CN107093023A - Handling of goods and materials device and material Management System - Google Patents

Handling of goods and materials device and material Management System Download PDF

Info

Publication number
CN107093023A
CN107093023A CN201710278869.6A CN201710278869A CN107093023A CN 107093023 A CN107093023 A CN 107093023A CN 201710278869 A CN201710278869 A CN 201710278869A CN 107093023 A CN107093023 A CN 107093023A
Authority
CN
China
Prior art keywords
goods
user
handling
information
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710278869.6A
Other languages
Chinese (zh)
Inventor
闫震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prudential Preferred (beijing) Agel Ecommerce Ltd
Original Assignee
Prudential Preferred (beijing) Agel Ecommerce Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prudential Preferred (beijing) Agel Ecommerce Ltd filed Critical Prudential Preferred (beijing) Agel Ecommerce Ltd
Priority to CN201710278869.6A priority Critical patent/CN107093023A/en
Publication of CN107093023A publication Critical patent/CN107093023A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

The invention discloses a kind of handling of goods and materials device and material Management System, the handling of goods and materials device includes communication module, material information acquisition module and sees plate module;The communication module is used to set up to communicate with service end to be connected;The material information acquisition module is used for the material information for obtaining user's typing, and the material information of the typing is uploaded into the service end by the communication module;It is described to see that plate module is used to obtain the analysis result that the service end carries out the material information of user's typing data analysis, and the displaying analysis result in the form of billboard by the communication module.The present invention is conducive to goods and materials situation of the user timely and effectively in understanding project, provides the user effective administration base in real time, is advantageously implemented user's management effective in real time to goods and materials.

Description

Handling of goods and materials device and material Management System
Technical field
The present invention relates to materials management technique field, and in particular to a kind of handling of goods and materials device and material Management System.
Background technology
For current Railway Construction Projects, the unit for participating in building generally has multiple, is related to plan, contract, delivers, test Ten several business such as receipts, clearing, there is the different enterprises of the various rolls such as construction unit, unit in charge of construction, supervisor, supplier, How to realize that the management effective in real time to goods and materials is current urgent problem to be solved in Project Process.
The content of the invention
It is an object of the invention to provide a kind of handling of goods and materials device and material Management System, user can be advantageously implemented The management effective in real time to goods and materials.
To achieve the above object, technical scheme provides a kind of handling of goods and materials device, including communication module, thing Provide information acquisition module and see plate module;
The communication module is used to set up to communicate with service end to be connected;
The material information acquisition module is used to obtaining the material information of user's typing, and by the material information of the typing The service end is uploaded by the communication module;
It is described to see that plate module is used to enter the material information of user's typing by the communication module acquisition service end The analysis result of row data analysis, and the displaying analysis result in the form of billboard.
Preferably, the material information acquisition module includes following at least one:
Planning management unit, the overall MRP information of project and year for obtaining construction unit's user's typing MRP information;
Bid and purchase unit, the bid and purchase plan of needs information for obtaining unit in charge of construction's user's typing;
Production shipping unit, the season MRP information for obtaining unit in charge of construction's user's typing;
Check and accept unit, the item-test information for obtaining unit in charge of construction user and supervisor's user's typing.
Preferably, the handling of goods and materials device also includes clearing payment module, and the clearing payment module is used for described Service end sends the settlement request information of user, and receives the clearing that the service end is generated according to the settlement request information Account information.
Preferably, the handling of goods and materials device also includes login module, and the login module is used for stepping on that user inputs Record information and send the service end, to realize User logs in.
Preferably, the handling of goods and materials device also includes message module, and the message module is used to show the service end The information of transmission.
Preferably, the handling of goods and materials device is mobile phone or tablet personal computer.
To achieve the above object, technical scheme additionally provides a kind of material Management System, including above-mentioned thing Provide managing device and the service end.
The handling of goods and materials device that the present invention is provided, sets up communication by communication module and service end and is connected, believed by goods and materials Cease acquisition module and obtain the material information of user's typing, and by the material information upload service end of typing, make service end to user The material information of typing carries out data analysis, and by seeing that plate module shows the analysis result in the form of billboard, so that favorably Goods and materials situation in user timely and effectively understanding project, provides the user effective administration base in real time, is advantageously implemented User's management effective in real time to goods and materials.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram for handling of goods and materials device that embodiment of the present invention is provided.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Referring to Fig. 1, Fig. 1 is a kind of schematic diagram for handling of goods and materials device that embodiment of the present invention is provided, the handling of goods and materials Device includes communication module 100, material information acquisition module 200 and sees plate module 300:
The communication module 100 is used to set up to communicate with service end to be connected;
The material information acquisition module 200 is used to obtaining the material information of user's typing, and by the goods and materials of the typing Information uploads the service end by the communication module 100;
It is described to see that plate module 300 is used to obtain goods and materials of the service end to user's typing by the communication module 100 Information carries out the analysis result of data analysis, and the displaying analysis result in the form of billboard.
The handling of goods and materials device that embodiment of the present invention is provided, sets up communication by communication module and service end and is connected, lead to Cross material information acquisition module and obtain the material information of user's typing, and by the material information upload service end of typing, make service Hold and data analysis is carried out to the material information of user's typing, and by seeing that plate module shows the analysis result in the form of billboard, So as to be conducive to goods and materials situation of the user timely and effectively in understanding project, effective administration base in real time is provided the user, is had The management effective in real time to goods and materials beneficial to user is realized.
For example, for current Railway Construction Projects, being usually directed to plan, contract, delivery, examination, clearing etc. ten several Business, the different enterprises for having the various rolls such as construction unit, unit in charge of construction, supervisor, supplier, apply at construction unit user Work order position user, supervisor user, supplier user etc. can upload goods and materials to service end by the handling of goods and materials device and believe Breath, wherein, the material information of the user's typing obtained by material information acquisition module 200 can include:Material equipment inventory The overall MRP information of information, project, annual MRP information, bid and purchase plan of needs information, contract Information, season MRP information, supply requirement plan information, invoice information, arrival initial test information, treat sampling delivery Single information, the single information of sampling, issue handling information, service charge information, honour the bill of exchange information etc..
For example material information acquisition module 200 includes following at least one:Planning management unit, bid and purchase unit, Production shipping unit, examination unit;
Wherein, planning management unit be used for the overall MRP information of project for obtaining construction unit's user's typing and Annual MRP information, by the planning management unit, construction unit user can control overall and annual goods and materials in real time Conditions of demand, further, it is also possible to the plan information of unit in charge of construction's reporting of user is checked, the reporting of user plan of examination unit in charge of construction Accuracy, promptness, integrality;
Bid and purchase unit is used for the bid and purchase plan of needs information for obtaining unit in charge of construction's user's typing;Pass through the bid Unit is purchased, unit in charge of construction user can upload bid and purchase plan of needs, construction unit user is understood each construction in time Demand of the unit to goods and materials;
Production shipping unit is used for the season MRP information for obtaining unit in charge of construction's user's typing;Pass through the production Ship unit, unit in charge of construction user can report the material requirements situation when season (moon), allow supplier user as According to the production and supply for carrying out goods and materials;
Check and accept unit, the item-test information for obtaining unit in charge of construction user and supervisor's user's typing;Work order Position user and supervisor user can carry out show up initial test and sampling inspection to goods and materials, uploaded examine by the examination unit afterwards The result tested.
Service end can be first by the goods and materials after the material information that user is uploaded by the handling of goods and materials device is received Information is stored, and the data that can have been stored afterwards using big data analysis mode to itself carry out data analysis, so as to In order to which user understands the goods and materials overview of project from macroscopic perspective, in addition, the index that service end can also upload different user Data (i.e. material information) are contrasted, so as to provide user administration base effective in real time.
The handling of goods and materials device provided for embodiment of the present invention, user can pass through material information acquisition module typing Material information, material information acquisition module is by the material information of user's typing by upload service end, and service end is to user's typing Material information carry out after data analysis, analysis result returned into the handling of goods and materials device, handling of goods and materials device sees plate module The analysis result is shown in the form of billboard, for example, this sees that plate module can carry out the super form of section, contract platform in the form of billboard Account, the analysis displaying of contract account, furthermore it is also possible to intuitively patterned way show the seasonal plan of project, dispatch list, The typing situation of advice of settlement, provides user administration base effective in real time.
Preferably, the handling of goods and materials device in embodiment of the present invention also includes clearing payment module, and the clearing are paid Module is used for the settlement request information that user is sent to the service end, and receives the service end according to the settlement request The clearing account information of information generation.Settled accounts for example, supplier user can be sent by the clearing payment module to service end Solicited message, service end is settled accounts after the settlement request information is received according to the supply goods and materials of the supplier user, Each billing cycle automatically generates clearing account information, and construction unit user can carry out clearing payment with this.
Preferably, the handling of goods and materials device in embodiment of the present invention can also include login module, the login The log-on message that module is used to input user sends the service end, to realize User logs in.
Preferably, the handling of goods and materials device in embodiment of the present invention also includes message module, the message module For showing the information that the service end is sent, wherein, the information can include backlog message, bulletin and disappear Breath, conversation message and other systems message.
For example, the handling of goods and materials device in embodiment of the present invention can be mobile phone or tablet personal computer.
The handling of goods and materials device that embodiment of the present invention is provided, sets up communication by communication module and service end and is connected, lead to Cross material information acquisition module and obtain the material information of user's typing, and by the material information upload service end of typing, make service Hold and data analysis is carried out to the material information of user's typing, and by seeing that plate module shows the analysis result in the form of billboard, So as to be conducive to goods and materials situation of the user timely and effectively in understanding project, effective administration base in real time is provided the user, can To realize real-time, comprehensive handling of goods and materials during railway construction.
In addition, embodiment of the present invention additionally provides a kind of material Management System, the material Management System includes above-mentioned Handling of goods and materials device and the service end.
Although above with general explanation and specific embodiment, the present invention is described in detail, at this On the basis of invention, it can be made some modifications or improvements, this will be apparent to those skilled in the art.Therefore, These modifications or improvements, belong to the scope of protection of present invention without departing from theon the basis of the spirit of the present invention.

Claims (7)

1. a kind of handling of goods and materials device, it is characterised in that including communication module, material information acquisition module and see plate module;
The communication module is used to set up to communicate with service end to be connected;
The material information acquisition module is used for the material information for obtaining user's typing, and the material information of the typing is passed through The communication module uploads the service end;
It is described to see that plate module is used to enter line number to the material information of user's typing by the communication module acquisition service end According to the analysis result of analysis, and the displaying analysis result in the form of billboard.
2. handling of goods and materials device according to claim 1, it is characterised in that the material information acquisition module includes following At least one:
Planning management unit, the overall MRP information of project and annual goods and materials for obtaining construction unit's user's typing Plan of needs information;
Bid and purchase unit, the bid and purchase plan of needs information for obtaining unit in charge of construction's user's typing;
Production shipping unit, the season MRP information for obtaining unit in charge of construction's user's typing;
Check and accept unit, the item-test information for obtaining unit in charge of construction user and supervisor's user's typing.
3. handling of goods and materials device according to claim 1, it is characterised in that the handling of goods and materials device also includes clearing branch Module is paid, the clearing payment module is used for the settlement request information that user is sent to the service end, and receives the clothes The clearing account information that business end is generated according to the settlement request information.
4. handling of goods and materials device according to claim 1, it is characterised in that the handling of goods and materials device also includes logging in mould Block, the log-on message that the login module is used to input user sends the service end, to realize User logs in.
5. handling of goods and materials device according to claim 1, it is characterised in that the handling of goods and materials device also includes message mould Block, the message module is used for the information for showing that the service end is sent.
6. according to any described handling of goods and materials devices of claim 1-5, it is characterised in that the handling of goods and materials device is mobile phone Or tablet personal computer.
7. a kind of material Management System, it is characterised in that including any described handling of goods and materials devices of claim 1-6 and institute State service end.
CN201710278869.6A 2017-04-25 2017-04-25 Handling of goods and materials device and material Management System Pending CN107093023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710278869.6A CN107093023A (en) 2017-04-25 2017-04-25 Handling of goods and materials device and material Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710278869.6A CN107093023A (en) 2017-04-25 2017-04-25 Handling of goods and materials device and material Management System

Publications (1)

Publication Number Publication Date
CN107093023A true CN107093023A (en) 2017-08-25

Family

ID=59637136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710278869.6A Pending CN107093023A (en) 2017-04-25 2017-04-25 Handling of goods and materials device and material Management System

Country Status (1)

Country Link
CN (1) CN107093023A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780720A (en) * 2021-07-28 2021-12-10 广东电网有限责任公司佛山供电局 Electric power material overall process management method
CN113837524A (en) * 2021-07-28 2021-12-24 广东电网有限责任公司佛山供电局 Digital material management system applied to power industry

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1790394A (en) * 2004-12-17 2006-06-21 鸿富锦精密工业(深圳)有限公司 Electronic billboard information display system and method
CN101127104A (en) * 2007-09-19 2008-02-20 渤海船舶重工有限责任公司 Ship engineering material integrated handling computer management system
CN104424552A (en) * 2013-09-10 2015-03-18 北京市燃气集团有限责任公司 Materials management system
CN104866987A (en) * 2015-05-11 2015-08-26 国家电网公司 Processing method of electrical equipment material purchasing data
CN106327127A (en) * 2016-08-26 2017-01-11 国网山东省电力公司滨州市滨城区供电公司 Power distribution equipment material warehousing management and monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1790394A (en) * 2004-12-17 2006-06-21 鸿富锦精密工业(深圳)有限公司 Electronic billboard information display system and method
CN101127104A (en) * 2007-09-19 2008-02-20 渤海船舶重工有限责任公司 Ship engineering material integrated handling computer management system
CN104424552A (en) * 2013-09-10 2015-03-18 北京市燃气集团有限责任公司 Materials management system
CN104866987A (en) * 2015-05-11 2015-08-26 国家电网公司 Processing method of electrical equipment material purchasing data
CN106327127A (en) * 2016-08-26 2017-01-11 国网山东省电力公司滨州市滨城区供电公司 Power distribution equipment material warehousing management and monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113780720A (en) * 2021-07-28 2021-12-10 广东电网有限责任公司佛山供电局 Electric power material overall process management method
CN113837524A (en) * 2021-07-28 2021-12-24 广东电网有限责任公司佛山供电局 Digital material management system applied to power industry
CN113780720B (en) * 2021-07-28 2022-09-13 广东电网有限责任公司佛山供电局 Electric power material overall process management method

Similar Documents

Publication Publication Date Title
CN110766528A (en) Client credit self-evaluation factory real-time intelligent analysis management system
CN104240037A (en) Remote bid evaluation system and method
CN106570673A (en) Commercial concrete online ordering system based on intelligent mobile phone application
CN111667165A (en) Intelligent mobile application service system based on electric power and application
CN110334950B (en) Iron tower intelligent production and group management and control system
CN111081361A (en) Intelligent logistics platform management system
CN105205682A (en) Product design Internet platform and application method thereof
CN106779104A (en) A kind of campus maintenance service system and method based on mobile terminal
CN106384189A (en) Enterprise management system based on sale management
CN109345168A (en) A kind of petrochemical plant mounting material storage management method and system
CN106447315A (en) Transaction payment method based on cloud platform and transaction payment system thereof
CN104240072A (en) Multi-channel network integrated payment system and multi-channel network integrated payment method
Stadnicka et al. Minimization of service disturbance: VSM based case study in telecommunication industry
CN111353787A (en) Equipment comprehensive guarantee system based on cloud platform
CN106156984A (en) A kind of logistics system based on ecommerce
CN107093023A (en) Handling of goods and materials device and material Management System
CN115953038A (en) Intelligent management system for SaaS (software as a service) sites of oil and gas station
CN111445171A (en) Production management system for port based on information technology
CN111080262A (en) Intelligent logistics platform management method
CN107886288A (en) Settlement system and its control method on a kind of service charge line
CN110827172A (en) Wisdom water affairs cloud service platform
CN107093027A (en) Material Management System and goods and material handling method
CN107093024A (en) Service end and material Management System for handling of goods and materials
CN111429081B (en) Human resource information processing method, device and system
CN107067137A (en) A kind of power marketing metering class's routine work management control method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825