Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011512245.4A
Other languages
Chinese (zh)
Inventor
王贤军
孟学伟
王延忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN202011512245.4A priority Critical patent/CN112502422A/en
Publication of CN112502422A publication Critical patent/CN112502422A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention provides a preset platform scaffold structure and a construction method thereof, wherein the preset platform scaffold structure comprises a stand column seat cushion, a stand column, a cross rod and a preset platform, the stand column seat cushion is arranged on a bottom support of a concrete floor to be poured, one end of the stand column is detachably connected with the stand column seat cushion, the other end of the stand column is connected with the preset platform, the cross rod is connected with the stand column, and the cross rod and the stand column are arranged in an intersecting manner to support. The invention has the advantages that the preset platform scaffold is erected before the floor concrete is poured, the dismantling of the preset platform scaffold is not influenced after the floor concrete is poured, the requirement of post-treatment on the floor concrete structure is not required after the dismantling, the materials and the post-treatment labor are saved, and the work efficiency is improved.

Description

Scaffold structure with preset platform and construction method thereof
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a preset platform scaffold structure and a construction method thereof.
Background
When a concrete structure is constructed, a platform is required to be preset above a floor before concrete of the floor is poured. Because this floor slab has not pour yet, platform scaffold stand can only directly be sat on the floor slab template is predetermine on upper portion. When the floor slab is poured, the scaffold upright post is also poured into the floor slab concrete. So, when predetermineeing platform scaffold frame and demolish, the stand need will pour in floor concrete part excision back, can demolish completely. The columns left in the floor concrete usually need to be post-processed, such as being removed for repair, or being directly repaired, which wastes a lot of materials and labor.
Disclosure of Invention
In view of the above problems, the present invention provides a scaffold structure with a preset platform and a construction method thereof, so as to solve the above or other former problems in the prior art.
In order to solve the technical problems, the invention adopts the technical scheme that: the utility model provides a predetermine platform scaffold structure, includes stand seatpad, stand, horizontal pole and predetermines the platform, on the stand seatpad was located and is waited to pour concrete floor bottom support, stand one end can be dismantled with the stand seatpad and be connected, the stand other end with predetermine the platform and be connected, the horizontal pole is connected with the stand, and the crossing setting of horizontal pole and stand supports.
Furthermore, the quantity of stand seatpads and stand is a plurality ofly, and a plurality of stands can dismantle with a plurality of stand seatpads one-to-one and be connected.
Furthermore, a plurality of stand parallel arrangement, and all with treat that the concrete floor bottom support of pouring sets up perpendicularly.
Furthermore, the quantity of horizontal pole is a plurality of, and a plurality of horizontal pole parallel arrangement, and each horizontal pole is connected with a plurality of stand that parallel arrangement each other.
Furthermore, at least two cross bars are arranged along the length direction of the upright post.
Furthermore, the material of the upright post seat cushion is the same as that of the concrete floor to be poured.
Furthermore, the height of the upright post seat cushion is the same as the thickness of the concrete floor to be poured.
A construction method for a preset platform scaffold structure comprises the following steps:
arranging a plurality of upright post seat cushions on a bottom support of a concrete floor to be cast;
arranging an upright on each upright seat cushion, wherein the upright is vertically arranged with the bottom support of the concrete floor to be cast;
a cross bar is arranged on the upright post;
arranging a preset platform at the free end of the upright post;
pouring the concrete floor;
and after the floor slab is poured, sequentially removing the preset platform, the cross rods and the stand columns.
Furthermore, the upright post and the upright post seat cushion are coaxially arranged.
By adopting the technical scheme, the preset platform scaffold is simple in structure and convenient to use, and is provided with the upright post seat cushion, the upright post seat cushion is detachably connected with the upright post and arranged on the bottom support of a concrete floor to be poured, the material of the upright post seat cushion is the same as that of the floor, and the thickness of the upright post seat cushion is the same as that of the floor, so that the preset platform scaffold is erected before the concrete of the floor is poured, the dismantling of the preset platform scaffold is not influenced after the concrete of the floor is poured, the requirement of post-treatment on the concrete structure of the floor is not required after the dismantling, materials and post-treatment labor are saved, and the work efficiency; the structure and construction operation of a platform scaffold preset before the concrete pouring of the traditional floor are not changed, and the method is easy to master by operators; the upright posts of the scaffold do not need to be cut, and materials are saved.
Drawings
Fig. 1 is a front view schematically illustrating a preset platform scaffold according to an embodiment of the present invention;
fig. 2 is a schematic top view of a pre-set platform scaffold according to an embodiment of the present invention;
fig. 3 is a left side view schematically illustrating a preset platform scaffold according to an embodiment of the present invention.
In the figure:
1. bottom support 2 of concrete floor to be poured, floor 3 and upright post seat cushion
4. Upright post 5, cross rod 6 and preset platform
Detailed Description
The invention is further described with reference to the following figures and specific embodiments.
Fig. 1 shows a schematic structural diagram of an embodiment of the present invention, which relates to a preset platform scaffold structure and a construction method, the preset platform scaffold structure is used before floor slab concrete pouring, the preset platform scaffold structure is provided with a stand column seat cushion, the stand column seat cushion is detachably connected with a stand column, after the floor slab concrete pouring, the stand column is removed from the stand column seat cushion, the removal of the preset platform scaffold is not affected, the requirement of post-treatment on the floor slab concrete structure is not required after the removal, materials and post-treatment labor are saved, and the work efficiency is improved.
A preset platform scaffold structure is shown in figures 1-3 and comprises a stand column seat cushion 3, a stand column 4, a cross rod 5 and a preset platform 6, wherein the stand column seat cushion 3 is arranged on a bottom support 1 of a concrete floor to be poured, one end of the stand column 4 is detachably connected with the stand column seat cushion 3, the other end of the stand column 4 is connected with the preset platform 6, the cross rod 5 is connected with the stand column 4, the cross rod 5 and the stand column 4 are intersected and arranged for supporting, the stand column seat cushion 3 is detachably connected with the stand column 4, the preset platform 6 is installed on the bottom support 1 of the concrete floor to be poured through the stand column 4 and the cross rod 5 before the concrete floor 2 is poured, the stand column 4 is detached from the stand column seat cushion 3 after the concrete floor 2 is poured, the stand column seat cushion 3 does not need to be treated, materials and post-treatment.
The upright post seat cushion 3 is provided with a groove, and the shape of the groove is consistent with that of the upright post 4, so that the upright post 4 is conveniently connected with the upright post seat cushion 3 in an inserting way.
The quantity of stand seatpad 3 and stand 4 is a plurality ofly, and a plurality of stands 4 can dismantle with a plurality of stand seatpads 3 one-to-one and be connected, and is preferred, in this embodiment, stand 4 is for pegging graft with the connected mode of stand seatpad 3. A plurality of stands 4 parallel arrangement, and all with treat that the concrete floor bottom that pours supports 1 perpendicular setting. On waiting to cast concrete floor bottom support 1, set up a plurality of stand seatpads 3, a plurality of stand seatpads 3 set gradually along horizontal direction and vertical direction, construct into multirow multiseriate, and a plurality of stand seatpads 3 can be equidistant setting, also can be non-equidistant setting, select according to actual demand, do not do the concrete requirement here. Each upright seat cushion 3 is inserted with an upright 4 to facilitate the installation of a cross rod 5.
The quantity of horizontal pole 5 is a plurality of, and 5 parallel arrangement of a plurality of horizontal poles, each horizontal pole 5 is connected with a plurality of mutual parallel arrangement's stand 4, along the horizontal direction, adjacent parallel arrangement's stand 4 all is connected with a horizontal pole 5, horizontal pole 5 sets up with stand 4 is perpendicular, along vertical direction, adjacent parallel arrangement's stand 4 all is connected with a horizontal pole 5, horizontal pole 5 sets up with stand 4 is perpendicular, each stand 4 all is connected with the horizontal pole 5 of two mutually perpendicular settings, horizontal pole 5 supports stand 4, strengthen stand 4's intensity.
Along the length direction of the upright 4, at least two crossbars 5 are provided, that is, a plurality of crossbars 5 are provided between the preset platform 6 and the upright seat cushion 3, and the crossbars 5 are arranged in parallel to support the upright 4 from different positions.
The material of stand seatpad 3 is the same with waiting to pour concrete floor 2 material, and the height of stand seatpad 3 is the same with waiting to pour concrete floor 2's thickness, and after stand 4 demolishs, stand seatpad 3 need not handle, remains on floor 2, carries out the concrete shutoff, accomplishes concrete floor 2 and pours promptly.
A construction method for a preset platform scaffold structure comprises the following steps:
arranging a plurality of upright post seat cushions 3 on a bottom support 1 of a concrete floor to be cast, wherein the number of the upright post seat cushions 3 is selected according to the volume of a preset platform scaffold;
each upright post seat cushion 3 is provided with an upright post 4, the upright posts 4 are perpendicular to the bottom support 1 of the concrete floor to be cast, the upright posts 4 are inserted in the upright post seat cushions 3, the upright posts 4 and the upright post seat cushions 3 are coaxially arranged, so that the upright posts 4 are perpendicular to the bottom support 1 of the concrete floor to be cast, and the upright posts 4 are all arranged in parallel;
the upright post 4 is provided with a cross bar 5, two cross bars 5 are arranged along the length direction of the upright post 4, and the cross bars 5 are fixedly connected with the upright post 4 through fasteners;
the method comprises the following steps that a preset platform 6 is arranged at the free end of each upright column 4, the preset platform 6 is fixedly connected with each upright column 4, so that the preset platform 6 is in a horizontal state, and the upright columns 4 and the preset platform 6 can be connected in an inserting manner or in a threaded connection manner and can be selected according to actual requirements;
pouring the concrete floor 2;
after the floor slab 2 is poured, the preset platform 6, the cross rods 5 and the stand columns 4 are sequentially removed (the installation sequence is opposite), the stand column seat cushions 3 are left at the floor slab 2, and because the stand column seat cushions 3 are made of the same material as the floor slab 2, subsequent treatment is not needed, and the stand column seat cushions 3 are subjected to concrete plugging.
By adopting the technical scheme, the preset platform scaffold is simple in structure and convenient to use, and is provided with the upright post seat cushion, the upright post seat cushion is detachably connected with the upright post and arranged on the bottom support of a concrete floor to be poured, the material of the upright post seat cushion is the same as that of the floor, and the thickness of the upright post seat cushion is the same as that of the floor, so that the preset platform scaffold is erected before the concrete of the floor is poured, the dismantling of the preset platform scaffold is not influenced after the concrete of the floor is poured, the requirement of post-treatment on the concrete structure of the floor is not required after the dismantling, materials and post-treatment labor are saved, and the work efficiency; the structure and construction operation of a platform scaffold preset before the concrete pouring of the traditional floor are not changed, and the method is easy to master by operators; the upright posts of the scaffold do not need to be cut, and materials are saved.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All equivalent changes and modifications made within the scope of the present invention shall fall within the scope of the present invention.

Claims (9)

1. The utility model provides a predetermine platform scaffold structure which characterized in that: including stand seatpad, stand, horizontal pole and preset the platform, the stand seatpad is located and is waited to pour on the concrete floor bottom supports, stand one end with the connection can be dismantled to the stand seatpad, the stand other end with preset the platform and connect, the horizontal pole with the stand is connected, just the horizontal pole with the crossing setting of stand supports.
2. The pre-existing platform scaffolding structure as claimed in claim 1, wherein: the stand seatpad with the quantity of stand is a plurality ofly, and is a plurality of the stand is with a plurality of the stand seatpad one-to-one is dismantled and is connected.
3. The pre-set platform scaffolding structure as claimed in claim 2, wherein: and the plurality of stand columns are arranged in parallel and are vertically arranged with the bottom support of the concrete floor to be poured.
4. The pre-set platform scaffolding structure according to any one of claims 1 to 3, wherein: the quantity of horizontal pole is a plurality of, and is a plurality of horizontal pole parallel arrangement, each the horizontal pole with a plurality of mutual parallel arrangement the stand is connected.
5. The pre-existing platform scaffolding structure as claimed in claim 4, wherein: at least two cross bars are arranged along the length direction of the upright post.
6. The pre-set platform scaffolding structure according to any one of claims 1-3, 5, wherein: the material of the upright post seat cushion is the same as that of the concrete floor to be poured.
7. The pre-set platform scaffolding structure as claimed in claim 6, wherein: the height of the upright post seat cushion is the same as the thickness of the concrete floor to be poured.
8. A construction method for a preset platform scaffold structure is characterized by comprising the following steps: the method comprises the following steps:
arranging a plurality of upright post seat cushions on the bottom support of the concrete floor to be cast;
arranging one upright on each upright seat cushion, wherein the upright is vertically arranged with the bottom support of the concrete floor to be cast;
the cross bar is arranged on the upright post;
arranging the preset platform at the free end of the upright post;
pouring the concrete floor;
and after the floor slab is poured, the preset platform, the cross rods and the upright columns are sequentially dismantled.
9. The preset platform scaffold structure construction method of claim 8, wherein: the upright post and the upright post seat cushion are coaxially arranged.
CN202011512245.4A 2020-12-19 2020-12-19 Scaffold structure with preset platform and construction method thereof Pending CN112502422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011512245.4A CN112502422A (en) 2020-12-19 2020-12-19 Scaffold structure with preset platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011512245.4A CN112502422A (en) 2020-12-19 2020-12-19 Scaffold structure with preset platform and construction method thereof

Publications (1)

Publication Number Publication Date
CN112502422A true CN112502422A (en) 2021-03-16

Family

ID=74922677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011512245.4A Pending CN112502422A (en) 2020-12-19 2020-12-19 Scaffold structure with preset platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN112502422A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550579A (en) * 2021-06-22 2021-10-26 中国五冶集团有限公司 Scaffold erecting method for cast-in-place stair platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113550579A (en) * 2021-06-22 2021-10-26 中国五冶集团有限公司 Scaffold erecting method for cast-in-place stair platform

Similar Documents

Publication Publication Date Title
CN212129960U (en) Overhead installation device for frame beam reinforcing steel bars
CN112502422A (en) Scaffold structure with preset platform and construction method thereof
CN113389379A (en) Construction method of post-cast strip floor with independent support
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN214739777U (en) Preset platform scaffold structure
CN208052253U (en) A kind of positioning moulding bed prefabricated for T beam web reinforced frames
CN106639328B (en) Concrete beam steel reinforcement framework construction device and construction method
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN202990415U (en) Nuclear power plant four tubular post early detaching supporting device
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN214220599U (en) Batter post bearing structure
JP2015045131A (en) Underground beam bar arrangement method using vertically separable frame for underground beam bar arrangement and the frame
CN209741681U (en) Heavy steel support
CN209369334U (en) A kind of large-span concrete stay in place form support device
CN209779457U (en) Supporting device for box girder side template
CN221031401U (en) Floor engineering construction support
CN212271607U (en) Floor post-cast strip separating type supporting formwork structure
CN218699939U (en) Prefabricated component napping device
CN214786112U (en) Rack track support bed-jig that slides
CN214785954U (en) Floor post-cast strip template supporting structure
CN219973822U (en) Can turnover support demolishs finished product dish knot frame
CN219746187U (en) Vertical pipe gallery mould steel reinforcement cage ligature support
CN209923774U (en) Precise alignment finish rolling threaded die for steel box girder installation consolidation pier construction
CN215254696U (en) Beam rib steel bar group stand for rib type floor cast-in-place construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination