CN108133307A - Goods and materials plan review method, system and terminal device - Google Patents
Goods and materials plan review method, system and terminal device Download PDFInfo
- Publication number
- CN108133307A CN108133307A CN201711246876.4A CN201711246876A CN108133307A CN 108133307 A CN108133307 A CN 108133307A CN 201711246876 A CN201711246876 A CN 201711246876A CN 108133307 A CN108133307 A CN 108133307A
- Authority
- CN
- China
- Prior art keywords
- plan
- goods
- materials
- annual
- default
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention is suitable for materials management technique field, provides a kind of goods and materials plan review method, system and terminal device, goods and materials plan review method includes:After cut-off is declared in goods and materials plan, goods and materials plan is obtained;According to preset examination standard, examine whether material information is accurate;Obtain purchase of goods and materials historical data and investment plan;According to purchase of goods and materials historical data and investment plan, examine whether agreement inventory planning is reasonable;Obtain the default capital scale in comprehensive annual plan and default material category;Default capital scale and default material category in comprehensive annual plan, examine whether annual demand plan meets the requirements;After the completion of material information, agreement inventory planning and annual demand plan examination, examination result is exported.Goods and materials plan review method provided by the invention, system and terminal device, save a large amount of manpowers, shorten and examine the time, improve examination accuracy rate.
Description
Technical field
The invention belongs to a kind of materials management technique field more particularly to goods and materials plan review method, system and terminals to set
It is standby.
Background technology
Material on hand plan checking method is audited by the way of examining step by step, is examined with the goods and materials plan of State Grid Corporation of China
For core, the requirement for whether meeting state's network mark standard is examined in the goods and materials plan of State Grid Corporation of China step by step, and in power grid goods and materials point
Company carries out concentration examination.During existing goods and materials plan review, in addition to censorship is carried out to common goods and materials plan, other
Such as agreement inventory, annual demand plan needs are manually examined and are reported and submitted.Due to agreement, inventory examines five every time
6000 plans, censorship amount is big, and work is heavy, and manual review, which exists, examines that the time is long, examines the problem of accuracy rate is low.
Invention content
In view of this, an embodiment of the present invention provides a kind of goods and materials plan review method, system and terminal device, to solve
Goods and materials plan review is not comprehensive enough in the prior art, examines that the time is long, examines the problem of accuracy rate is relatively low.
To achieve the above object, the first aspect of the embodiment of the present invention provides a kind of goods and materials plan review method, including
Following steps:
After cut-off is declared in goods and materials plan, goods and materials plan is obtained, the goods and materials include material information, agreement inventory in the works
Plan and annual demand plan.
According to preset examination standard, examine whether the material information is accurate.
Obtain purchase of goods and materials historical data and investment plan.
According to the purchase of goods and materials historical data and the investment plan, examine whether the agreement inventory planning is reasonable.
Obtain the default capital scale in comprehensive annual plan and default material category.
Default capital scale and default material category in the comprehensive annual plan, examine the yearly demand meter
It draws and whether meets the requirements.
After the completion of the basic material information, the agreement inventory planning and the annual demand plan examination, export
Examination result.
Further, the goods and materials plan review method further includes:
There is inaccurate information in the material information if examining, the delivering early warning for the inaccuracy is believed
Breath.
Further, it is described to examine whether the agreement inventory planning accurately includes:
Examine whether agreement inventory material category in the works, goods and materials quantity and technical specification ID are reasonable respectively.
Further, the default capital scale in the comprehensive annual plan and default material category examine
The annual demand plan whether meet the requirements including:
Examine whether capital scale in the annual demand plan and the default capital scale are consistent.
If the capital scale and the default capital scale in the annual demand plan are inconsistent, the year is needed
Capital scale in the works is asked to be modified.
Examine whether material category in the annual demand plan and the default material category are consistent.
If the material category and the default material category in the annual demand plan are inconsistent, the year is needed
Material category in the works is asked to be modified.
Further, the goods and materials plan review method further includes:
According to the material information after examination, material information report is generated.
According to the agreement inventory planning after examination, agreement inventory's plan sheet is generated.
According to the annual demand plan after examination, annual demand plan report is generated.
The second aspect of the embodiment of the present invention provides a kind of goods and materials plan review system, including:
Goods and materials plan acquisition module, for after cut-off is declared in goods and materials plan, obtaining goods and materials plan, the goods and materials are in the works
Including material information, agreement inventory planning and annual demand plan.
Material information examines module, for according to preset examination standard, examining whether the material information is accurate.
First data acquisition module, for obtaining purchase of goods and materials historical data and investment plan.
Agreement inventory's plan review module, for according to the purchase of goods and materials historical data and the investment plan, examining
Whether the agreement inventory planning is reasonable.
Second data acquisition module, for obtaining default capital scale and the default material category in comprehensive annual plan.
Annual demand plan examines module, for the default capital scale in the comprehensive annual plan and default object
Classification is provided, examines whether the annual demand plan meets the requirements.
Examination result export module, based in the material information, the agreement inventory planning and the yearly demand
It draws after the completion of examining, exports examination result.
Further, the goods and materials plan review system further includes:
Warning module, if there is inaccurate information in the material information for examining, for the inaccuracy
Delivering warning information.
Further, the goods and materials plan review system further includes:
Material information report generation module, for according to the material information after examination, generating material information report.
Agreement inventory's plan sheet generation module, for according to the agreement inventory planning after examination, generating agreement inventory's meter
Draw report.
Annual demand plan report generation module, for according to the annual demand plan after examination, generating yearly demand meter
Draw report.
The third aspect of the embodiment of the present invention provides a kind of goods and materials plan review terminal device, including memory, processing
Device and it is stored in the computer program that can be run in the memory and on the processor, which is characterized in that the place
Reason device realizes the goods and materials plan review method of above-mentioned first aspect when performing the computer program.
The fourth aspect of the embodiment of the present invention provides a kind of computer readable storage medium, the computer-readable storage
Media storage has computer program, and the computer program realizes that the goods and materials plan of above-mentioned first aspect is examined when being executed by processor
Checking method.
Existing advantageous effect is the embodiment of the present invention compared with prior art:After cut-off is declared in goods and materials plan, obtain
Goods and materials plan can realize material information, agreement inventory planning and yearly demand meter to goods and materials in the works according to certain standard
Draw etc. examined, save a large amount of manpowers, shorten examine the time, improve examination accuracy rate, and effectively increase object
The management level and working efficiency of plan are provided, improves material resources intensive management level.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some
Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is a kind of schematic flow diagram of goods and materials plan review method provided in an embodiment of the present invention;
Fig. 2 is a kind of schematic block diagram of goods and materials plan review system provided in an embodiment of the present invention;
Fig. 3 is a kind of schematic diagram of goods and materials plan review terminal device provided in an embodiment of the present invention.
Specific embodiment
In being described below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc
Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specifically
The present invention can also be realized in the other embodiments of details.In other situations, it omits to well-known system, device, electricity
Road and the detailed description of method, in case unnecessary details interferes description of the invention.
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
With reference to Fig. 1, a kind of goods and materials plan review method provided in an embodiment of the present invention includes the following steps:
S101 after cut-off is declared in goods and materials plan, obtains goods and materials plan, and the goods and materials include material information, association in the works
Discuss inventory planning and annual demand plan.
Specifically, after cut-off is declared in goods and materials plan, unexamined goods and materials plan is obtained from ERP system according to batch number,
The goods and materials of acquisition include material information, agreement inventory planning and annual demand plan in the works.
S102 according to preset examination standard, examines whether the material information is accurate.
Specifically, according to preset examination standard, i.e., according to the examination of setting rule and parameter, examine goods and materials in the works
Whether material information is accurate, for example, examining whether inspection date is reasonable and examines material number whether using standardization material
Whether amount and price are reasonable etc., and each project is carried out to examine tactful inspection, that is, check the info class in each project
It is whether incorrect.
S103 obtains purchase of goods and materials historical data and investment plan..
Whether S104 according to the purchase of goods and materials historical data and the investment plan, examines the agreement inventory planning
Rationally.
Specifically, according to the purchase of goods and materials historical data and investment plan of acquisition, agreement inventory object in the works is examined respectively
It whether reasonable provides classification, goods and materials quantity and technical specification ID, and analyzes the relationship of investment amount and amount of purchase, to the goods and materials declared
It is for statistical analysis according to material category, in addition, statistical analysis different angle material use ratio is also wanted, finally to agreement inventory
Plan carries out report and rigister.
S105 obtains the default capital scale in comprehensive annual plan and default material category.
S106, default capital scale and default material category in the comprehensive annual plan, examines the year
Whether plan of needs meets the requirements.
Specifically, comprehensive annual plan is the physical planning to information such as capital scale, the material categories in year, by year
Degree plan of needs and comprehensive annual plan are compared analysis, it is ensured that annual demand plan is advised with comprehensive annual plan in fund
Mould, material category etc. are consistent.Annual demand plan and established comprehensive annual plan are compared and analyzed,
Examine whether the capital scale in annual demand plan and the default capital scale in comprehensive annual plan are consistent, if needed in year
Ask the default capital scale in capital scale and comprehensive annual plan in the works inconsistent, then to the money in annual demand plan
Golden scale is modified, if examining the default material category in the material category and comprehensive annual plan in annual demand plan
It is whether consistent, if the material category in annual demand plan and the default material category in comprehensive annual plan are inconsistent,
Material category in annual demand plan is modified.
S107, after the completion of the material information, the agreement inventory planning and the annual demand plan examination, export
Examination result.
Specifically, after the completion of material information, the agreement inventory planning and the annual demand plan examination, export is examined
It comes to an end in fruit to ERP system, including export material information examination result, agreement inventory's plan review result and yearly demand meter
Draw examination result etc..
By foregoing description it is found that the embodiment of the present invention existing advantageous effect is compared with prior art:In goods and materials meter
It draws after declaring cut-off, obtains goods and materials plan, can be realized according to certain standard to goods and materials material information in the works, agreement inventory
Plan and annual demand plan etc. are examined, save a large amount of manpowers, are shortened and are examined the time, improve examination accuracy rate,
And the management level and working efficiency of goods and materials plan are effectively increased, improves material resources intensive management level.
Further, the goods and materials plan review method further includes:
There is inaccurate information in the material information if examining, the delivering early warning for the inaccuracy is believed
Breath.
Specifically, it if during goods and materials plan review, examines out the project of information inaccuracy, is then not allowed for information
True project sends out warning information, and instruction related personnel performs other operations.
Further, it is described to examine whether the agreement inventory planning accurately includes:
Examine whether agreement inventory material category in the works, goods and materials quantity and technical specification ID are reasonable respectively.
Specifically, according to the purchase of goods and materials historical data and investment plan of acquisition, agreement inventory object in the works is examined respectively
Whether reasonable provide classification, goods and materials quantity and technical specification ID.
Further, the default capital scale in the comprehensive annual plan and default material category examine
The annual demand plan whether meet the requirements including:
Examine whether capital scale in the annual demand plan and the default capital scale are consistent.
If the capital scale and the default capital scale in the annual demand plan are inconsistent, the year is needed
Capital scale in the works is asked to be modified.
Examine whether material category in the annual demand plan and the default material category are consistent.
If the material category and the default material category in the material category annual demand plan are inconsistent, to institute
The material category stated in annual demand plan is modified.
Further, the goods and materials plan review method further includes:
According to the material information after examination, material information report is generated.
According to the agreement inventory planning after examination, agreement inventory's plan sheet is generated.
According to the annual demand plan after examination, annual demand plan report is generated.
Specifically, report generation rule is established, to the material information of goods and materials in the works, after carrying out reasonability examination, according to
Report generation rule, generates material information report, similarly, after carrying out reasonability examination to agreement inventory planning, is given birth to according to report
Into rule, agreement inventory's plan sheet is generated, it is regular according to report generation after carrying out reasonability examination to annual demand plan,
Generate annual demand plan report.
With reference to Fig. 2, another embodiment of the present invention provides a kind of goods and materials plan review system, including:
Goods and materials plan acquisition module 201, for after cut-off is declared in goods and materials plan, obtaining goods and materials plan, the goods and materials meter
It draws and includes material information, agreement inventory planning and annual demand plan.
Material information examines module 202, for according to preset examination standard, examining whether the material information is accurate.
First data acquisition module 203, for obtaining purchase of goods and materials historical data and investment plan.
Agreement inventory's plan review module 204, for according to the purchase of goods and materials historical data and the investment plan, examining
Whether reasonable look into the agreement inventory planning.
Second data acquisition module 205, for obtaining default capital scale and the default goods and materials class in comprehensive annual plan
Not.
Annual demand plan examines module 206, for the default capital scale in the comprehensive annual plan and in advance
If material category, examine whether the annual demand plan meets the requirements.
Examination result export module 207, in the material information, the agreement inventory planning and the yearly demand
After the completion of plan review, examination result is exported.
Further, the goods and materials plan review system further includes.
Warning module, if there is inaccurate information in the material information for examining, for the inaccuracy
Delivering warning information.
Further, the goods and materials plan review system further includes:
Material information report generation module, for according to the material information after examination, generating material information report.
Agreement inventory's plan sheet generation module, for according to the agreement inventory planning after examination, generating agreement inventory's meter
Draw report.
Annual demand plan report generation module, for according to the annual demand plan after examination, generating yearly demand meter
Draw report.
Further, the agreement inventory plan review module 204 includes:
Agreement inventory's plan review submodule, for examining agreement inventory material category in the works, goods and materials respectively
Whether quantity and technical specification ID are reasonable.
Further, the annual demand plan examines that module 205 includes:
Capital scale examines module, for examining capital scale and the default fund rule in the annual demand plan
Whether mould is consistent.
Capital scale correcting module, if for the capital scale in the annual demand plan and the default capital scale
It is inconsistent, then the capital scale in the annual demand plan is modified.
Material category examines module, for examining material category and the default goods and materials class in the annual demand plan
It is whether not consistent.
Material category correcting module, if for the material category in the annual demand plan and the default material category
It is inconsistent, then the material category in the annual demand plan is modified.
Fig. 3 is a kind of schematic diagram for goods and materials plan review terminal device that further embodiment of this invention provides.Such as Fig. 3 institutes
Show, the goods and materials plan review terminal device 3 of the embodiment includes:Processor 30, memory 31 and it is stored in the memory
In 31 and the computer program 32 that can be run on the processor 30, such as goods and materials plan review program.The processor 30
The step in above-mentioned each goods and materials plan review embodiment of the method is realized when performing the computer program 32, such as shown in Fig. 1
Step S101 to S107.Alternatively, the processor 30 realizes above-mentioned each device embodiment when performing the computer program 32
In each module/unit function, such as the function of module 201 to 207 shown in Fig. 2.
Illustratively, the computer program 32 can be divided into one or more module/units, it is one or
Multiple module/units are stored in the memory 31, and are performed by the processor 30, to complete the present invention.Described one
A or multiple module/units can be the series of computation machine program instruction section that can complete specific function, which is used for
Implementation procedure of the computer program 32 in the goods and materials plan review terminal device 3 is described.For example, the computer journey
Sequence 32 can be divided into synchronization module, summarizing module, acquisition module, return to module (module in virtual bench), each module
Concrete function it is as follows:
After cut-off is declared in goods and materials plan, goods and materials plan is obtained, the goods and materials include material information, agreement inventory in the works
Plan and annual demand plan;
According to preset examination standard, examine whether the material information is accurate;
Obtain purchase of goods and materials historical data and investment plan;
According to the purchase of goods and materials historical data and the investment plan, examine whether the agreement inventory planning is reasonable;
Obtain the default capital scale in comprehensive annual plan and default material category;
Default capital scale and default material category in the comprehensive annual plan, examine the yearly demand meter
It draws and whether meets the requirements;
After the completion of the material information, the agreement inventory planning and the annual demand plan examination, export examines
As a result.
Further, the concrete function of each module further includes:
There is inaccurate information in the material information if examining, the delivering early warning for the inaccuracy is believed
Breath.
Further, the concrete function of each module further includes:
Examine whether agreement inventory material category in the works, goods and materials quantity and technical specification ID are reasonable respectively.
Further, the concrete function of each module further includes:
Examine whether capital scale in the annual demand plan and the default capital scale are consistent;
If the capital scale and the default capital scale in the annual demand plan are inconsistent, the year is needed
Capital scale in the works is asked to be modified;
Examine whether material category in the annual demand plan and the default material category are consistent;
If material category and the material category in the annual demand plan and the default material category are inconsistent, right
Material category in the annual demand plan is modified.
Further, the concrete function of each module further includes:
According to the material information after examination, material information report is generated;
According to the agreement inventory planning after examination, agreement inventory's plan sheet is generated;
According to the annual demand plan after examination, annual demand plan report is generated.
The goods and materials plan review terminal device 3 can be desktop PC, notebook, palm PC and cloud service
The computing devices such as device.The goods and materials plan review terminal device may include, but be not limited only to, processor 30, memory 31.Ability
Field technique personnel are appreciated that Fig. 3 is only the example of goods and materials plan review terminal device 3, do not form and goods and materials plan is examined
The restriction of terminal device 3 is looked into, components more more or fewer than diagram can be included and either combine certain components or different
Component, such as the goods and materials plan review terminal device can also include input-output equipment, network access equipment, bus etc..
Alleged processor 30 can be central processing unit (Central Processing Unit, CPU), can also be
Other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit
(Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-
Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic,
Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor
Deng.
The memory 31 can be the internal storage unit of the goods and materials plan review terminal device 3, such as goods and materials meter
Draw the hard disk or memory for examining terminal device 3.The memory 31 can also be the outer of the goods and materials plan review terminal device 3
The plug-in type hard disk being equipped in portion's storage device, such as the goods and materials plan review terminal device 3, intelligent memory card (Smart
Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further,
The memory 31 can also both include the internal storage unit of the goods and materials plan review terminal device 3 or including external storage
Equipment.The memory 31 is used to storing the computer program and other needed for the goods and materials plan review terminal device
Program and data.The memory 31 can be also used for temporarily storing the data that has exported or will export.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work(
Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different
Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion
The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used
To be that each unit is individually physically present, can also two or more units integrate in a unit, it is above-mentioned integrated
The form that hardware had both may be used in unit is realized, can also be realized in the form of SFU software functional unit.In addition, each function list
Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Above system
The specific work process of middle unit, module can refer to the corresponding process in preceding method embodiment, and details are not described herein.
Those of ordinary skill in the art may realize that each exemplary lists described with reference to the embodiments described herein
Member and algorithm steps can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
It is performed with hardware or software mode, specific application and design constraint depending on technical solution.Professional technician
Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device and method can pass through others
Mode is realized.For example, system embodiment described above is only schematical, for example, the division of the module or unit,
Only a kind of division of logic function, can there is an other dividing mode in actual implementation, such as multiple units or component can be with
With reference to or be desirably integrated into another system or some features can be ignored or does not perform.Another point, it is shown or discussed
Mutual coupling or direct-coupling or communication connection can be by some interfaces, the INDIRECT COUPLING of device or unit or
Communication connection can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit
The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple
In network element.Some or all of unit therein can be selected according to the actual needs to realize the mesh of this embodiment scheme
's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
That each unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list
The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and be independent product sale or
In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation
All or part of flow in example method, can also instruct relevant hardware to complete, the meter by computer program
Calculation machine program can be stored in a computer readable storage medium, the computer program when being executed by processor, it can be achieved that on
The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation
Code can be source code form, object identification code form, executable file or certain intermediate forms etc..The computer-readable medium
It can include:Any entity of the computer program code or device, recording medium, USB flash disk, mobile hard disk, magnetic can be carried
Dish, CD, computer storage, read-only memory (ROM, Read-Only Memory), random access memory (RAM,
Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described
The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice
Subtract, such as in certain jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and
Telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to aforementioned reality
Example is applied the present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to aforementioned each
Technical solution recorded in embodiment modifies or carries out equivalent replacement to which part technical characteristic;And these are changed
Or replace, the spirit and scope for various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution should all
It is included within protection scope of the present invention.
Claims (10)
- A kind of 1. goods and materials plan review method, which is characterized in that include the following steps:After cut-off is declared in goods and materials plan, goods and materials plan is obtained, the goods and materials include material information, agreement inventory planning in the works And annual demand plan;According to preset examination standard, examine whether the material information is accurate;Obtain purchase of goods and materials historical data and investment plan;According to the purchase of goods and materials historical data and the investment plan, examine whether the agreement inventory planning is reasonable;Obtain the default capital scale in comprehensive annual plan and default material category;Default capital scale and default material category in the comprehensive annual plan examine that the annual demand plan is It is no to meet the requirements;After the completion of the material information, the agreement inventory planning and the annual demand plan examination, examination result is exported.
- 2. goods and materials plan review method according to claim 1, which is characterized in that further include:There is inaccurate information in the material information if examining, for the delivering warning information of the inaccuracy.
- 3. goods and materials plan review method according to claim 1, which is characterized in that described to examine the agreement inventory planning Whether rationally include:Examine whether agreement inventory material category in the works, goods and materials quantity and technical specification ID are reasonable respectively.
- 4. goods and materials plan review method according to claim 1, which is characterized in that described according to the comprehensive annual plan In default capital scale and default material category, examine the annual demand plan whether meet the requirements including:Examine whether capital scale in the annual demand plan and the default capital scale are consistent;If the capital scale and the default capital scale in the annual demand plan are inconsistent, to the yearly demand meter Capital scale in drawing is modified;Examine whether material category in the annual demand plan and the default material category are consistent;If the material category and the default material category in the annual demand plan are inconsistent, to the yearly demand meter Material category in drawing is modified.
- 5. goods and materials plan review method according to claim 1, which is characterized in that further include:According to the material information after examination, material information report is generated;According to the agreement inventory planning after examination, agreement inventory's plan sheet is generated;According to the annual demand plan after examination, annual demand plan report is generated.
- 6. a kind of goods and materials plan review system, which is characterized in that including:Goods and materials plan acquisition module, for after cut-off is declared in goods and materials plan, obtaining goods and materials plan, the goods and materials include in the works Material information, agreement inventory planning and annual demand plan;Material information examines module, for according to preset examination standard, examining whether the material information is accurate;First data acquisition module, for obtaining purchase of goods and materials historical data and investment plan;Agreement inventory's plan review module, for according to the purchase of goods and materials historical data and the investment plan, described in examination Whether agreement inventory planning is reasonable;Second data acquisition module, for obtaining default capital scale and the default material category in comprehensive annual plan;Annual demand plan examines module, for the default capital scale in the comprehensive annual plan and default goods and materials class Not, examine whether the annual demand plan meets the requirements;Examination result export module, for being examined in the material information, the agreement inventory planning and the annual demand plan After the completion of looking into, examination result is exported.
- 7. goods and materials plan review system according to claim 6, which is characterized in that further include:Warning module, if there is inaccurate information in the material information for examining, for the information of the inaccuracy Send out warning information.
- 8. goods and materials plan review system according to claim 6, which is characterized in that further include:Material information report generation module, for according to the material information after examination, generating material information report;Agreement inventory's plan sheet generation module, for according to the agreement inventory planning after examination, generating agreement inventory planning report Table;Annual demand plan report generation module, for according to the annual demand plan after examination, generating annual demand plan report Table.
- 9. a kind of goods and materials plan review terminal device, including memory, processor and it is stored in the memory and can be The computer program run on the processor, which is characterized in that the processor is realized such as when performing the computer program The step of any one of claim 1 to 5 goods and materials plan review method.
- 10. a kind of computer readable storage medium, the computer-readable recording medium storage has computer program, and feature exists In realizing the goods and materials plan review method as described in any one of claim 1 to 5 when the computer program is executed by processor Step.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711246876.4A CN108133307A (en) | 2017-12-01 | 2017-12-01 | Goods and materials plan review method, system and terminal device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711246876.4A CN108133307A (en) | 2017-12-01 | 2017-12-01 | Goods and materials plan review method, system and terminal device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108133307A true CN108133307A (en) | 2018-06-08 |
Family
ID=62389050
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711246876.4A Pending CN108133307A (en) | 2017-12-01 | 2017-12-01 | Goods and materials plan review method, system and terminal device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108133307A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109087074A (en) * | 2018-08-15 | 2018-12-25 | 国网湖北省电力有限公司武汉供电公司 | It is a kind of to plan to declare to check oneself method and system |
CN109359842A (en) * | 2018-09-30 | 2019-02-19 | 国网山东省电力公司物资公司 | A kind of single multivariate data examines processing method, apparatus and terminal device |
CN109636296A (en) * | 2019-01-08 | 2019-04-16 | 北京探感科技股份有限公司 | A kind of method of calibration and system of neck shopping money |
CN112348337A (en) * | 2020-10-27 | 2021-02-09 | 国网山东省电力公司经济技术研究院 | Material demand planning system and method based on artificial intelligence |
CN112365221A (en) * | 2020-09-29 | 2021-02-12 | 国网冀北电力有限公司物资分公司 | Method for improving material plan control efficiency and electronic equipment |
CN112529337A (en) * | 2020-12-28 | 2021-03-19 | 国网安徽省电力有限公司 | Reserve library optimization method and system based on power material demand management |
CN114529118A (en) * | 2021-07-28 | 2022-05-24 | 广东电网有限责任公司佛山供电局 | Material management monitoring method and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065225A (en) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | Material purchasing plan examining method |
CN104866987A (en) * | 2015-05-11 | 2015-08-26 | 国家电网公司 | Processing method of electrical equipment material purchasing data |
CN105139111A (en) * | 2015-08-11 | 2015-12-09 | 江苏天源招标有限公司 | Agreement inventory material order allocation method based on greedy algorithm |
CN105447624A (en) * | 2015-11-12 | 2016-03-30 | 云南电网有限责任公司物流服务中心 | Typical configuration model and system for auditing material requirement plan of power project |
-
2017
- 2017-12-01 CN CN201711246876.4A patent/CN108133307A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103065225A (en) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | Material purchasing plan examining method |
CN104866987A (en) * | 2015-05-11 | 2015-08-26 | 国家电网公司 | Processing method of electrical equipment material purchasing data |
CN105139111A (en) * | 2015-08-11 | 2015-12-09 | 江苏天源招标有限公司 | Agreement inventory material order allocation method based on greedy algorithm |
CN105447624A (en) * | 2015-11-12 | 2016-03-30 | 云南电网有限责任公司物流服务中心 | Typical configuration model and system for auditing material requirement plan of power project |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109087074A (en) * | 2018-08-15 | 2018-12-25 | 国网湖北省电力有限公司武汉供电公司 | It is a kind of to plan to declare to check oneself method and system |
CN109359842A (en) * | 2018-09-30 | 2019-02-19 | 国网山东省电力公司物资公司 | A kind of single multivariate data examines processing method, apparatus and terminal device |
CN109636296A (en) * | 2019-01-08 | 2019-04-16 | 北京探感科技股份有限公司 | A kind of method of calibration and system of neck shopping money |
CN112365221A (en) * | 2020-09-29 | 2021-02-12 | 国网冀北电力有限公司物资分公司 | Method for improving material plan control efficiency and electronic equipment |
CN112348337A (en) * | 2020-10-27 | 2021-02-09 | 国网山东省电力公司经济技术研究院 | Material demand planning system and method based on artificial intelligence |
CN112529337A (en) * | 2020-12-28 | 2021-03-19 | 国网安徽省电力有限公司 | Reserve library optimization method and system based on power material demand management |
CN114529118A (en) * | 2021-07-28 | 2022-05-24 | 广东电网有限责任公司佛山供电局 | Material management monitoring method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108133307A (en) | Goods and materials plan review method, system and terminal device | |
CN103678437B (en) | Supplier retrieves device and supplier's search method | |
CN107784426A (en) | Post distribution method, device and the equipment of a kind of employee | |
CN108182479A (en) | Equipment point-detecting method, device and server | |
CN108335216A (en) | A kind of insurance risk assessment method, apparatus, terminal device and storage medium | |
CN109615267A (en) | Evaluating Methods of Inviting Bidding and system | |
CN105930259B (en) | A kind of method and apparatus of WEB regression tests | |
CN111176635A (en) | Modularized quantization system, execution method thereof and electronic equipment | |
CN110135711A (en) | A kind of information management method and device | |
CN107067138A (en) | Power Material recruits the electronic accessory system of the assessment of bids | |
CN115098589A (en) | Industrial energy consumption data monitoring method and device based on Internet of things | |
CN116151868A (en) | Intelligent price checking method, intelligent price checking device, computer equipment and storage medium | |
CN111339084A (en) | Data processing method and system | |
CN107368962A (en) | The automatic reference method and system of business transaction | |
CN107767242A (en) | Accounting data processing method and accounting data processing unit | |
Ingemansson et al. | Reducing bottle‐necks in a manufacturing system with automatic data collection and discrete‐event simulation | |
CN112884496A (en) | Method, device and computer storage medium for calculating enterprise credit factor score | |
CN113485982A (en) | Power business data display method and device and terminal equipment | |
CN107391872A (en) | The method and device that PDMS threedimensional models use in software | |
CN112085344A (en) | Equipment health analysis method and device and electronic equipment | |
CN110222391A (en) | Electrical equipment drawing practice, system and terminal device | |
Rabbani et al. | Integrated dynamic cell formation-production planning: a new mathematical model | |
CN107958370A (en) | Project cost data verification method and terminal device | |
CN110147813B (en) | User portrait construction method and device, storage medium and server | |
CN107491987A (en) | A kind of batch cost accounting system and method based on diamond product dynamic database |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180608 |
|
RJ01 | Rejection of invention patent application after publication |