CN109083199A - A kind of pipe gallery and its cabinet waterproof construction - Google Patents

A kind of pipe gallery and its cabinet waterproof construction Download PDF

Info

Publication number
CN109083199A
CN109083199A CN201811160604.7A CN201811160604A CN109083199A CN 109083199 A CN109083199 A CN 109083199A CN 201811160604 A CN201811160604 A CN 201811160604A CN 109083199 A CN109083199 A CN 109083199A
Authority
CN
China
Prior art keywords
layer
parts
pipe gallery
cabinet
wet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811160604.7A
Other languages
Chinese (zh)
Other versions
CN109083199B (en
Inventor
卢二侠
吴嘉佳
蓝华
史健波
李博
张思瑜
李鹏
李晓
谢惠静
欧秋杰
周焱
杨理广
李信
董岩岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Zhuang Autonomous Region Urban And Rural Planning And Design Institute
Original Assignee
Guangxi Zhuang Autonomous Region Urban And Rural Planning And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Urban And Rural Planning And Design Institute filed Critical Guangxi Zhuang Autonomous Region Urban And Rural Planning And Design Institute
Priority to CN201811160604.7A priority Critical patent/CN109083199B/en
Publication of CN109083199A publication Critical patent/CN109083199A/en
Application granted granted Critical
Publication of CN109083199B publication Critical patent/CN109083199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B26/00Compositions of mortars, concrete or artificial stone, containing only organic binders, e.g. polymer or resin concrete
    • C04B26/02Macromolecular compounds
    • C04B26/26Bituminous materials, e.g. tar, pitch
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/254Roof garden systems; Roof coverings with high solar reflectance
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/32Roof garden systems

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Hydrology & Water Resources (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Road Paving Structures (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of pipe gallery and its cabinet waterproof constructions, belong to underground pipe gallery technical field.Cabinet in the pipe gallery includes top plate, side wall and bottom plate; two layers of wet-laying waterproof roll, the waterproof roll of resistance to root thorn and pea gravel concreten protective layer are successively equipped on top plate; it is successively equipped with pea gravel concreten protective layer, two layers of wet-laying waterproof roll and concrete cushion on bottom plate, two layers of wet-laying waterproof roll and sintered porous brick setting are successively equipped with outside side wall;Adhesive-layer in wet-laying waterproof roll is mainly made of the ingredient of following parts by weight: modified pitch, plasticizer, antioxidant and fire retardant;Modified pitch is mainly made of raw material from the following weight: pitch, rubber powder, epoxy resin, organic silicon emulsion, polyacrylate, stearic acid, aluminic acid lipoprotein, polyvinyl alcohol, aluminium oxide and calcium carbonate superfine powder.The present invention improves the waterproof effect and service life of pipe gallery cabinet, and reduces the protrusion on ground, improves traffic, has beautified environment.

Description

A kind of pipe gallery and its cabinet waterproof construction
Technical field
The present invention relates to underground pipe gallery technical fields, and in particular to a kind of pipe gallery and its cabinet waterproof construction.
Background technique
Pipe gallery is exactly the comprehensive corridor of underground urban duct.A tunnel space is built in Urban Underground, it will be electric Power, communication, the various utilities pipelines such as combustion gas, heat supply, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring System implements unified planning, Uniting, unified construction and management, is the important infrastructure and " life for ensureing city operations Line ".
Because pipe gallery is construction of underground structure, to guarantee that each pipeline operates normally in piping lane, piping lane internal box is respectively connect The waterproof, seepage control of mouth, construction joint etc. is particularly important.However the quality that leakage problem is always puzzlement infrastructure engineering is led to Disease prevents pipeline and impregnates phenomenon by percolating water for a long time, and resolving waterproof problem is that the technology that pipe gallery construction must be taken into consideration is asked One of topic.In addition, node structure is generally the node of simple function in current pipe gallery, do not consider a variety of function Can node be combined together, and the ventilation opening in current each cabin of piping lane separately designs and is all exposed ground, feeding port be also as This, keeps the ventilation opening to basset and feeding port more, while influencing traffic, also exerts a certain influence to surrounding enviroment
Summary of the invention
In view of the above-mentioned problems, the object of the present invention is to provide a kind of pipe gallery and its cabinet waterproof construction, it is comprehensive to improve The waterproof effect and service life of piping lane cabinet are closed, and reduces the protrusion on ground, improves traffic, beautifies surrounding enviroment.
To achieve the goals above, the technical solution adopted by the present invention are as follows:
A kind of pipe gallery cabinet waterproof construction, the cabinet include top plate, side wall and bottom plate, are successively spread on the top plate Equipped with two layers of wet-laying waterproof roll, the waterproof roll of resistance to root thorn and pea gravel concreten protective layer, successively it is equipped on the bottom plate thin Stone concrete protective layer, two layers of wet-laying waterproof roll and concrete cushion are successively equipped with two layers of wet-laying waterproof on the side wall Coiled material and sintered porous brick setting;The corner of the side wall and bottom plate or top plate is additionally provided with additional coiled material, and the side wall is applied Wet-laying waterproof roll enhancement layer is also affixed at construction joint at work seam and in cabinet between each cabin;The top plate and bottom plate It is connected integrally with two layers of wet-laying waterproof roll on side wall.
Further, galvanized steel plain sheet waterstop or slow expansion type water-swellable water-stop glue are additionally provided in the middle part of the construction joint, The galvanized steel plain sheet waterstop with a thickness of 3mm, galvanizing coating in the galvanized steel plain sheet waterstop with a thickness of 8-10um;Institute It states and is also coated with cement-base infiltration crystallization water-repellent paint in construction joint.
Further, the wet-laying waterproof roll includes bottom separating film layer, material layer, adhesive-layer and top isolation film Layer;The adhesive-layer is divided into two layers, is respectively arranged on the upper surface of described material layer and following;The adhesive-layer is mainly by following weight The ingredient of part is made: 28-55 parts of modified pitch, 8-15 parts of plasticizer, 6-12 parts of antioxidant and 5-12 parts of fire retardant;
The modified pitch is mainly made of raw material from the following weight: 16-32 parts of pitch, 15-30 parts of rubber powder, epoxy 15-25 parts of resin, 10-18 parts of organic silicon emulsion, 6-12 parts of polyacrylate, 4-10 parts of stearic acid, 4-8 parts of aluminic acid lipoprotein, poly- second 3-8 parts of enol, 2-6 parts of aluminium oxide and 1-5 parts of calcium carbonate superfine powder.
Further, the preparation method of the modified pitch includes the following steps:
(1) raw material of above-mentioned parts by weight is weighed;
(2) pitch is placed in agitator tank, is heated to 130-140 DEG C, then by rubber powder, epoxy resin, organic silicon emulsion, Polyacrylate and stearic acid are added, and are warming up to 160-175 DEG C, stir 1-2 hours, obtain fusant;
(3) by alumina lap, 300 meshes are crossed, then are uniformly mixed with calcium carbonate superfine powder, inorganic particle is obtained;
(4) above-mentioned inorganic particle, aluminic acid lipoprotein and polyvinyl alcohol are added into above-mentioned fusant, are mixed, stirring Simultaneously PVDF is added, stir evenly to get.
Preferably, the plasticizer is butyl naphthenate or citrate, and the antioxidant is the double phosphorous of pentaerythrite Acid esters, the fire retardant are aluminium hydroxide.
Preferably, the material layer is macromolecule membranous layer, azide polymer press mold layer, thermoplastic elastomer (TPE) containing zinc coat Two or more in layer, polyester fiber cloth, glass fabric or scrim layer;The bottom separating film layer and top every It is polyethylene film, polyvinyl chloride film or polyester film from film layer.
Preferably, concrete used in the pea gravel concreten protective layer is water-proof concrete, the water-proof concrete Strength grade be C35, seepage-resistant grade P8;Selected cement is low hydration heat cement in the water-proof concrete, described The fineness of low hydration heat cement is no more than 350m2/kg;It is gel that the siliceous waterproofing agent volume of cracking resistance is mixed in the water-proof concrete The dosage of the 5% of material utilization amount, cementitious material is not less than 300Kg/m2, and it is not more than 400Kg/m2;Chlorine in the water-proof concrete Ion concentration is no more than the 0.1% of binder total amount;The voidage of the aggregate of the water-proof concrete is no more than 40%, and enters Slump control is pumped in 120mm ± 20.
Piping lane main line made of a kind of pipe gallery, including several box body splicings further includes to carry out to the cabinet The cabinet waterproof construction of waterproof.
Further, combined joint structure is additionally provided on the piping lane main line, the combined joint structure includes setting side by side In combustion gas cabin, comprehensive cabin and electric compartment in piping lane main line, the surface of the comprehensive cabin and electric compartment is equipped with conversion layer, described Conversion layer includes horizontally disposed equipment room, divulge information conversion layer and the conversion layer that feeds intake, and the equipment room, ventilation conversion layer and is fed intake Escaping exit, the first ventilation opening and the first feeding port, the equipment room and the ventilation conversion layer are respectively equipped at the top of conversion layer Between obstructed by normally closed fire resistant doorsets, between the ventilation conversion layer and the conversion layer that feeds intake pass through the first fire resisting shutter gate resistance Every;The comprehensive cabin and electric compartment are respectively divided into two fire compartments, and the top of each fire compartment offers one second Ventilation opening, four second ventilation openings pass through the ventilation conversion layer and are connected to first ventilation opening;Each described A blower is mounted on two ventilation openings, the base position of each blower is each equipped with one and far controls electronic smoke-and fire-preventing valve.
Further, the first ventilation opening upper cover is equipped with the first prefabricated cover board, and first ventilation opening is surrounded by Rain and snow shutter and fly net, the rain and snow shutter are located at outside fly net;The first feeding port upper cover is equipped with second Prefabricated cover board;The escaping exit is equipped with anti-drop net and remote-controlled automatic hydraulic well lid, and the anti-drop net is located at automatic The lower section of hydraulic well lid;A vertical ladder is additionally provided between the bottom plate of the piping lane main line and the top of the equipment room, it is described The top of vertical ladder is connected to the escaping exit.
In the modified pitch of wet-laying waterproof roll of the invention, polyacrylate can form good luster and water-fast film, glue It closes securely, is not easy to peel off, flexible and flexible at room temperature, good weatherability, but tensile strength is not high.Stearic acid be natural gum, Widely applied vulcanizing activator in synthetic rubber and latex, it is also possible to make plasticizer, softening agent and waterproofing agent etc..Organosilicon cream Liquid is oil-in-water type defoaming agent, has good heat resistance and deep freeze resistance, and water repellent waterproof effect is good.
Aluminic acid lipoprotein is a kind of cohesive promoting agent or surface treating agent, can promote bonding, has catalytic action;Improve dispersion and rheology Performance;Shock strength is improved, brittleness will not be generated;Improve mechanical performance, improves loading, reduce cost;It prevents from mutually separating, prevent The effects of rotten, anti-oxidant, fire-retardant.In addition, the compatibility of inorganic particle and plastics also can be improved in aluminic acid lipoprotein.Work based on the ingredient With the ingredient is applied in the modification of pitch by present invention trial, does not see at present and the ingredient is applied in modified pitch Report.
Calcium carbonate superfine powder is increasing plastic product volume, reduces cost, improves stability, hardness and stiffness, improves plastics Processing performance, improve its heat resistance, improve the astigmatism of plastics, resistance to marring, smoothness and to notched Izod impact hit intensity Viscosity flow etc. in toughening effect and mixing process all has a significant effect.Effect based on the ingredient, the present invention taste The ingredient is applied in the modification of pitch by examination, does not see the report being applied to the ingredient in modified pitch at present.
In conclusion by adopting the above-described technical solution, the invention has the benefit that
(1) it in pipe gallery cabinet waterproof construction of the invention, is laid with by side wall, bottom plate and the top plate to cabinet The water-proofing treatments such as wet-laying waterproof roll, pea gravel concreten protective layer, while paving in the additional coiled material of on the corner setting, construction joint There are wet-laying waterproof roll enhancement layer and galvanized steel plain sheet waterstop or slow expansion type water-swellable water-stop glue, multiple waterproof to be used in combination, makes case The waterproof effect of body is good, durable.And the wet-laying waterproof roll being laid with includes bottom separating film layer, material layer, is located at The material layer and following adhesive-layer and top separating film layer, in the modified pitch of adhesive-layer, by pitch, rubber Organic silicon emulsion, polyacrylate and stearic acid, organic silicon emulsion, stearic acid and poly- third are added in the major ingredient of powder and resin composition The lotion formed after the optimization mixing of olefin(e) acid ester improves the tensile property of polyacrylate, improves the viscosity of modified pitch, into And improve be laid with wet-laying waterproof roll waterproofness and durability;Add the inorganic powder of aluminium oxide and calcium carbonate superfine powder composition Body has not only properly increased the filling rate and hardness of modified pitch, further improves the toughening effect of impact strength and processed Viscosity flow in journey;Finally by addition aluminic acid lipoprotein, the bonding of each material composition is promoted, modified pitch is further improved Shock strength.By the interaction of these ingredients, the performances such as degree of adhesion, the durability of adhesive-layer are improved, make wet-laying waterproof Layers of material cementability in coiled material is good, wet-laying waterproof roll good mechanical properties, improves the waterproof of wet-laying waterproof roll Property and durability, finally improve the waterproof effect and service life of pipe gallery cabinet.
(2) present invention is also by using water-proof concrete, to the siliceous waterproofing agent volume of the cracking resistance of water-proof concrete, chloride ion The many indexs such as content optimize restriction, further improve the waterproofness and durable wear-resistant of cabinet.
(3) the combined joint structure of pipe gallery of the present invention, to increase conversion layer, conversion layer on the basis of existing piping lane Upper equipment room arranged side by side, divulge information conversion layer and the conversion layer that feeds intake, equipment room, the top of divulge information conversion layer and the conversion layer that feeds intake are right respectively It should be equipped with escaping exit, total ventilation opening and total feeding port, i.e., escaping exit, total ventilation opening and total feeding port are designed at same node shape At combination node structure, facilitate design, is conducive to construction, provides good guidance for other pilot projects and subsequent piping lane project Effect and reference function.In the combined joint structure, all fire prevention of each cabin (except combustion gas cabin) are made by design ventilation conversion layer Subregion shares a total ventilation opening, can effectively reduce the ventilation opening quantity basseted, reduce the protrusion on ground, improve friendship It is logical, also beautify surrounding enviroment.Meanwhile also being fed intake conversion layer by design, making to feed intake can be by total exposed ground Feeding port feeds intake, then is given to each cabin by the conversion layer that feeds intake, and to each cabin feeding port, (such as the second feeding port and third feed intake Mouthful) feed intake, the quantity of the feeding port to basset can be greatly reduced, further reduce the protrusion on ground, improve traffic, beauty Surrounding enviroment are changed.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the pipe gallery cabinet waterproof construction of the embodiment of the present invention 1;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the partial enlarged view in Fig. 1 at B;
Fig. 4 is the structural schematic diagram of wet-laying waterproof roll in a kind of pipe gallery cabinet waterproof construction of the embodiment of the present invention 1;
Fig. 5 is the sectional drawing of the combined joint structure in a kind of pipe gallery of the embodiment of the present invention 1;
Fig. 6 is the cross-section diagram (one) of the combined joint structure in a kind of pipe gallery of the embodiment of the present invention 1;
Fig. 7 is the cross-section diagram (two) of the combined joint structure in a kind of pipe gallery of the embodiment of the present invention 1;
Fig. 8 is the partial enlarged view in Fig. 5 at A;
In figure, 101- cabinet, 102- piping lane main line, 1- top plate, 2- wet-laying waterproof roll, the bottom 2-1- separating film layer, 2- 2- material layer, 2-3- adhesive-layer, the top 2-4- separating film layer, the 3- waterproof roll of resistance to root thorn, 4- pea gravel concreten protective layer, the bottom 5- Plate, 6- concrete cushion, 7- side wall, the sintered porous brick setting of 8-, 9- plain concrete, 10- add coiled material, 11- construction joint, 12- Cabin, 13- enhancement layer, 14- galvanized steel plain sheet waterstop, 15- combustion gas cabin, the comprehensive cabin 16-, 17- electric compartment, 18- equipment room, 19- It divulges information conversion layer, 20- feeds intake conversion layer, the first fire retarding division of 20-1-, the second fire retarding division of 20-2-, the second fireproof rolling of 20-3- Curtain door, 21- escaping exit, the first ventilation opening of 22-, the first feeding port of 23-, the normally closed fire resistant doorsets of 24-, the first fire resistance rolling shutter door of 25-, The second ventilation opening of 26-, 27- blower, 28- far control electronic smoke-and fire-preventing valve, the prefabricated cover board of 29- first, 30- rain and snow shutter, The prefabricated cover board of 31- second, 311- rubber belt, 312- bolt, 313- polysulfide sealant, 32- anti-drop net, 33- automatic hydraulic well lid, The vertical ladder of 34-, 35- lintel, the second feeding port of 36-, 37- third feeding port, 38- light fire-proof cover board.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It should be noted that it can be directly on another component when component is referred to as " being fixed on " another component Or there may also be components placed in the middle.When a component is considered as " connection " another component, it, which can be, is directly connected to To another component or it may be simultaneously present component placed in the middle.When a component is considered as " being set to " another component, it It can be and be set up directly on another component or may be simultaneously present component placed in the middle.Term as used herein is " vertical ", " horizontal ", "left", "right" and similar statement for illustrative purposes only.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more phases Any and all combinations of the listed item of pass.
Embodiment 1
A kind of pipe gallery further includes to the case including the piping lane main line 102 that several cabinets 101 are spliced The cabinet waterproof construction of the progress waterproof of body 101.The piping lane main line 102 is equipped with combined joint structure.
Please referring also to Fig. 1-Fig. 3, the cabinet waterproof construction are, firstly, the cabinet 101 includes top plate 1, side wall 7 With bottom plate 5.Secondly, being successively equipped with the resistance to root thorn of the wet-laying waterproof roll 2 of two layers of 1.5mm thickness, 1.2mm thickness on the top plate 1 The C35 pea gravel concreten protective layer 4 of waterproof roll 3 and 70mm thickness.The microlith of 50mm thickness C35 is successively equipped on the bottom plate 5 The wet-laying waterproof roll 2 and concrete cushion 6 of concrete cover 4, two layers 1.5mm thickness.Two are successively equipped with outside the side wall 7 The thick sintered porous brick setting 8 of wet-laying waterproof roll 2, the 20mm of layer 1.5mm thickness (i.e. build Mu15 sintered perforated brick and add by M7.5 mortar 20mm thickness 1:3 cement mortar) and 500mm thickness plain concrete 9 (setting of roadbed section is only worn under).In addition, the wet-laying in the side wall 7 The inside of waterproof roll 2 is additionally provided with baffle (not shown), to prevent mechanical damage or electric spark from burning wet-laying waterproof roll 2. Two layers of wet-laying waterproof roll 2 on the top plate 1, bottom plate 5 and side wall 7 is connected integrally, two layers of wet-laying waterproof roll 2 Lap width be not less than 100mm, and using cold bonding paste.
The side wall 7 in addition to being equipped with two layers of wet-laying waterproof roll 2, is additionally provided with Addon Volume with the corner of bottom plate 5 or top plate 1 Material 10, and corner is set as the M7.5 cement mortar chamfering 15 of 50 × 50mm.At construction joint 11 in side wall waterproof construction and cabinet Wet-laying waterproof roll enhancement layer 13 is affixed at construction joint 11 between interior each cabin 12, the width of enhancement layer 13 is 500mm, With a thickness of 1.5mm.
Preferably, the middle part of the construction joint 11 is additionally provided with galvanized steel plain sheet waterstop 14, galvanized steel plain sheet waterstop 14 not Water-swellable water-stop glue is then arranged in the position preferably constructed.The galvanized steel plain sheet waterstop 14 with a thickness of 3mm, the galvanized steel plain sheet Galvanizing coating in waterstop 14 with a thickness of 8um.After 11 initial set of construction joint, wire brush should be used its surface laitance and sundries It removes.Horizontal construction joint 11 pours smash before, first brushing high grade cement base osmotic crystalline waterproof material, the waterproof material dosage are many In 1.5Kg/m2, repave the cement mortar of the 1:1 of 30-50mm thickness;Vertical or circular construction joint 11 pours before smashing, and first brushes high-quality Cementitious capillary waterproofing material, the waterproof material dosage are no less than 1.5Kg/m2, and it is poured concrete in time.
Wherein, for galvanized steel plain sheet waterstop 14, the main reinforcement of galvanized steel plain sheet waterstop 14 and adjacent reinforced concrete bodies structure It is connected using reinforcement welding, the longitudinal pitch of tie point is no more than 5 meters, to prevent 14 couple corrosion of galvanized steel plain sheet waterstop.
For water-swellable water-stop glue, the sand grains and coagulation of construction joint in laying range should be removed before construction using wire brush Then native slag uses rag or high pressure water flushing wash clean.Distance of the water-swellable water-stop glue apart from concrete edge is not preferably less than 100mm, its too small swelling stress of distance will lead to concrete spalling.Water-swellable water-stop glue squeeze out section minimum dimension be 15 × 8 (wide × high), the lap of splice is not less than 20mm, and answers continuous uniform.Water-swellable water-stop glue, which should have, delays swollen performance, 7D's Expansion rate is not more than the 60% of final expansion rate, causes expansion for immersion and makes water-swellable water-stop glue premature inflation, must It must construct again.
Meanwhile Fig. 4 is referred to, the wet-laying waterproof roll 2 includes bottom separating film layer 2-1, material layer 2-2, adhesive-layer 2-3 and top separating film layer 2-4;The adhesive-layer 2-3 point is two layers, is respectively arranged on the upper surface of described material layer 2-2 and following. The material layer 2-2 can be fine for macromolecule membranous layer, azide polymer press mold layer, thermoplastic elastomer, polyester containing zinc coat Two or more in Wei Bu, glass fabric or scrim layer.Material layer 2-2 is preferably comprised successively in the present embodiment The macromolecule membranous layer containing zinc coat, azide polymer press mold layer, thermoplastic elastomer, polyester fiber cloth and the glass fibre being laid with Cloth.The adhesive-layer 2-3 is mainly made of the ingredient of following parts by weight: 28 parts of modified pitch, 8 parts of N-BUTYL NAPHTHENATE PLASTICIZER, 6 parts and 5 parts of aluminium hydroxide fire retardant of pentaerythritol bis-phosphite antioxidant.
The modified pitch is mainly made of raw material from the following weight: 16 parts of pitch, 15 parts of rubber powder, epoxy resin 15 Part, 10 parts of organic silicon emulsion, 6 parts of polyacrylate, 4 parts of stearic acid, 4 parts of aluminic acid lipoprotein, 3 parts of polyvinyl alcohol, 2 parts of aluminium oxide and super Thin 1 part of calcium carbonate.The preparation method of the modified pitch includes the following steps:
(1) raw material of above-mentioned parts by weight is weighed;
(2) pitch is placed in agitator tank, is heated to 130 DEG C, then by rubber powder, epoxy resin, organic silicon emulsion, poly- third Olefin(e) acid ester and stearic acid are added, and are warming up to 160 DEG C, stir 1 hour, obtain fusant;
(3) by alumina lap, 300 meshes are crossed, then are uniformly mixed with calcium carbonate superfine powder, inorganic particle is obtained;
(4) above-mentioned inorganic particle, aluminic acid lipoprotein and polyvinyl alcohol are added into above-mentioned fusant, are mixed, stirring Simultaneously PVDF is added, stir evenly to get.
The bottom separating film layer 2-1 and top separating film layer 2-4 is polyethylene film.
In addition, concrete used in pea gravel concreten protective layer in the present invention is water-proof concrete, the waterproof is mixed The strength grade for coagulating soil is C35, seepage-resistant grade P8.Selected cement is low hydration heat cement in the water-proof concrete, The fineness of the low hydration heat cement is no more than 350m2/kg.The fineness of low hydration heat cement described in the present embodiment is 300m2/ kg.5% that the siliceous waterproofing agent volume of cracking resistance is gel rubber material dosage is mixed in the water-proof concrete, the dosage of cementitious material is not Less than 300Kg/m2, and it is not more than 400Kg/m2(including admixture and additive).In the present embodiment, the dosage of cementitious material is 356Kg/m2.Chloride ion content is no more than the 0.1% of binder total amount in the water-proof concrete;The water-proof concrete The voidage of aggregate is no more than 40%, and enters to pump slump control in 120mm ± 20.In the present embodiment, the water-proof concrete Middle chloride ion content is the 0.08% of binder total amount;The voidage of the aggregate of the water-proof concrete is 37%, and enters pump The slump is controlled in 120mm ± 10.
Please referring also to Fig. 5-Fig. 7, the combined joint structure on piping lane main line 102 include being set to piping lane main line 102 side by side The surface of interior combustion gas cabin 15, comprehensive cabin 16 and electric compartment 17, the comprehensive cabin 16 and electric compartment 17 is equipped with conversion layer, described It is equipped at intervals with lintel 35 on the top plate of conversion layer, security risk is brought to conversion layer when preventing local pressure excessive.Described turn Changing layer includes horizontally disposed equipment room 18, ventilation conversion layer 19 and the conversion layer 20 that feeds intake, the equipment room 18, ventilation conversion layer 19 and the top of conversion layer 20 of feeding intake be respectively equipped with escaping exit 21, the first ventilation opening 22 and the first feeding port 23, wherein first is logical Air port 22 and the first feeding port 23 are above ground, to prevent rainwater from flowing backward.First feeding port 23 can also also serve as blower and pipeline Feed intake use, it can opens and reuses.Pass through normally closed fire resistant doorsets between the equipment room 18 and the ventilation conversion layer 19 24 barriers, are obstructed between the ventilation conversion layer 19 and the conversion layer 20 that feeds intake by the first fire resistance rolling shutter door 25.It is described comprehensive It closes cabin 16 and electric compartment 17 is divided into two fire compartments by normally closed fire resistant doorsets respectively, the top of each fire compartment opens up There is one second ventilation opening 26, four second ventilation openings 26 pass through the ventilation conversion layer 19 and first ventilation opening 22 Connection.The present invention by design ventilation conversion layer 19 make all fire compartments of comprehensive cabin 16 and electric compartment 17 share one it is total logical Air port (the first ventilation opening 22), can effectively reduce the ventilation opening quantity basseted, reduce the protrusion on ground, improve traffic While, also beautify surrounding enviroment.A blower 27, each blower 27 are mounted on each second ventilation opening 26 Base position be each equipped with one and far control electronic smoke-and fire-preventing valve 28, play the role of independent fire retarding division between the more cabins of isolation.This Blower 27 in embodiment is roof type blower.
Further, escaping exit 21 is equipped with anti-drop net 32 and remote-controlled automatic hydraulic well lid 33, anti-drop net 32 Positioned at the lower section of automatic hydraulic well lid 33.It is vertical that one is additionally provided between the bottom plate of the piping lane 1 and the top of the equipment room 18 The top of ladder 34, the vertical ladder 34 is connected to the escaping exit 21, i.e., constitutes escape by vertical ladder 34 and escaping exit 21 Channel.Escaping exit 21 also also serves as staff's entrance, and staff is also used for while for escaping usually and emergency Under enter pipe gallery.It is fixed to set anti-drop net 32 to prevent from falling suddenly since escape route is very deep, to guarantee safety.This Outside, it using automatic hydraulic well lid 33, can prevent unauthorized personnel from stealing to well lid, or enter piping lane without authorization, and inside piping lane Personnel can easily open well lid escape, discrepancy etc..This simple construction of vertical ladder 34 has the preciousness being not take up in piping lane empty Between effect.
On the top of first ventilation opening 22 by pillar cover be equipped with the first prefabricated cover board 29, the four of first ventilation opening 22 Week is equipped with rain and snow shutter 30 and fly net (not shown), and rain and snow shutter 30 is located at outside fly net, rain and snow shutter 30 and fly net can play ventilation, insect prevention, antitheft effect simultaneously.In the present embodiment, rain and snow shutter 30 be with a thickness of The aluminium alloy of 1.4mm, fly net are that the eyelet of steel wire and fly net is 10 × 10mm.First ventilation opening 22 is set as ventilating shaft and makes Type, available ventilation area are not less than 4.5 square metres.
First feeding port, 23 upper cover is equipped with the second prefabricated cover board 31.The bottom of second prefabricated cover board 31 is additionally provided with rubber belt 311, the second prefabricated cover board 31 is tightened by 312 nut of bolt and rubber belt 311, and antitheft, waterproof is played the role of in this setting, It is played anti-by polysulfide sealant 313 to being sealed at the second prefabricated cover board 31 and the EDGE CONTACT of the first feeding port 23 again Water effect, such as Fig. 8.
The bottom interval for feeding intake conversion layer 20 offers the second feeding port 36 and third feeding port 37, and described second throws Material mouth 36 is connected to the comprehensive cabin 16, and the third feeding port 37 is connected to the electric compartment 17.Second feeding port 36 With light fire-proof cover board 38 is covered on third feeding port 37, light fire-proof cover board 38 is in off state when flat and (covers), It is just opened when that need to feed intake and use.In the present embodiment, light fire-proof cover board 38 uses fibreglass reinforced plastic cover, and load-bearing is not less than 5KPa. First feeding port 23 is equivalent to a total feeding port, after the present invention is fed intake by the feeding port on a total exposed ground, then passes through The conversion layer 20 that feeds intake is given to each cabin, feeds intake to each cabin feeding port (such as the second feeding port 36 and third feeding port 37), can be significantly The quantity for reducing the feeding port to basset, further reduces the protrusion on ground, improves traffic, beautified surrounding enviroment.
Further, it is additionally provided with the second fire resistance rolling shutter door 20-3 in the conversion layer 20 that feeds intake, to play segmentation fire district Between effect, i.e., the conversion layer 20 that feeds intake is divided into the first fire retarding division 20-1 and the second fire retarding division 20-2.This is second anti- Fiery rolling screen door 20-3 is in off state when flat, is opened when feeding intake.Second feeding port 36 is located at first fire district Between 20-1 bottom, the third feeding port 37 is located at the bottom of the second fire retarding division 20-2.
Certainly, in other embodiments, the combined joint structure may also include the bilge tank in piping lane main line.It is described Bilge tank is set side by side with the combustion gas cabin 2, comprehensive cabin 3 and electric compartment 4, and the conversion layer is set to the comprehensive cabin 3, electric compartment 4 and bilge tank surface, the bilge tank is also classified into two fire compartments, and the top of each fire compartment also offers one Two ventilation openings 13, second ventilation opening 13 are connected to by the ventilation conversion layer 6 with first ventilation opening 9.The throwing The bottom of material conversion layer 7 is additionally provided with the 4th feeding port, and the 4th feeding port is connected to the bilge tank.
Embodiment 2
In the present embodiment, except the thickness of the galvanizing coating in galvanized steel plain sheet waterstop 14 and the ingredient of wet-laying waterproof roll Outside, other are same as Example 1.
In the present embodiment, galvanizing coating in the galvanized steel plain sheet waterstop 14 with a thickness of 10um.
The wet-laying waterproof roll include bottom separating film layer 2-1, material layer 2-2, be located at the material layer 2-2 above and Following adhesive-layer 2-3 and top separating film layer 2-4.The material layer 2-2 includes the azide polymer press mold layer being successively laid with, heat Thermoplastic elastic layer, polyester fiber cloth and glass fabric.The adhesive-layer 2-3 is mainly made of the ingredient of following parts by weight: 55 parts of modified pitch, 15 parts of citrate plasticizer, 12 parts of pentaerythritol bis-phosphite antioxidant and aluminium hydroxide flame-retardant 12 parts of agent.
The modified pitch is mainly made of raw material from the following weight: 32 parts of pitch, 30 parts of rubber powder, epoxy resin 25 Part, 18 parts of organic silicon emulsion, 12 parts of polyacrylate, 10 parts of stearic acid, 8 parts of aluminic acid lipoprotein, 8 parts of polyvinyl alcohol, 6 parts of aluminium oxide and 5 parts of calcium carbonate superfine powder.The preparation method of the modified pitch includes the following steps:
(1) raw material of above-mentioned parts by weight is weighed;
(2) pitch is placed in agitator tank, is heated to 140 DEG C, then by rubber powder, epoxy resin, organic silicon emulsion, poly- third Olefin(e) acid ester and stearic acid are added, and are warming up to 175 DEG C, stir 2 hours, obtain fusant;
(3) by alumina lap, 300 meshes are crossed, then are uniformly mixed with calcium carbonate superfine powder, inorganic particle is obtained;
(4) above-mentioned inorganic particle, aluminic acid lipoprotein and polyvinyl alcohol are added into above-mentioned fusant, are mixed, stirring Simultaneously PVDF is added, stir evenly to get.
The bottom separating film layer 2-1 and top separating film layer 2-4 is polyvinyl chloride film.
Embodiment 3
In the present embodiment, except the thickness of the galvanizing coating in galvanized steel plain sheet waterstop 14 and the ingredient of wet-laying waterproof roll Outside, other are same as Example 1.
In the present embodiment, galvanizing coating in the galvanized steel plain sheet waterstop 14 with a thickness of 9um.
The wet-laying waterproof roll includes bottom separating film layer 2-1, material layer 2-2, adhesive-layer 2-3 and top from bottom to top Portion separating film layer 2-4.The material layer 2-2 include the macromolecule membranous layer containing zinc coat being successively laid with, azide polymer press mold layer, Thermoplastic elastomer and scrim layer.The adhesive-layer 2-3 is mainly made of the ingredient of following parts by weight: modified pitch 35 Part, 12 parts of N-BUTYL NAPHTHENATE PLASTICIZER, 8 parts of pentaerythritol bis-phosphite antioxidant and 8 parts of aluminium hydroxide fire retardant.
The modified pitch is mainly made of raw material from the following weight: 25 parts of pitch, 22 parts of rubber powder, epoxy resin 20 Part, 15 parts of organic silicon emulsion, 8 parts of polyacrylate, 6 parts of stearic acid, 5 parts of aluminic acid lipoprotein, 4 parts of polyvinyl alcohol, 3 parts of aluminium oxide and super Thin 2 parts of calcium carbonate.The preparation method of the modified pitch includes the following steps:
(1) raw material of above-mentioned parts by weight is weighed;
(2) pitch is placed in agitator tank, is heated to 135 DEG C, then by rubber powder, epoxy resin, organic silicon emulsion, poly- third Olefin(e) acid ester and stearic acid are added, and are warming up to 170 DEG C, stir 1.5 hours, obtain fusant;
(3) by alumina lap, 300 meshes are crossed, then are uniformly mixed with calcium carbonate superfine powder, inorganic particle is obtained;
(4) above-mentioned inorganic particle, aluminic acid lipoprotein and polyvinyl alcohol are added into above-mentioned fusant, are mixed, stirring Simultaneously PVDF is added, stir evenly to get.
The bottom separating film layer 2-1 and top separating film layer 2-4 is polyester film.
Comparative example
In the comparative example, except used wet-laying waterproof roll be SBS modified asphalt waterproof coiled material in addition to, other with implementation Example 1 is identical.
Applicant detects the waterproofness and tensile property of the wet-laying waterproof roll of the various embodiments described above and comparative example, The results are shown in Table 1:
Table 1
By the data of above table, the impermeability and draftability of the wet-laying waterproof roll of various embodiments of the present invention It can be superior to SBS modified asphalt waterproof coiled material, show the waterproof effect and good tolerance of wet-laying waterproof roll of the invention, make The waterproof effect for obtaining pipe gallery cabinet waterproof construction of the present invention is good, and service life is longer.
Above description is the detailed description for the present invention preferably possible embodiments, but embodiment is not limited to this hair Bright patent claim, it is all the present invention suggested by technical spirit under completed same changes or modifications change, should all belong to In the covered the scope of the patents of the present invention.

Claims (10)

1. a kind of pipe gallery cabinet waterproof construction, the cabinet includes top plate, side wall and bottom plate, which is characterized in that the top Successively be equipped with two layers of wet-laying waterproof roll, the waterproof roll of resistance to root thorn and pea gravel concreten protective layer on plate, on the bottom plate according to It is secondary to be equipped with pea gravel concreten protective layer, two layers of wet-laying waterproof roll and concrete cushion, two are successively equipped on the side wall Layer wet-laying waterproof roll and sintered porous brick setting;The corner of the side wall and bottom plate or top plate is additionally provided with additional coiled material, institute It states and is also affixed with wet-laying waterproof roll enhancement layer at the construction joint at the construction joint of side wall and in cabinet between each cabin;It is described Top plate and bottom plate is connected integrally with two layers of wet-laying waterproof roll on side wall.
2. pipe gallery cabinet waterproof construction according to claim 1, which is characterized in that the middle part of the construction joint is also set Have galvanized steel plain sheet waterstop or a slow expansion type water-swellable water-stop glue, the galvanized steel plain sheet waterstop with a thickness of 3mm, it is described zinc-plated Galvanizing coating in steel plate water stopper with a thickness of 8-10um;Cement-base infiltration crystallization waterproof is also coated in the construction joint Coating.
3. pipe gallery cabinet waterproof construction according to claim 1, which is characterized in that the wet-laying waterproof roll includes Bottom separating film layer, material layer, adhesive-layer and top separating film layer;The adhesive-layer is divided into two layers, is respectively arranged on the material Layer the upper surface of and it is following;The adhesive-layer is mainly made of the ingredient of following parts by weight: 28-55 parts of modified pitch, plasticizer 8- 15 parts, 6-12 parts of antioxidant and 5-12 parts of fire retardant;
The modified pitch is mainly made of raw material from the following weight: 16-32 parts of pitch, 15-30 parts of rubber powder, epoxy resin 15-25 parts, 10-18 parts of organic silicon emulsion, 6-12 parts of polyacrylate, 4-10 parts of stearic acid, 4-8 parts of aluminic acid lipoprotein, polyvinyl alcohol 3-8 parts, 2-6 parts of aluminium oxide and 1-5 parts of calcium carbonate superfine powder.
4. pipe gallery cabinet waterproof construction according to claim 3, which is characterized in that the preparation side of the modified pitch Method includes the following steps:
(1) raw material of above-mentioned parts by weight is weighed;
(2) pitch is placed in agitator tank, is heated to 130-140 DEG C, then by rubber powder, epoxy resin, organic silicon emulsion, poly- third Olefin(e) acid ester and stearic acid are added, and are warming up to 160-175 DEG C, stir 1-2 hours, obtain fusant;
(3) by alumina lap, 300 meshes are crossed, then are uniformly mixed with calcium carbonate superfine powder, inorganic particle is obtained;
(4) above-mentioned inorganic particle, aluminic acid lipoprotein and polyvinyl alcohol are added into above-mentioned fusant, are mixed, while stirring Be added PVDF, stir evenly to get.
5. pipe gallery cabinet waterproof construction according to claim 3, which is characterized in that the plasticizer is aphthenic acids fourth Ester or citrate, the antioxidant are pentaerythritol bis-phosphite, and the fire retardant is aluminium hydroxide.
6. pipe gallery cabinet waterproof construction according to claim 3, which is characterized in that the material layer is containing zinc coat Macromolecule membranous layer, azide polymer press mold layer, thermoplastic elastomer, polyester fiber cloth, in glass fabric or scrim layer Two or more;The bottom separating film layer and top separating film layer be polyethylene film, polyvinyl chloride film or Polyester film.
7. pipe gallery cabinet waterproof construction according to claim 1, which is characterized in that the pea gravel concreten protective layer Used concrete is water-proof concrete, and the strength grade of the water-proof concrete is C35, seepage-resistant grade P8;It is described anti- Selected cement is low hydration heat cement in water coagulation soil, and the fineness of the low hydration heat cement is no more than 350m2/kg;Institute Stating and mixing the siliceous waterproofing agent volume of cracking resistance in water-proof concrete is the 5% of gel rubber material dosage, and the dosage of cementitious material is not less than 300Kg/m2, and it is not more than 400Kg/m2;Chloride ion content is no more than the 0.1% of binder total amount in the water-proof concrete; The voidage of the aggregate of the water-proof concrete is no more than 40%, and enters to pump slump control in 120mm ± 20.
8. piping lane main line made of a kind of pipe gallery, including several box body splicings, which is characterized in that further include to described The described in any item cabinet waterproof constructions of claim 1 to 7 of cabinet progress waterproof.
9. pipe gallery according to claim 8, which is characterized in that be additionally provided with combined joint knot on the piping lane main line Structure, the combined joint structure include the combustion gas cabin in the piping lane main line, comprehensive cabin and electric compartment side by side, the comprehensive cabin and The surface of electric compartment is equipped with conversion layer, and the conversion layer includes horizontally disposed equipment room, ventilation conversion layer and the conversion that feeds intake Layer, escaping exit is respectively equipped at the top of the equipment room, divulge information conversion layer and the conversion layer that feeds intake, the first ventilation opening and first feeds intake Mouthful, it is obstructed, the ventilation conversion layer and described is fed intake by normally closed fire resistant doorsets between the equipment room and the ventilation conversion layer It is obstructed between conversion layer by the first fire resistance rolling shutter door;The comprehensive cabin and electric compartment are respectively divided into two fire compartments, often The top of one fire compartment offers one second ventilation opening, four second ventilation openings pass through the ventilation conversion layer with The first ventilation opening connection;A blower is mounted on each second ventilation opening, the base position of each blower is equal Electronic smoke-and fire-preventing valve is far controlled configured with one.
10. pipe gallery according to claim 9, which is characterized in that it is prefabricated that the first ventilation opening upper cover is equipped with first Cover board, first ventilation opening are surrounded by rain and snow shutter and fly net, and the rain and snow shutter is located at fly net Outside;The first feeding port upper cover is equipped with the second prefabricated cover board;The escaping exit be equipped with anti-drop net and it is remote-controlled from Hydrodynamic pressure cover for manhole, the anti-drop net are located at the lower section of automatic hydraulic well lid;The bottom plate of the piping lane main line and the equipment room A vertical ladder is additionally provided between top, the top of the vertical ladder is connected to the escaping exit.
CN201811160604.7A 2018-09-30 2018-09-30 Utility tunnel and box waterproof construction thereof Active CN109083199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811160604.7A CN109083199B (en) 2018-09-30 2018-09-30 Utility tunnel and box waterproof construction thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811160604.7A CN109083199B (en) 2018-09-30 2018-09-30 Utility tunnel and box waterproof construction thereof

Publications (2)

Publication Number Publication Date
CN109083199A true CN109083199A (en) 2018-12-25
CN109083199B CN109083199B (en) 2023-10-27

Family

ID=64843265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811160604.7A Active CN109083199B (en) 2018-09-30 2018-09-30 Utility tunnel and box waterproof construction thereof

Country Status (1)

Country Link
CN (1) CN109083199B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924446A (en) * 2019-11-22 2020-03-27 浙江大学 Waterproof structure with prefabricated plate for construction joint of comprehensive pipe gallery and construction method
CN111139863A (en) * 2019-12-31 2020-05-12 上海市政工程设计研究总院(集团)有限公司 Waterproof construction method for open cut semi-reverse construction method tunnel purlin enclosing node
CN112252374A (en) * 2020-10-23 2021-01-22 西南交通大学 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5496615A (en) * 1991-03-01 1996-03-05 W. R. Grace & Co.-Conn. Waterproofing membrane
JP2002242598A (en) * 2001-02-16 2002-08-28 Ohbayashi Corp Composite waterproof sheet for tunnel
KR20090118252A (en) * 2008-05-13 2009-11-18 김기태 The waterproof and corrosion protection method of structure using complex-waterproof-sheet
CN206545228U (en) * 2016-11-30 2017-10-10 上海东方雨虹防水工程有限公司 A kind of piping lane with waterproof construction
CN107386326A (en) * 2017-09-22 2017-11-24 中建五局土木工程有限公司 Underground pipe gallery structure and its construction method
CN206768880U (en) * 2017-05-11 2017-12-19 中国建筑第六工程局有限公司 A kind of waterproof construction for seashore pipe gallery
CN107989068A (en) * 2017-12-07 2018-05-04 中国市政工程西北设计研究院有限公司 A kind of waterproof construction of pipe gallery outer wall
CN208996082U (en) * 2018-09-30 2019-06-18 广西壮族自治区城乡规划设计院 A kind of pipe gallery and its cabinet waterproof construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5496615A (en) * 1991-03-01 1996-03-05 W. R. Grace & Co.-Conn. Waterproofing membrane
JP2002242598A (en) * 2001-02-16 2002-08-28 Ohbayashi Corp Composite waterproof sheet for tunnel
KR20090118252A (en) * 2008-05-13 2009-11-18 김기태 The waterproof and corrosion protection method of structure using complex-waterproof-sheet
CN206545228U (en) * 2016-11-30 2017-10-10 上海东方雨虹防水工程有限公司 A kind of piping lane with waterproof construction
CN206768880U (en) * 2017-05-11 2017-12-19 中国建筑第六工程局有限公司 A kind of waterproof construction for seashore pipe gallery
CN107386326A (en) * 2017-09-22 2017-11-24 中建五局土木工程有限公司 Underground pipe gallery structure and its construction method
CN107989068A (en) * 2017-12-07 2018-05-04 中国市政工程西北设计研究院有限公司 A kind of waterproof construction of pipe gallery outer wall
CN208996082U (en) * 2018-09-30 2019-06-18 广西壮族自治区城乡规划设计院 A kind of pipe gallery and its cabinet waterproof construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924446A (en) * 2019-11-22 2020-03-27 浙江大学 Waterproof structure with prefabricated plate for construction joint of comprehensive pipe gallery and construction method
CN111139863A (en) * 2019-12-31 2020-05-12 上海市政工程设计研究总院(集团)有限公司 Waterproof construction method for open cut semi-reverse construction method tunnel purlin enclosing node
CN112252374A (en) * 2020-10-23 2021-01-22 西南交通大学 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Also Published As

Publication number Publication date
CN109083199B (en) 2023-10-27

Similar Documents

Publication Publication Date Title
CN109083199A (en) A kind of pipe gallery and its cabinet waterproof construction
CN109574585A (en) A kind of water-tight concrete and its construction method
WO2005110940A9 (en) Cement mortar composition and concrete composition
CN101016759A (en) Fiver cement board grouting wall and construction method therefor
CN106285074A (en) A kind of design specification of Logistics Park
CN208996082U (en) A kind of pipe gallery and its cabinet waterproof construction
EP1451128B1 (en) Method for coating a cement-containing molding piece
CN105201101A (en) Light aggregate concrete small hollow block building masonry construction method
CN109626934A (en) A kind of formula being used to prepare insulation construction integrated board and its insulation construction integrated board
CN109747035A (en) A kind of production method using flat-die technique production light thermal-insulation structural integrity plate
CN208996084U (en) A kind of four cabin Pipe racks with intersection
CN209025106U (en) A kind of pipe gallery combined joint structure
CN109083196A (en) A kind of pipe gallery combined joint structure
CN109083198B (en) Take three cabin piping lane structures at crossing
CN109056814A (en) A kind of three cabin pipe gallery systems
CN111962772A (en) Light steel type roof insulation board and production method thereof
CN109252544A (en) A kind of four cabin pipe gallery systems
CN110284686A (en) Kitchen, toilet warterproof construction technology
JP6144896B2 (en) Crack prevention structure for concrete structures
CN109083197A (en) A kind of four cabin Pipe racks with intersection
JPH0893077A (en) Fire-resistant covering laminate structure of steel with draining/deaerating mechanism
CN107476592A (en) A kind of construction material for installing high-strength durable fiber cloth or/and plastic sheeting
CN209482514U (en) A kind of water proof exterior wall in rainy season area
CN209620341U (en) Curtain wall and building floor closing-in structure
CN109487819B (en) Comprehensive pipe gallery and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant