CN214739777U - Preset platform scaffold structure - Google Patents
Preset platform scaffold structure Download PDFInfo
- Publication number
- CN214739777U CN214739777U CN202023077279.3U CN202023077279U CN214739777U CN 214739777 U CN214739777 U CN 214739777U CN 202023077279 U CN202023077279 U CN 202023077279U CN 214739777 U CN214739777 U CN 214739777U
- Authority
- CN
- China
- Prior art keywords
- stand
- platform
- horizontal pole
- seatpad
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model provides a predetermine platform scaffold structure, including stand seatpad, stand, horizontal pole and predetermine the platform, on the stand seatpad was located and is waited to pour concrete floor bottom support, stand one end can be dismantled with the stand seatpad and be connected, and the stand other end is connected with predetermineeing the platform, and the horizontal pole is connected with the stand, and the crossing setting of horizontal pole and stand supports. The beneficial effects of the utility model are that satisfy and set up before floor concrete placement and predetermine platform scaffold, floor concrete placement back does not influence the demolising of predetermineeing platform scaffold, also need not carry out the requirement of post processing to floor concrete structure after demolising, and material saving and post processing are artifical, improve the work efficiency.
Description
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a predetermine platform scaffold structure.
Background
When a concrete structure is constructed, a platform is required to be preset above a floor before concrete of the floor is poured. Because this floor slab has not pour yet, platform scaffold stand can only directly be sat on the floor slab template is predetermine on upper portion. When the floor slab is poured, the scaffold upright post is also poured into the floor slab concrete. So, when predetermineeing platform scaffold frame and demolish, the stand need will pour in floor concrete part excision back, can demolish completely. The columns left in the floor concrete usually need to be post-processed, such as being removed for repair, or being directly repaired, which wastes a lot of materials and labor.
SUMMERY OF THE UTILITY MODEL
In view of the above, the utility model provides a preset platform scaffold structure to solve above or other former problems that prior art exists.
In order to solve the technical problem, the utility model discloses a technical scheme is: the utility model provides a predetermine platform scaffold structure, includes stand seatpad, stand, horizontal pole and predetermines the platform, on the stand seatpad was located and is waited to pour concrete floor bottom support, stand one end can be dismantled with the stand seatpad and be connected, the stand other end with predetermine the platform and be connected, the horizontal pole is connected with the stand, and the crossing setting of horizontal pole and stand supports.
Furthermore, the quantity of stand seatpads and stand is a plurality ofly, and a plurality of stands can dismantle with a plurality of stand seatpads one-to-one and be connected.
Furthermore, a plurality of stand parallel arrangement, and all with treat that the concrete floor bottom support of pouring sets up perpendicularly.
Furthermore, the quantity of horizontal pole is a plurality of, and a plurality of horizontal pole parallel arrangement, and each horizontal pole is connected with a plurality of stand that parallel arrangement each other.
Furthermore, at least two cross bars are arranged along the length direction of the upright post.
Furthermore, the material of the upright post seat cushion is the same as that of the concrete floor to be poured.
Furthermore, the height of the upright post seat cushion is the same as the thickness of the concrete floor to be poured.
A construction method for a preset platform scaffold structure comprises the following steps:
arranging a plurality of upright post seat cushions on a bottom support of a concrete floor to be cast;
arranging an upright on each upright seat cushion, wherein the upright is vertically arranged with the bottom support of the concrete floor to be cast;
a cross bar is arranged on the upright post;
arranging a preset platform at the free end of the upright post;
pouring the concrete floor;
and after the floor slab is poured, sequentially removing the preset platform, the cross rods and the stand columns.
Furthermore, the upright post and the upright post seat cushion are coaxially arranged.
By adopting the technical scheme, the preset platform scaffold is simple in structure and convenient to use, and is provided with the upright post seat cushion, the upright post seat cushion is detachably connected with the upright post and arranged on the bottom support of a concrete floor to be poured, the material of the upright post seat cushion is the same as that of the floor, and the thickness of the upright post seat cushion is the same as that of the floor, so that the preset platform scaffold is erected before the concrete of the floor is poured, the dismantling of the preset platform scaffold is not influenced after the concrete of the floor is poured, the requirement of post-treatment on the concrete structure of the floor is not required after the dismantling, materials and post-treatment labor are saved, and the work efficiency is improved; the structure and construction operation of a platform scaffold preset before the concrete pouring of the traditional floor are not changed, and the method is easy to master by operators; the upright posts of the scaffold do not need to be cut, and materials are saved.
Drawings
Fig. 1 is a schematic front view of a scaffold with a preset platform according to an embodiment of the present invention;
fig. 2 is a schematic top view of a scaffold with a preset platform according to an embodiment of the present invention;
fig. 3 is a left side view structural diagram of the scaffold with the preset platform according to an embodiment of the present invention.
In the figure:
1. bottom support 2 of concrete floor to be poured, floor 3 and upright post seat cushion
4. Upright post 5, cross rod 6 and preset platform
Detailed Description
The invention will be further described with reference to the accompanying drawings and specific embodiments.
Fig. 1 shows the structural schematic diagram of an embodiment, this embodiment relates to a predetermine platform scaffold structure, uses before floor concrete placement, should predetermine platform scaffold structure and have the stand seatpad, the stand seatpad can be dismantled with the stand and be connected, floor concrete placement back, with the stand from the stand seatpad stack up demolish can, do not influence predetermine platform scaffold's demolish, also need not carry out the requirement of post processing to floor concrete structure after demolising, material saving and post processing are artifical, improve the work efficiency.
A preset platform scaffold structure is shown in figures 1-3 and comprises a stand column seat cushion 3, a stand column 4, a cross rod 5 and a preset platform 6, wherein the stand column seat cushion 3 is arranged on a bottom support 1 of a concrete floor to be poured, one end of the stand column 4 is detachably connected with the stand column seat cushion 3, the other end of the stand column 4 is connected with the preset platform 6, the cross rod 5 is connected with the stand column 4, the cross rod 5 and the stand column 4 are intersected and arranged for supporting, the stand column seat cushion 3 is detachably connected with the stand column 4, the preset platform 6 is installed on the bottom support 1 of the concrete floor to be poured through the stand column 4 and the cross rod 5 before the concrete floor 2 is poured, the stand column 4 is detached from the stand column seat cushion 3 after the concrete floor 2 is poured, the stand column seat cushion 3 does not need to be treated, materials and post-treatment labor are saved, and work efficiency is improved.
The upright post seat cushion 3 is provided with a groove, and the shape of the groove is consistent with that of the upright post 4, so that the upright post 4 is conveniently connected with the upright post seat cushion 3 in an inserting way.
The quantity of stand seatpad 3 and stand 4 is a plurality ofly, and a plurality of stands 4 can dismantle with a plurality of stand seatpads 3 one-to-one and be connected, and is preferred, in this embodiment, stand 4 is for pegging graft with the connected mode of stand seatpad 3. A plurality of stands 4 parallel arrangement, and all with treat that the concrete floor bottom that pours supports 1 perpendicular setting. On waiting to cast concrete floor bottom support 1, set up a plurality of stand seatpads 3, a plurality of stand seatpads 3 set gradually along horizontal direction and vertical direction, construct into multirow multiseriate, and a plurality of stand seatpads 3 can be equidistant setting, also can be non-equidistant setting, select according to actual demand, do not do the concrete requirement here. Each upright seat cushion 3 is inserted with an upright 4 to facilitate the installation of a cross rod 5.
The quantity of horizontal pole 5 is a plurality of, and 5 parallel arrangement of a plurality of horizontal poles, each horizontal pole 5 is connected with a plurality of mutual parallel arrangement's stand 4, along the horizontal direction, adjacent parallel arrangement's stand 4 all is connected with a horizontal pole 5, horizontal pole 5 sets up with stand 4 is perpendicular, along vertical direction, adjacent parallel arrangement's stand 4 all is connected with a horizontal pole 5, horizontal pole 5 sets up with stand 4 is perpendicular, each stand 4 all is connected with the horizontal pole 5 of two mutually perpendicular settings, horizontal pole 5 supports stand 4, strengthen stand 4's intensity.
Along the length direction of the upright 4, at least two crossbars 5 are provided, that is, a plurality of crossbars 5 are provided between the preset platform 6 and the upright seat cushion 3, and the crossbars 5 are arranged in parallel to support the upright 4 from different positions.
The material of stand seatpad 3 is the same with waiting to pour concrete floor 2 material, and the height of stand seatpad 3 is the same with waiting to pour concrete floor 2's thickness, and after stand 4 demolishs, stand seatpad 3 need not handle, remains on floor 2, carries out the concrete shutoff, accomplishes concrete floor 2 and pours promptly.
A construction method for a preset platform scaffold structure comprises the following steps:
arranging a plurality of upright post seat cushions 3 on a bottom support 1 of a concrete floor to be cast, wherein the number of the upright post seat cushions 3 is selected according to the volume of a preset platform scaffold;
each upright post seat cushion 3 is provided with an upright post 4, the upright posts 4 are perpendicular to the bottom support 1 of the concrete floor to be cast, the upright posts 4 are inserted in the upright post seat cushions 3, the upright posts 4 and the upright post seat cushions 3 are coaxially arranged, so that the upright posts 4 are perpendicular to the bottom support 1 of the concrete floor to be cast, and the upright posts 4 are all arranged in parallel;
the upright post 4 is provided with a cross bar 5, two cross bars 5 are arranged along the length direction of the upright post 4, and the cross bars 5 are fixedly connected with the upright post 4 through fasteners;
the method comprises the following steps that a preset platform 6 is arranged at the free end of each upright column 4, the preset platform 6 is fixedly connected with each upright column 4, so that the preset platform 6 is in a horizontal state, and the upright columns 4 and the preset platform 6 can be connected in an inserting manner or in a threaded connection manner and can be selected according to actual requirements;
pouring the concrete floor 2;
after the floor slab 2 is poured, the preset platform 6, the cross rods 5 and the stand columns 4 are sequentially removed (the installation sequence is opposite), the stand column seat cushions 3 are left at the floor slab 2, and because the stand column seat cushions 3 are made of the same material as the floor slab 2, subsequent treatment is not needed, and the stand column seat cushions 3 are subjected to concrete plugging.
By adopting the technical scheme, the preset platform scaffold is simple in structure and convenient to use, and is provided with the upright post seat cushion, the upright post seat cushion is detachably connected with the upright post and arranged on the bottom support of a concrete floor to be poured, the material of the upright post seat cushion is the same as that of the floor, and the thickness of the upright post seat cushion is the same as that of the floor, so that the preset platform scaffold is erected before the concrete of the floor is poured, the dismantling of the preset platform scaffold is not influenced after the concrete of the floor is poured, the requirement of post-treatment on the concrete structure of the floor is not required after the dismantling, materials and post-treatment labor are saved, and the work efficiency is improved; the structure and construction operation of a platform scaffold preset before the concrete pouring of the traditional floor are not changed, and the method is easy to master by operators; the upright posts of the scaffold do not need to be cut, and materials are saved.
The embodiments of the present invention have been described in detail, but the description is only for the preferred embodiments of the present invention and should not be construed as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.
Claims (7)
1. The utility model provides a predetermine platform scaffold structure which characterized in that: including stand seatpad, stand, horizontal pole and preset the platform, the stand seatpad is located and is waited to pour on the concrete floor bottom supports, stand one end with the connection can be dismantled to the stand seatpad, the stand other end with preset the platform and connect, the horizontal pole with the stand is connected, just the horizontal pole with the crossing setting of stand supports.
2. The pre-existing platform scaffolding structure as claimed in claim 1, wherein: the stand seatpad with the quantity of stand is a plurality ofly, and is a plurality of the stand is with a plurality of the stand seatpad one-to-one is dismantled and is connected.
3. The pre-set platform scaffolding structure as claimed in claim 2, wherein: and the plurality of stand columns are arranged in parallel and are vertically arranged with the bottom support of the concrete floor to be poured.
4. The pre-set platform scaffolding structure according to any one of claims 1 to 3, wherein: the quantity of horizontal pole is a plurality of, and is a plurality of horizontal pole parallel arrangement, each the horizontal pole with a plurality of mutual parallel arrangement the stand is connected.
5. The pre-existing platform scaffolding structure as claimed in claim 4, wherein: at least two cross bars are arranged along the length direction of the upright post.
6. The pre-set platform scaffolding structure according to any one of claims 1-3, 5, wherein: the material of the upright post seat cushion is the same as that of the concrete floor to be poured.
7. The pre-set platform scaffolding structure as claimed in claim 6, wherein: the height of the upright post seat cushion is the same as the thickness of the concrete floor to be poured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023077279.3U CN214739777U (en) | 2020-12-19 | 2020-12-19 | Preset platform scaffold structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023077279.3U CN214739777U (en) | 2020-12-19 | 2020-12-19 | Preset platform scaffold structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214739777U true CN214739777U (en) | 2021-11-16 |
Family
ID=78632617
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023077279.3U Active CN214739777U (en) | 2020-12-19 | 2020-12-19 | Preset platform scaffold structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214739777U (en) |
-
2020
- 2020-12-19 CN CN202023077279.3U patent/CN214739777U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206942131U (en) | Cast-in-situ concrete beam plate form bracing system | |
CN212129960U (en) | Overhead installation device for frame beam reinforcing steel bars | |
CN112502422A (en) | Scaffold structure with preset platform and construction method thereof | |
CN202117074U (en) | Foundation bed steel structure for positioning and mounting base of tower crane | |
CN214739777U (en) | Preset platform scaffold structure | |
CN106639328B (en) | Concrete beam steel reinforcement framework construction device and construction method | |
CN209384526U (en) | A kind of prefabricated assembled constructing device of cast in place frame column steel reinforcement cage | |
CN208052253U (en) | A kind of positioning moulding bed prefabricated for T beam web reinforced frames | |
CN203531381U (en) | Temporary hanging and supporting device used for steel bar truss formworks | |
CN202990415U (en) | Nuclear power plant four tubular post early detaching supporting device | |
CN215561870U (en) | Sea vase pier steel reinforcement framework limiting device | |
CN212388363U (en) | A auxiliary device for construction of hollow mound cross slab of bridge | |
CN209369334U (en) | A kind of large-span concrete stay in place form support device | |
CN210482242U (en) | Cylindrical tail water surge chamber impedance plate concrete pouring combined supporting system | |
CN209741681U (en) | Heavy steel support | |
JP2015045131A (en) | Underground beam bar arrangement method using vertically separable frame for underground beam bar arrangement and the frame | |
CN209779457U (en) | Supporting device for box girder side template | |
CN221031401U (en) | Floor engineering construction support | |
CN219746187U (en) | Vertical pipe gallery mould steel reinforcement cage ligature support | |
CN208604976U (en) | A kind of mould plate supporting device of hanging concrete straining beam | |
CN214786112U (en) | Rack track support bed-jig that slides | |
CN218699939U (en) | Prefabricated component napping device | |
CN214785954U (en) | Floor post-cast strip template supporting structure | |
CN209465882U (en) | A kind of reinforcement welding support frame | |
CN205329686U (en) | Modular supplementary formwork grudging post of single pile bored concrete pile circle template |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |