CN1118033A - Method for producing vault of house - Google Patents

Method for producing vault of house Download PDF

Info

Publication number
CN1118033A
CN1118033A CN 94115957 CN94115957A CN1118033A CN 1118033 A CN1118033 A CN 1118033A CN 94115957 CN94115957 CN 94115957 CN 94115957 A CN94115957 A CN 94115957A CN 1118033 A CN1118033 A CN 1118033A
Authority
CN
China
Prior art keywords
arch
arc
semiarch
model
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 94115957
Other languages
Chinese (zh)
Inventor
赵国志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 94115957 priority Critical patent/CN1118033A/en
Publication of CN1118033A publication Critical patent/CN1118033A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The present invention relates to a kind of method for making arc roof. The sample plate is firstly made on ground, and the form work is utilized to prefabricate the symmetrical half arc plate, which is then cured after being preformed, such half arc plates are butted ont he top of the house to form the arc roof. Said method economizes the timber for making arc model, shortens the period for making arc and is suitable for spreading in the vast countryside.

Description

The preparation method of vault of house
The present invention relates to a kind of preparation method of vault of house.
The making of existing arch lid all is to make the arch mould on the roof with yoke earlier, and further tile work is built into the arch caping again, and then removes loose tool, and this kind technology will be used a certain amount of timber, expends man-hour, and the duration is longer.
The invention provides the manufacture craft of the no loose tool arch lid that a kind of cost is low, the duration short, the life-span is long.
The object of the present invention is achieved like this:
A. span length, sagitta, radius, the making model that provides according to design drawing earlier: unwrapping wire in the plane on ground, make arc, with veneer along center line and arc stickfast, then the termination baffle plate is fixed on the arc two ends, and at arc end fixed support flitch, the last gripper shoe that adds the upper support veneer in the arc both sides;
B. according to the prefabricated semiarch plate of model: a prefabricated semiarch plate on a model, bottom brick and the brick fault above it are opened bat, behind masonry of cement mortar, just model are thrown off;
C. maintenance: the arch bar after building by laying bricks or stones was a water seasoning through 24 hours, kept the arch bar surface wettability in 7 days, reached intensity up to mortar;
D., vault of house is installed: will encircle ash earlier and lay 1: 3 cement mortar, semiarch one end of two symmetries is put in the arch at two ends respectively and takes, mortar rear arch arc is spread up to together in two other termination, form a complete arch bar, the tight arrangement of a plurality of arch bars that this form is installed has just formed the arch lid, at last with the semiarch centre joint of the floating butt joint of cement mortar and the side seam that connects back arch bar and arch bar, after 7 days, whole arch lid is covered one deck with cement mortar, promptly finished the making of arch lid.
Table 1
The roofing type Cost Application life Characteristic
The brick roofing 60 yuan/meter Longer The normal repairing
Timber roof truss iron sheet face 55 yuan/meter Longer Be afraid of extreme wind
The asbestos FE Tiler 30 yuan/meter 15 years (weak point) Be afraid of extreme wind
Brick arch covers two stringcourses 20 yuan/meter Longer Repair and be not afraid of wind less
Brick arch lid layer arch 13 yuan/meter Longer Repair and be not afraid of wind less
The every index analysis that provides from table 1, adopt process of the present invention arch lid for building, every index all is better than other roofing, can save the timber that is used to make the arch mould in a large number, reduced cost, on the house, build a large amount of man-hours of encircleing mould owing to saved original technology simultaneously, thereby shortened the duration.
Fig. 1 is the sectional drawing of model;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is the B-B sectional drawing of Fig. 1;
Fig. 4 is for installing the structural representation of rear arch lid;
Fig. 5 is the arch lid structural representation that has prestressed reinforcement.
Below in conjunction with drawings and Examples the present invention is further described.
First step a that the present invention adopts is span length, sagitta, radius, the making model as shown in Figure 1 that provides according to design drawing on ground earlier, unwrapping wire in the plane, make arc, as shown in Figure 3 with veneer 4 along center line and arc 1 stickfast, then termination baffle plate 2 is fixed on arc 1 two ends, and in the arc end fixing support flitch 3 as shown in Figure 2, the last gripper shoe 5 that adds upper support veneer 4 in arc 1 both sides; B. according to the prefabricated semiarch plate of model, prepare 1: 3 cement mortar and brick, a prefabricated semiarch plate on a model, in prefabricated process, bottom brick 6 and the relative bat that staggers of brick layer above it behind masonry of cement mortar, just break away from arch bar with model, the Piao Ping that mortar is discontented continues to build by laying bricks or stones next piece semiarch plate; C. maintenance: the arch bar after building by laying bricks or stones was a water seasoning through 24 hours, kept the arch bar surface wettability in 7 days, reached predetermined strength up to mortar; D., vault of house is installed, as shown in Figure 4 abut 7 is laid 1: 3 cement mortar, the semiarch 8 of two symmetries and an end of semiarch 9 are put in respectively on the abut 7 at two ends, after cement mortar is spread in two other termination of semiarch, the arch arc is up to together, form a complete arch bar, the tight arrangement of a plurality of arch bars of installing with this form has just formed arch and has covered 10, again with the semiarch centre joint of floating each butt joint of cement mortar and the side seam of docking back arch bar and arch bar, after 7 days, whole arch lid is covered one deck 11 with cement mortar, promptly finish the basic making of arch lid.Vertically handle if desired, available as 1.0~1.25 meters of Fig. 4 institute shapes, the long muscle 12 of taking off, right angle structure head is grilled in the seam, can be arch section anchorage, 300 millimeter one of its spacing, layout straggly, no loose tool arch section can pull into one with donor and foundation wall body and function post-tensioning prestressed steel 13 by shown in Figure 5 as being designed to the antidetonation arch.

Claims (1)

1, the preparation method of vault of house is characterized in that:
A. first span length, sagitta, radius, the making model that provides according to design drawing on ground, unwrapping wire in the plane, make arc (1), with veneer along center line and arc stickfast, then termination baffle plate (2) is fixed on the arc two ends, and, add the gripper shoe (5) of upper support veneer (4) at last in the arc both sides at arc small end fixed support flitch (3);
B. according to the prefabricated semiarch plate of model: a prefabricated semiarch plate on a model, bottom brick and the brick fault above it are opened bat, behind masonry of cement mortar, just model are thrown off, and put model well, build next piece semiarch plate by laying bricks or stones;
C. maintenance: the arch bar after building by laying bricks or stones was a water seasoning through 24 hours, kept the arch bar surface wettability in 7 days, reached intensity up to mortar;
D., vault of house is installed: will encircle earlier to sit and lay 1: 3 cement mortar, semiarch one end of two symmetries is put in the arch at two ends respectively and takes, mortar rear arch arc is spread up to together in two other termination, form a complete arch bar, the tight arrangement of a plurality of arch bars that this form is installed has just formed the arch lid, at last with the semiarch centre joint of the floating butt joint of cement mortar and the side seam of docking back arch bar and arch bar, after 7 days, whole arch lid is covered one deck with cement mortar 11, promptly finished the making of arch lid.
CN 94115957 1994-09-01 1994-09-01 Method for producing vault of house Pending CN1118033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 94115957 CN1118033A (en) 1994-09-01 1994-09-01 Method for producing vault of house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 94115957 CN1118033A (en) 1994-09-01 1994-09-01 Method for producing vault of house

Publications (1)

Publication Number Publication Date
CN1118033A true CN1118033A (en) 1996-03-06

Family

ID=5037740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 94115957 Pending CN1118033A (en) 1994-09-01 1994-09-01 Method for producing vault of house

Country Status (1)

Country Link
CN (1) CN1118033A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105365027A (en) * 2015-11-16 2016-03-02 广州驭蓝驿站工程技术有限公司 Rapid forming method for integrated arch structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105365027A (en) * 2015-11-16 2016-03-02 广州驭蓝驿站工程技术有限公司 Rapid forming method for integrated arch structure

Similar Documents

Publication Publication Date Title
CN105908859A (en) Heat-preservation precast wall body and assembled house
CN205776895U (en) Heat insulation prefabricated body of wall and prefabricated buildings
CN111364667B (en) Raw soil-laminated wood composite floor slab
CN211499913U (en) Low-energy-consumption prefabricated house
CN108286341B (en) Anti-cracking steel mesh template structure at joint of different substrate materials and construction method using same
CN109281487B (en) Traditional soil kiln resident house integral structure reinforcing system and construction process thereof
CN215053993U (en) Prefabricated steel-concrete beam, column and floor combined house
CN113103427A (en) Prefabricated assembled concrete exterior wall cladding and decorative layer mixed-striking method thereof
CN103334534B (en) Earthquake-proof energy-saving reinforced masonry dedicated building block
CN107035027A (en) A kind of assembled steel reinforced concrete structure light wt compound external wall panel
CN204238264U (en) A kind of sole plate post-poured strip structure
CN1118033A (en) Method for producing vault of house
CN215054296U (en) High strength fire prevention heat preservation partition wall structure
CN109296074A (en) A kind of assembly concrete column beam connecting node
JPH07504240A (en) Building system consisting of molded bricks and lightweight supporting framework
CN210439672U (en) Combined steel shuttering
CN109779008B (en) Anti-seismic anti-cracking steel structure house and construction method thereof
CN108894364B (en) Prefabricated assembled composite heat-insulating outer wall body and construction method
CN106638956A (en) Concrete wallboard and ribbed slab dry type connection node
CN206245606U (en) A kind of EPS composite heat-insulation roofs
CN201087508Y (en) Double-roof roofing
CN1800534A (en) Combined prestressing force concrete sandwich board and its construction method
CN218116846U (en) Heat-insulating wall
CN204609079U (en) Rearmounted pvc pipe prestressed concrete overlapped hollow plate
CN215106441U (en) Archaize building roof based on continuous steel purlines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication