CN112252374A - Top surface waterproof and drainage construction method applied to comprehensive pipe gallery - Google Patents

Top surface waterproof and drainage construction method applied to comprehensive pipe gallery Download PDF

Info

Publication number
CN112252374A
CN112252374A CN202011147121.0A CN202011147121A CN112252374A CN 112252374 A CN112252374 A CN 112252374A CN 202011147121 A CN202011147121 A CN 202011147121A CN 112252374 A CN112252374 A CN 112252374A
Authority
CN
China
Prior art keywords
waterproof
wall body
modified asphalt
self
adhesive modified
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011147121.0A
Other languages
Chinese (zh)
Inventor
袁红
何媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN202011147121.0A priority Critical patent/CN112252374A/en
Publication of CN112252374A publication Critical patent/CN112252374A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The invention relates to a top surface waterproof and drainage construction method applied to a comprehensive pipe gallery, which comprises the following steps: the outer side is waterproof, and polyester tire base self-adhesive modified asphalt waterproof coiled materials are arranged on the outer side of the wall body and the outer side of the top plate; the inner side is waterproof, and polyurethane waterproof paint is smeared on the inner side of the wall body and the inner side of the top plate; before the polyester tire base self-adhesive modified asphalt waterproof coiled material is laid, descaling treatment is carried out on the outer base surface of the wall body and the outer base surface of the top plate, and the wall body and the top plate are kept in a dry state; and polymer waterproof cement mortar is poured outside the polyester tire-based self-adhesive modified asphalt waterproof coiled material. The technical scheme is as follows: through carrying out multi-level construction in the wall body outside and the top surface outside, form a plurality of waterproof aspect, can effectively improve overall structure's waterproof performance, combine the inboard polyurethane waterproof coating who paints, the inside and outside combination further improves whole waterproof performance.

Description

Top surface waterproof and drainage construction method applied to comprehensive pipe gallery
Technical Field
The invention relates to the field of pipe gallery waterproofing, in particular to a top surface waterproof and drainage construction method applied to a comprehensive pipe gallery.
Background
The utility tunnel system not only solves the problem of urban traffic jam, but also greatly facilitates the maintenance and overhaul of municipal facilities such as electric power, communication, gas, water supply and drainage and the like. In addition, the system also has a certain shockproof and disaster reduction effect. For example, in 1995, during the great earthquake of Osaka, Japan, a large number of houses in the Shenhu city collapse and roads are damaged, but most of local underground comprehensive pipe galleries are intact, so that the difficulty of post-earthquake disaster relief and reconstruction work is greatly reduced. The utility tunnel plays an important role in meeting the basic demands of the civilian life and improving the comprehensive bearing capacity of the city. The construction of the common ditch avoids the influence and interference on traffic and resident trip caused by frequently digging roads for laying and maintaining underground pipelines, and keeps the road appearance complete and beautiful. The cost of repeated repair of the road surface and the maintenance cost of the engineering pipeline are reduced. The integrity of the pavement and the durability of various pipelines are maintained. Is convenient for laying, increasing, decreasing, maintaining and daily managing various pipelines. Because the pipeline arrangement is compact reasonable in the ditch, effectively utilized the space under the road, practiced thrift urban land. Because the number of the posts of the road and the inspection wells, rooms and the like of various pipelines are reduced, the urban landscape is beautiful. Because the overhead pipelines enter the ground together, the contradiction between the overhead pipelines and the greening is reduced.
Because be in the position below the ground, waterproof requirement to the construction is higher, and waterproof not can not locate in the later stage use and easily appear various potential safety hazards, the problem how to improve construction water-proof effects is urgently needed to be solved.
Disclosure of Invention
Aiming at the technical problems in the prior art, the invention provides a top surface waterproof and drainage construction method applied to a comprehensive pipe gallery.
The technical scheme for solving the technical problems is as follows:
a top surface waterproof and drainage construction method applied to a comprehensive pipe gallery comprises the following steps:
the outer side is waterproof, and polyester tire base self-adhesive modified asphalt waterproof coiled materials are arranged on the outer side of the wall body and the outer side of the top plate;
the inner side is waterproof, and polyurethane waterproof paint is smeared on the inner side of the wall body and the inner side of the top plate;
before the polyester tire base self-adhesive modified asphalt waterproof coiled material is laid, descaling treatment is carried out on the outer base surface of the wall body and the outer base surface of the top plate, and the wall body and the top plate are kept in a dry state;
and polymer waterproof cement mortar is poured outside the polyester tire-based self-adhesive modified asphalt waterproof coiled material.
Further inject, the wall body outside has still been piled up concrete block, and forms the appearance chamber that is used for watering polymer waterproof cement mortar through between concrete block and the wall body outside.
Further limiting, when the self-adhesive modified asphalt waterproof coiled materials are laid, the overlapping edge of two adjacent self-adhesive modified asphalt waterproof coiled materials is not less than 8 cm;
the distance between two adjacent lap joints is not less than 50 cm;
when the self-adhesive modified asphalt waterproof coiled material is adhered to the outer side of a wall body and the outer side of a top plate, a compression roller is used for compacting to remove air, and the self-adhesive modified asphalt waterproof coiled material is kept flat;
after the self-adhesive modified asphalt waterproof roll outside the wall is paved, the end of the self-adhesive modified asphalt waterproof roll is fixed and sealed by a sealing material.
Further limiting, the concrete blocks are built inside and outside, staggered joints are arranged up and down, and the gaps are filled fully and compactly.
Further limiting, curing the polymer waterproof cement mortar, curing after final setting, wherein the curing temperature is not lower than 5 ℃, the surface of the casting body is kept moist in the curing process, and the curing time is not less than 14 days;
when the polymer waterproof cement mortar does not reach the hardening state, watering maintenance or water scouring is not required;
adopting a dry-wet alternative curing method after the polymer waterproof cement mortar is hardened;
or, maintaining under natural conditions in a humid environment.
Further limiting, adopting galvanized steel water stops at construction joints and deformation joints for water prevention, enabling the width of a water section of each galvanized steel to be not less than 30cm, and adopting welded supporting tie bars to fix the positions of the galvanized steel water stops in the construction process.
The invention has the beneficial effects that: through carrying out multi-level construction in the wall body outside and the top surface outside, form a plurality of waterproof aspect, can effectively improve overall structure's waterproof performance, combine the inboard polyurethane waterproof coating who paints, the inside and outside combination further improves whole waterproof performance.
Drawings
FIG. 1 is a flow chart of the construction of the present invention;
Detailed Description
The principles and features of this invention are described below in conjunction with examples which are set forth to illustrate, but are not to be construed to limit the scope of the invention.
A top surface waterproof and drainage construction method applied to a comprehensive pipe gallery comprises the following steps:
the outer side is waterproof, and polyester tire base self-adhesive modified asphalt waterproof coiled materials are arranged on the outer side of the wall body and the outer side of the top plate;
the inner side is waterproof, and polyurethane waterproof paint is smeared on the inner side of the wall body and the inner side of the top plate;
before the polyester tire base self-adhesive modified asphalt waterproof coiled material is laid, descaling treatment is carried out on the outer base surface of the wall body and the outer base surface of the top plate, and the wall body and the top plate are kept in a dry state;
and polymer waterproof cement mortar is poured outside the polyester tire-based self-adhesive modified asphalt waterproof coiled material.
Further inject, the wall body outside has still been piled up concrete block, and forms the appearance chamber that is used for watering polymer waterproof cement mortar through between concrete block and the wall body outside.
Further limiting, when the self-adhesive modified asphalt waterproof coiled materials are laid, the overlapping edge of two adjacent self-adhesive modified asphalt waterproof coiled materials is not less than 8 cm;
the distance between two adjacent lap joints is not less than 50 cm;
when the self-adhesive modified asphalt waterproof coiled material is adhered to the outer side of a wall body and the outer side of a top plate, a compression roller is used for compacting to remove air, and the self-adhesive modified asphalt waterproof coiled material is kept flat;
after the self-adhesive modified asphalt waterproof roll outside the wall is paved, the end of the self-adhesive modified asphalt waterproof roll is fixed and sealed by a sealing material.
Further limiting, the concrete blocks are built inside and outside, staggered joints are arranged up and down, and the gaps are filled fully and compactly.
Further limiting, curing the polymer waterproof cement mortar, curing after final setting, wherein the curing temperature is not lower than 5 ℃, the surface of the casting body is kept moist in the curing process, and the curing time is not less than 14 days;
when the polymer waterproof cement mortar does not reach the hardening state, watering maintenance or water scouring is not required;
adopting a dry-wet alternative curing method after the polymer waterproof cement mortar is hardened;
or, maintaining under natural conditions in a humid environment.
Further limiting, adopting galvanized steel water stops at construction joints and deformation joints for water prevention, enabling the width of a water section of each galvanized steel to be not less than 30cm, and adopting welded supporting tie bars to fix the positions of the galvanized steel water stops in the construction process.
The technical scheme is as follows: through carrying out multi-level construction in the wall body outside and the top surface outside, form a plurality of waterproof aspect, can effectively improve overall structure's waterproof performance, combine the inboard polyurethane waterproof coating who paints, the inside and outside combination further improves whole waterproof performance.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (6)

1. The utility model provides a be applied to utility tunnel's top surface waterproof drainage construction method which characterized in that: the method comprises the following steps:
the outer side is waterproof, and polyester tire base self-adhesive modified asphalt waterproof coiled materials are arranged on the outer side of the wall body and the outer side of the top plate;
the inner side is waterproof, and polyurethane waterproof paint is smeared on the inner side of the wall body and the inner side of the top plate;
before the polyester tire base self-adhesive modified asphalt waterproof coiled material is laid, descaling treatment is carried out on the outer base surface of the wall body and the outer base surface of the top plate, and the wall body and the top plate are kept in a dry state;
and polymer waterproof cement mortar is poured outside the polyester tire-based self-adhesive modified asphalt waterproof coiled material.
2. The top surface waterproof and drainage construction method applied to the comprehensive pipe rack as claimed in claim 1, wherein: concrete blocks are further piled on the outer side of the wall body, and a containing cavity for pouring polymer waterproof cement mortar is formed between the concrete blocks and the outer side of the wall body.
3. The top surface waterproof and drainage construction method applied to the comprehensive pipe rack as claimed in claim 2, wherein: when the self-adhesive modified asphalt waterproof coiled materials are laid, the overlapping edge of two adjacent self-adhesive modified asphalt waterproof coiled materials is not less than 8 cm;
the distance between two adjacent lap joints is not less than 50 cm;
when the self-adhesive modified asphalt waterproof coiled material is adhered to the outer side of a wall body and the outer side of a top plate, a compression roller is used for compacting to remove air, and the self-adhesive modified asphalt waterproof coiled material is kept flat;
after the self-adhesive modified asphalt waterproof roll outside the wall is paved, the end of the self-adhesive modified asphalt waterproof roll is fixed and sealed by a sealing material.
4. The top surface waterproof and drainage construction method applied to the comprehensive pipe rack as claimed in claim 3, wherein: the concrete blocks are built inside and outside, staggered joint up and down, and the gaps are full and compact.
5. The top surface waterproof and drainage construction method applied to the comprehensive pipe rack as claimed in claim 4, wherein: maintaining the polymer waterproof cement mortar, and maintaining after final setting, wherein the maintenance temperature is not lower than 5 ℃, the surface of the casting body is kept moist in the maintenance process, and the maintenance time is not less than 14 days;
when the polymer waterproof cement mortar does not reach the hardening state, watering maintenance or water scouring is not required;
adopting a dry-wet alternative curing method after the polymer waterproof cement mortar is hardened;
or, maintaining under natural conditions in a humid environment.
6. The top surface waterproof and drainage construction method applied to the comprehensive pipe rack as claimed in claim 5, wherein: and adopting galvanized steel plate waterstops to prevent water at the construction joints and deformation joints, wherein the width of a water section of the galvanized steel plate is not less than 30cm, and adopting welded supporting tie bars to fix the positions of the galvanized steel plate waterstops in the construction process.
CN202011147121.0A 2020-10-23 2020-10-23 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery Pending CN112252374A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011147121.0A CN112252374A (en) 2020-10-23 2020-10-23 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011147121.0A CN112252374A (en) 2020-10-23 2020-10-23 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Publications (1)

Publication Number Publication Date
CN112252374A true CN112252374A (en) 2021-01-22

Family

ID=74263316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011147121.0A Pending CN112252374A (en) 2020-10-23 2020-10-23 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Country Status (1)

Country Link
CN (1) CN112252374A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204060729U (en) * 2014-07-28 2014-12-31 厦门中平公路勘察设计院有限公司 Tunnel waterproofing construction
JP2016108815A (en) * 2014-12-05 2016-06-20 株式会社ダイフレックス Waterproof structure and waterproofing method
CN206768880U (en) * 2017-05-11 2017-12-19 中国建筑第六工程局有限公司 A kind of waterproof construction for seashore pipe gallery
CN207700220U (en) * 2017-12-07 2018-08-07 中国市政工程西北设计研究院有限公司 A kind of waterproof construction of pipe gallery outer wall
CN109083199A (en) * 2018-09-30 2018-12-25 广西壮族自治区城乡规划设计院 A kind of pipe gallery and its cabinet waterproof construction
CN211172083U (en) * 2019-11-15 2020-08-04 中国有色金属工业第六冶金建设有限公司 Waterproof pipe gallery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204060729U (en) * 2014-07-28 2014-12-31 厦门中平公路勘察设计院有限公司 Tunnel waterproofing construction
JP2016108815A (en) * 2014-12-05 2016-06-20 株式会社ダイフレックス Waterproof structure and waterproofing method
CN206768880U (en) * 2017-05-11 2017-12-19 中国建筑第六工程局有限公司 A kind of waterproof construction for seashore pipe gallery
CN207700220U (en) * 2017-12-07 2018-08-07 中国市政工程西北设计研究院有限公司 A kind of waterproof construction of pipe gallery outer wall
CN109083199A (en) * 2018-09-30 2018-12-25 广西壮族自治区城乡规划设计院 A kind of pipe gallery and its cabinet waterproof construction
CN211172083U (en) * 2019-11-15 2020-08-04 中国有色金属工业第六冶金建设有限公司 Waterproof pipe gallery

Similar Documents

Publication Publication Date Title
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN110725341B (en) Basement outer wall embedded sleeve and pipeline gap leakage treatment method
CN105256810B (en) Construction method for round underground continuous wall two-in-one structure
CN110206073B (en) Waterproof construction method for lattice column pile and main structure joint
CN110306595B (en) Co-building structure of electric power pipe gallery and flood control wall and construction method thereof
CN208088344U (en) With waterproof, the underground pipe gallery structure of drain function
KR100324889B1 (en) Filling method to protect hidden pipe
CN107355234B (en) Seepage-proofing corrosion-proofing durable confluence regulation type deep tunnel
CN211006779U (en) Water stop ring device of lattice column pile
CN112252374A (en) Top surface waterproof and drainage construction method applied to comprehensive pipe gallery
CN210658443U (en) Structure is built altogether with flood control wall in electric power piping lane
CN214738600U (en) Bypass type drainage pipeline inspection well structure
CN113187487A (en) Double-deck full section of subway freezes secretly digs station structure
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN206640277U (en) A kind of steel moulds combination cable ditch
CN216474308U (en) Assembled concrete garden way with decorative cover layer
CN108678002B (en) Prefabricated assembly pipe gallery structure
CN214363639U (en) A well lid device that is used for urban road to have and increases function
CN217629232U (en) Flexible buffering waterproof traffic lane structure of driving roof
CN217352622U (en) Waterproof device between adjacent building foundations of underground space
CN106948373A (en) A kind of three-dimensional individual layer pipe gallery of steel modeling combination
CN111593628B (en) Multifunctional self-fastening permeable environment-friendly greening brick
Dan et al. Application of Sealing Construction Technology for Precast Concrete City Pipe Gallery Interface
CN201433386Y (en) Broken-line type dam joint structure
Chen The Related Problems in the Construction of the Rainy Season

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210122

RJ01 Rejection of invention patent application after publication