CN112529337A - Reserve library optimization method and system based on power material demand management - Google Patents

Reserve library optimization method and system based on power material demand management Download PDF

Info

Publication number
CN112529337A
CN112529337A CN202011582523.3A CN202011582523A CN112529337A CN 112529337 A CN112529337 A CN 112529337A CN 202011582523 A CN202011582523 A CN 202011582523A CN 112529337 A CN112529337 A CN 112529337A
Authority
CN
China
Prior art keywords
material demand
plan
demand plan
reserve
library
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011582523.3A
Other languages
Chinese (zh)
Inventor
章光东
孙楷淇
陈煜�
谢岗
胡红兰
邢娟娟
徐强强
江伟
陈琳琳
杜长安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Materials Branch of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Materials Branch of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Materials Branch of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN202011582523.3A priority Critical patent/CN112529337A/en
Publication of CN112529337A publication Critical patent/CN112529337A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a reserve bank optimization method and system based on power material demand management, which comprises the following steps: transmitting the project processing parameters to a material demand prediction model, and outputting a material advance storage demand plan; inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into a material demand plan storage library; converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, and realizing the linkage of the material demand plan reserve library and the material demand plan compilation of the ERP system; the stock optimization method links the material demand planning stock and the material demand planning of the ERP system, realizes the centralized confirmation of the material demands in the material demand planning stock, improves the effective updating of the material demands and is convenient for the arrangement of subsequent purchasing work.

Description

Reserve library optimization method and system based on power material demand management
Technical Field
The invention relates to the technical field of county material demand management, in particular to a method and a system for optimizing a reserve bank based on power material demand management.
Background
In order to improve management benefits and efficiency, the innovation of 'putting management service' is comprehensively promoted in the field of materials, and the optimization construction of a modern intelligent supply chain is promoted based on the improvement. In the field of materials, the planning and management of the demand of electric power materials always occupies an important position and is closely related to future development and construction and daily operation. However, the demand planning of the power material supply is strong, the total amount is large, the raw material resources are short, and the uncertainty of emergency demand exists, so that the demand planning management has extremely high requirements. Meanwhile, in the service layer: the material demand plan storage management is not available before the procurement batch plan is submitted, the material specialty cannot grasp the material demand in advance, the procurement plan compilation work is repeated frequently, and the examination efficiency and the subsequent procurement work arrangement are also influenced by scattered examination; at a system level: the reserve library is planned according to the material demand, and the full-information coverage is not realized.
Disclosure of Invention
Based on the technical problems in the background art, the invention provides a reserve bank optimization method and system based on power material demand management, which are used for compiling and linking a material demand plan reserve bank and a material demand plan of an ERP system, so that the material demand in the material demand plan reserve bank is centrally confirmed, the effective updating of the material demand is improved, and the subsequent purchasing work arrangement is facilitated.
The invention provides a reserve bank optimization method based on power material demand management, which comprises the following steps:
transmitting the project processing parameters to a material demand prediction model, and outputting a material advance storage demand plan;
inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into a material demand plan storage library;
and converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, so as to realize the linkage of the material demand plan reserve library and the material demand plan compilation of the ERP system.
Further, a material demand planning reserve library is constructed, and the method comprises the following steps: for the project which is already clear, the annual material advance storage demand plan is converted into a material demand plan and is brought into a material demand plan storage library, and the purchasing demand which is already clear but does not reach the batch submission time point is updated and maintained in the storage library in advance.
Further, the step of converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system includes:
according to the project information and the batch requirements, the material demands in the material demand plan reserve library are selected, converted into the formal material demand plan of the ERP system, and the material demand plan reserve library is linked with the material demand plan compilation of the ERP system, so that the material demands in the material demand plan reserve library are confirmed in a centralized mode.
A reserve bank optimization system based on power material demand management comprises a material advance reserve demand plan output module, a material import module and a material confirmation conversion module;
the material advance reserve demand plan output module is used for transmitting project processing parameters to the material demand prediction model and outputting a material advance reserve demand plan;
the material import module is used for inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into the material demand plan storage library;
the material confirmation and conversion module is used for converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, and the material demand plan reserve library is linked with the material demand plan compilation of the ERP system.
A computer readable storage medium having stored thereon a number of get taxonomy procedures for being invoked by a processor and performing the method of repository optimization of claim 1.
The reserve bank optimization method and the reserve bank optimization system based on the power material demand management have the advantages that: the reserve bank optimization method and system based on power material demand management, which are provided by the structure, establish a demand plan reserve bank management mechanism, provide an information channel for material plan managers to pre-estimate material demand scale in advance, realize staged centralized review, and directly convert the demand detail selection into a formal material demand plan of an ERP system to realize the optimization of a reserve bank; the method overcomes the defect that no material demand plan stock management is required before the plan submission of the procurement batch in the conventional ERP system.
Drawings
FIG. 1 is a schematic structural view of the present invention;
Detailed Description
The present invention is described in detail below with reference to specific embodiments, and in the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein, but rather should be construed as broadly as the present invention is capable of modification in various respects, all without departing from the spirit and scope of the present invention.
The method for optimizing the reserve library in the embodiment depends on an ERP system and an auxiliary decision system, is associated with a foreground service scene for constructing material demands and intelligently predicting annual demands in the system, and is used for structuring forecast information of the material demands, including demanded materials, material types, demanded dates, demanded quantities, amounts, units, projects and the like, and forecast external material demands, including data of the demanded materials, the material types, the demanded dates, the demanded quantities, the amounts, the units, the projects and the like. Meanwhile, data standardization processing is carried out on material demand prediction information, prediction external material demands and material demand plans including required materials, material types, required dates, required quantity, money, units, projects and the like. The data source system comprises a capital construction management and control system and an ERP system, service implementation is based on the ERP system, deployment is carried out in a two-level deployment mode, and a decision-making assisting system needs to be provided with a data interface.
As shown in fig. 1, the method for optimizing a reserve bank based on demand management of electric power supplies according to the present invention includes:
s1: transmitting the project processing parameters to a material demand prediction model, and outputting a material advance storage demand plan;
the project progress parameters comprise a project reserve plan, a project investment plan, a project milestone plan, historical material requirements and a project progress; and the material demand prediction model compares and screens the parameters of the project to obtain a material advance storage demand plan of the current project.
S2: inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into a material demand plan storage library;
wherein, the construction of the material demand plan reserve library comprises the steps of; for the project which is already clear, the annual material advance storage demand plan is converted into a material demand plan and is brought into a material demand plan storage library, and the purchasing demand which is already clear but does not reach the batch submission time point is updated and maintained in the storage library in advance.
Therefore, the material demand reserve plan for the project is reserved in the material demand plan reserve library after the construction is completed, the material demand reserve plan can be understood as an accurate prediction plan before the project is started, and the accurate prediction plan is stored in the material demand plan reserve library.
The material demand plan reserve library is mainly implemented through an ERP system. In specific implementation, an ECP2.0 and ERP typical design are combined, a material demand plan reserve library management module is constructed in an ERP system, and the annual material advance reserve demand plan in the decision-making system is assisted to be converted into information of a material demand plan reserve library in the ERP through an interface.
S3: and converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, so as to realize the linkage of the material demand plan reserve library and the material demand plan compilation of the ERP system.
According to the project information and the batch requirements, the material demands in the material demand plan reserve library are selected, converted into the formal material demand plan of the ERP system, and linked with the material demand plan schedule compilation of the ERP system, so that the demand plan reporting work is simplified, the material demands in the material demand plan reserve library are confirmed in a centralized manner, and the material demand review efficiency is improved.
Through steps S10 to S30, an entrance for inputting a material demand and reserve plan in advance is provided by establishing a demand plan and reserve management mechanism and system functions, meanwhile, an annual material advance reserve demand plan with definite projects is directly converted into a material demand plan and is brought into a material demand plan reserve library, an information channel is provided for material plan managers to estimate the material demand scale in advance, and staged centralized review is realized; a purchasing planning and arranging mode is innovated, the quality and the effect of material planning reporting and reviewing management are improved, the active service capability of a material management department is enhanced, and the defect that no material demand planning stock library management is needed before purchasing batch planning reporting in the conventional ERP system is overcome. Meanwhile, the material demand plan reserve library mainly provides support for a material demand department and a plan management department to carry out demand plan management work, after the material demand plan reserve library is established, the material demand department can update and maintain a material demand reserve plan stored in a project reserve library, the plan management department can carry out centralized examination in the material demand plan reserve library, and the requirement detail is selected and directly converted into a formal material demand plan of an ERP system, so that optimization of the reserve library is realized.
A reserve bank optimization system based on power material demand management comprises a material advance reserve demand plan output module, a material import module and a material confirmation conversion module;
the material advance reserve demand plan output module is used for transmitting project processing parameters to the material demand prediction model and outputting a material advance reserve demand plan;
the material import module is used for inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into the material demand plan storage library;
the material confirmation and conversion module is used for converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, and the material demand plan reserve library is linked with the material demand plan compilation of the ERP system.
A computer readable storage medium having stored thereon a number of get taxonomy procedures for being invoked by a processor and performing the method of vault optimization described above.
Those of ordinary skill in the art will understand that: all or part of the steps for implementing the method embodiments may be implemented by hardware related to program instructions, and the program may be stored in a computer readable storage medium, and when executed, the program performs the steps including the method embodiments; and the aforementioned storage medium includes: various media that can store program codes, such as ROM, RAM, magnetic or optical disks.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (5)

1. A reserve bank optimization method based on power material demand management is characterized by comprising the following steps:
transmitting the project processing parameters to a material demand prediction model, and outputting a material advance storage demand plan;
inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into a material demand plan storage library;
and converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, so as to realize the linkage of the material demand plan reserve library and the material demand plan compilation of the ERP system.
2. The reserve bank optimization method based on power material demand management according to claim 1, wherein constructing a material demand planning reserve bank comprises: for the project which is already clear, the annual material advance storage demand plan is converted into a material demand plan and is brought into a material demand plan storage library, and the purchasing demand which is already clear but does not reach the batch submission time point is updated and maintained in the storage library in advance.
3. The reserve bank optimization method based on power material demand management according to claim 1, wherein the step of converting the material demand plan in the confirmed material demand plan reserve bank into a formal material demand plan of the ERP system comprises:
according to the project information and the batch requirements, the material demands in the material demand plan reserve library are selected, converted into the formal material demand plan of the ERP system, and the material demand plan reserve library is linked with the material demand plan compilation of the ERP system, so that the material demands in the material demand plan reserve library are confirmed in a centralized mode.
4. A reserve bank optimization system based on power material demand management is characterized by comprising a material advance reserve demand plan output module, a material import module and a material confirmation conversion module;
the material advance reserve demand plan output module is used for transmitting project processing parameters to the material demand prediction model and outputting a material advance reserve demand plan;
the material import module is used for inputting the material advance storage demand plan and the material demand storage plan stored in the project storage library into the material demand plan storage library;
the material confirmation and conversion module is used for converting the confirmed material demand plan in the material demand plan reserve library into a formal material demand plan of the ERP system, and the material demand plan reserve library is linked with the material demand plan compilation of the ERP system.
5. A computer readable storage medium having stored thereon a plurality of get taxonomy procedures for being invoked by a processor and performing the method of repository optimization according to claim 1.
CN202011582523.3A 2020-12-28 2020-12-28 Reserve library optimization method and system based on power material demand management Pending CN112529337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011582523.3A CN112529337A (en) 2020-12-28 2020-12-28 Reserve library optimization method and system based on power material demand management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011582523.3A CN112529337A (en) 2020-12-28 2020-12-28 Reserve library optimization method and system based on power material demand management

Publications (1)

Publication Number Publication Date
CN112529337A true CN112529337A (en) 2021-03-19

Family

ID=74976865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011582523.3A Pending CN112529337A (en) 2020-12-28 2020-12-28 Reserve library optimization method and system based on power material demand management

Country Status (1)

Country Link
CN (1) CN112529337A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113408830A (en) * 2021-08-19 2021-09-17 国网浙江省电力有限公司金华供电公司 Precise multidimensional material linkage utilization method and device based on ZigBee
CN113592351A (en) * 2021-08-12 2021-11-02 山西益通电网保护自动化有限责任公司 Material demand plan implementation method and device
CN114529118A (en) * 2021-07-28 2022-05-24 广东电网有限责任公司佛山供电局 Material management monitoring method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105447624A (en) * 2015-11-12 2016-03-30 云南电网有限责任公司物流服务中心 Typical configuration model and system for auditing material requirement plan of power project
CN108133307A (en) * 2017-12-01 2018-06-08 国家电网公司 Goods and materials plan review method, system and terminal device
CN110942204A (en) * 2019-12-04 2020-03-31 国网安徽省电力有限公司合肥供电公司 New power grid capital construction project annual planning model construction method and system
CN111553643A (en) * 2020-05-18 2020-08-18 国网河北省电力有限公司物资分公司 Material purchasing plan and supply chain management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105447624A (en) * 2015-11-12 2016-03-30 云南电网有限责任公司物流服务中心 Typical configuration model and system for auditing material requirement plan of power project
CN108133307A (en) * 2017-12-01 2018-06-08 国家电网公司 Goods and materials plan review method, system and terminal device
CN110942204A (en) * 2019-12-04 2020-03-31 国网安徽省电力有限公司合肥供电公司 New power grid capital construction project annual planning model construction method and system
CN111553643A (en) * 2020-05-18 2020-08-18 国网河北省电力有限公司物资分公司 Material purchasing plan and supply chain management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
夏子朋: "供电企业物资管理提质增效的实践与思考", 《中国电业》, no. 10, 10 October 2020 (2020-10-10), pages 84 - 85 *
宋孜等: "智慧申报 需求计划更智能", 《华北电业》, no. 08, 25 August 2020 (2020-08-25), pages 28 - 29 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114529118A (en) * 2021-07-28 2022-05-24 广东电网有限责任公司佛山供电局 Material management monitoring method and system
CN113592351A (en) * 2021-08-12 2021-11-02 山西益通电网保护自动化有限责任公司 Material demand plan implementation method and device
CN113408830A (en) * 2021-08-19 2021-09-17 国网浙江省电力有限公司金华供电公司 Precise multidimensional material linkage utilization method and device based on ZigBee

Similar Documents

Publication Publication Date Title
CN112529337A (en) Reserve library optimization method and system based on power material demand management
Donti et al. Task-based end-to-end model learning in stochastic optimization
US20220027817A1 (en) Deep reinforcement learning for production scheduling
US20180018614A1 (en) Method and apparatus for optimizing constraint-based data
JP3332032B2 (en) Generator operation planning device, generator operation planning method, and storage medium storing generator operation planning program
Chaleshtarti et al. A hybrid genetic and Lagrangian relaxation algorithm for resource-constrained project scheduling under nonrenewable resources
Wang et al. Synchronizing production scheduling with resources allocation for precast components in a multi-agent system environment
Rostami et al. Resource pool location for periodic services in decentralized multi-project scheduling problems
Ekel et al. Decision making in a fuzzy environment and its application to multicriteria power engineering problems
CN106325232A (en) Mold manufacture automatic production control system and method
Trentesaux et al. Product-driven control: concept, literature review and future trends
JP6917288B2 (en) Maintenance plan generation system
Maalouf et al. Production management for mass customization and smart cellular manufacturing system: NSGAII and SMPSO for factory-level planning
Ullah et al. Towards comprehensive release planning for software product lines
Owusu et al. On optimising resource planning in BT plc with FOS
Khokhlovsky et al. MODERNISATION OF A CONTROL CABINET PRODUCTION PROCESS USING MULTICRITERIA OPTIMIZATION LOGIC AND AUGMENTED REALITY.
Di Nucci et al. Making nuclear waste problems governable: Conflicts, participation and acceptability
Joe et al. Developing a strategy for full nuclear plant modernization
Ridgway Analysis of decision centres and information flow in project management
KR102242446B1 (en) A power management device and a power system capable of automatic modification of constraint code during operation of the power system
Bo et al. Modeling and Optimizing Pumped Storage in a Multi-stage Large Scale Electricity Market under Portfolio Evolution
Wei et al. Intelligent manufacturing: bridging the gap between the Internet of Things and machinery to achieve optimized operations
US11315201B2 (en) Intelligent bill of materials advisor
Rzevski et al. Customization of Multi-Agent Systems for Adaptive Resource Management with the Use of Domain Ontologies
Elfaham et al. Recipe Based Skill Matching

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210319

RJ01 Rejection of invention patent application after publication