CN104866987A - Processing method of electrical equipment material purchasing data - Google Patents
Processing method of electrical equipment material purchasing data Download PDFInfo
- Publication number
- CN104866987A CN104866987A CN201510237792.9A CN201510237792A CN104866987A CN 104866987 A CN104866987 A CN 104866987A CN 201510237792 A CN201510237792 A CN 201510237792A CN 104866987 A CN104866987 A CN 104866987A
- Authority
- CN
- China
- Prior art keywords
- materials
- goods
- purchase
- data
- material purchasing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a processing method of electrical equipment material purchasing data. The method comprises the steps of: obtaining material purchasing data input by a user through a client end; carrying out classification processing on the material purchasing data to generate classified material purchasing data; carrying out screening processing on the classified material purchasing data to generate a material purchasing plan table; and according to a preset material purchasing examination criterion, examining the material purchasing plan table, and generating a material purchasing management result. The processing method of the electrical equipment material purchasing data solves the technical problems in the prior art that the material purchasing data needs to be manually analyzed by the user, so that the workload of personnel is large, and the efficiency of the data analysis is relatively low; in addition, by adopting the processing method of the electrical equipment material purchasing data, the workload of finance personnel is reduced, and the efficiency and the accuracy of electrical equipment material purchasing data management are improved.
Description
Technical field
The invention belongs to material equipment technical field of data processing, particularly a kind of disposal route of power equipment purchase of goods and materials data.
Background technology
Along with the growth of enterprise develops, goods and materials management and control becomes the important service of enterprise.Guarantee raw material supply and the cost control of enterprise, just can guarantee that enterprise completes operating plan, and then reach the strategic objective of enterprise.Wherein, the purchase cost of enterprise's materials purchased, commodity etc. is adjusted in purchase of goods and materials.Circulation business of commodities commodities purchased can not be adjusted by undergraduate course order, circulation business of commodities because of commodities purchased the end of term occur commodity in transit, and adopt real cost adjust material, commodity enterprise, adjust according to the accounting method of goods and materials in transit.The various materials of business inventory adjusted by starting material, comprise planned costs or the real cost of raw material and main material, auxiliary material, outsourcing semi-manufacture (outsourcing piece), spare parts for repair (standby redundancy), wrappage, fuel etc.
At present, in goods and materials data practical management process, employee checks corresponding form often, via manual analysis, knows the current goods and materials situation of company.So, strengthen the workload of personnel, the efficiency that result in purchase of goods and materials data management is lower.
Summary of the invention
In view of this, the invention provides a kind of disposal route of power equipment purchase of goods and materials data, be intended to solve because needing user's manual analysis purchase of goods and materials data in prior art, the person works caused measures greatly, the technical matters that data analysis efficiency is lower.
The present invention solves its technical matters and takes following technical scheme to realize:
A disposal route for power equipment purchase of goods and materials data, comprises method step as follows:
(1) obtain the purchase of goods and materials data that inputs via client of user, described purchase of goods and materials data at least comprise material data, quotation is ask in material supply quotient data, buying, purchase of goods and materials contract, project purchase of goods and materials data, production cost class purchase of goods and materials data, class of buying retail fix goods and materials procurement data, promptly purchase of goods and materials data, class of buying retail capital assets and low value easily-consumed products procurement data, purchase in returns data at least one;
(2) classification process is carried out to described purchase of goods and materials data, generate and sort out purchase of goods and materials data; Described classification process at least comprises confirmation buying goods and materials kind, buying goods and materials time limit, purchases goods and materials quotation, project purchasing goods and materials, the urgent one purchasing goods and materials;
(3) according to described classification purchase of goods and materials data, purchasing plan of materials and equipment table is generated; Described purchasing plan of materials and equipment table comprises procurement plan and the procurement process of purchase of goods and materials;
(4) according to the purchase of goods and materials examination criterion preset, examine described purchasing plan of materials and equipment table, generate materiel acquisition management result.
And in described step (3), when the parameter of purchasing plan of materials and equipment table meets described default purchase of goods and materials examination criterion, the purchase of goods and materials data pointing out user current are authority data, meet the health requirements of purchase of goods and materials; When the parameter of purchasing plan of materials and equipment table does not meet described default purchase of goods and materials examination criterion, present indicating alarm information, prompting does not meet the health requirements of purchase of goods and materials.
And purchase of goods and materials examination criterion at least comprises in following criterion in described step (4): whether the amount of money of purchase of goods and materials meets preset rules, whether the time limit of purchase of goods and materials meets preset rules, whether the progress of purchase of goods and materials meets preset rules, whether project purchase of goods and materials exceeds predetermined threshold value, whether the ratio of all kinds of purchase of goods and materials exceeds default ratio value, whether the quality of buying goods and materials meets preset rules.
And purchase of goods and materials examination criterion comprises at least one in following criterion in described step (4): take international technical standards as examination criterion, take national standard as examination criterion, take Technical specifications as examination criterion, using the universality parameter comparison of same material pairing comparision as examination criterion.
And, for the materiel acquisition management result generated in described step (4), also further do following process: store current materiel acquisition management result, and current materiel acquisition management result and the last materiel acquisition management result generated are compared;
1. comparative result be current materiel acquisition management result be better than last materiel acquisition management result time, present encouragement information;
2. comparative result be current materiel acquisition management result be inferior to last materiel acquisition management result time, display data discrepancy, and provide corresponding suggestion and measure.
Advantage of the present invention and good effect are:
The invention solves in prior art because needing user's manual analysis purchase of goods and materials data, the workload of the personnel caused is large, the technical matters that data analysis efficiency is lower, reduces the workload of financial staff, improves efficiency and the accuracy of power equipment purchase of goods and materials data management.
Accompanying drawing explanation
Fig. 1 is the hardware system structure schematic diagram that the inventive method is applied.
Embodiment
Be further described the invention process below in conjunction with accompanying drawing, following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A disposal route for power equipment purchase of goods and materials data, as shown in Figure 1, the hardware system that this method uses comprises acquiring unit, obtains the purchase of goods and materials data that user inputs via client; Sort out processing unit, classification process is carried out to described purchase of goods and materials data, generates and sort out purchase of goods and materials data; Form generation unit, according to described classification purchase of goods and materials data, generates purchasing plan of materials and equipment table; Examination unit, according to the purchase of goods and materials examination criterion preset, examines described purchasing plan of materials and equipment table, generates materiel acquisition management result.
The step of the inventive method is as follows:
(1) obtain the purchase of goods and materials data that inputs via client of user, described purchase of goods and materials data at least comprise material data, quotation is ask in material supply quotient data, buying, purchase of goods and materials contract, project purchase of goods and materials data, production cost class purchase of goods and materials data, class of buying retail fix goods and materials procurement data, promptly purchase of goods and materials data, class of buying retail capital assets and low value easily-consumed products procurement data, purchase in returns data at least one;
(2) classification process is carried out to described purchase of goods and materials data, generate and sort out purchase of goods and materials data; Described classification process at least comprises confirmation buying goods and materials kind, buying goods and materials time limit, purchases goods and materials quotation, project purchasing goods and materials, the urgent one purchasing goods and materials;
(3) according to described classification purchase of goods and materials data, purchasing plan of materials and equipment table is generated; Described purchasing plan of materials and equipment table comprises procurement plan and the procurement process of purchase of goods and materials;
(5) according to the purchase of goods and materials examination criterion preset, examine described purchasing plan of materials and equipment table, generate materiel acquisition management result.
Comprise as generating materiel acquisition management result described in a modification of the present invention: when the parameter of described purchasing plan of materials and equipment table meets described default purchase of goods and materials examination criterion, the purchase of goods and materials data pointing out user current are authority data, meet the health requirements of purchase of goods and materials; When the parameter of described purchasing plan of materials and equipment table does not meet described default purchase of goods and materials examination criterion, present indicating alarm information, prompting does not meet the health requirements of purchase of goods and materials.
One in following criterion is at least comprised: whether the amount of money of purchase of goods and materials meets preset rules, whether the time limit of purchase of goods and materials meets preset rules, whether the progress of purchase of goods and materials meets preset rules, whether project purchase of goods and materials exceeds predetermined threshold value, whether the ratio of all kinds of purchase of goods and materials exceeds default ratio value, whether the quality of buying goods and materials meets preset rules as the purchase of goods and materials examination criterion preset described in a modification of the present invention.
At least one in following criterion is comprised: take international technical standards as examination criterion, take national standard as examination criterion, take Technical specifications as examination criterion, using the universality parameter comparison of same material pairing comparision as examination criterion as purchase of goods and materials examination criterion described in a modification of the present invention.
Also comprise as method described in a modification of the present invention: store current materiel acquisition management result, and current materiel acquisition management result and the last materiel acquisition management result generated are compared;
Comparative result be current materiel acquisition management result be better than last materiel acquisition management result time, present encouragement information; Comparative result be current materiel acquisition management result be inferior to last materiel acquisition management result time, display data discrepancy, and provide corresponding suggestion and measure.
Claims (5)
1. a disposal route for power equipment purchase of goods and materials data, is characterized in that comprising method step as follows:
(1) obtain the purchase of goods and materials data that inputs via client of user, described purchase of goods and materials data at least comprise material data, quotation is ask in material supply quotient data, buying, purchase of goods and materials contract, project purchase of goods and materials data, production cost class purchase of goods and materials data, class of buying retail fix goods and materials procurement data, promptly purchase of goods and materials data, class of buying retail capital assets and low value easily-consumed products procurement data, purchase in returns data at least one;
(2) classification process is carried out to described purchase of goods and materials data, generate and sort out purchase of goods and materials data; Described classification process at least comprises confirmation buying goods and materials kind, buying goods and materials time limit, purchases goods and materials quotation, project purchasing goods and materials, the urgent one purchasing goods and materials;
(3) according to described classification purchase of goods and materials data, purchasing plan of materials and equipment table is generated; Described purchasing plan of materials and equipment table comprises procurement plan and the procurement process of purchase of goods and materials;
(4) according to the purchase of goods and materials examination criterion preset, examine described purchasing plan of materials and equipment table, generate materiel acquisition management result.
2. the disposal route of power equipment purchase of goods and materials data according to claim 1, it is characterized in that: in described step (3), when the parameter of purchasing plan of materials and equipment table meets described default purchase of goods and materials examination criterion, the purchase of goods and materials data pointing out user current are authority data, meet the health requirements of purchase of goods and materials; When the parameter of purchasing plan of materials and equipment table does not meet described default purchase of goods and materials examination criterion, present indicating alarm information, prompting does not meet the health requirements of purchase of goods and materials.
3. the disposal route of power equipment purchase of goods and materials data according to claim 1, is characterized in that: in described step (4), purchase of goods and materials examination criterion at least comprises in following criterion: whether the amount of money of purchase of goods and materials meets preset rules, whether the time limit of purchase of goods and materials meets preset rules, whether the progress of purchase of goods and materials meets preset rules, whether project purchase of goods and materials exceeds predetermined threshold value, whether the ratio of all kinds of purchase of goods and materials exceeds default ratio value, whether the quality of buying goods and materials meets preset rules.
4. the disposal route of power equipment purchase of goods and materials data according to claim 1, is characterized in that: in described step (4), purchase of goods and materials examination criterion comprises at least one in following criterion: take international technical standards as examination criterion, take national standard as examination criterion, take Technical specifications as examination criterion, using the universality parameter comparison of same material pairing comparision as examination criterion.
5. the disposal route of power equipment purchase of goods and materials data according to claim 1, it is characterized in that: for the materiel acquisition management result generated in described step (4), also further do following process: store current materiel acquisition management result, and current materiel acquisition management result and the last materiel acquisition management result generated are compared;
1. comparative result be current materiel acquisition management result be better than last materiel acquisition management result time, present encouragement information;
2. comparative result be current materiel acquisition management result be inferior to last materiel acquisition management result time, display data discrepancy, and provide corresponding suggestion and measure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510237792.9A CN104866987A (en) | 2015-05-11 | 2015-05-11 | Processing method of electrical equipment material purchasing data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510237792.9A CN104866987A (en) | 2015-05-11 | 2015-05-11 | Processing method of electrical equipment material purchasing data |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104866987A true CN104866987A (en) | 2015-08-26 |
Family
ID=53912807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510237792.9A Pending CN104866987A (en) | 2015-05-11 | 2015-05-11 | Processing method of electrical equipment material purchasing data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104866987A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107093023A (en) * | 2017-04-25 | 2017-08-25 | 诚品优选(北京)电子商务有限公司 | Handling of goods and materials device and material Management System |
CN107644091A (en) * | 2017-09-27 | 2018-01-30 | 山东浪潮通软信息科技有限公司 | A kind of method of multidimensional control procurement process |
CN108133307A (en) * | 2017-12-01 | 2018-06-08 | 国家电网公司 | Goods and materials plan review method, system and terminal device |
CN109063981A (en) * | 2018-07-16 | 2018-12-21 | 广东电网有限责任公司 | Power Material supplies management-control method, device and electronic equipment |
CN109359842A (en) * | 2018-09-30 | 2019-02-19 | 国网山东省电力公司物资公司 | A kind of single multivariate data examines processing method, apparatus and terminal device |
CN110766339A (en) * | 2019-10-31 | 2020-02-07 | 国网河南省电力公司南阳供电公司 | Electric power company e-commerce purchasing method |
CN111815113A (en) * | 2020-06-03 | 2020-10-23 | 苏州热工研究院有限公司 | Integrated management platform, method and computer readable storage medium |
CN113077143A (en) * | 2021-03-31 | 2021-07-06 | 国网浙江省电力有限公司物资分公司 | Comprehensive plan management and control system based on remote examination |
CN115965226A (en) * | 2023-03-16 | 2023-04-14 | 深圳前海硬之城信息技术有限公司 | Control method, device and equipment for goods purchase and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963850A (en) * | 2006-11-21 | 2007-05-16 | 南京鑫源招标咨询有限公司 | System for managing stock service of business |
CN102142108A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Information processing method of corresponding relationship among materials and equipment suitable for power system |
CN102346885A (en) * | 2011-09-26 | 2012-02-08 | 镇江科大船苑计算机网络工程有限公司 | Logistics purchasing/supplying management method capable of realizing automatic quantitative purchasing |
CN102456191A (en) * | 2010-10-27 | 2012-05-16 | 镇江华扬信息科技有限公司 | Material purchase requisition system |
CN103065225A (en) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | Material purchasing plan examining method |
-
2015
- 2015-05-11 CN CN201510237792.9A patent/CN104866987A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1963850A (en) * | 2006-11-21 | 2007-05-16 | 南京鑫源招标咨询有限公司 | System for managing stock service of business |
CN102142108A (en) * | 2010-02-03 | 2011-08-03 | 上海市电力公司 | Information processing method of corresponding relationship among materials and equipment suitable for power system |
CN102456191A (en) * | 2010-10-27 | 2012-05-16 | 镇江华扬信息科技有限公司 | Material purchase requisition system |
CN102346885A (en) * | 2011-09-26 | 2012-02-08 | 镇江科大船苑计算机网络工程有限公司 | Logistics purchasing/supplying management method capable of realizing automatic quantitative purchasing |
CN103065225A (en) * | 2012-12-31 | 2013-04-24 | 国家电网公司 | Material purchasing plan examining method |
Non-Patent Citations (2)
Title |
---|
吴迪: "拓海公司采购管理系统设计与实现", 《中国学位论文全文数据库》 * |
潘明惠: "《豪情电力路》", 31 August 2012, 清华大学出版社 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107093023A (en) * | 2017-04-25 | 2017-08-25 | 诚品优选(北京)电子商务有限公司 | Handling of goods and materials device and material Management System |
CN107644091A (en) * | 2017-09-27 | 2018-01-30 | 山东浪潮通软信息科技有限公司 | A kind of method of multidimensional control procurement process |
CN108133307A (en) * | 2017-12-01 | 2018-06-08 | 国家电网公司 | Goods and materials plan review method, system and terminal device |
CN109063981A (en) * | 2018-07-16 | 2018-12-21 | 广东电网有限责任公司 | Power Material supplies management-control method, device and electronic equipment |
CN109359842A (en) * | 2018-09-30 | 2019-02-19 | 国网山东省电力公司物资公司 | A kind of single multivariate data examines processing method, apparatus and terminal device |
CN110766339A (en) * | 2019-10-31 | 2020-02-07 | 国网河南省电力公司南阳供电公司 | Electric power company e-commerce purchasing method |
CN111815113A (en) * | 2020-06-03 | 2020-10-23 | 苏州热工研究院有限公司 | Integrated management platform, method and computer readable storage medium |
CN111815113B (en) * | 2020-06-03 | 2024-01-05 | 苏州热工研究院有限公司 | Integrated management platform, method and computer readable storage medium |
CN113077143A (en) * | 2021-03-31 | 2021-07-06 | 国网浙江省电力有限公司物资分公司 | Comprehensive plan management and control system based on remote examination |
CN113077143B (en) * | 2021-03-31 | 2022-06-07 | 国网浙江省电力有限公司物资分公司 | Comprehensive plan management and control system based on remote examination |
CN115965226A (en) * | 2023-03-16 | 2023-04-14 | 深圳前海硬之城信息技术有限公司 | Control method, device and equipment for goods purchase and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104866987A (en) | Processing method of electrical equipment material purchasing data | |
Thurston et al. | Assessing greenhouse gas emissions from university purchases | |
Zvezdov et al. | Carbon footprinting of large product portfolios. Extending the use of Enterprise Resource Planning systems to carbon information management | |
Kouhizadeh et al. | Blockchain technology and the circular economy: an exploration | |
Odhiambo et al. | Effect of inventory management practices on supply chain performance of government health facilities in Kisumu county in Kenya | |
Wang | A Decision Method for Returns Logistics based on the Customer's Behaviour in E-commerce | |
Bagautdinova et al. | Development of management system of manufacturing companies on the basis of management accounting elements | |
Fajrah et al. | Analysis of the application of quality management systems in the rubber industry based on ISO 9001: 2015 | |
Öztürk et al. | AN ECONOMIC ORDER QUANTITY MODEL FOR LOTS CONTAINING DEFECTIVE ITEMS WITH REWORK OPTION. | |
Datta et al. | Measuring sustainability performance: A green supply chain index | |
CN105184461A (en) | Unified procurement management system for enterprise | |
Saha et al. | Benchmarking Practice for Identification of Internal Supply Chain Management Performance Factors Gap. | |
Mousavi et al. | Corporate social responsibility | |
Dörndorfer et al. | The impact of mobile devices and applications on business process management | |
Singh | Significance of working capital turnover ratio: A case study of BHEL and Crompton Greaves | |
Bokade et al. | Cost effectiveness and flexibility of reverse logistics for consumables and raw material: an empirical investigation | |
Shamsuddin et al. | Green supply chain management (GSCM): A research agenda | |
Zahra et al. | Halal SCM: how to monitor halal performance of procurement process for food industry in Indonesia by using ERP system | |
Mohamad et al. | Effect of corporate sustainable development on green purchasing: insights from ISO 14001 certified manufacturing companies in Malaysia | |
Vasantha | Green Supply Chain Management Methods To Enhance Sustainable Supply Chain-A Literature Review. | |
Ang et al. | Carbon Footprint Analysis for Baby Strollers | |
Li et al. | Research on radio frequency identification influence factors of enterprises | |
Kim | Single Manufacturer and Multiple Retailers Multi-Product Inventory Model under Cap-and-Trade Mechanism | |
TAUFIK et al. | Radio Frequency Identification (RFID) Technology for Support Supply Chain Strategic to Achieve High Performance in Textile and Apparel Industries of Indonesia. | |
Qu et al. | An Estimation Method of the Carbon Footprint in Manufacturing Logistics Systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150826 |