CN107958370A - Project cost data verification method and terminal device - Google Patents

Project cost data verification method and terminal device Download PDF

Info

Publication number
CN107958370A
CN107958370A CN201711262371.7A CN201711262371A CN107958370A CN 107958370 A CN107958370 A CN 107958370A CN 201711262371 A CN201711262371 A CN 201711262371A CN 107958370 A CN107958370 A CN 107958370A
Authority
CN
China
Prior art keywords
parameter
verification
technical parameter
type
technical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711262371.7A
Other languages
Chinese (zh)
Inventor
王艳芹
董祯
刘光辉
王勇
杨宏伟
王冬超
周玉锁
赵贤
刘云
郭振新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711262371.7A priority Critical patent/CN107958370A/en
Publication of CN107958370A publication Critical patent/CN107958370A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention is suitable for electric power network technique renovation technique field, there is provided a kind of Project Cost data verification method and terminal device.The described method includes:The individual works of project to be rebuilt are obtained, and determine the type of the individual works of project to be rebuilt;Obtain the corresponding technical parameter of type of the individual works of project to be rebuilt;Whether judgment technology parameter is checking parameter;If it is determined that technical parameter is checking parameter, it is determined that the verification type of technical parameter;The corresponding verification rule of verification type of acquiring technology parameter;It is whether reasonable according to the regular calibration technology parameter of verification;Verification report is generated according to the check results of technical parameter.It after using the above scheme, can efficiently help related personnel to note abnormalities from substantial amounts of data item, shorten the time of data check, improve the accuracy of data check, improve the work efficiency of staff.

Description

Project Cost data verification method and terminal device
Technical field
The invention belongs to electric power network technique renovation technique field, more particularly to a kind of Project Cost data verification method and terminal Equipment.
Background technology
During power grid technological transformation project implementation management, cost Control is important step therein, directly affect project and The economic benefit and social benefit of enterprise, for the project cost regulatory level of enterprise is continuously improved, annual power grid wants normalization Carry out technological transformation project analysis of prices work.
But carry out analysis of prices need of work and make a report on substantial amounts of project data, easily occur mistake during making a report on and fill out, leak Situations such as filling out, has seriously affected the orderly development of analysis of prices work, and to ensure being normally carried out for analysis of prices work, works Personnel generally require to devote a tremendous amount of time the data progress desk checking for making a report on projects unit, substantially increase work The workload of personnel, and reduce the work efficiency of staff.
The content of the invention
In view of this, an embodiment of the present invention provides a kind of Project Cost data verification method and terminal device, to solve Staff generally requires to devote a tremendous amount of time the data progress desk checking for making a report on projects unit, pole in the prior art The problem of greatly adding the workload of staff, and reducing the work efficiency of staff.
The first aspect of the embodiment of the present invention provides a kind of Project Cost data verification method, comprises the following steps:
The individual works of project to be rebuilt are obtained, and determine the type of the individual works of the project to be rebuilt;
Obtain the corresponding technical parameter of type of the individual works of the project to be rebuilt;
Judge whether the technical parameter is checking parameter;
If it is determined that the technical parameter is checking parameter, it is determined that the verification type of the technical parameter;
Obtain the corresponding verification rule of verification type of the technical parameter;
It is whether reasonable that the technical parameter is verified according to the verification rule;
Verification report is generated according to the check results of the technical parameter.
As further technical solution, the verification type of the technical parameter is basic parameter;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification base The type or scope of plinth parameter;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
As further technical solution, the verification type of the technical parameter is relevant parameter;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verification institute State the relation of the corresponding relevant parameter value of relevant parameter and the relevant parameter;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
As further technical solution, the verification type of the technical parameter is average dispersion;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding average dispersion verification rule of the average dispersion is obtained, the average dispersion verification rule includes Average dispersion in the project of standard development cost report to prestore verifies the average dispersion of the technical parameter;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether the average dispersion for verifying the technical parameter is reasonable.
As further technical solution, the method further includes:
If being verified according to the verification rule, the technical parameter is reasonable, and the check results for obtaining the technical parameter are Upcheck;
If unreasonable according to the verification rule verification technical parameter, the check results of the technical parameter are obtained To examine mistake.
The second aspect of the embodiment of the present invention provides a kind of Project Cost data verification device, including:
Individual works determination type module, for obtaining the individual works of project to be rebuilt, and determines the item to be rebuilt The type of purpose individual works;
Technical parameter acquisition module, for obtaining the corresponding technology ginseng of the type of individual works of the project to be rebuilt Number;
Technical parameter judgment module, for judging whether the technical parameter is checking parameter;
Determination type module is verified, for if it is determined that the technical parameter is checking parameter, it is determined that the technical parameter Verification type;
Rule acquisition module is verified, the corresponding verification rule of the verification type for obtaining the technical parameter;
Technical parameter correction verification module, it is whether reasonable for verifying the technical parameter according to the verification rule;
Report generation module is verified, for generating verification report according to the check results of the technical parameter.
As further technical solution, the verification type of the technical parameter is basic parameter;
The verification rule acquisition module is additionally operable to:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification base The type or scope of plinth parameter;
The technical parameter correction verification module is additionally operable to:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
As further technical solution, the verification type of the technical parameter is relevant parameter;
The verification rule acquisition module is additionally operable to:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verification institute State the relation of the corresponding relevant parameter value of relevant parameter and the relevant parameter;
The technical parameter correction verification module is additionally operable to:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
The third aspect of the embodiment of the present invention provides a kind of Project Cost data verification terminal device, including:Memory, Processor and the computer program that can be run in the memory and on the processor is stored in, the processor performs The method as described in above-mentioned first aspect is realized during the computer program.
The fourth aspect of the embodiment of the present invention provides a kind of computer-readable recording medium, the computer-readable storage Media storage has computer program, and the side as described in above-mentioned first aspect is realized when the computer program is executed by processor Method.
Existing beneficial effect is the embodiment of the present invention compared with prior art:Grid company is in data check work for many years During work, by analyzing the place for refining induction and conclusion and making a report on project data and easily malfunctioning, based on staff for many years The data check experience of summary, have developed Project Cost data verification technology, by formulating substantial amounts of data in software systems Verification rule, it is efficient to help related personnel to note abnormalities from substantial amounts of data item, the time of data check is shortened, is improved The accuracy of data check, improves the work efficiency of staff.
Brief description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the step flow chart for the Project Cost data verification method that the embodiment of the present invention one provides;
Fig. 2 is the structure diagram of Project Cost data verification device provided by Embodiment 2 of the present invention;
Fig. 3 is the structure diagram for the Project Cost data verification device that the embodiment of the present invention three provides;
Fig. 4 is the structure diagram for the Project Cost data verification terminal device that the embodiment of the present invention four provides.
Embodiment
In being described below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, to understand thoroughly the embodiment of the present invention.However, it will be clear to one skilled in the art that these are specific The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details hinders description of the invention.
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one
As shown in Figure 1, for a kind of step flow chart of Project Cost data verification method, comprise the following steps:
Step S101, obtains the individual works of project to be rebuilt, and determines the class of the individual works of the project to be rebuilt Type.
Specifically, obtaining the individual works of project to be rebuilt, individual works can be complete from exchange change (matching somebody with somebody) electricity, substation respectively In the Engineering Specialities such as Comprehensive Automation Retrofit, exchange relay protection, ac transmission, communication engineering, communications optical cable, dispatch automated system of standing Obtain, exchange change (matching somebody with somebody) electricity specialty includes main transformer and replaces engineering, 10kV distribution transformers replacement engineering, arrester replacing work Journey, shunt capacitor replace engineering, reactor replaces engineering, current transformer replaces engineering, voltage transformer replaces engineering, disconnected Road device replaces engineering, high-tension switch cabinet replaces engineering, disconnecting switch replaces engineering;Substation's whole station Comprehensive Automation Retrofit specialty includes becoming Power station whole station Comprehensive Automation Retrofit engineering;Exchanging relay protection specialty includes replacing bus differential protection engineering, replaces mother or breaker is protected Nurse's journey, replaces route protection engineering, replaces main transformer protection engineering;Ac transmission specialty includes cable body improvement project, electricity Cable passage improvement project, pole and tower foundation engineering, restringing engineering, replaces shaft tower (tower body) engineering, replaces insulator engineering, more Common earth wire project is changed, replaces on-Line Monitor Device engineering;Communication engineering specialty is including replacement video conference terminal engineering and more Change optical transmitter and receiver engineering;Communications optical cable specialty includes replacing ADSS optical cable telecommunication lines and replaces OPGW optical cable projects;Scheduling is automatic Change system specialty includes transformation dispatch automated system engineering, transformation dispatch data net engineering and transformation scheduling large screen system work Journey, different Engineering Specialities include different types of individual works, the engineering type of transformation are judged according to engineering type parameter, each Engineering is assigned with only one engineering type parameter.
Step S102, obtains the corresponding technical parameter of type of the individual works of the project to be rebuilt.
Specifically, exchange becomes, (matching somebody with somebody) electrical engineering correspond to main transformer replacement engineering, 10kV distribution transformers replace engineering, Arrester replacing engineering, shunt capacitor replace engineering, reactor replaces engineering, current transformer replaces engineering, mutual induction of voltage Device replaces engineering, breaker replaces engineering, high-tension switch cabinet replaces engineering, disconnecting switch replaces engineering these technical parameters.
The type of the individual works of each project to be rebuilt correspond to one to multiple technical parameters, such as main transformer pressure Device is replaced engineering and is taken including individual capacity, transformation number of units, architectural engineering expense, original equipment cost, installing engineering expense, projects Deng.
Step S103, judges whether the technical parameter is checking parameter.
Specifically, whether judgment technology parameter is checking parameter respectively, such as judge that main transformer replaces engineering parameter and is No is checking parameter.
Step S104, if it is determined that the technical parameter is checking parameter, it is determined that the verification type of the technical parameter.
Specifically, if it is determined that technical parameter is checking parameter, then the verification type of technical parameter is determined respectively, verify type Including underlying parameter verification, relevant parameter verification and the verification of average dispersion, for example, judging that main transformer replaces engineering parameter and is It is underlying parameter verification, relevant parameter verification or the verification of average dispersion in his definite verification type after checking parameter.
Step S105, obtains the corresponding verification rule of verification type of the technical parameter.
Specifically, after the verification type of technical parameter is determined, the corresponding verification rule of definite verification type are obtained Then, for example, if it is determined that the verification type of technical parameter is basic parameter verification, then the verification for obtaining underlying parameter verification is advised Then;If it is determined that the verification type of technical parameter verifies for relevant parameter, then the verification rule of relevant parameter verification is obtained;Such as Fruit determines that the verification type of technical parameter verifies for average dispersion, then obtains the verification rule of average dispersion verification.
Step S106, the whether reasonable of technical parameter is verified according to the verification rule
Specifically, after obtaining the verification rule of corresponding verification type, according to the regular calibration technology parameter of verification whether Rationally, if for example, what is obtained is underlying parameter verification rule, whether regular calibration technology parameter is verified according to underlying parameter Rationally, relevant parameter verification and average dispersion verify similarly.
Step S107, verification report is generated according to the check results of the technical parameter.
Specifically, after the completion of verification, the verification report containing check results is generated, facilitates staff to be directly viewable verification As a result.
In addition, in a specific example, the verification type of the technical parameter is basic parameter.
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification base The type or scope of plinth parameter.
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
Specifically, underlying parameter verification be underlying parameter type or data area, be main transformer as shown in table 1 The underlying parameter verification details of parameter:
Table 1
In addition, in a specific example, the verification type of the technical parameter is relevant parameter.
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verification institute State the relation of the corresponding relevant parameter value of relevant parameter and the relevant parameter.
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
Specifically, relevant parameter verification be the corresponding relevant parameter value of relevant parameter and the relevant parameter relation, As shown in table 2, details are verified for the relevant parameter of main transformer parameter:
Table 2
In addition, in a specific example, the verification type of the technical parameter is average dispersion.
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding average dispersion verification rule of the average dispersion is obtained, the average dispersion verification rule includes Average dispersion in the project of standard development cost report to prestore verifies the average dispersion of the technical parameter.
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether the average dispersion for verifying the technical parameter is reasonable.
Specifically, described in average dispersion verification of the average dispersion verification in the project of standard development cost report to prestore The average dispersion of technical parameter, as shown in table 3, details is verified for the average dispersion of main transformer parameter:
Table 3
As shown in table 4,5 and 6, underlying parameter verification details, the relevant parameter of bus differential protection technical parameter are respectively replaced Verify details and average dispersion verification details:
Table 4
Table 5
Table 6
Other kinds of technical parameter also similarly, within the protection domain of this programme.
In addition, in a specific example, the method further includes:
If being verified according to the verification rule, the technical parameter is reasonable, and the check results for obtaining the technical parameter are Upcheck.
If unreasonable according to the verification rule verification technical parameter, the check results of the technical parameter are obtained To examine mistake.
Specifically, this programme is based primarily upon the basic data report of standard, the verification rule of each field is formulated, is realized to making The reasonableness check of valency basic data, when carrying out data inspection, system is based on data check flow, preferentially reads individual works Type, corresponding data check rule and logic are called further according to individual works type, by verify not by data be used as it is different Regular data exports, and facilitates staff to check check results, finds unreasonable data in time, solve a problem promptly.
After using the above scheme, grid company is concluded always in the data check course of work for many years by analyzing to refine Tie and made a report on the place that project data easily malfunctions, the data check experience summarized for many years based on staff, have developed and treat Transformation project cost data verification scheme, it is efficient to help related personnel to note abnormalities from substantial amounts of data item, shorten number According to the time of verification, data check work efficiency is lifted:The individual works type Auto-matching of data is made a report on according to Project Unit Work efficiency raising can be substantially improved in corresponding verification rule, quick output error data, relatively conventional manually examining one by one The work efficiency of staff.Lift data check reliability:All data can accurately and effectively be verified according to rule, There is no the situation of carelessness, mistakes and omissions, relatively conventional manually verifying one by one can ensure that verification is arrived per data.Pass through power grid technological transformation Project Cost basic data assistant analysis technology, it is possible to achieve the various dimensions of analysis of prices data are verified, contribute to state's net public The accuracy that department's lifting data are made a report on.
Embodiment two
As shown in Fig. 2, be a kind of structure diagram of Project Cost data verification device, including:
Individual works determination type module 201, for obtaining the individual works of project to be rebuilt, and determines described to be rebuilt The type of the individual works of project.
Technical parameter acquisition module 202, the corresponding technology of type of the individual works for obtaining the project to be rebuilt Parameter.
Technical parameter judgment module 203, for judging whether the technical parameter is checking parameter.
Determination type module 204 is verified, for if it is determined that the technical parameter is checking parameter, it is determined that the technology ginseng Several verification types;
Rule acquisition module 205 is verified, the corresponding verification rule of the verification type for obtaining the technical parameter.
Technical parameter correction verification module 206, for verifying the whether reasonable of technical parameter according to the verification rule
Report generation module 207 is verified, for generating verification report according to the check results of the technical parameter.
After using the above scheme, grid company is concluded always in the data check course of work for many years by analyzing to refine Tie and made a report on the place that project data easily malfunctions, the data check experience summarized for many years based on staff, have developed and treat Transformation project cost data verification scheme, it is efficient to help related personnel to note abnormalities from substantial amounts of data item, shorten number According to the time of verification, data check work efficiency is lifted:The individual works type Auto-matching of data is made a report on according to Project Unit Work efficiency raising can be substantially improved in corresponding verification rule, quick output error data, relatively conventional manually examining one by one The work efficiency of staff.Lift data check reliability:All data can accurately and effectively be verified according to rule, There is no the situation of carelessness, mistakes and omissions, relatively conventional manually verifying one by one can ensure that verification is arrived per data.Pass through power grid technological transformation Project Cost basic data assistant analysis technology, it is possible to achieve the various dimensions of analysis of prices data are verified, contribute to state's net public The accuracy that department's lifting data are made a report on.
Embodiment three
As shown in figure 3, a kind of structure diagram of the Project Cost data verification device provided for embodiment, including:
Individual works determination type module 301, for obtaining the individual works of project to be rebuilt, and determines described to be rebuilt The type of the individual works of project.
Technical parameter acquisition module 302, the corresponding technology of type of the individual works for obtaining the project to be rebuilt Parameter.
Technical parameter judgment module 303, for judging whether the technical parameter is checking parameter.
Determination type module 304 is verified, for if it is determined that the technical parameter is checking parameter, it is determined that the technology ginseng Several verification types;
Rule acquisition module 305 is verified, the corresponding verification rule of the verification type for obtaining the technical parameter.
Technical parameter correction verification module 306, for verifying the whether reasonable of technical parameter according to the verification rule
Report generation module 307 is verified, for generating verification report according to the check results of the technical parameter.
In addition, in a specific example, the verification type of the technical parameter is basic parameter;
The verification rule acquisition module 305 is additionally operable to:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification base The type or scope of plinth parameter;
The technical parameter correction verification module 306 is additionally operable to:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
In addition, in a specific example, the verification type of the technical parameter is relevant parameter;
The verification rule acquisition module 305 is additionally operable to:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verification institute State the relation of the corresponding relevant parameter value of relevant parameter and the relevant parameter;
The technical parameter correction verification module 306 is additionally operable to:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
In addition, in a specific example, the verification type of the technical parameter is average dispersion;
The verification rule acquisition module 305 is additionally operable to:
The corresponding average dispersion verification rule of the average dispersion is obtained, the average dispersion verification rule includes Average dispersion in the project of standard development cost report to prestore verifies the average dispersion of the technical parameter;
The technical parameter correction verification module 306 is additionally operable to:Whether the average dispersion for verifying the technical parameter is reasonable.
In addition, in a specific example, described device further includes:
Module of upchecking 308, if reasonable for verifying the technical parameter according to the verification rule, obtains described The check results of technical parameter are to upcheck;
Error module 309 is examined, if unreasonable for verifying the technical parameter according to the verification rule, obtains institute The check results for stating technical parameter are inspection mistake.
After using the above scheme, grid company is concluded always in the data check course of work for many years by analyzing to refine Tie and made a report on the place that project data easily malfunctions, the data check experience summarized for many years based on staff, have developed and treat Transformation project cost data verification scheme, it is efficient to help related personnel to note abnormalities from substantial amounts of data item, shorten number According to the time of verification, data check work efficiency is lifted:The individual works type Auto-matching of data is made a report on according to Project Unit Work efficiency raising can be substantially improved in corresponding verification rule, quick output error data, relatively conventional manually examining one by one The work efficiency of staff.Lift data check reliability:All data can accurately and effectively be verified according to rule, There is no the situation of carelessness, mistakes and omissions, relatively conventional manually verifying one by one can ensure that verification is arrived per data.Pass through power grid technological transformation Project Cost basic data assistant analysis technology, it is possible to achieve the various dimensions of analysis of prices data are verified, contribute to state's net public The accuracy that department's lifting data are made a report on.
It is to be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention forms any limit with its function and internal logic It is fixed.
Example IV
As shown in figure 4, a kind of structure diagram of the Project Cost data verification terminal device provided for embodiment, bag Include:Processor 40, memory 41 and it is stored in the computer that can be run in the memory 41 and on the processor 40 Program 42, such as Project Cost data verifying program.The processor 40 is realized above-mentioned each when performing the computer program 42 Step in a Project Cost data verification method embodiment, such as step 101 shown in Fig. 1 is to 107.Alternatively, the processing Device 40 realizes the function of each module/unit in above-mentioned each device embodiment when performing the computer program 42, such as shown in Fig. 2 The function of module 201 to 207.
Exemplary, the computer program 42 can be divided into one or more module/units, it is one or Multiple module/units are stored in the memory 41, and are performed by the processor 40, to complete the present invention.Described one A or multiple module/units can be the series of computation machine programmed instruction section that can complete specific function, which is used for Implementation procedure of the computer program 42 in the Project Cost data verification terminal device 4 is described.For example, the calculating Machine program 42 can be divided into synchronization module, summarizing module, acquisition module, return module (module in virtual bench), respectively Module concrete function is as follows:
The individual works of project to be rebuilt are obtained, and determine the type of the individual works of the project to be rebuilt;
Obtain the corresponding technical parameter of type of the individual works of the project to be rebuilt.
Judge whether the technical parameter is checking parameter.
If it is determined that the technical parameter is checking parameter, it is determined that the verification type of the technical parameter.
Obtain the corresponding verification rule of verification type of the technical parameter.
It is whether reasonable that the technical parameter is verified according to the verification rule.
Verification report is generated according to the check results of the technical parameter.
The Project Cost data verification terminal device 4 can be desktop PC, notebook, palm PC and high in the clouds The computing devices such as server.The Project Cost data verification terminal device may include, but be not limited only to, processor 40, storage Device 41.It will be understood by those skilled in the art that Fig. 4 is only the example of Project Cost data verification terminal device 4, do not form Restriction to Project Cost data verification terminal device 4, can include components more more or fewer than diagram, or combine some Component, or different components, such as the Project Cost data verification terminal device can also include input-output equipment, net Network access device, bus etc..
Alleged processor 40 can be central processing unit (Central Processing Unit, CPU), can also be Other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic, Discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processor Deng.
The memory 41 can be the internal storage unit of the Project Cost data verification terminal device 4, such as item The hard disk or memory of mesh cost data verification terminal device 4.The memory 41 can also be the Project Cost data verification The plug-in type hard disk being equipped with the External memory equipment of terminal device 4, such as the Project Cost data verification terminal device 4, Intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Further, the memory 41 can also both include the inside of the Project Cost data verification terminal device 4 Storage unit also includes External memory equipment.The memory 41 is used to store the computer program and the Project Cost Other programs and data needed for data verification terminal device.The memory 41, which can be also used for temporarily storing, have been exported Or the data that will be exported.
It is apparent to those skilled in the art that for convenience of description and succinctly, only with above-mentioned each work( Can unit, module division progress for example, in practical application, can be as needed and by above-mentioned function distribution by different Functional unit, module are completed, i.e., the internal structure of described device are divided into different functional units or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that unit is individually physically present, can also two or more units integrate in a unit, it is above-mentioned integrated Unit can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.In addition, each function list Member, the specific name of module are not limited to the protection domain of the application also only to facilitate mutually distinguish.Said system The specific work process of middle unit, module, may be referred to the corresponding process in preceding method embodiment, details are not described herein.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, and is not described in detail or remembers in some embodiment The part of load, may refer to the associated description of other embodiments.
Those of ordinary skill in the art may realize that each exemplary list described with reference to the embodiments described herein Member and algorithm steps, can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, application-specific and design constraint depending on technical solution.Professional technician Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed device/terminal device and method, can be with Realize by another way.For example, device described above/terminal device embodiment is only schematical, for example, institute The division of module or unit is stated, is only a kind of division of logic function, there can be other dividing mode when actually realizing, such as Multiple units or component can combine or be desirably integrated into another system, or some features can be ignored, or not perform.Separately A bit, shown or discussed mutual coupling or direct-coupling or communication connection can be by some interfaces, device Or INDIRECT COUPLING or the communication connection of unit, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown may or may not be physical location, you can with positioned at a place, or can also be distributed to multiple In network unit.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated module/unit realized in the form of SFU software functional unit and as independent production marketing or In use, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-mentioned implementation All or part of flow in example method, can also instruct relevant hardware to complete, the meter by computer program Calculation machine program can be stored in a computer-readable recording medium, the computer program when being executed by processor, it can be achieved that on The step of stating each embodiment of the method.Wherein, the computer program includes computer program code, the computer program generation Code can be source code form, object identification code form, executable file or some intermediate forms etc..The computer-readable medium It can include:Any entity or device, recording medium, USB flash disk, mobile hard disk, the magnetic of the computer program code can be carried Dish, CD, computer storage, read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium etc..It is it should be noted that described The content that computer-readable medium includes can carry out appropriate increasing according to legislation in jurisdiction and the requirement of patent practice Subtract, such as in some jurisdictions, according to legislation and patent practice, computer-readable medium do not include be electric carrier signal and Telecommunication signal.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to foregoing reality Example is applied the present invention is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to foregoing each Technical solution described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical solution, should all Within protection scope of the present invention.

Claims (10)

1. a kind of Project Cost data verification method, it is characterised in that comprise the following steps:
The individual works of project to be rebuilt are obtained, and determine the type of the individual works of the project to be rebuilt;
Obtain the corresponding technical parameter of type of the individual works of the project to be rebuilt;
Judge whether the technical parameter is checking parameter;
If it is determined that the technical parameter is checking parameter, it is determined that the verification type of the technical parameter;
Obtain the corresponding verification rule of verification type of the technical parameter;
It is whether reasonable that the technical parameter is verified according to the verification rule;
Verification report is generated according to the check results of the technical parameter.
2. Project Cost data verification method as claimed in claim 1, it is characterised in that the verification type of the technical parameter For basic parameter;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification basis ginseng Several types or scope;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
3. Project Cost data verification method as claimed in claim 1, it is characterised in that the verification type of the technical parameter For relevant parameter;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verifying the pass Join the corresponding relevant parameter value of parameter and the relation of the relevant parameter;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
4. Project Cost data verification method as claimed in claim 1, it is characterised in that the verification type of the technical parameter For average dispersion;
The corresponding verification rule of verification type for obtaining the technical parameter includes:
The corresponding average dispersion verification rule of the average dispersion is obtained, the average dispersion verification rule includes basis Average dispersion in the project of standard development cost report to prestore verifies the average dispersion of the technical parameter;
It is described to verify whether the technical parameter rationally includes according to the verification rule:
Whether the average dispersion for verifying the technical parameter is reasonable.
5. Project Cost data verification method as claimed in claim 1, it is characterised in that further include:
If being verified according to the verification rule, the technical parameter is reasonable, and the check results for obtaining the technical parameter are inspection Pass through;
If being verified according to the verification rule, the technical parameter is unreasonable, and the check results for obtaining the technical parameter are inspection Error checking misses.
A kind of 6. Project Cost data verification device, it is characterised in that including:
Individual works determination type module, for obtaining the individual works of project to be rebuilt, and determines the project to be rebuilt The type of individual works;
Technical parameter acquisition module, the corresponding technical parameter of type of the individual works for obtaining the project to be rebuilt;
Technical parameter judgment module, for judging whether the technical parameter is checking parameter;
Determination type module is verified, for if it is determined that the technical parameter is checking parameter, it is determined that the school of the technical parameter Test type;
Rule acquisition module is verified, the corresponding verification rule of the verification type for obtaining the technical parameter;
Technical parameter correction verification module, it is whether reasonable for verifying the technical parameter according to the verification rule;
Report generation module is verified, for generating verification report according to the check results of the technical parameter.
7. Project Cost data verification device as claimed in claim 6, it is characterised in that the verification type of the technical parameter For basic parameter;
The verification rule acquisition module is additionally operable to:
The corresponding underlying parameter verification rule of the underlying parameter is obtained, the underlying parameter verification rule includes verification basis ginseng Several types or scope;
The technical parameter correction verification module is additionally operable to:
Whether reasonable verify the type of underlying parameter or scope in the technical parameter.
8. Project Cost data verification device as claimed in claim 6, it is characterised in that the verification type of the technical parameter For relevant parameter;
The verification rule acquisition module is additionally operable to:
The corresponding relevant parameter verification rule of the relevant parameter is obtained, the relevant parameter verification rule includes verifying the pass Join the corresponding relevant parameter value of parameter and the relation of the relevant parameter;
The technical parameter correction verification module is additionally operable to:
Whether reasonable verify relevant parameter and the corresponding relevant parameter value in the technical parameter.
9. a kind of Project Cost data verification terminal device, including memory, processor and it is stored in the memory simultaneously The computer program that can be run on the processor, it is characterised in that the processor performs real during the computer program Now such as the step of any one of claim 1 to 5 the method.
10. a kind of computer-readable recording medium, the computer-readable recording medium storage has computer program, its feature exists In when the computer program is executed by processor the step of realization such as any one of claim 1 to 5 the method.
CN201711262371.7A 2017-12-04 2017-12-04 Project cost data verification method and terminal device Pending CN107958370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711262371.7A CN107958370A (en) 2017-12-04 2017-12-04 Project cost data verification method and terminal device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711262371.7A CN107958370A (en) 2017-12-04 2017-12-04 Project cost data verification method and terminal device

Publications (1)

Publication Number Publication Date
CN107958370A true CN107958370A (en) 2018-04-24

Family

ID=61962991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711262371.7A Pending CN107958370A (en) 2017-12-04 2017-12-04 Project cost data verification method and terminal device

Country Status (1)

Country Link
CN (1) CN107958370A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109344369A (en) * 2018-08-22 2019-02-15 中国平安人寿保险股份有限公司 Voucher production method and terminal device based on initial value verification
CN110874221A (en) * 2019-11-19 2020-03-10 深圳忆联信息系统有限公司 SSD firmware packaging method and device based on command line and computer equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150006434A1 (en) * 2013-06-27 2015-01-01 First American Financial Corporation Rules-based escrow systems and methods
CN104391934A (en) * 2014-11-21 2015-03-04 深圳市银雁金融配套服务有限公司 Data calibration method and device
CN105989546A (en) * 2016-04-13 2016-10-05 国网吉林省电力有限公司经济技术研究院 Power transmission and transformation construction cost basic data collection and analysis system
CN107329849A (en) * 2017-07-06 2017-11-07 北京理工大学 A kind of data verification method and system based on Java systems

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150006434A1 (en) * 2013-06-27 2015-01-01 First American Financial Corporation Rules-based escrow systems and methods
CN104391934A (en) * 2014-11-21 2015-03-04 深圳市银雁金融配套服务有限公司 Data calibration method and device
CN105989546A (en) * 2016-04-13 2016-10-05 国网吉林省电力有限公司经济技术研究院 Power transmission and transformation construction cost basic data collection and analysis system
CN107329849A (en) * 2017-07-06 2017-11-07 北京理工大学 A kind of data verification method and system based on Java systems

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109344369A (en) * 2018-08-22 2019-02-15 中国平安人寿保险股份有限公司 Voucher production method and terminal device based on initial value verification
CN110874221A (en) * 2019-11-19 2020-03-10 深圳忆联信息系统有限公司 SSD firmware packaging method and device based on command line and computer equipment

Similar Documents

Publication Publication Date Title
AU2013398952B2 (en) System, method and apparatuses for distribution network reconfiguration and a tangible computer readable medium
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
EP2930634A2 (en) System and method for automated substation design and configuration
CN108733928B (en) SCD file virtual circuit automatic checking method based on intermediate model file
CN104123271A (en) Secondary design system for intelligent substation on basis of Excel
CN108153996B (en) Method for realizing electric wiring group cabinet by COMOS platform
US8706468B2 (en) Method and program product for validation of circuit models for phase connectivity
CN103729557A (en) Static N-X batch processing method on basis of PSD-BPA
CN113094932A (en) Method, device, equipment and storage medium for acquiring construction cost of power transformation project
CN107526007A (en) The recognition methods of fault type and device
CN111769638B (en) Operation ticket checking method, device, equipment and storage medium
CN116561941B (en) SCD virtual loop template model and modeling and application method thereof
CN107958370A (en) Project cost data verification method and terminal device
CN111509706A (en) Power supply topology information correction method, system, device and storage medium
CN107609797A (en) Electric operating checking method and terminal device
CN107886252A (en) Electricity electricity charge review method, system and terminal device
CN109325603B (en) Fault request processing method and device and terminal equipment
CN107609654A (en) Management method, managing device and the terminal device of taiwan area
CN112766783B (en) Method and system for evaluating operation quality of power equipment, terminal equipment and medium
CN111611665B (en) Intelligent substation design method based on three-dimensional modular design
CN109034623A (en) Electric Power Network Planning data processing method and terminal device
CN107169175A (en) One kind verification rational method and system of overhead transmission line topology design
CN108197179A (en) Facility information querying method and terminal device
CN107818522A (en) Custom power status inquiry method and terminal device
CN106599318A (en) Data verification method for power distribution network model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180424

RJ01 Rejection of invention patent application after publication