CN204060729U - Tunnel waterproofing construction - Google Patents

Tunnel waterproofing construction Download PDF

Info

Publication number
CN204060729U
CN204060729U CN201420417906.9U CN201420417906U CN204060729U CN 204060729 U CN204060729 U CN 204060729U CN 201420417906 U CN201420417906 U CN 201420417906U CN 204060729 U CN204060729 U CN 204060729U
Authority
CN
China
Prior art keywords
waterproof
tunnel
steel plate
water
waterstop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420417906.9U
Other languages
Chinese (zh)
Inventor
陈亮
胡崇武
练江锋
彭兴宇
赵怡琳
章华东
郑冲
陈少兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Co Ltd Of Zhong Ping Highway Survey And Design Institute
Original Assignee
Xiamen Co Ltd Of Zhong Ping Highway Survey And Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Co Ltd Of Zhong Ping Highway Survey And Design Institute filed Critical Xiamen Co Ltd Of Zhong Ping Highway Survey And Design Institute
Priority to CN201420417906.9U priority Critical patent/CN204060729U/en
Application granted granted Critical
Publication of CN204060729U publication Critical patent/CN204060729U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The open tunnel waterproofing construction of the utility model; tunnel is followed successively by structure wall layer, 20mm waterproof polymer mortar, 4mm wet-laid process self-adhesion asphaltic base polyester blank waterproof roll, topping from the inside to the outside; be sewn in structure wall along tunnel circumferential deformation and arrange buried steel plate water stopper and back-adhering waterstop in a circle, transversely, longitudinal constuction joint arranges steel plate luting waterstop and cement based crystal permeability type water-repellent paint.The utility model is considered as a system engineering tunneling and underground engineering waterproof.According to engineering specific requirement and situation, waterproof principle, waterproofing design, Material selec-tion, Waterproof Construction Technique, waterproof construction management, the selection of waterproof construction troop etc. are all included in water-proof system, sets up complete water-proof system.

Description

Tunnel waterproofing construction
Technical field
The utility model relates to tunnel waterproofing construction.
Background technology
Tunnel water proofing technology is technical difficulty in Tunnel Design and emphasis always, and water seepage of tunnel in constructed item, to leak also be a kind of common quality defect.There is following Railway Project in existing tunnel waterproofing design: 1) water-proof system is not considered as a system engineering.2) the continuing to bring out of waterproof material and technology, for selecting to provide favourable condition and space, but also makes selection add difficulty.3) tunnel recombination formula waterproofing course and deformation joint construction control not strict.4) impermeable structure fails to reach due effect.5) additional waterproofing layer selects to fail incorporation engineering concrete condition.
Utility model content
For solving the technical problem of tunnel water proofing, the utility model object is to provide a kind of waterproof effect preferably tunnel waterproofing construction.
For solving the problems of the technologies described above, the utility model by the following technical solutions:
Tunnel waterproofing construction; it is characterized in that; described tunnel is followed successively by structure wall layer, 20mm waterproof polymer mortar, 4mm wet-laid process self-adhesion asphaltic base polyester blank waterproof roll, topping from the inside to the outside; be sewn in structure wall along tunnel circumferential deformation and arrange buried steel plate water stopper and back-adhering waterstop in a circle, transversely, longitudinal constuction joint arranges steel plate luting waterstop and cement based crystal permeability type water-repellent paint.
Wherein, described middle buried water stop be 350mm wide can slip casting rubber watertight strip.
Wherein, the rubber putty that described steel plate luting waterstop is wrapped up in entirely by 0.6mm steel plate and outside thereof forms.
Wherein, described cement based crystal permeability type water-repellent paint width is 600mm.
Compared with prior art, the utility model has following beneficial effect:
The utility model is considered as a system engineering tunneling and underground engineering waterproof.According to engineering specific requirement and situation, waterproof principle, waterproofing design, Material selec-tion, Waterproof Construction Technique, waterproof construction management, the selection of waterproof construction troop etc. are all included in water-proof system, sets up complete water-proof system.Composite water-proof is emphasis of the present utility model, namely based on concrete structure self-waterproofing, at upstream face additional flexibility waterproofing course, forms the waterproof defence line of a rigid flexible system.
Accompanying drawing explanation
Fig. 1 is the utility model tunnel waterproofing construction schematic diagram;
Fig. 2 is circular construction joint plan;
Fig. 3 is longitudinal constuction joint plan;
Fig. 4 is housing side wall deformation joint plan;
Fig. 5 is housing roof deformation seam plan;
Fig. 6 is housing bottom deformation seam plan.
Detailed description of the invention
By describing technology contents of the present utility model, structural feature in detail, realized object and effect, accompanying drawing is coordinated to be explained in detail below in conjunction with embodiment.
Referring to Fig. 1 to Fig. 6, is the utility model tunnel water proofing plan.Tunnel waterproofing construction; it is characterized in that; described tunnel is followed successively by structure wall layer, 20mm waterproof polymer mortar, 4mm wet-laid process self-adhesion asphaltic base polyester blank waterproof roll, topping from the inside to the outside; be sewn in structure wall along tunnel circumferential deformation and arrange buried steel plate water stopper and back-adhering waterstop in a circle, transversely, longitudinal constuction joint arranges the cement based crystal permeability type water-repellent paint of steel plate luting waterstop and 600mm width.
In the above-described embodiments, middle buried water stop have employed 350mm wide can slip casting rubber watertight strip, the telescopicing performance that rubber has meets the deform in same pace needs of concrete shrinkage; The feature supplements of steel plate and concrete tight bond General Purpose Rubber waterstop and concrete binding is strong, easily slippage cause the deficiency of infiltration, the Grouting Pipe on both sides can be utilized to carry out slip casting shutoff to leakage at any time simultaneously.The back-adhering waterstop that face is arranged near water adds refuses outlet capacity outside deformation joint.
Transversely, longitudinal constuction joint arranges steel plate luting waterstop and cement based crystal permeability type water-repellent paint.The rubber putty that steel plate putty is wrapped up in entirely by 0.6mm steel plate and outside thereof forms, general steel plate water stopper easily causes concrete to be engaged insufficient, steel plate easy-to-rust with steel plate, the putty of steel plate outsourcing not only can weaken the degree of steel plate corrosion, and the water swelling ability of self can be utilized, filling, because being engaged the not enough weakness zone formed, ensure that the validity of waterproof.
The utility model is considered as a system engineering tunneling and underground engineering waterproof.According to engineering specific requirement and situation, waterproof principle, waterproofing design, Material selec-tion, Waterproof Construction Technique, waterproof construction management, the selection of waterproof construction troop etc. are all included in water-proof system, sets up complete water-proof system.Composite water-proof is emphasis of the present utility model, namely based on concrete structure self-waterproofing, at upstream face additional flexibility waterproofing course, forms the waterproof defence line of a rigid flexible system.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claim.

Claims (4)

1. tunnel waterproofing construction; it is characterized in that; described tunnel is followed successively by structure wall layer, 20mm waterproof polymer mortar, 4mm wet-laid process self-adhesion asphaltic base polyester blank waterproof roll, topping from the inside to the outside; be sewn in structure wall along tunnel circumferential deformation and arrange buried steel plate water stopper and back-adhering waterstop in a circle, transversely, longitudinal constuction joint arranges steel plate luting waterstop and cement based crystal permeability type water-repellent paint.
2. tunnel waterproofing construction according to claim 1, is characterized in that, described middle buried water stop be 350mm wide can slip casting rubber watertight strip.
3. tunnel waterproofing construction according to claim 1, is characterized in that, the rubber putty that described steel plate luting waterstop is wrapped up in entirely by 0.6mm steel plate and outside thereof forms.
4. tunnel waterproofing construction according to claim 1, is characterized in that, cement based crystal permeability type water-repellent paint width is 600mm.
CN201420417906.9U 2014-07-28 2014-07-28 Tunnel waterproofing construction Active CN204060729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420417906.9U CN204060729U (en) 2014-07-28 2014-07-28 Tunnel waterproofing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420417906.9U CN204060729U (en) 2014-07-28 2014-07-28 Tunnel waterproofing construction

Publications (1)

Publication Number Publication Date
CN204060729U true CN204060729U (en) 2014-12-31

Family

ID=52202266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420417906.9U Active CN204060729U (en) 2014-07-28 2014-07-28 Tunnel waterproofing construction

Country Status (1)

Country Link
CN (1) CN204060729U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332720A (en) * 2015-11-25 2016-02-17 大同煤矿集团有限责任公司 Waterproof closed construction method of I-shaped steel framework
CN105970880A (en) * 2016-05-30 2016-09-28 中建五局第三建设有限公司 Expansion joint structure with several waterproof guards and construction method of expansion joint structure
CN107605513A (en) * 2017-09-13 2018-01-19 中交公局桥隧工程有限公司 A kind of application process of tunnel longitudinal direction construction joint cement base crystalline waterproof material
CN109736360A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Tunnel open excavation section waterproof construction method
CN109952414A (en) * 2016-12-30 2019-06-28 Sika技术股份公司 Water-proof system
CN110284908A (en) * 2019-07-26 2019-09-27 济南城建集团有限公司 A kind of circumferential grouting for water plugging method in shield received well
CN111287216A (en) * 2020-04-02 2020-06-16 中建四局第五建筑工程有限公司 Cast-in-place utility tunnel structure movement joint
CN112252374A (en) * 2020-10-23 2021-01-22 西南交通大学 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332720A (en) * 2015-11-25 2016-02-17 大同煤矿集团有限责任公司 Waterproof closed construction method of I-shaped steel framework
CN105332720B (en) * 2015-11-25 2017-10-10 大同煤矿集团有限责任公司 The construction method of I-shaped steel skeleton water-proof sealing
CN105970880A (en) * 2016-05-30 2016-09-28 中建五局第三建设有限公司 Expansion joint structure with several waterproof guards and construction method of expansion joint structure
CN105970880B (en) * 2016-05-30 2018-02-16 中建五局第三建设有限公司 A kind of multi layer waterproof is set up defences the construction method of expansion joint structure
CN109952414A (en) * 2016-12-30 2019-06-28 Sika技术股份公司 Water-proof system
CN109952414B (en) * 2016-12-30 2021-10-29 Sika技术股份公司 Water-repellent system
CN107605513A (en) * 2017-09-13 2018-01-19 中交公局桥隧工程有限公司 A kind of application process of tunnel longitudinal direction construction joint cement base crystalline waterproof material
CN109736360A (en) * 2018-12-30 2019-05-10 中铁十四局集团有限公司 Tunnel open excavation section waterproof construction method
CN110284908A (en) * 2019-07-26 2019-09-27 济南城建集团有限公司 A kind of circumferential grouting for water plugging method in shield received well
CN111287216A (en) * 2020-04-02 2020-06-16 中建四局第五建筑工程有限公司 Cast-in-place utility tunnel structure movement joint
CN112252374A (en) * 2020-10-23 2021-01-22 西南交通大学 Top surface waterproof and drainage construction method applied to comprehensive pipe gallery

Similar Documents

Publication Publication Date Title
CN204060729U (en) Tunnel waterproofing construction
CN105019919B (en) Tunnel and its construction method for transmitting fluid
CN207700220U (en) A kind of waterproof construction of pipe gallery outer wall
CN104264717A (en) Basement rigid material and flexible material combined waterproof construction method
CN106120873A (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN203821311U (en) Water-stop structure for core-wall rock-fill dam inner gallery structural gap
CN109811802A (en) Pipe gallery composite water-proof structure under a kind of unfavorable geological condition
CN202830997U (en) Deformation joint waterproof structure for subway station main body side wall
CN205502264U (en) Waterproof structure of movement joint
CN205804633U (en) A kind of basement bottom board waterproof construction
CN105220713A (en) The waterproof construction of outer wall of basement settlement joint
CN107989068A (en) A kind of waterproof construction of pipe gallery outer wall
CN107700556A (en) Underground pipe gallery water-proof system and its construction method
CN209179060U (en) The deformation joint structure of underground pipe gallery
CN207714386U (en) A kind of interface position and its waterproof construction of seabed tunnel and open cut accessory structure
CN207454000U (en) A kind of tunnel arch wall waterproofing of movement joints node
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN203412598U (en) Cable-tunnel composite lining waterproof structure
CN204827469U (en) A tunnel for transmission fluid
CN108361049A (en) A kind of tunnel waterproofing construction construction method
CN208777467U (en) A kind of sealed dividing joint waterproof construction of side wall
CN207812513U (en) Bottom plate corner waterproof construction
CN204804859U (en) Waterproof system of genuine structure in city
CN204982977U (en) Basement bottom plate and waterproofing membrane integration waterproof construction
CN104405420A (en) Method applied to airtight and waterproof treatment of gas tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Liang

Inventor after: Hu Chongwu

Inventor after: Lian Jiangfeng

Inventor after: Peng Xingyu

Inventor after: Zhao Yilin

Inventor after: Zhang Huadong

Inventor after: Zheng Chong

Inventor after: Chen Shaobing

Inventor before: Chen Liang

Inventor before: Hu Chongwu

Inventor before: Lian Jiangfeng

Inventor before: Peng Xingyu

Inventor before: Zhao Yilin

Inventor before: Zhang Huadong

Inventor before: Zheng Chong

Inventor before: Chen Shaobing