CN111948596A - 基于多时间尺度的台区电能表误差在线检测方法和系统 - Google Patents
基于多时间尺度的台区电能表误差在线检测方法和系统 Download PDFInfo
- Publication number
- CN111948596A CN111948596A CN202010857564.2A CN202010857564A CN111948596A CN 111948596 A CN111948596 A CN 111948596A CN 202010857564 A CN202010857564 A CN 202010857564A CN 111948596 A CN111948596 A CN 111948596A
- Authority
- CN
- China
- Prior art keywords
- data
- electric energy
- phase
- energy meter
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R35/00—Testing or calibrating of apparatus covered by the other groups of this subclass
- G01R35/04—Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明公开了基于多时间尺度的台区电能表误差在线检测方法和系统,涉及电能计量设备检测技术领域,解决了拆回检定导致的换表停电损失与优质供电服务影响的问题。本发明包括数据周期性采集、数据有效性判断与数据的线损计算、构建误差模型、导出计算结果等步骤,对待核查台区的台区总表、台区下所有分表的用电信息数据进行周期性采集,对周期性采集到的数据进行有效性判断,如不合格执行补采操作,数据的有效性合格构建线损模型进行线损计算;本发明基于台区总电量等于各分表电能量及线损之和的能量守恒模型,通过构建不同尺度的采样周期,实现线损的有效估计,提升台区下各分表误差计算的准确性。
Description
技术领域
本发明涉及电能计量设备检测技术领域,具体涉及基于多时间尺度的台区电能表误差在线检测方法和系统。
背景技术
电能已成为人类社会赖以生存和发展的重要能源,人类的所有活动几乎都与电有密切的关系。电能表作为客户与电力公司电能结算的重要设备,其质量的好坏直接关乎到各方的直接经济利益。因此,如何保证电能表的质量的好坏,就成为摆在电力公司及质量管理部门面前亟需解决的问题。
根据《电子式交流电能表检定规程》JJG596要求,0.2S级、0.5S级有功电能表,其检定周期一般不超过6年;l级、2级有功电能表和2级、3级无功电能表,其检定周期一般不超过8年,到期电能表应及时送回计量检定机构进行再次检定。按照现有智能电能表市场规模测算,拆回检定将导致每年百亿级资金浪费以及无法预计的换表停电损失与优质供电服务影响。
发明内容
针对上述问题,本发明引入一种基于多时间尺度的台区电能表误差在线检测方法和系统。该方法相比现有方案主要优势在于,基于台区总电量等于各分表电能量及线损之和的能量守恒模型,通过构建不同尺度的采样周期,实现线损的有效估计,提升台区下各分表误差计算的准确性。
本发明通过下述技术方案实现:
基于多时间尺度的台区电能表误差在线检测方法,包括如下步骤:
步骤1、数据周期性采集:对待核查台区的台区总表、台区下所有分表的用电信息数据进行周期性采集;
步骤2、数据有效性判断与数据的线损计算:对周期性采集到的数据进行有效性判断,如不合格执行补采操作,数据的有效性合格构建线损模型进行线损计算;
步骤3、构建误差模型:将所述步骤2后的台区总表和分表数据采用误差模型进行实时的误差计算;
步骤4、导出计算结果。
进一步地,用电信息数据包括一类数据和二类数据;
一类数据为长周期数据采集的数据,二类数据为短周期数据采集的数据,其中一类数据包括台区总表电能量数据、台区下所有分表的电能量数据;二类数据包括台区总表及台区下所有分表电压数据、电流数据及功率因数。
进一步地,所述步骤1中的周期性采集的详细步骤如下:
步骤a、首先确定一类数据采集组次Nl;每组数据采集两次,两次采集时间间隔为Tl,其中采集组次Nl在数值上应等于台区下分表数量之和;
步骤b、对台区总表、台区下所有分表执行一类数据采集操作,共采集Nl组数据,每组数据采集时间间隔应不小于Tl;ΔWij表示第i只电能表在执行第j组采集操作期间计量的电能量数据;其中i=0表示台区总表,i=1,2,3....Nl表示该台区下的第1只,2只,3只...Nl分表;j=1,2,3....Nl;
步骤c、在执行一类数据采集同时,同步采集台区总表和台区下各分表的二类数据;
表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电压数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电流数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的功率因数数据;采集时刻为ts=t0+s*Ts j,其中t0表示一类数据采集开始时间;Ts j为第j组二类数据采集周期,表示每个一类数据采集周期内的二类数据采集次数;
进一步地,步骤1中,对于不同时刻的一类数据采集周期,其对应的的二类数据采集周期Ts j可能相同,可能不相同。
进一步地,所述步骤1中,Ts j对应的采样频率应不小于第(j-1)个Tl周期内出现的最高频率信号频率的2倍。
进一步地,所述步骤1中,为保证每组采集数据线性不相关,每组次之间采集间隔应不小于T,其中T>Tl。
进一步地,数据有效性判断的方法如下:
当不平衡度δ超过设定阈值时,则该采样周期内的一类数据和二类数据均无效,此时应执行补采操作,补采操作为再次执行步骤1,直到一类数据有效组数等于Nl组,方可停止补采操作;
当不平衡度δ未超过设定阈值时,则该采样周期内的一类数据和二类数据为有效数据,此时进行步骤3。
进一步地,所述步骤2的线损模型为
对于单相电能表:
对于三相四线制电能表而言,
进一步地,所述步骤3中:
台区总表、分表在线误差检测模型为
其中εi表示台区下第i只电能表的误差数据;
基于多时间尺度的台区电能表误差在线检测系统,所述系统包括线损模型、误差模型和多种传感器用于数据采集和处理,所述系统用于实现上述方法步骤。
进一步地,一种计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,所述计算机程序被处理器执行时实现本方法中的步骤。本方法的具体使用依赖大量计算,因此优选的通过计算机程序来实现上述计算过程,所以任何包含本方法中所保护的步骤的计算机程序及其存储介质也属于本申请的保护范围内。
本发明具有如下的优点和有益效果:
本发明基于台区总电量等于各分表电能量及线损之和的能量守恒模型,通过构建不同尺度的采样周期,实现线损的有效估计,提升台区下各分表误差计算的准确性。
附图说明
此处所说明的附图用来提供对本发明实施例的进一步理解,构成本申请的一部分,并不构成对本发明实施例的限定。在附图中:
图1为本发明的流程示意图。
图2为本发明的数据采集时刻示意图。
具体实施方式
在对本发明的任意实施例进行详细的描述之前,应该理解本发明的应用不局限于下面的说明或附图中所示的结构的细节。本发明可采用其它的实施例,并且可以以各种方式被实施或被执行。基于本发明中的实施例,本领域普通技术人员在没有做出创造性改进前提下所获得的所有其它实施例,均属于本发明保护的范围。
基于多时间尺度的台区电能表误差在线检测方法,如图1所示,包括如下步骤:
步骤1、数据周期性采集:如图2所示,对待核查台区的台区总表、台区下所有分表的用电信息数据进行周期性采集;
步骤2、数据有效性判断与数据的线损计算:对周期性采集到的数据进行有效性判断,如不合格执行补采操作,数据的有效性合格构建线损模型进行线损计算;
步骤3、构建误差模型:将所述步骤2后的台区总表和分表数据采用误差模型进行实时的误差计算;
步骤4、导出计算结果。
优选的,用电信息数据包括一类数据和二类数据;
一类数据为长周期数据采集的数据,二类数据为短周期数据采集的数据,其中一类数据包括台区总表电能量数据、台区下所有分表的电能量数据;二类数据包括台区总表及台区下所有分表电压数据、电流数据及功率因数。
优选的,所述步骤1中的周期性采集的详细步骤如下:
步骤a、首先确定一类数据采集组次Nl;每组数据采集两次,两次采集时间间隔为Tl,其中采集组次Nl在数值上应等于台区下分表数量之和;
步骤b、对台区总表、台区下所有分表执行一类数据采集操作,共采集Nl组数据,每组数据采集时间间隔应不小于Tl;ΔWij表示第i只电能表在执行第j组采集操作期间计量的电能量数据;其中i=0表示台区总表,i=1,2,3....Nl表示该台区下的第1只,2只,3只...Nl分表;j=1,2,3....Nl;
步骤c、在执行一类数据采集同时,同步采集台区总表和台区下各分表的二类数据;
表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电压数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电流数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的功率因数数据;采集时刻为ts=t0+s*Ts j,其中t0表示一类数据采集开始时间;Ts j为第j组二类数据采集周期,表示每个一类数据采集周期内的二类数据采集次数;
优选的,步骤1中,对于不同时刻的一类数据采集周期,其对应的的二类数据采集周期Ts j可能相同,可能不相同。
优选的,所述步骤1中,Ts j对应的采样频率应不小于第(j-1)个Tl周期内出现的最高频率信号频率的2倍。
优选的,所述步骤1中,为保证每组采集数据线性不相关,每组次之间采集间隔应不小于T,其中T>Tl。
优选的,数据有效性判断的方法如下:
当不平衡度δ超过设定阈值时,则该采样周期内的一类数据和二类数据均无效,此时应执行补采操作,补采操作为再次执行步骤1,直到一类数据有效组数等于Nl组,方可停止补采操作;
当不平衡度δ未超过设定阈值时,则该采样周期内的一类数据和二类数据为有效数据,此时进行步骤3。
优选的,所述步骤2的线损模型为
对于单相电能表:
对于三相四线制电能表而言,
优选的,所述步骤3中:
台区总表、分表在线误差检测模型为
其中εi表示台区下第i只电能表的误差数据;
基于多时间尺度的台区电能表误差在线检测系统,所述系统包括线损模型、误差模型和多种传感器用于数据采集和处理,所述系统用于实现上述方法步骤。
优选的,一种计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,所述计算机程序被处理器执行时实现本方法中的步骤。本方法的具体使用依赖大量计算,因此优选的通过计算机程序来实现上述计算过程,所以任何包含本方法中所保护的步骤的计算机程序及其存储介质也属于本申请的保护范围内。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (9)
1.基于多时间尺度的台区电能表误差在线检测方法,其特征在于,包括如下步骤:
步骤1、数据周期性采集:对待核查台区的台区总表、台区下所有分表的用电信息数据进行周期性采集;
步骤2、数据有效性判断与数据的线损计算:对周期性采集到的数据进行有效性判断,如不合格执行补采操作,数据的有效性合格构建线损模型进行线损计算;
步骤3、构建误差模型:将所述步骤2后的台区总表和分表数据采用误差模型进行实时的误差计算;
步骤4、导出计算结果。
2.根据权利要求1所述的基于多时间尺度的台区电能表误差在线检测方法,其特征在于,用电信息数据包括一类数据和二类数据;
一类数据为长周期数据采集的数据,二类数据为短周期数据采集的数据,其中一类数据包括台区总表电能量数据、台区下所有分表的电能量数据;二类数据包括台区总表及台区下所有分表电压数据、电流数据及功率因数。
3.根据权利要求2所述的基于多时间尺度的台区电能表误差在线检测方法,其特征在于,所述步骤1中的周期性采集的详细步骤如下:
步骤a、首先确定一类数据采集组次Nl;每组数据采集两次,两次采集时间间隔为Tl,其中采集组次Nl在数值上应等于台区下分表数量之和;
步骤b、对台区总表、台区下所有分表执行一类数据采集操作,共采集Nl组数据,每组数据采集时间间隔应不小于Tl;ΔWij表示第i只电能表在执行第j组采集操作期间计量的电能量数据;其中i=0表示台区总表,i=1,2,3....Nl表示该台区下的第1只,2只,3只...Nl分表;j=1,2,3....Nl;
步骤c、在执行一类数据采集同时,同步采集台区总表和台区下各分表的二类数据;
表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电压数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的电流数据,表示第i只电能表在执行第j组一类数据采集操作期间在ts时刻采集到的功率因数数据;采集时刻为ts=t0+s*Ts j,其中t0表示一类数据采集开始时间;Ts j为第j组二类数据采集周期,表示每个一类数据采集周期内的二类数据采集次数;
4.根据权利要求3所述的基于多时间尺度的台区电能表误差在线检测方法,其特征在于,所述步骤1中,Ts j对应的采样频率应不小于第(j-1)个Tl周期内出现的最高频率信号频率的2倍。
5.根据权利要求3所述的基于多时间尺度的台区电能表误差在线检测方法,其特征在于,所述步骤1中,每组次之间采集间隔应不小于T,其中T>Tl。
9.基于多时间尺度的台区电能表误差在线检测系统,其特征在于,所述系统为基于权利要求1-8任意一条所述的基于多时间尺度的台区电能表误差在线检测方法的系统,所述系统用于实现所述方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010857564.2A CN111948596B (zh) | 2020-08-24 | 2020-08-24 | 基于多时间尺度的台区电能表误差在线检测方法和系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010857564.2A CN111948596B (zh) | 2020-08-24 | 2020-08-24 | 基于多时间尺度的台区电能表误差在线检测方法和系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111948596A true CN111948596A (zh) | 2020-11-17 |
CN111948596B CN111948596B (zh) | 2023-03-14 |
Family
ID=73360089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010857564.2A Active CN111948596B (zh) | 2020-08-24 | 2020-08-24 | 基于多时间尺度的台区电能表误差在线检测方法和系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111948596B (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112698261A (zh) * | 2020-11-25 | 2021-04-23 | 国网湖南省电力有限公司 | 一种智能电能表故障预警方法及装置 |
CN112816934A (zh) * | 2021-03-01 | 2021-05-18 | 云南电网有限责任公司电力科学研究院 | 一种判定电能表误差自监测准确性和及时性的方法及系统 |
CN113126019A (zh) * | 2021-04-19 | 2021-07-16 | 广东电网有限责任公司计量中心 | 一种智能电表误差远程估计方法、系统、终端和存储介质 |
CN113466779A (zh) * | 2021-07-14 | 2021-10-01 | 国网四川省电力公司营销服务中心 | 一种具备抗扰动能力的电能表计量故障诊断方法及系统 |
CN113484818A (zh) * | 2021-07-14 | 2021-10-08 | 国网四川省电力公司营销服务中心 | 基于滑动窗口的抗高频采集异常电能表精准定位方法 |
CN114062998A (zh) * | 2021-11-11 | 2022-02-18 | 国网四川省电力公司技能培训中心 | 一种检定装置运行状态监测方法、电子装置及存储介质 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617357A (zh) * | 2013-11-30 | 2014-03-05 | 国网河南省电力公司南阳供电公司 | 一种公变台区低压线损分析系统及使用方法 |
CN107462863A (zh) * | 2017-09-05 | 2017-12-12 | 中国电力科学研究院 | 一种智能电能表运行误差运行诊断分析方法及系统 |
CN109472714A (zh) * | 2018-06-11 | 2019-03-15 | 国网浙江海宁市供电有限公司 | 一种基于大数据的线路台区异常分析系统及方法 |
CN110531304A (zh) * | 2019-08-07 | 2019-12-03 | 深圳供电局有限公司 | 一种在线监测台区失准率的计算方法、设备及介质 |
CN110907884A (zh) * | 2019-12-06 | 2020-03-24 | 国网天津市电力公司电力科学研究院 | 一种基于非侵入式量测电能表误差诊断分析方法 |
CN111159844A (zh) * | 2019-12-02 | 2020-05-15 | 中国电建集团江西省电力设计院有限公司 | 一种电站燃气轮机排气温度的异常检测方法 |
CN111398885A (zh) * | 2020-03-27 | 2020-07-10 | 天津大学 | 一种结合线损分析的智能电表运行误差监控方法 |
-
2020
- 2020-08-24 CN CN202010857564.2A patent/CN111948596B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617357A (zh) * | 2013-11-30 | 2014-03-05 | 国网河南省电力公司南阳供电公司 | 一种公变台区低压线损分析系统及使用方法 |
CN107462863A (zh) * | 2017-09-05 | 2017-12-12 | 中国电力科学研究院 | 一种智能电能表运行误差运行诊断分析方法及系统 |
CN109472714A (zh) * | 2018-06-11 | 2019-03-15 | 国网浙江海宁市供电有限公司 | 一种基于大数据的线路台区异常分析系统及方法 |
CN110531304A (zh) * | 2019-08-07 | 2019-12-03 | 深圳供电局有限公司 | 一种在线监测台区失准率的计算方法、设备及介质 |
CN111159844A (zh) * | 2019-12-02 | 2020-05-15 | 中国电建集团江西省电力设计院有限公司 | 一种电站燃气轮机排气温度的异常检测方法 |
CN110907884A (zh) * | 2019-12-06 | 2020-03-24 | 国网天津市电力公司电力科学研究院 | 一种基于非侵入式量测电能表误差诊断分析方法 |
CN111398885A (zh) * | 2020-03-27 | 2020-07-10 | 天津大学 | 一种结合线损分析的智能电表运行误差监控方法 |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112698261A (zh) * | 2020-11-25 | 2021-04-23 | 国网湖南省电力有限公司 | 一种智能电能表故障预警方法及装置 |
CN112816934A (zh) * | 2021-03-01 | 2021-05-18 | 云南电网有限责任公司电力科学研究院 | 一种判定电能表误差自监测准确性和及时性的方法及系统 |
CN113126019A (zh) * | 2021-04-19 | 2021-07-16 | 广东电网有限责任公司计量中心 | 一种智能电表误差远程估计方法、系统、终端和存储介质 |
CN113466779A (zh) * | 2021-07-14 | 2021-10-01 | 国网四川省电力公司营销服务中心 | 一种具备抗扰动能力的电能表计量故障诊断方法及系统 |
CN113484818A (zh) * | 2021-07-14 | 2021-10-08 | 国网四川省电力公司营销服务中心 | 基于滑动窗口的抗高频采集异常电能表精准定位方法 |
CN113466779B (zh) * | 2021-07-14 | 2024-01-30 | 国网四川省电力公司营销服务中心 | 一种具备抗扰动能力的电能表计量故障诊断方法及系统 |
CN113484818B (zh) * | 2021-07-14 | 2024-02-27 | 国网四川省电力公司营销服务中心 | 基于滑动窗口的抗高频采集异常电能表精准定位方法 |
CN114062998A (zh) * | 2021-11-11 | 2022-02-18 | 国网四川省电力公司技能培训中心 | 一种检定装置运行状态监测方法、电子装置及存储介质 |
CN114062998B (zh) * | 2021-11-11 | 2023-07-04 | 国网四川省电力公司技能培训中心 | 一种检定装置运行状态监测方法、电子装置及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN111948596B (zh) | 2023-03-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111948596B (zh) | 基于多时间尺度的台区电能表误差在线检测方法和系统 | |
WO2022110558A1 (zh) | 一种智能电能表故障预警方法及装置 | |
CN106443168A (zh) | 一种远程采集抄表数据分析系统 | |
CN102280874A (zh) | 一种台区线损率检测系统 | |
CN106526312A (zh) | 基于r‑v (ⅲ)窗fft双峰插值的电能计量方法 | |
CN113985339B (zh) | 智能电表的误差诊断方法及系统、设备、存储介质 | |
CN113406558B (zh) | 基于线性回归的电表失准检测方法、装置及电子设备 | |
CN106814246A (zh) | 基于Kaiser窗FFT单峰插值的电能计量方法 | |
CN110503471A (zh) | 一种用户最大需量估计方法 | |
CN116933157A (zh) | 一种窃电检测方法 | |
CN111969604A (zh) | 基于实测数据的台区线损动态计算方法及装置 | |
CN114529023A (zh) | 一种台区智能电能表的智慧型周期轮换方法 | |
CN105068035B (zh) | 一种电压互感器误差水平动态检测方法及系统 | |
Milligan | Measuring wind plant capacity value | |
Cho et al. | A waveform distortion evaluation method based on a simple half-cycle RMS calculation | |
CN113376456A (zh) | 基于云平台的电力大用户电量电费分析与治理方法 | |
CN113722557A (zh) | 一种燃气供销差的确定方法及装置 | |
CN111444478B (zh) | 一种综合厂用电率统计方法 | |
Berrisford | The harmonic impact project—IEEE-1459 power definitions trialed in revenue meters | |
CN113406555A (zh) | 一种交流充电站的电量计量误差监测方法及充电站 | |
CN111948597A (zh) | 基于负荷曲线分段统计分析的电能误差退补电能量计算方法 | |
CN111275337A (zh) | 一种电力市场发展状态评价方法及系统 | |
CN115496358A (zh) | 电能表在线误差远程估计测试数据生成方法、装置和设备 | |
CN106771552B (zh) | 一种畸变功率计量方法 | |
CN114463059A (zh) | t分布GARCH模型的热力负荷-绿色能源交易电价预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230817 Address after: Floor 1, No. 50, section 4, Renmin South Road, Wuhou District, Chengdu, Sichuan 610000 Patentee after: Marketing service center of State Grid Sichuan Electric Power Co. Address before: 610000 1-7 25 Qinghua Road, Qingyang District, Chengdu, Sichuan, China 25 Patentee before: STATE GRID SICHUAN ELECTRIC POWER Research Institute |
|
TR01 | Transfer of patent right |