CN112227633A CN202010984744.7A CN202010984744A CN112227633A CN 112227633 A CN112227633 A CN 112227633A CN 202010984744 A CN202010984744 A CN 202010984744A CN 112227633 A CN112227633 A CN 112227633A
Authority
CN
China
Prior art keywords
hole
screw
piece
adjusting piece
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010984744.7A
Other languages
Chinese (zh)
Inventor
张杰鹏
陈清民
罗斌乾
富尧
牛义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhuang Brothers Beijing Decoration Engineering Co ltd
Original Assignee
Huazhuang Brothers Beijing Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhuang Brothers Beijing Decoration Engineering Co ltd filed Critical Huazhuang Brothers Beijing Decoration Engineering Co ltd
Priority to CN202010984744.7A priority Critical patent/CN112227633A/en
Publication of CN112227633A publication Critical patent/CN112227633A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • E04F13/0805Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall
    • E04F13/0807Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and the wall adjustable perpendicular to the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention provides a wall whole brick suspension structure and a construction method, wherein the wall whole brick suspension structure comprises a base layer fixing piece, and the base layer fixing piece is connected with a wall; the adjusting piece is connected with the base layer fixing piece and can move relative to the base layer fixing piece to change the distance between the adjusting piece and the wall body, and the adjusting piece is also provided with a first through hole penetrating through the left surface and the right surface of the adjusting piece and a second through hole penetrating through the upper surface and the lower surface of the adjusting piece; the first screw rod penetrates through the first through hole and is connected with the adjusting piece; the second screw rod penetrates through the second through hole and is connected with the adjusting piece; and the connecting piece is connected with the first screw and/or the second screw and can move along the axial direction of the first screw and/or the axial direction of the second screw. The technical problems that wall bricks are easy to drop and low in efficiency when being pasted and mortar plastering construction are solved by arranging the base layer fixing part, the adjusting part, the first screw rod, the second screw rod and the connecting part, and the technical effects of improving safety and construction efficiency are achieved.

Description

Wall whole brick suspension structure and construction method
The technical field is as follows:
the invention relates to the technical field of architectural decoration, in particular to a wall whole brick suspension structure and a construction method.
Background art:
in modern interior decoration, more and more families begin to decorate walls by using decorative materials during decoration, so as to improve the indoor aesthetic degree, the decorative materials comprise stone materials, ceramics, metals, wood materials and the like, and the decorative plates are generally directly adhered and fixed on the surfaces of the walls.
In particular, the ceramic decoration project uses large-sized decorative tiles which are large in mass, difficult to carry and high in falling probability in the pasting process, and are easy to damage once falling; in addition, when the adhesive is used, the proportion of the adhesive to concrete and mortar needs to be adjusted, so that the construction site is messy, the construction progress is slow, and the adhesive has very high requirements on the technology of workers.
The invention is provided in view of the above.
The invention content is as follows:
the invention provides a wall whole brick suspension structure and a construction method, and solves at least one technical problem.
The invention discloses a wall whole brick suspension structure, which comprises:
the base layer fixing piece is connected with the wall body;
the adjusting piece is connected with the base layer fixing piece, can move relative to the base layer fixing piece to change the distance between the adjusting piece and the wall body, and is also provided with a first through hole penetrating through the left surface and the right surface of the adjusting piece and a second through hole penetrating through the upper surface and the lower surface of the adjusting piece;
the first screw rod penetrates through the first through hole and is connected with the adjusting piece;
the second screw rod penetrates through the second through hole and is connected with the adjusting piece;
and the connecting piece is connected with the first screw and/or the second screw and can move along the axial direction of the first screw and/or the axial direction of the second screw.
Adopt above-mentioned scheme, basic unit's mounting can adopt chemical crab-bolt or have the slider mounting etc. of spout, will basic unit's mounting sets up in the wall hole, then will regulating part and basic unit's mounting are connected.
Further, after the first screw or the second screw penetrates the first through hole and the second through hole respectively, the keel installed by the wall brick can be used, at the moment, a fastener can be installed at the intersection of the first screw and the second screw and the adjusting piece, or the inner threads matched with the first screw and the second screw are respectively arranged on the inner walls of the first through hole and the second through hole, so that connection is carried out, and at the moment, the position of the first screw or the position of the second screw can be fixed.
Adopt above-mentioned scheme, the connecting piece is used for being connected with the wall brick, because the mounting hole of being connected with the connecting piece need be seted up to the wall brick, and carry out the trompil with most wall brick back same positions earlier usually for promoting work efficiency in actual installation, so through the connecting piece can be followed first screw rod axial and/or second screw rod axial and produced the removal, can be so that the connecting piece just corresponding with the position of wall brick back trompil, and then avoid unmatched phenomenon to take place.
Preferably, the outer surface of the base layer fixing piece is provided with an external thread, the adjusting piece is provided with a connecting hole, and the inner surface of the connecting hole is provided with an internal thread matched with the external thread.
By adopting the scheme, the connection mode of the adjusting piece and the base layer fixing piece is provided, the adjusting piece can control the distance between the adjusting piece and the wall body by screwing, and the blocking of the threads can also ensure that the adjusting piece cannot be obviously changed in position due to touch in the horizontal direction.
Preferably, the adjusting member includes a blocking body capable of preventing the connection hole from being communicated with the first through hole or the second through hole.
Adopt above-mentioned scheme, the fender body can set up between first through-hole, second through-hole and connecting hole for prevent basic unit's mounting stretches out the overlength and leads to the unable normal setting of first screw rod or second screw rod in first through-hole, the second through-hole, keep off the body can set up with regulating part integrated into one piece.
Specifically, the first through hole and the second through hole have the same outer diameter and shape, the second through hole is intersected with the first through hole, and the distances between the first through hole and the blocking body and the distances between the second through hole and the blocking body are equal; and a third through hole is formed in the intersection of the second through hole and the first through hole of the first screw, and the second screw penetrates through the third through hole.
By adopting the scheme, the positions of the first screw and the second screw cannot be staggered along the axial direction of the adjusting piece, so that the wall bricks can be more conveniently arranged on the same mounting surface when the wall bricks are mounted subsequently by mounting the connecting piece.
Preferably, a filling body is arranged between one end of the adjusting piece close to the wall body and the wall body.
By adopting the scheme, the filler can be made of a material which does not corrode the base layer fixing piece; when a plurality of adjusting pieces are arranged, after the adjusting pieces are installed, the first through holes in each row or the second through holes in each column are arranged on the same straight line, namely, the installation base of the connecting piece is kept consistent, so that the installation surfaces of the wall bricks are ensured to be on the same surface, at the moment, a filling body is arranged between one end, close to the wall body, of each adjusting piece and the wall body, the position, close to the wall body, of one end of each adjusting piece is the position when the adjusting piece abuts against the filling body, and the purpose is to prevent a constructor from screwing the adjusting pieces due to misoperation and forgetting the position where the adjusting piece should be.
Specifically, the first screw and/or the second screw are provided with position marks.
By adopting the mode, the position mark is used for determining the actual position of the connecting piece after being fixed, so that the positions of other connecting pieces can be determined more conveniently.
Preferably, the connecting member includes a clamping portion and a supporting portion detachably connected to the clamping portion.
Adopt above-mentioned scheme, the clamping part is connected with first screw rod and/or second screw rod, the supporting part is used for being connected with the wall brick.
Specifically, the clamping part includes first clamping part, with the second clamping part of connection can be dismantled to first clamping part, second clamping part are connected and are formed the trepanning, the trepanning cover is established on first screw rod or second screw rod surface.
Adopt above-mentioned scheme, a mode of setting up of clamping part is provided, the external diameter of trepanning is greater than the external diameter of first screw rod and/or second screw rod, after first screw rod and/or second screw rod have been installed, be connected the clamping part earlier with first screw rod and/or second screw rod and set up initial position, can connect first clamping part, second clamping part through the bolt, it can remove to ensure the clamping part not to screw up the bolt when setting up initial position, a supporting part that will be connected with the wall brick is connected with one of them clamping part again and is carried out the primary localization this moment, correspond all the good positions with all the other supporting parts again and be connected.
Further, the supporting part comprises a brick body fixing part and a brick body connecting part connected with the brick body fixing part, and the brick body connecting part is further connected with the clamping part.
By adopting the scheme, the bolt hole can be formed in the back face of the wall brick, the bolt matched with the bolt hole is formed in the brick body fixing part to be connected, and then the brick body fixing part is connected with the clamping part.
The invention also discloses a construction method of the whole brick suspension structure of the wall, which comprises the following steps:
a positioning step, namely snapping a line on the surface of the wall body, forming a positioning hole matched with the base layer fixing piece, and drilling the base layer fixing piece into the positioning hole for fixing;
the method comprises the following steps of mounting, namely connecting the adjusting piece with the base layer fixing piece, and aligning the first through holes in the same row with the second through holes in the same column by changing the distance between the adjusting piece and a wall body; penetrating the first screw rod into a first side first through hole in each row, installing a clamping part after each first through hole penetrates through the next first through hole, fixing the first screw rod through a fastener, and then installing a second screw rod, so that at least one clamping part is arranged between the adjacent second through holes and the second screw rod is fixed through the fastener; the wall brick is connected with the supporting part, and then the supporting part is connected with the clamping part.
The invention has the beneficial effects that:
1. the technical problems that wall bricks are easy to drop and low in efficiency when being pasted and mortar plastering construction are solved by arranging the base layer fixing part, the adjusting part, the first screw rod, the second screw rod and the connecting part, and the technical effects of improving safety and construction efficiency are achieved.
2. The technical problem that the position of the adjusting part is changed due to mistaken touch is solved by the filling body, and the technical effect of improving the construction efficiency is achieved.
Description of the drawings:
in order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic installation view of one embodiment of the present invention;
FIG. 2 is a schematic diagram of a base layer according to an embodiment of the present invention;
FIG. 3 is a schematic view of an adjustment member according to one embodiment of the present invention;
FIG. 4 is a schematic view of a first screw according to one embodiment of the present invention;
FIG. 5 is a partial schematic view of FIG. 1;
FIG. 6 is a schematic view of a connector according to an embodiment of the present invention.
Description of reference numerals:
the technical scheme of the invention can be more clearly understood and explained by combining the embodiment of the invention through the reference sign description.
1-wall body, 2-base layer fixing piece, 3-adjusting piece, 31-first through hole, 32-second through hole, 33-connecting hole, 34-blocking body, 41-first screw rod, 411-third through hole, 42-second screw rod, 43-fastening piece, 5-connecting piece, 51-clamping part, 511-first clamping part, 512-second clamping part, 513-trepanning, 52-supporting part, 521-brick body fixing part, 522-brick body connecting part, 6-filling body and 7-wall brick.
The specific implementation mode is as follows:
reference will now be made in detail to the exemplary embodiments, examples of which are illustrated in the accompanying drawings. When the following description refers to the accompanying drawings, like numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following exemplary embodiments do not represent all embodiments consistent with the present invention. Rather, they are merely examples of apparatus and methods consistent with certain aspects of the invention, as detailed in the appended claims.
The terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used in this specification and the appended claims, the singular forms "a", "an", and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It should also be understood that the term "and/or" as used herein refers to and encompasses any and all possible combinations of one or more of the associated listed items.
The present invention will be described in detail below by way of embodiments.
Referring to fig. 1 and 5, the invention provides a wall whole brick hanging structure, comprising:
the base layer fixing piece 2 is connected with the wall body 1;
the adjusting piece 3 is connected with the base layer fixing piece 2, the adjusting piece 3 can move relative to the base layer fixing piece 2 to change the distance between the adjusting piece 3 and the wall body 1, and the adjusting piece 3 is further provided with a first through hole 31 penetrating through the left surface and the right surface of the adjusting piece 3 and a second through hole 32 penetrating through the upper surface and the lower surface of the adjusting piece;
a first screw rod 41, wherein the first screw rod 41 passes through the first through hole 31 and is connected with the adjusting piece 3;
a second screw rod 42, wherein the second screw rod 42 passes through the second through hole 32 and is connected with the adjusting piece 3;
and the connecting piece 5 is connected with the first screw rod 41 and/or the second screw rod 42, and the connecting piece 5 can move along the axial direction of the first screw rod 41 and/or the axial direction of the second screw rod 42.
Adopt above-mentioned scheme, at first clear up 1 wall of wall body, then transversely play the line with vertically, can set up the through-wall hole in the nodical department of horizontal and vertical mark line, basic unit mounting 2 can adopt chemical crab-bolt or have the slider mounting etc. of spout, will basic unit mounting 2 sets up in the through-wall hole, then will regulating part 3 is connected with basic unit mounting 2, because constructor may cause the depth to differ when seting up the through-wall hole, the degree of depth of installation is different when installation basic unit mounting 2, reasons such as wall unevenness can cause follow-up installation not at the coplanar, can produce the removal through making regulating part 3 can be relative basic unit mounting 2 this moment in order to change the distance between regulating part 3 and the wall body 1 to guarantee follow-up installation face that makes wall brick 7 on the coplanar.
After the first screw 41 or the second screw 42 penetrates the first through hole 31 and the second through hole 32 respectively, the keel for installing the wall brick 7 can be used, at the moment, a fastening piece 43 can be installed at the intersection of the first screw 41 and the second screw 42 and the adjusting piece 3, or the inner walls of the first through hole 31 and the second through hole 32 are respectively provided with inner threads matched with the first screw 41 and the second screw 42, so that connection is carried out, and at the moment, the position of the first screw 41 or the position of the second screw 42 can be fixed.
The connecting piece 5 is used for being connected with the wall brick 7, because the mounting hole that is connected with the connecting piece needs to be seted up to the wall brick 7, and in actual installation carry out the trompil with most wall brick 7 back same positions earlier usually for promoting work efficiency, so through the connecting piece 5 can be followed first screw 41 axial and/or second screw 42 axial and produced the removal, can make the connecting piece 5 just corresponding with the position of the trompil in the wall brick 7 back, and then avoid unmatched phenomenon to take place. The scheme does not adopt the mode of pasting the wall brick, plastering to install to security and efficiency of construction have been promoted.
Referring to fig. 2 and 3, the outer surface of the base fixing member 2 is provided with an external thread, the adjusting member 3 is provided with a connecting hole 33, and the inner surface of the connecting hole 33 is provided with an internal thread adapted to the external thread.
By adopting the scheme, the connection mode of the adjusting piece 3 and the base layer fixing piece 2 is provided, the distance between the adjusting piece 3 and the wall body 1 can be controlled by screwing, and the change of an obvious position in the horizontal direction due to touch can be avoided due to the blocking of threads. In the present embodiment, the adjuster 3 is formed in a cylindrical shape as a whole, and the first screw 41 and the second screw 42 are formed in a circular rod shape.
Referring to fig. 3, the adjusting member 3 includes a stopper 34, and the stopper 34 prevents the connecting hole 33 from communicating with the first through hole 31 or the second through hole 32.
By adopting the above scheme, the blocking body 34 can be arranged between the first through hole 31, the second through hole 32 and the connecting hole 33, so as to prevent the base layer fixing piece 2 from extending too long into the first through hole 31 and the second through hole 32 to cause the first screw rod 41 or the second screw rod 42 to be unable to be normally arranged, and the blocking body 34 and the adjusting piece 34 can be integrally formed.
Referring to fig. 3 and 4, the first through hole 31 and the second through hole 32 have the same outer diameter and shape, the second through hole 32 intersects with the first through hole 31, and the distances between the first through hole 31 and the second through hole and the stopper 34 are equal; the first screw 41 is provided with a third through hole 411 at the intersection of the second through hole 32 and the first through hole 31, and the second screw 42 passes through the third through hole 411.
By adopting the scheme, the positions of the first screw rod 41 and the second screw rod 42 can not be staggered along the axial direction of the adjusting piece 3, so that the wall brick 7 can be more conveniently arranged on the same installation surface when the connecting piece 5 is installed subsequently and then the wall brick 7 is installed again. If the first through hole 31 and the second through hole 32 are formed in a staggered manner, the connecting members 5 connected to the first screw rod 41 and the second screw rod 42 are not in a consistent position after installation, thereby affecting subsequent construction.
Referring to fig. 5, a filling body 6 is arranged between one end of the adjusting member 3 close to the wall body 1 and the wall body 1.
By adopting the scheme, the filling body 6 can be made of materials which do not corrode the base layer fixing piece 2, such as foaming agent, foaming glue and the like; when a plurality of adjusting parts are arranged, after the adjusting parts 3 are installed, the first through holes 31 in each row or the second through holes 32 in each column are arranged on the same straight line, namely, the installation base of the connecting part 5 is kept consistent, so that the installation surfaces of the wall bricks 7 are ensured to be on the same surface, at the moment, the filling bodies 6 are arranged between one ends, close to the wall bodies 7, of the adjusting parts 3 and the wall bodies 7, and the positions, corresponding to one ends, close to the wall bodies 7, of the adjusting parts 3 are positions for supporting the filling bodies 6, so that the purpose is to prevent constructors from screwing the adjusting parts 3 due to misoperation and further forgetting the positions, which the constructors should locate, and further, the subsequent installation can be carried out more conveniently, and the construction efficiency is improved.
The first screw rod 41 and/or the second screw rod (42) are/is provided with a position mark.
By adopting the mode, the position mark is used for determining the actual position of the connecting piece 5 after being fixed, so that the positions of other connecting pieces 5 can be more conveniently determined.
Referring to fig. 6, the connector 5 includes a holding portion 51 and a supporting portion 52 detachably connected to the holding portion 51.
With the above scheme, the clamping portion 51 is connected with the first screw 41 and/or the second screw 42, and the supporting portion 52 is used for connecting with the wall brick 7.
Referring to fig. 6, the clamping portion 51 includes a first clamping portion 511 and a second clamping portion 512 detachably connected to the first clamping portion 511, the first clamping portion 511 and the second clamping portion 512 are connected to form a sleeve hole 513, and the sleeve hole 513 is sleeved on the surface of the first screw 41 or the second screw 42.
By adopting the scheme, the arrangement mode of the clamping parts 51 is provided, the outer diameter of the sleeve hole 513 is larger than the outer diameter of the first screw rod 41 and/or the second screw rod 42, after the first screw rod 41 and/or the second screw rod 42 are/is installed, the clamping parts 51 are firstly connected with the first screw rod 41 and/or the second screw rod 42 and are arranged at initial positions, the first clamping part 511 and the second clamping part 512 can be connected through bolts, the bolts are not screwed down when the initial positions are arranged, the clamping parts 51 can be ensured to move, at the moment, one supporting part 52 connected with the wall brick 7 is connected with one clamping part 51 for initial positioning, the other clamping parts 51 are connected with the other supporting parts 52 in a position corresponding to each other, and the installation accuracy of the wall brick 7 and the construction efficiency can be ensured.
Referring to fig. 6, the supporting portion 52 includes a brick fixing portion 521, and a brick connecting portion 522 connected to the brick fixing portion 521, and the brick connecting portion 521 is further connected to the clamping portion 51.
By adopting the scheme, the back of the wall brick 7 can be provided with the bolt hole, the brick fixing part 521 is provided with the bolt matched with the bolt hole for connection, and then the brick fixing part 521 is connected with the clamping part 51.
The invention also discloses a construction method of the whole brick suspension structure of the wall, which comprises the following steps:
a positioning step, namely snapping a line on the surface of the wall body 1, forming a positioning hole matched with the base layer fixing piece 2, and drilling the base layer fixing piece 2 into the positioning hole for fixing;
an installation step, connecting the adjusting piece 3 with the base layer fixing piece 2, and aligning the first through holes 31 in the same row with the second through holes 32 in the same column by changing the distance between the adjusting piece 3 and the wall body 1; the first screw rod 41 penetrates through the first side first through hole 31 in each row, a clamping part 51 is installed after each first through hole 31 penetrates through the next first through hole 31, so that at least one clamping part 51 is arranged between the adjacent first through holes 31, the first screw rod 41 is fixed through a fastening piece 43, then the second screw rod 42 is installed, and at least one clamping part 51 is arranged between the adjacent second through holes 32 and the second screw rod 42 is fixed through the fastening piece 43; the wall brick 7 is connected to the support part 52, and the support part 52 is connected to the holding part 51.
It should be noted that, for those skilled in the art, it is possible to make several improvements and modifications to the present invention without departing from the principle of the present invention, and those improvements and modifications also fall within the protection scope of the claims of the present invention.

Claims (10)

1. The utility model provides a whole brick suspended structure of wall body which characterized in that includes:
the base layer fixing piece (2), the base layer fixing piece (2) is connected with the wall body (1);
the adjusting piece (3) is connected with the base layer fixing piece (2), the adjusting piece (3) can move relative to the base layer fixing piece (2) to change the distance between the adjusting piece (3) and the wall body (1), and the adjusting piece (3) is further provided with a first through hole (31) penetrating through the left surface and the right surface of the adjusting piece and a second through hole (32) penetrating through the upper surface and the lower surface of the adjusting piece;
a first screw (41), wherein the first screw (41) passes through the first through hole (31) and is connected with the adjusting piece (3);
a second screw (42), wherein the second screw (42) passes through the second through hole (32) and is connected with the adjusting piece (3);
the connecting piece (5) is connected with the first screw rod (41) and/or the second screw rod (42), and the connecting piece (5) can move along the axial direction of the first screw rod (41) and/or the axial direction of the second screw rod (42).
2. The whole wall brick hanging structure of claim 1, wherein: base layer mounting (2) surface is provided with the external screw thread, and regulating part (3) are provided with connecting hole (33), connecting hole (33) internal surface be provided with the internal thread of external screw thread adaptation.
3. The whole wall brick hanging structure of claim 2, wherein: the adjusting piece (3) comprises a blocking body (34), and the blocking body (34) can prevent the connecting hole (33) from being communicated with the first through hole (31) or the second through hole (32).
4. The whole wall brick hanging structure of claim 3, wherein: the first through hole (31) and the second through hole (32) are identical in outer diameter and shape, the second through hole (32) is intersected with the first through hole (31), and the distances between the first through hole (31) and the second through hole (32) and the blocking body (34) are equal; the first screw rod (41) is provided with a third through hole (411) at the intersection of the second through hole (32) and the first through hole (31), and the second screw rod (42) penetrates through the third through hole (411).
5. The whole wall brick hanging structure of claim 4, wherein: and a filling body (6) is arranged between one end of the adjusting piece (3) close to the wall body (1) and the wall body (1).
6. The whole wall brick hanging structure of claim 5, wherein: the first screw (41) and/or the second screw (42) are/is provided with a position mark.
7. The whole wall brick hanging structure according to any one of claims 1 to 6, characterized in that: the connecting piece (5) comprises a clamping part (51) and a supporting part (52) detachably connected with the clamping part (51).
8. The whole wall brick hanging structure of claim 7, wherein: the clamping part (51) comprises a first clamping part (511) and a second clamping part (512) detachably connected with the first clamping part (511), the first clamping part (511) and the second clamping part (512) are connected to form a sleeve hole (513), and the surface of the first screw (41) or the surface of the second screw (42) is sleeved with the sleeve hole (513).
9. The whole wall brick hanging structure of claim 8, wherein: the supporting portion (52) comprises a brick body fixing portion (521) and a brick body connecting portion (522) connected with the brick body fixing portion (521), and the brick body connecting portion (521) is further connected with the clamping portion (51).
10. A construction method of a whole-brick suspension structure of a wall body is characterized by comprising the following steps:
a positioning step, namely snapping a line on the surface of the wall body (1), forming a positioning hole matched with the base layer fixing piece (2), and drilling the base layer fixing piece (2) into the positioning hole for fixing;
the method comprises the following steps of (1) mounting, namely connecting the adjusting piece (3) with the base layer fixing piece (2), and aligning the first through holes (31) in the same row with the second through holes (32) in the same column by changing the distance between the adjusting piece (3) and the wall body (1); the first screw (41) penetrates through a first through hole (31) on the side edge of each row, a clamping part (51) is installed after each first through hole (31) penetrates through the next first through hole (31), so that at least one clamping part (51) is arranged between the adjacent first through holes (31), the first screw (41) is fixed through a fastening piece (43), then the second screw (42) is installed, and at least one clamping part (51) is arranged between the adjacent second through holes (32) and the second screw (42) is fixed through the fastening piece (43); the wall brick (7) is connected with the supporting part (52), and then the supporting part (52) is connected with the clamping part (51).
CN202010984744.7A 2020-09-18 2020-09-18 Wall whole brick suspension structure and construction method Pending CN112227633A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010984744.7A CN112227633A (en) 2020-09-18 2020-09-18 Wall whole brick suspension structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010984744.7A CN112227633A (en) 2020-09-18 2020-09-18 Wall whole brick suspension structure and construction method

Publications (1)

Publication Number Publication Date
CN112227633A true CN112227633A (en) 2021-01-15

Family

ID=74107194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010984744.7A Pending CN112227633A (en) 2020-09-18 2020-09-18 Wall whole brick suspension structure and construction method

Country Status (1)

Country Link
CN (1) CN112227633A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027340A (en) * 1998-07-14 2000-01-25 Itoki Crebio Corp Rear face reinforcing device in wall-surface panel device
CN203429854U (en) * 2013-07-26 2014-02-12 珠海市晶艺玻璃工程有限公司 Fixing system for space curved plate
CN105178546A (en) * 2015-06-17 2015-12-23 陈锦汗 Wall surface decorating plate and wall surface decorating method
CN205955097U (en) * 2016-08-16 2017-02-15 珠海市晶艺玻璃工程有限公司 Installation fixing device of space curved plate
CN110331833A (en) * 2019-06-26 2019-10-15 浙江筑加装饰股份有限公司 Metope levels component and metope leveling method
CN210152147U (en) * 2019-01-21 2020-03-17 张淑君 Novel keel structure for building engineering

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027340A (en) * 1998-07-14 2000-01-25 Itoki Crebio Corp Rear face reinforcing device in wall-surface panel device
CN203429854U (en) * 2013-07-26 2014-02-12 珠海市晶艺玻璃工程有限公司 Fixing system for space curved plate
CN105178546A (en) * 2015-06-17 2015-12-23 陈锦汗 Wall surface decorating plate and wall surface decorating method
CN205955097U (en) * 2016-08-16 2017-02-15 珠海市晶艺玻璃工程有限公司 Installation fixing device of space curved plate
CN210152147U (en) * 2019-01-21 2020-03-17 张淑君 Novel keel structure for building engineering
CN110331833A (en) * 2019-06-26 2019-10-15 浙江筑加装饰股份有限公司 Metope levels component and metope leveling method

Similar Documents

Publication Publication Date Title
CN111305410B (en) Anti-cracking wall and construction method thereof
CN102839804B (en) Method for paving and sticking stone materials or ceramic tiles
KR20110033425A (en) Stone panel fixing device of a building wall
CN112554489A (en) Freely-leveled wallboard mounting structure and mounting method thereof
CN103243890A (en) Hanging and buckling assembly of heat-insulating decorating plate and installation process of buckle assembly
CN103195226B (en) Method for mounting decoration panel
WO2021031509A1 (en) Wall leveling assembly and mounting method therefor
CN212224513U (en) Assembled fitment wall top surface T type levelling device
CN204475767U (en) Wall decoration building materials hang special part
CN112227633A (en) Wall whole brick suspension structure and construction method
CN211774781U (en) External wall insulation decorates intergral template construction structures
CN112554486A (en) Indoor wall surface ceramic tile dry hanging assembly and application method thereof
CN101519906A (en) Implanted pottery-stone connector for building decorative plates, and dry-hanging installation technique thereof
CN202500296U (en) Embedded prearranged pipe locking pin used for fixing veneer
CN207003896U (en) A kind of decorative panel suspension member and decorative panel install node
CN213448991U (en) Assembly quality of side fascia for assembly type structure
CN104612358B (en) A kind of hanging method of wall decoration building materials
CN103321329A (en) Finished-product partition ground rail system and construction method thereof
CN112663886A (en) Hanging composite wallboard installation system and installation method thereof
CN103967252B (en) A kind of decorative panel for building timber securing member and mounting method thereof
CN206844551U (en) A kind of cement fibrolite plate mounting suspension member
CN207553363U (en) A kind of prefabricated partition wall connecting structure
CN216587494U (en) Keel mounting system for decorative wallboard
CN203440951U (en) Ground rail system of finished partition wall
CN219386974U (en) Keel mounting structure of wallboard assembly type

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210115