CN112504934A - 一种混凝土坝渗流渗压预测和监控阈值确定方法 - Google Patents
一种混凝土坝渗流渗压预测和监控阈值确定方法 Download PDFInfo
- Publication number
- CN112504934A CN112504934A CN202011317247.8A CN202011317247A CN112504934A CN 112504934 A CN112504934 A CN 112504934A CN 202011317247 A CN202011317247 A CN 202011317247A CN 112504934 A CN112504934 A CN 112504934A
- Authority
- CN
- China
- Prior art keywords
- value
- monitoring
- measuring point
- dam
- level
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 97
- 238000000034 method Methods 0.000 title claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 50
- 230000003204 osmotic effect Effects 0.000 claims abstract description 44
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 26
- 238000013461 design Methods 0.000 claims abstract description 12
- 230000002159 abnormal effect Effects 0.000 claims description 22
- 238000011156 evaluation Methods 0.000 claims description 15
- 230000005856 abnormality Effects 0.000 claims description 13
- 150000001875 compounds Chemical class 0.000 claims description 3
- 230000007547 defect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N15/00—Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
- G01N15/08—Investigating permeability, pore-volume, or surface area of porous materials
- G01N15/082—Investigating permeability by forcing a fluid through a sample
- G01N15/0826—Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change
Landscapes
- Chemical & Material Sciences (AREA)
- Physics & Mathematics (AREA)
- Analytical Chemistry (AREA)
- Dispersion Chemistry (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Alarm Systems (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
本发明公开了一种混凝土坝渗流渗压预测和监控阈值确定方法,包括:首先,根据已有的监测资料和上游水位实测值,计算测点的渗压折减系数。然后,通过数据拟合,得到渗压折减系数与上游水位的函数关系,利用该函数关系可对测点渗压进行预测。最后,基于测点渗压的预测值,结合统计误差和设计允许渗压,即可确定测点渗压的多级监控阈值。本发明的优点是:能够为大坝实时监控和安全预警提供方法基础。
Description
技术领域
本发明涉及混凝土建筑技术领域,特别涉及一种混凝土坝渗流渗压预测和监控阈值确定方法。
背景技术
在混凝土坝运行期间,渗流渗压是衡量大坝是否正常运行的重要指数。目前,主要依赖规范规定的折减系数方法对渗流渗压进行控制,这种方法能够保证大坝整体安全有效,但对于实时监控意义不大。因为实时监控需要解决局部或轻微异常问题,工程出现较大危险时再进行预警则失去监控意义,此外,渗压预测还可采用数值分析方法确定,但由于基岩条件十分复杂,预测精度很难满足要求。
发明内容
本发明针对现有技术的缺陷,提供了一种混凝土坝渗流渗压预测和监控阈值确定方法,解决了现有技术中存在的缺陷。
为了实现以上发明目的,本发明采取的技术方案如下:
一种混凝土坝渗流渗压预测和监控阈值确定方法,包括以下步骤:
步骤一,根据已有的监测资料和上游水位实测值,计算测点i在不同时刻的渗压折减系数,如公式1所示:
步骤三,对测点i在未来某时刻k的渗压进行预测,如公式3所示:
步骤九,若出现测点i的渗压监测值大于设计允许值的情况,则测点i在k时刻的二级监控阈值 小于2m水头时,按2m水头取值,大于10m水头时,按10m水头取值;测点i在k时刻的三级监控阈值 小于3m水头时,按3m水头取值,大于30m水头时,取30m水头取值。
步骤十一,基于渗压测点的监控状态,对大坝运行安全状态进行综合评估,评估等级分为四级:
1)若大坝所有渗压测点的监控状态均为正常,则大坝运行安全状态评估等级为安全。
2)若渗压测点为非连续性轻微异常或异常,即同一坝段内的轻微异常或异常测点数量小于等于1,或相邻两个坝段的轻微异常或异常测点数小于等于2,则大坝运行安全状态评估等级为一级预警。
3)若渗压测点有连续性轻微异常或异常,但不存在危险点,即同一坝段存在2个或2个以上轻微异常或异常点,或相邻坝段存在2个以上轻微异常或异常点,但不超过两个相邻坝段。则大坝运行安全状态评估等级为二级预警。
4)若测点有连续性异常或危险测点,即相邻两个坝段的各自出现2个以上异常测点,或相邻两个坝段的异常点数的和大于2个,则大坝运行安全状态评估等级为三级预警。
与现有技术相比,本发明的优点在于:
提出了可操作性的渗压测点安全分级标准和判断阈值以及大坝安全分级和判断标准,为大坝实时预警和长期安全运行提供保障。
附图说明
图1是本发明实施例流程图;
图2是渗压测点布置俯视图;
图3是渗压分级监控示意图;
图4是异常渗压测点俯视图;
图中标记的含义:1-大坝坝段(俯视),2-防渗帷幕,3-排水孔幕,4-渗压测点,5-渗压监测值,6-一级监控阈值,7-二级监控阈值,8-三级监控阈值,9-异常测点。
具体实施方式
为使本发明的目的、技术方案及优点更加清楚明白,以下根据附图并列举实施例,对本发明做进一步详细说明。
如图1所示,一种混凝土坝渗流渗压预测和监控阈值确定方法,包括以下步骤:
步骤一,图2为渗压测点布置俯视图,根据已有的监测资料和上游水位实测值,计算测点i在不同时刻的渗压折减系数,如公式1所示:
步骤三,对测点i在未来某时刻k的渗压进行预测,如公式3所示:
步骤八,历史上,若测点i的渗压监测值始终小于设计允许值则依据未来某时刻k的预测上游水位按照行业规范(本行业基本知识),计算测点i在未来某时刻k的设计允许渗压值令测点i在k时刻的二级监控阈值令测点i在k时刻的三级监控阈值
步骤九,历史上,若出现测点i的渗压监测值大于设计允许值的情况,则测点i在k时刻的二级监控阈值 小于2m水头时,按2m水头取值,大于10m水头时,按10m水头取值;测点i在k时刻的三级监控阈值 小于3m水头时,按3m水头取值,大于30m水头时,取30m水头取值。
步骤十一,基于渗压测点的监控状态,对大坝运行安全状态进行综合评估,评估等级分为四级:
1)若大坝所有渗压测点的监控状态均为正常,则大坝运行安全状态评估等级为安全。
2)若渗压测点为非连续性轻微异常或异常,即同一坝段内的轻微异常或异常测点数量小于等于1,或相邻两个坝段的轻微异常或异常测点数小于等于2,则大坝运行安全状态评估等级为一级预警。
3)若渗压测点有连续性轻微异常或异常,但不存在危险点,即同一坝段存在2个或2个以上轻微异常或异常点,或相邻坝段存在2个以上轻微异常或异常点,但不超过两个相邻坝段。则大坝运行安全状态评估等级为二级预警。
4)若测点有连续性异常或危险测点,即相邻两个坝段的各自出现2个以上异常测点,或相邻两个坝段的异常点数的和大于2个,则大坝运行安全状态评估等级为三级预警。
本领域的普通技术人员将会意识到,这里所述的实施例是为了帮助读者理解本发明的实施方法,应被理解为本发明的保护范围并不局限于这样的特别陈述和实施例。本领域的普通技术人员可以根据本发明公开的这些技术启示做出各种不脱离本发明实质的其它各种具体变形和组合,这些变形和组合仍然在本发明的保护范围内。
Claims (1)
1.一种混凝土坝渗流渗压预测和监控阈值确定方法,其特征在于,包括以下步骤:
步骤一,根据已有的监测资料和上游水位实测值,计算测点i在不同时刻的渗压折减系数,如公式1所示:
步骤三,对测点i在未来某时刻k的渗压进行预测,如公式3所示:
步骤九,若出现测点i的渗压监测值大于设计允许值的情况,则测点i在k时刻的二级监控阈值 小于2m水头时,按2m水头取值,大于10m水头时,按10m水头取值;测点i在k时刻的三级监控阈值 小于3m水头时,按3m水头取值,大于30m水头时,取30m水头取值;
步骤十一,基于渗压测点的监控状态,对大坝运行安全状态进行综合评估,评估等级分为四级:
1)若大坝所有渗压测点的监控状态均为正常,则大坝运行安全状态评估等级为安全;
2)若渗压测点为非连续性轻微异常或异常,即同一坝段内的轻微异常或异常测点数量小于等于1,或相邻两个坝段的轻微异常或异常测点数小于等于2,则大坝运行安全状态评估等级为一级预警;
3)若渗压测点有连续性轻微异常或异常,但不存在危险点,即同一坝段存在2个或2个以上轻微异常或异常点,或相邻坝段存在2个以上轻微异常或异常点,但不超过两个相邻坝段;则大坝运行安全状态评估等级为二级预警;
4)若测点有连续性异常或危险测点,即相邻两个坝段的各自出现2个以上异常测点,或相邻两个坝段的异常点数的和大于2个,则大坝运行安全状态评估等级为三级预警。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011317247.8A CN112504934B (zh) | 2020-11-23 | 2020-11-23 | 一种混凝土坝渗流渗压预测和监控阈值确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011317247.8A CN112504934B (zh) | 2020-11-23 | 2020-11-23 | 一种混凝土坝渗流渗压预测和监控阈值确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112504934A true CN112504934A (zh) | 2021-03-16 |
CN112504934B CN112504934B (zh) | 2021-09-21 |
Family
ID=74958804
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011317247.8A Active CN112504934B (zh) | 2020-11-23 | 2020-11-23 | 一种混凝土坝渗流渗压预测和监控阈值确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112504934B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117932747A (zh) * | 2024-01-24 | 2024-04-26 | 华能澜沧江水电股份有限公司 | 一种基于多测点组合计算的混凝土坝渗流分析方法及设备 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040060351A1 (en) * | 2002-09-30 | 2004-04-01 | Gunter William Daniel | Process for predicting porosity and permeability of a coal bed |
US20140058676A1 (en) * | 2012-08-23 | 2014-02-27 | Ingrain, Inc. | Digital rock analysis systems and methods that reliably predict a porosity-permeability trend |
CN104389594A (zh) * | 2014-10-13 | 2015-03-04 | 成都创源油气技术开发有限公司 | 页岩气井产能评价预测方法 |
CN104541152A (zh) * | 2012-06-15 | 2015-04-22 | 卢米尼克斯股份有限公司 | 使用拟合选择标准的高斯残差的图像归一化装置、系统和方法 |
CN104616473A (zh) * | 2015-02-08 | 2015-05-13 | 张朝利 | 一种大型水利工程渗流实时监测系统及其趋势预测方法 |
CN107273564A (zh) * | 2017-04-26 | 2017-10-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种基于折减系数的渗流安全评价方法 |
CN111259590A (zh) * | 2020-01-17 | 2020-06-09 | 南昌大学 | 一种混凝土坝变形安全监控模型的构建方法 |
CN111275255A (zh) * | 2020-01-17 | 2020-06-12 | 南昌大学 | 一种混凝土坝变形监测预报模型的构建方法 |
CN111382526A (zh) * | 2020-04-13 | 2020-07-07 | 四创科技有限公司 | 一种识别防渗断面类型耦合监测数据的堤坝渗流分析方法 |
CN111444461A (zh) * | 2020-03-24 | 2020-07-24 | 成都理工大学 | 高水压下围岩大变形灾害等级预测方法 |
CN111651708A (zh) * | 2020-05-29 | 2020-09-11 | 四川大学 | 一种大坝安全监测数据异常识别的预警阈值设置方法 |
-
2020
- 2020-11-23 CN CN202011317247.8A patent/CN112504934B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040060351A1 (en) * | 2002-09-30 | 2004-04-01 | Gunter William Daniel | Process for predicting porosity and permeability of a coal bed |
CN104541152A (zh) * | 2012-06-15 | 2015-04-22 | 卢米尼克斯股份有限公司 | 使用拟合选择标准的高斯残差的图像归一化装置、系统和方法 |
US20140058676A1 (en) * | 2012-08-23 | 2014-02-27 | Ingrain, Inc. | Digital rock analysis systems and methods that reliably predict a porosity-permeability trend |
CN104389594A (zh) * | 2014-10-13 | 2015-03-04 | 成都创源油气技术开发有限公司 | 页岩气井产能评价预测方法 |
CN104616473A (zh) * | 2015-02-08 | 2015-05-13 | 张朝利 | 一种大型水利工程渗流实时监测系统及其趋势预测方法 |
CN107273564A (zh) * | 2017-04-26 | 2017-10-20 | 中国电建集团西北勘测设计研究院有限公司 | 一种基于折减系数的渗流安全评价方法 |
CN111259590A (zh) * | 2020-01-17 | 2020-06-09 | 南昌大学 | 一种混凝土坝变形安全监控模型的构建方法 |
CN111275255A (zh) * | 2020-01-17 | 2020-06-12 | 南昌大学 | 一种混凝土坝变形监测预报模型的构建方法 |
CN111444461A (zh) * | 2020-03-24 | 2020-07-24 | 成都理工大学 | 高水压下围岩大变形灾害等级预测方法 |
CN111382526A (zh) * | 2020-04-13 | 2020-07-07 | 四创科技有限公司 | 一种识别防渗断面类型耦合监测数据的堤坝渗流分析方法 |
CN111651708A (zh) * | 2020-05-29 | 2020-09-11 | 四川大学 | 一种大坝安全监测数据异常识别的预警阈值设置方法 |
Non-Patent Citations (4)
Title |
---|
DENGHUA ZHONG等: "Dam break threshold value and risk probability assessment for an earth dam", 《NAT HAZARDS》 * |
周秋景等: "高拱坝短期变形和应力预测预警方法及工程应用", 《水利水电技术》 * |
缪长健等: "基于CM-AFSA-BP神经网络的土石坝渗流压力预测", 《水电能源科学》 * |
胡波: "基于原型监测的广西乐滩电站大坝渗流特性分析", 《水电与抽水蓄能》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117932747A (zh) * | 2024-01-24 | 2024-04-26 | 华能澜沧江水电股份有限公司 | 一种基于多测点组合计算的混凝土坝渗流分析方法及设备 |
Also Published As
Publication number | Publication date |
---|---|
CN112504934B (zh) | 2021-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110298455B (zh) | 一种基于多变量估计预测的机械设备故障智能预警方法 | |
CN111256754A (zh) | 一种混凝土坝长期运行安全预警方法 | |
CN106570259B (zh) | 一种大坝位移数据的粗差剔除方法 | |
AU2019440174A1 (en) | Inversion calculation method of fast test while drilling of coal-bed gas parameters | |
CN112348237B (zh) | 一种动态钻井数据异常趋势检测方法 | |
CN108663995B (zh) | 一种工业过程变量趋势异常检测方法及装置 | |
CN112504934B (zh) | 一种混凝土坝渗流渗压预测和监控阈值确定方法 | |
CN113128098B (zh) | 基于de-lof的混凝土坝奇异值检测方法和设备 | |
Ivankevich et al. | A proactive strategy of ship maintenance operations | |
CN115455791B (zh) | 一种基于数值模拟技术提高滑坡位移预测准确率的方法 | |
CN111855219A (zh) | 一种基于灰色理论的柴油机润滑油进机安保参数预测方法 | |
CN113468757A (zh) | 一种基于模糊随机理论评估腐蚀天然气管道可靠性的方法 | |
CN108345707A (zh) | 基于概率的管道腐蚀缺陷计划响应时间确定方法及装置 | |
CN115392089A (zh) | 一种智能预警方法 | |
CN112611353B (zh) | 一种大坝监控报警系统和方法 | |
Qu et al. | Outlier Detection and Forecasting for Bridge Health Monitoring Based on Time Series Intervention Analysis. | |
CN108536980A (zh) | 一种考虑可靠性因素的气体探测器离散选址优化方法 | |
CN114322446B (zh) | 冷却系统故障预警方法、装置、冷却系统及作业机械 | |
CN111339589B (zh) | 消力池安全评估方法、装置、存储介质及电子设备 | |
CN112651139A (zh) | 水库大坝技术状况评估方法 | |
CN113742814A (zh) | 大坝安全预警方法、装置、计算机设备和存储介质 | |
CN110909764A (zh) | 一种船闸健康监测关键部件的确定方法 | |
CN115907565A (zh) | 引水隧洞结构安全评价方法、装置、电子设备和存储介质 | |
CN103617463A (zh) | 齿轮磨损速度预警方法 | |
Bekker et al. | Probabilistic modeling of the corrosion of steel structures in marine water-development works |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |