assembled ladder cage
CN207277373U (en) A kind of riding track being used in foundation pit construction
CN206735567U (en) Top layer mounting platform without scaffold installation elevator
CN207048333U (en) A kind of lattice steel pipe column and material distributing machine pedestal attachment means
CN201808660U (en) Movable scaffold hook
CN214656449U (en) Active type high-altitude safe operation platform device using pier stud capping beam as attachment
CN105140828B (en) Icing observation platform outside a kind of multi-voltage grade ultra-high-tension power transmission line room
CN205348726U (en) Steel frame - steel sheet shear wall structure system construction tool formula operation platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant