CN205776895U - Heat insulation prefabricated body of wall and prefabricated buildings - Google Patents

Heat insulation prefabricated body of wall and prefabricated buildings Download PDF

Info

Publication number
CN205776895U
CN205776895U CN201620439545.7U CN201620439545U CN205776895U CN 205776895 U CN205776895 U CN 205776895U CN 201620439545 U CN201620439545 U CN 201620439545U CN 205776895 U CN205776895 U CN 205776895U
Authority
CN
China
Prior art keywords
wall
layer
building block
concrete
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620439545.7U
Other languages
Chinese (zh)
Inventor
史世英
史喜珍
史喜婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Shihao Building Materials New Technology Engineering Co Ltd
Original Assignee
Suzhou Shihao Building Materials New Technology Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Shihao Building Materials New Technology Engineering Co Ltd filed Critical Suzhou Shihao Building Materials New Technology Engineering Co Ltd
Priority to CN201620439545.7U priority Critical patent/CN205776895U/en
Application granted granted Critical
Publication of CN205776895U publication Critical patent/CN205776895U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

本实用新型涉及一种保温预制墙体和装配式房屋,属于固定建筑物的墙技术领域。该保温预制墙体是在现有砌墙施工前预先由砌块自下而上垒砌而成的一片墙体,砌块制有沿其高度方向贯通砌块本体的空腔和小柱孔,每层砌块中的空腔和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通,空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有立柱钢管或立柱钢筋的空腔内注填有混凝土并形成芯柱,上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,钢筋按插固定在小柱孔内的高强混凝土中。该墙体和房屋结构安全且牢固,同时具有保温和消声功能。

The utility model relates to a thermal insulation prefabricated wall body and an assembled house, belonging to the technical field of walls for fixed buildings. The thermal insulation prefabricated wall is a piece of wall that is pre-built from bottom to top by blocks before the existing wall construction. The cavities and small column holes in each layer of blocks are respectively connected with the cavities and small column holes in the adjacent layer of blocks built up and down. The insulation sheet is filled with concrete according to the cavity of the column steel pipe or the column steel bar to form a core column. The multi-layer blocks built up and down are fixed into one body by pouring high-strength concrete in the small column holes that are partially connected. The piece of wall is provided with at least one steel bar for hoisting and assembling the piece of wall, and the steel bar is inserted and fixed in the high-strength concrete in the small column hole. The wall and the structure of the house are safe and firm, and at the same time have the functions of heat preservation and sound attenuation.

Description

保温预制墙体和装配式房屋Insulated prefabricated walls and prefabricated houses

技术领域 technical field

本实用新型涉及一种保温预制墙体和装配式房屋,属于固定建筑物的墙技术领域。 The utility model relates to a thermal insulation prefabricated wall body and an assembled house, belonging to the technical field of walls for fixing buildings.

背景技术 Background technique

国外发达国家的建筑能耗占社会总能耗的30%~40%,我国建筑单位面积能耗仍是气候相近发达国家的3~5倍。建筑节能是各种节能途径中潜力最大、最直接的有效的方式。建筑能耗中,通过墙体造成的能耗约占建筑总能耗的60%,因而墙体保温是实现建筑节能的关键。 The energy consumption of buildings in foreign developed countries accounts for 30% to 40% of the total energy consumption of the society, and the energy consumption per unit area of buildings in my country is still 3 to 5 times that of developed countries with similar climates. Building energy conservation is the most potential and most direct and effective way among various ways of energy conservation. Among the building energy consumption, the energy consumption caused by the wall accounts for about 60% of the total building energy consumption, so wall insulation is the key to realizing building energy saving.

据申请人了解,现有的内保温墙体,虽然其保温性能良好,但其保温材料粘贴于承重墙体内侧,导致采用内保温的墙面上难以吊挂物件,甚至安设窗帘盒、散热器都较为困难。 According to the applicant's understanding, although the existing internal thermal insulation wall has good thermal insulation performance, its thermal insulation material is pasted on the inner side of the load-bearing wall, which makes it difficult to hang objects on the wall with internal thermal insulation, and even install curtain boxes to dissipate heat. devices are more difficult.

现有的外保温墙体,其保温材料外侧无有效防护,保温材料容易脱落,不安全,墙体整体耐久性差;同时由于施工过程中施工工艺复杂、人工控制过程相对较多,因此施工质量低、施工速度慢,影响了建筑物的节能效率和建筑物的安全性。 The existing external thermal insulation wall has no effective protection on the outside of the thermal insulation material, the thermal insulation material is easy to fall off, unsafe, and the overall durability of the wall is poor; at the same time, due to the complicated construction process and relatively many manual control processes during the construction process, the construction quality is low , The construction speed is slow, which affects the energy-saving efficiency of the building and the safety of the building.

实用新型内容 Utility model content

本实用新型要解决的技术问题是针对现有技术不足,提出一种安全、结构牢固且具有保温和消声功能的保温预制墙体和装配式房屋。 The technical problem to be solved by the utility model is to propose a thermal insulation prefabricated wall and prefabricated house which is safe, firm in structure, and has thermal insulation and noise reduction functions.

本实用新型为解决上述技术问题提出的技术方案之一是:一种保温预制墙体,该保温预制墙体是在现有砌墙施工前预先由砌块自下而上垒砌而成的一片墙体,所述砌块制有沿其高度方向贯通砌块本体的空腔和小柱孔,每层砌块中的空腔和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通,所述空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有所述立柱钢管或立柱钢筋的空腔内注填有混凝土并形成芯柱,上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,所述钢筋按插并固定在小柱孔内的高强混凝土中。 One of the technical solutions proposed by the utility model to solve the above technical problems is: a thermal insulation prefabricated wall. For the wall, the blocks are formed with cavities and small column holes that pass through the block body along the height direction, and the cavities and small column holes in each layer of blocks are respectively connected with those in the adjacent layers of blocks that are built up and down. The cavity and the small column hole are connected, and the cavity is used to press the column steel pipe, the column steel bar or the heat preservation sheet, and the cavity provided with the column steel tube or the column steel bar is filled with concrete and formed The core column, the multi-layer blocks built up and down are fixed to each other by pouring high-strength concrete in the small column holes that are partially connected, and at least one steel bar for lifting and assembling the piece of wall is provided in the wall. The steel bar is inserted and fixed in the high-strength concrete in the small column hole.

本实用新型采用上述技术方案的效果是:1)通过将砌块制有沿其高度方向贯通砌块本体的空腔和小柱孔,每层砌块中的空腔和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通,这样,通过上下垒砌的多层砌块在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,可以防止墙体中的单块砌块脱落,解决了现有墙体保温中的保温材料被腐蚀,容易脱落的难题,本实用新型极其安全,结构牢固;2)由于在现有砌墙施工前预先由砌块自下而上垒砌而成的一片墙体,这样,本实用新型是预制墙体,可以在工厂内预先制作好,再在施工现场进行装配,节约了施工时间,提高了施工质量。 The utility model adopts the effect of the above-mentioned technical scheme: 1) by making the block with a cavity and a small column hole passing through the block body along its height direction, the cavity and the small column hole in each layer of block are respectively connected with the upper and lower The cavities and small column holes in the adjacent layers of blocks are connected, so that the multi-layer blocks built up and down are poured with high-strength concrete in the small column holes that are partially connected to each other to be fixed together, which can prevent The single block in the wall falls off, which solves the problem that the insulation material in the existing wall insulation is corroded and easy to fall off. The utility model is extremely safe and has a firm structure; A piece of wall formed by building blocks from bottom to top. Like this, the utility model is a prefabricated wall, which can be prefabricated in the factory, and then assembled at the construction site, which saves construction time and improves construction quality.

上述技术方案的改进是:该保温预制墙体是由两片墙体和夹持在两片墙体之间的一连续保温板体组成。 The improvement of the above technical solution is: the thermal insulation prefabricated wall is composed of two walls and a continuous thermal insulation board clamped between the two walls.

本实用新型采用上述技术方案的效果是:由于保温预制墙体是由两片墙体和夹持在两片墙体之间的一连续保温板体组成,两片墙体中间夹持一连续保温板体,使得墙体完全没有热桥作用,保温效果好。 The effect of the utility model adopting the above-mentioned technical scheme is: since the thermal insulation prefabricated wall is composed of two walls and a continuous thermal insulation board clamped between the two walls, a continuous thermal insulation board is clamped between the two walls The board body makes the wall completely free of thermal bridge effect and has good thermal insulation effect.

上述技术方案的进一步改进是:所述砌块顶部和底部处分别制有凸筋和凹槽,每层砌块与上下垒砌的相邻层砌块之间通过凸筋和凹槽一一对位榫插接合固定或通过凸筋和凹槽错位榫插接合固定;所述凸筋和凹槽是分别位于所述砌块的小柱孔处的边筋和边槽。 The further improvement of the above technical solution is: the top and the bottom of the block are respectively made with ribs and grooves, and each layer of blocks is connected to the adjacent layer of blocks built up and down through the ribs and grooves one by one. The ribs and grooves are fixed by mortise-and-mortise joints or dislocated ribs and grooves; the ribs and grooves are side ribs and side grooves respectively located at the small column holes of the blocks.

上述技术方案的更进一步改进是:每片墙体中制有用于与相邻墙体连接的一形、L形、T形或十字形连接柱体,所述一形、L形、T形或十字形连接柱体是分别由该片墙体内的一形、L形、T形或十字形砌块上下垒砌制成。 A further improvement of the above technical solution is: each wall is formed with a shape, L shape, T shape or cross-shaped connecting column for connecting with the adjacent wall, and the shape, L shape, T shape or The cross-shaped connecting column is respectively made of one-shaped, L-shaped, T-shaped or cross-shaped blocks in the wall.

本实用新型为解决上述技术问题提出的技术方案之二是:一种保温预制墙体,该保温预制墙体是在现有砌墙施工前预先由砂加气混凝土块切割而成的一片墙体,该片墙体内外两侧面上均按网格形交叉排布制有小凹槽,该片墙体上设有贯通该片墙体内外两侧面的多个通孔,所述小凹槽中浇注有高强混凝土,该片墙体上设有用于起吊和组装该片墙体的至少一条钢筋,所述钢筋按插并固定在小凹槽内的高强混凝土中。 The second technical solution proposed by the utility model to solve the above technical problems is: a thermal insulation prefabricated wall, the thermal insulation prefabricated wall is a piece of wall cut from sand aerated concrete blocks in advance before the existing wall construction , the inner and outer sides of the wall are arranged with small grooves crossed in a grid shape, and the wall is provided with a plurality of through holes passing through the inner and outer sides of the wall. High-strength concrete is poured, and at least one steel bar for hoisting and assembling the piece of wall is provided on the piece of wall, and the steel bar is inserted and fixed in the high-strength concrete in the small groove.

本实用新型为解决上述技术问题提出的技术方案之三是:一种保温预制墙体,该保温预制墙体是在现有砌墙施工前预先制成的一片墙体,该片墙体内纵向设有至少一条立柱钢管;该片墙体由从外到内依次设置的外混凝土薄型板体、降声保温层和内混凝土薄型板体组成,该片墙体内间隔设有轻集料混凝土连接柱,所述轻集料混凝土连接柱穿过降声保温层并将内、外混凝土薄型板体和降声保温层彼此连接固定成一体;所述外混凝土薄型板体内设有外钢筋网片,所述内混凝土薄型板体内设有内钢筋网片,所述连接柱内设有连接内、外钢筋网片的连接钢管,所述连接钢管的管孔中填实有轻集料混凝土。 The third technical solution proposed by the utility model for solving the above technical problems is: a thermal insulation prefabricated wall, the thermal insulation prefabricated wall is a piece of wall prefabricated before the existing wall construction, and the longitudinal direction of the wall is There is at least one column steel pipe; the wall consists of an outer concrete thin slab, a sound-reducing insulation layer and an inner concrete thin slab arranged in sequence from the outside to the inside, and light aggregate concrete connections are arranged at intervals in the wall The light aggregate concrete connecting column passes through the sound-reducing insulation layer and connects and fixes the inner and outer thin concrete slabs and the sound-reducing insulation layer to each other; the outer thin concrete slab is provided with an outer steel mesh The inner concrete thin slab is provided with an inner steel mesh, and the connecting column is provided with a connecting steel pipe connecting the inner and outer steel mesh, and the holes of the connecting steel pipe are filled with light aggregate concrete.

上述技术方案之三的改进是:所述内混凝土薄型板体的厚度≥150mm,所述内钢筋网片是二道粗钢筋网络片,二道粗钢筋网络片之间连接限位横筋,所述限位横筋与连接钢管之间焊接固定。 The third improvement of the above technical solution is: the thickness of the inner thin concrete slab body is ≥ 150mm, the inner steel mesh is two thick steel mesh sheets, and the limit horizontal bars are connected between the two thick steel mesh sheets. The limit cross bar and the connecting steel pipe are welded and fixed.

本实用新型为解决上述技术问题提出的技术方案之四是:一种保温预制墙体,该保温预制墙体是在现有砌墙施工前预先由砌块自下而上垒砌而成的一片墙体,所述砌块是由相对设置的两纵向块壁与连接两纵向块壁的横肋构成的工字形砌块,每层工字形砌块与该层相邻的工字形砌块之间相对合拢而形成有一完整的空腔,所述砌块制有位于所述横肋连接两纵向块壁连接点处的小柱孔,所述空腔和小柱孔沿砌块高度方向贯通砌块本体,每层砌块中的空腔和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通,所述空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有所述立柱钢管或立柱钢筋的上下垒砌的多层砌块相贯通的空腔内注填有混凝土而形成芯柱,上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,所述钢筋按插并固定在小柱孔内的高强混凝土中。 The fourth technical solution proposed by the utility model to solve the above technical problems is: a thermal insulation prefabricated wall, the thermal insulation prefabricated wall is a piece of bricks built from bottom to top before the existing wall construction. The wall, the blocks are I-shaped blocks composed of two opposite longitudinal block walls and transverse ribs connecting the two longitudinal block walls, and the gap between each layer of I-shaped blocks and the adjacent I-shaped blocks Relatively closed to form a complete cavity, the block is made with a small column hole located at the joint point where the transverse rib connects the two longitudinal block walls, the cavity and the small column hole run through the block along the height direction of the block The body, the cavities and small column holes in each layer of blocks are respectively connected with the cavities and small column holes in the adjacent layer blocks built up and down. Steel bars or clamping insulation sheets are filled with concrete to form a core column according to the interconnected cavities of the multi-layer blocks built up and down with the column steel pipes or column steel bars, and the multi-layer blocks built up and down pass through Pour high-strength concrete into the partially connected small column holes and fix them together. At least one steel bar for lifting and assembling the piece of wall is provided in the wall, and the steel bar is inserted and fixed in the small column holes. in high-strength concrete.

上述技术方案之四的改进是:所述横肋是分别连接两纵向块壁的两个相对设置的横肋,两个横肋之间形成有沿砌块高度方向贯通砌块本体的主空腔,每层砌块中的主空腔和与上下垒砌的相邻层砌块中的主空腔相贯通,所述主空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有所述立柱钢管或立柱钢筋的上下垒砌的多层砌块相贯通的主空腔内注填有混凝土而形成芯柱。 The improvement of the fourth technical solution is: the transverse ribs are two oppositely arranged transverse ribs respectively connecting the two longitudinal block walls, and a main cavity penetrating the block body along the block height direction is formed between the two transverse ribs , the main cavity in each layer of blocks is connected with the main cavity in the adjacent layer of blocks built up and down. The core column is formed by pouring concrete into the main cavity connected by the upper and lower multi-layer blocks provided with the column steel pipe or the column steel bar.

本实用新型为解决上述技术问题提出的技术方案之五是:一种保温预制墙体,该保温预制墙体是在现有砌墙施工前预先由砌块自下而上垒砌而成的一片墙体,所述砌块制有沿其高度方向贯通砌块本体的空腔,所述砌块侧面上沿高度方向制有竖直的半凹道,每层砌块与该层相邻的砌块之间的半凹道对合并形成有一完整的小柱孔,每层砌块中的空腔和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通,所述空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有所述立柱钢管或立柱钢筋的大空腔内注填有混凝土并形成芯柱,上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,所述钢筋按插并固定在小柱孔内的高强混凝土中。 The fifth technical solution proposed by the utility model to solve the above technical problems is: a thermal insulation prefabricated wall, the thermal insulation prefabricated wall is a piece of bricks built from bottom to top before the existing wall construction. In the wall, the blocks are formed with cavities that pass through the block body along the height direction, and vertical semi-recesses are formed on the side of the blocks along the height direction, and each layer of blocks is connected to the adjacent layers of the block. The half grooves between the blocks are combined to form a complete small column hole, and the cavity and small column hole in each layer of blocks are respectively connected with the cavity and small column hole in the adjacent layer of blocks built up and down. , the cavity is used to set up column steel pipes, set up column steel bars or clamp insulation sheets, and fill concrete in the large cavity provided with the column steel tubes or column steel bars to form a core column, and build more up and down Layer blocks are fixed to each other by pouring high-strength concrete in the small column holes that are partially connected, and at least one steel bar for lifting and assembling the wall is provided in the wall, and the steel bar is inserted and fixed in the In the high-strength concrete in the small column hole.

上述技术方案的进一步改进是:该片墙体内设有多道用于散热抽湿的气道孔,所述气道孔临近该片墙体外侧面设置并纵向贯通该片墙体。 A further improvement of the above technical solution is: the wall is provided with a plurality of air passage holes for heat dissipation and dehumidification, and the air passage holes are arranged adjacent to the outer surface of the wall and vertically penetrate the wall.

本实用新型采用上述技术方案的效果是:由于外墙在盛夏被太阳炙烤时,南、西墙面温度升达70度左右,严重影响墙体寿命及城区小气候,通过在该片墙体内设有多道用于散热抽湿的气道孔,气气道孔临近该片墙体外侧面设置并纵向贯通该片墙体,既可防止墙体开裂、渗漏、霉变又可解决因墙体蓄散热影响小区舒适度等弊端。 The effect of the utility model adopting the above-mentioned technical scheme is: when the outer wall is baked by the sun in midsummer, the temperature of the south and west walls rises to about 70 degrees, which seriously affects the life of the wall and the microclimate of the urban area. There are multiple air passage holes for heat dissipation and dehumidification. The air passage holes are set close to the outer side of the wall and run through the wall longitudinally, which can prevent the wall from cracking, leaking, and mildew, and can also solve the problem of The heat storage and heat dissipation of the wall affects the comfort of the community and other disadvantages.

本实用新型为解决上述技术问题提出的技术方案之六是:一种装配式房屋,采用如权利要求1、2、5、6、7、8、9或10所述的保温预制墙体,每层屋墙是由同一层的一片墙体与相邻墙体通过一形、L形、T形或十字形连接柱体彼此连接形成,每层屋墙的每片墙体的由多层砌块相贯通的空腔内按设有立柱钢管或立柱钢筋,所述空腔内注填有混凝土并将立柱钢管或立柱钢筋固定而形成立柱,每层屋墙上设有圈梁及楼板。 The sixth technical solution proposed by the utility model to solve the above technical problems is: a prefabricated house, which adopts the thermal insulation prefabricated wall as described in claim 1, 2, 5, 6, 7, 8, 9 or 10, and each A layered roof wall is formed by connecting a wall of the same layer with an adjacent wall through a shape, an L shape, a T shape or a cross-shaped connecting column. The interlinked cavities are provided with column steel pipes or column steel bars, and concrete is filled in the cavity and the column steel tubes or column steel bars are fixed to form columns, and ring beams and floor slabs are provided on the walls of each floor.

上述技术方案之六的改进是:位于装配式房屋的门口或窗洞口处的该片墙体内的小柱孔中注实有高强复合混凝土。 The sixth improvement of the above-mentioned technical solution is: high-strength composite concrete is filled in the small column hole in the wall at the door or window opening of the prefabricated house.

附图说明 Description of drawings

下面结合附图对本实用新型作进一步说明: Below in conjunction with accompanying drawing, the utility model is further described:

图1是本实用新型实施例一的保温预制墙体的结构示意图一。 Fig. 1 is a structural schematic diagram of a thermal insulation prefabricated wall according to Embodiment 1 of the present utility model.

图2是图1砌块的立体图一。 Fig. 2 is a first perspective view of the block in Fig. 1 .

图3是图1砌块的立体图二。 Fig. 3 is a second perspective view of the block in Fig. 1 .

图4是图2的剖视图。 FIG. 4 is a sectional view of FIG. 2 .

图5是图1的保温预制墙体立体图。 Fig. 5 is a perspective view of the thermal insulation prefabricated wall in Fig. 1 .

图6是图1空腔按设有立柱钢管的保温预制墙体装配结构示意图一。 Fig. 6 is a first schematic diagram of the assembly structure of the thermal insulation prefabricated wall body provided with column steel pipes in the cavity of Fig. 1 .

图7是图1空腔按设有立柱钢管的保温预制墙体装配结构示意图二。 Fig. 7 is the second schematic diagram of the assembly structure of the thermal insulation prefabricated wall with the steel pipes in the cavity of Fig. 1 .

图8是本实用新型实施例一的保温预制墙体的结构示意图二。 Fig. 8 is the second structural schematic diagram of the thermal insulation prefabricated wall in the first embodiment of the present invention.

图9是图8的部分保温预制墙体立体图。 Fig. 9 is a perspective view of part of the thermal insulation prefabricated wall in Fig. 8 .

图10是图1保温预制墙体的装配结构示意图 Figure 10 is a schematic diagram of the assembly structure of the thermal insulation prefabricated wall in Figure 1

图11是图10保温预制墙体的装配结构示意图 Figure 11 is a schematic diagram of the assembly structure of the thermal insulation prefabricated wall in Figure 10

图12是本实用新型实施例二的保温预制墙体的结构示意图。 Fig. 12 is a schematic diagram of the structure of the thermal insulation prefabricated wall of the second embodiment of the present invention.

图13是图12的剖视图。 FIG. 13 is a sectional view of FIG. 12 .

图14是本实用新型实施例三的保温预制墙体的结构示意图。 Fig. 14 is a schematic structural view of the thermal insulation prefabricated wall body of the third embodiment of the present invention.

图15是图14的剖视图。 FIG. 15 is a sectional view of FIG. 14 .

图16是图14的立体图。 FIG. 16 is a perspective view of FIG. 14 .

图17是本实用新型实施例四的保温预制墙体的结构示意图一。 Fig. 17 is a first schematic diagram of the structure of the thermal insulation prefabricated wall according to the fourth embodiment of the present invention.

图18是本实用新型实施例四的保温预制墙体的装配结构示意图二。 Fig. 18 is the second schematic diagram of the assembly structure of the thermal insulation prefabricated wall according to the fourth embodiment of the present invention.

图19是本实用新型实施例四砌块一的结构示意图。 Fig. 19 is a schematic structural view of Block 1 of Embodiment 4 of the present utility model.

图20是本实用新型实施例四砌块二的结构示意图。 Fig. 20 is a schematic structural view of the second block of the fourth embodiment of the utility model.

图21是本实用新型实施例四砌块三的结构示意图。 Fig. 21 is a schematic structural view of the third block of the fourth embodiment of the utility model.

图22是本实用新型实施例四砌块四的结构示意图。 Fig. 22 is a schematic structural view of block 4 of the fourth embodiment of the utility model.

图23是本发明实施例五砌块一的结构示意图。 Fig. 23 is a schematic structural view of block 1 of the fifth embodiment of the present invention.

图24是本发明实施例五砌块二的结构示意图。 Fig. 24 is a schematic structural view of the second block of the fifth embodiment of the present invention.

图25是本发明实施例五砌块三的结构示意图。 Fig. 25 is a schematic structural view of the third block of the fifth embodiment of the present invention.

具体实施方式 detailed description

实施例一 Embodiment one

本实施例的保温预制墙体,如图1至图5所示,该保温预制墙体是在现有砌墙施工前预先由砌块1自下而上垒砌而成的一片墙体。砌块1制有沿其高度方向贯通砌块本体的空腔1-1和小柱孔1-2,空腔1-1是沿砌块1高度方向贯通砌块本体的一排空腔、二排空腔、三排空腔,甚至更多排空腔。 The thermal insulation prefabricated wall of this embodiment, as shown in Fig. 1 to Fig. 5, is a piece of wall formed by building blocks 1 from bottom to top before the existing wall construction. The block 1 is formed with a cavity 1-1 and a small post hole 1-2 that penetrates the block body along its height direction, and the cavity 1-1 is a row of cavities that penetrate the block body along the height direction of the block 1. One row of cavities, three rows of cavities, and even more rows of cavities.

每层砌块1中的空腔1-1和小柱孔1-2分别与上下垒砌的相邻层砌块中的空腔1-1和小柱孔1-2相贯通。空腔1-1用于按设立柱钢管、按设立柱钢筋或夹持保温片1-3。 The cavity 1-1 and the small column hole 1-2 in each layer of building blocks 1 communicate with the cavity 1-1 and the small column hole 1-2 in the adjacent layer of building blocks built up and down. The cavity 1-1 is used for pressing the column steel pipe, pressing the column steel bar or clamping the insulation sheet 1-3.

按设有立柱钢管或立柱钢筋的空腔内注填有混凝土并形成芯柱。空腔1-1按设立柱钢管2,如图6和图7所示。这样,在立柱钢管2注入混凝土即成钢筋混凝土芯柱,此芯柱钢筋混搭间隔设置在大孔中作为大开间多高层住宅的抗震承重墙体,在大开间中可安装前述非承重薄型预制墙体。 Concrete is filled in the cavity provided with column steel pipes or column steel bars to form a core column. Cavity 1-1 is set up column steel pipe 2, as shown in Fig. 6 and Fig. 7. In this way, concrete is poured into the column steel pipe 2 to form a reinforced concrete core column, and the steel bars of this core column are mixed and arranged at intervals in the large holes as an earthquake-resistant load-bearing wall for a multi-story residence with a large bay, and the aforementioned non-load-bearing thin prefabricated wall can be installed in the large bay body.

上下垒砌的多层砌块1通过在部分相贯通的小柱孔1-2内浇注高强混凝土而彼此固定成一体。该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,钢筋按插并固定在小柱孔1-2内的高强混凝土中。 The multilayer blocks 1 built up and down are fixed into one body with each other by pouring high-strength concrete in the small column holes 1-2 which are partially connected. The piece of wall is provided with at least one steel bar for hoisting and assembling the piece of wall, and the steel bar is inserted and fixed in the high-strength concrete in the small column hole 1-2.

本实施例的砌块1顶部和底部处分别制有凸筋和凹槽。每层砌块1与上下垒砌的相邻层砌块之间通过凸筋和凹槽一一对位榫插接合固定,为了使得墙体砌筑牢固,每层砌块1与上下垒砌的相邻层砌块之间通过凸筋和凹槽错位榫插接合固定。凸筋和凹槽是分别位于砌块1的小柱孔1-2处的边筋和边槽。 Ribs and grooves are respectively formed on the top and bottom of the block 1 in this embodiment. Each layer of blocks 1 and the adjacent layers of blocks built up and down are fixed through the ribs and grooves one by one alignment. In order to make the wall solid, each layer of blocks 1 is connected with the upper and lower layers Adjacent layers of blocks are fixed by mortise-and-mortise joints between ribs and grooves. The ribs and the grooves are side ribs and side grooves respectively located at the small column holes 1-2 of the block 1 .

本实施例的每片墙体中制有用于与相邻墙体连接的一形、L形、T形或十字形连接柱体,一形、L形、T形或十字形连接柱体是分别由该片墙体内的一形、L形、T形或十字形砌块上下垒砌制成。该片墙体中的相邻两个砌块1之间可以通过涂覆的1-5mm厚度的水泥基胶结料进行彼此连接固定。 Each wall body of this embodiment is shaped on a shape, L shape, T shape or cross-shaped connecting cylinder for connecting with adjacent walls, and the shape, L shape, T-shaped or cross-shaped connecting cylinder are respectively It is made by building up and down one-shaped, L-shaped, T-shaped or cross-shaped blocks in the wall. Two adjacent building blocks 1 in the piece of wall can be connected and fixed to each other by applying cement-based cement with a thickness of 1-5 mm.

当然,为了完全消除墙体的热桥作用,更好的进行保温,如图8和图9所示,本实施例的该保温预制墙体是由两片墙体和夹持在两片墙体之间的一连续保温板体3组成。该片墙体内设有多道用于散热抽湿的气道孔,气道孔临近该片墙体外侧面设置并纵向贯通该片墙体。 Of course, in order to completely eliminate the thermal bridge effect of the wall and better carry out thermal insulation, as shown in Figure 8 and Figure 9, the thermal insulation prefabricated wall of this embodiment is composed of two walls and clamped between the two walls A continuous insulation board body 3 is formed between. The wall is provided with a plurality of air passage holes for heat dissipation and dehumidification, and the air passage holes are arranged adjacent to the outer side of the wall and vertically penetrate the wall.

实际施工时,该保温预制墙体在工厂内预先制作好,再在施工现场进行装配,节约了施工时间,提高了施工质量。这样,通过在两片墙体之间夹持的一连续保温板体3,使得墙体完全没有热桥作用,保温效果好。 During actual construction, the thermal insulation prefabricated wall body is prefabricated in the factory, and then assembled at the construction site, which saves construction time and improves construction quality. In this way, through a continuous insulation board 3 clamped between the two walls, the walls have no thermal bridge effect at all, and the insulation effect is good.

本实施例的一种装配式房屋,如图10和图11所示,采用上述保温预制墙体,将同一层的一片墙体与相邻墙体通过一形、L形、T形或十字形连接柱体彼此连接形成每层屋墙,然后在每层屋墙的每片墙体的由多层砌块相贯通的空腔内按设立柱钢管或立柱钢筋,接着,在空腔内注填混凝土将立柱钢管或立柱钢筋固定而形成立柱,然后,再在每层屋墙上设有圈梁及楼板,接着再重复上述步骤,逐层反复。同时在位于装配式房屋的门口或窗洞口处的该片墙体内的小柱孔1-2中注实有高强复合混凝土。 A prefabricated house in this embodiment, as shown in Figure 10 and Figure 11, adopts the above-mentioned thermal insulation prefabricated wall, and a piece of wall on the same floor and the adjacent wall are passed through a shape, L shape, T shape or cross shape. The connecting columns are connected with each other to form each layer of roof walls, and then the columns of steel pipes or column steel bars are installed in the cavities connected by multi-layer blocks of each wall of each layer of roof walls, and then filled in the cavities Concrete fixes the column steel tube or the column steel bar to form the column, and then installs ring beams and floor slabs on the roof wall of each floor, and then repeats the above steps, layer by layer. At the same time, high-strength composite concrete is filled in the small column hole 1-2 in the wall at the door or window opening of the prefabricated house.

本实施例可以将每片墙体中的立柱钢管或立柱钢筋的上端制为丝杆部,将每片墙体中的立柱钢管或立柱钢筋的下端螺接螺母,再将每层屋墙的每片墙体的立柱钢管或立柱钢筋的下端插入对接紧固管中,对接紧固管的下段制为可嵌卡住螺母的套筒状,对接紧固管的下口呈喇叭形,然后,使用对接紧固管将下层相邻墙体中的立柱钢管或立柱钢筋上端的丝杆部导入对接紧固管的呈喇叭形的下口中以与螺母对接,尔后转动对接紧固管,待螺母与下层相邻墙体中的立柱钢管或立柱钢筋上端的丝杆部对接紧定后拉出紧固导管。 In this embodiment, the upper end of the column steel pipe or the column steel bar in each wall can be made into a screw part, the lower end of the column steel tube or the column steel bar in each wall can be screwed with a nut, and then each layer of the roof wall can be screwed with a nut. The lower end of the column steel pipe or column steel bar of the wall is inserted into the butt fastening pipe, the lower section of the butt fastening pipe is made into a sleeve shape that can be embedded with a nut, and the lower opening of the butt fastening pipe is trumpet-shaped, and then, use The butt joint fastening pipe guides the column steel pipe or the screw rod at the upper end of the column steel bar in the adjacent wall of the lower layer into the trumpet-shaped lower mouth of the butt joint fastening pipe to be docked with the nut, and then rotates the butt joint fastening pipe until the nut is in contact with the lower layer Pull out the fastening conduit after the butt joint of the screw rods at the upper end of the column steel pipes or the column steel bars in the adjacent wall is tightened.

实施例二 Embodiment two

本实施例的保温预制墙体,是在实施例一基础上的改进,如图12和图13所示,与实施例一不同的是:该保温预制墙体是在现有砌墙施工前预先由砂加气混凝土块切割而成的一片墙体。该片墙体内外两侧面上均按网格形交叉排布制有小凹槽1-4,该片墙体上设有贯通该片墙体内外两侧面的多个通孔1-5,小凹槽1-4中浇注有高强混凝土。 The thermal insulation prefabricated wall of this embodiment is an improvement on the basis of the first embodiment, as shown in Figure 12 and Figure 13. The difference from the first embodiment is that the thermal insulation prefabricated wall is prefabricated before the existing wall construction. A piece of wall cut from blocks of sand aerated concrete. Small grooves 1-4 are arranged on the inner and outer sides of the piece of wall in a grid shape, and a plurality of through holes 1-5 that run through the inner and outer sides of the piece of wall are arranged on the piece of wall. High-strength concrete is cast in grooves 1-4.

该片墙体上设有用于起吊和组装该片墙体的至少一条钢筋,钢筋按插并固定在小凹槽1-4内的高强混凝土中。 The piece of wall is provided with at least one steel bar for hoisting and assembling the piece of wall, and the steel bar is inserted and fixed in the high-strength concrete in the small groove 1-4.

实施例三 Embodiment Three

本实施例的保温预制墙体,是在实施例一和实施例二基础上的改进,如图14至图16所示,与实施例一不同的是:该保温预制墙体是在现有砌墙施工前预先制成的一片墙体,该片墙体内纵向设有至少一条立柱钢管。 The thermal insulation prefabricated wall of this embodiment is an improvement on the basis of Embodiment 1 and Embodiment 2, as shown in Figure 14 to Figure 16, the difference from Embodiment 1 is that the thermal insulation prefabricated wall is built on the existing A piece of wall prefabricated before wall construction, the piece of wall is longitudinally provided with at least one column steel pipe.

该片墙体由从外到内依次设置的外混凝土薄型板体1-6、降声保温层1-7和内混凝土薄型板体1-8组成。该片墙体内间隔设有轻集料混凝土连接柱1-9,轻集料混凝土连接柱1-9穿过降声保温层1-7并将内混凝土薄型板体1-8、外混凝土薄型板体1-6和降声保温层1-7彼此连接固定成一体。 The wall body is composed of outer concrete thin-slabs 1-6, sound-reducing insulation layers 1-7 and inner concrete thin-slabs 1-8 arranged sequentially from outside to inside. Light aggregate concrete connection columns 1-9 are arranged at intervals in the wall, and the light aggregate concrete connection columns 1-9 pass through the sound-reducing insulation layer 1-7, and the inner concrete thin-slab body 1-8, the outer concrete thin-slab The board body 1-6 and the sound-reducing insulation layer 1-7 are connected and fixed into one body.

外混凝土薄型板体1-6内设有外钢筋网片,内混凝土薄型板体内设有内钢筋网片,轻集料混凝土连接柱1-9内设有连接内、外钢筋网片的连接钢管,连接钢管的管孔中填实有轻集料混凝土。 The outer concrete thin-slab body 1-6 is provided with an outer steel mesh sheet, the inner concrete thin-slab body is provided with an inner steel mesh sheet, and the light aggregate concrete connecting column 1-9 is provided with a connecting steel pipe connecting the inner and outer steel mesh sheets , the pipe holes connecting the steel pipes are filled with light aggregate concrete.

本实施例的内混凝土薄型板体1-8的厚度≥150mm,内钢筋网片是二道粗钢筋网络片,二道粗钢筋网络片之间连接限位横筋,限位横筋与连接钢管之间焊接固定。 The thickness of the inner concrete thin slab body 1-8 of the present embodiment is more than or equal to 150mm, and the inner steel mesh sheet is two thick steel mesh sheets, and the limit horizontal bars are connected between the two thick steel bar mesh sheets, and the limit horizontal bars are connected to the steel pipes. Welding fixed.

本实施例的该片墙体的外混凝土薄型板体1-6中设有多道用于散热抽湿的气道孔1-10,气道孔1-10临近该片墙体外侧面设置并纵向贯通该片墙体。 The outer concrete thin slab body 1-6 of the wall body of this embodiment is provided with a plurality of air passage holes 1-10 for heat dissipation and dehumidification, and the air passage holes 1-10 are arranged near the outer surface of the wall and Longitudinal through the piece of wall.

为了更好的做成连续整体(可达数十层)式抗震剪力墙,可以将该保温预制墙体内至少一根立柱钢管设为吊装定轴心的榫合钢管,吊装对位与下层墙体(或地基中)上伸过楼面的钢筋对接焊牢并封盖操作缝后,泵送注填实混凝土即成。 In order to better make a continuous integral (up to dozens of floors) type seismic shear wall, at least one column steel pipe in the prefabricated wall can be used as a tenon joint steel pipe with a fixed axis for hoisting, and the hoisting alignment and the lower layer After the steel bars extending over the floor on the wall (or in the foundation) are butt-welded firmly and the operation joints are sealed, the concrete is pumped and filled.

实施例四 Embodiment four

本实施例的保温预制墙体,是在实施例一、实施例二和实施例三基础上的改进,与上述实施例不同的是:如图17和图18所示,该保温预制墙体是在现有砌墙施工前预先由砌块1自下而上垒砌而成的一片墙体。 The thermal insulation prefabricated wall of this embodiment is an improvement on the basis of Embodiment 1, Embodiment 2 and Embodiment 3. The difference from the above embodiment is: as shown in Figure 17 and Figure 18, the thermal insulation prefabricated wall is Before the construction of the existing wall, a piece of wall is formed by building blocks 1 from bottom to top in advance.

砌块1是由相对设置的两纵向块壁与连接两纵向块壁的横肋构成的工字形砌块,每层工字形砌块与该层相邻的工字形砌块之间相对合拢而形成有一完整的空腔1-1,砌块1制有位于横肋连接两纵向块壁连接点处的小柱孔1-2,空腔1-1和小柱孔1-2沿砌块高度方向贯通砌块本体。 Block 1 is an I-shaped block composed of two opposite longitudinal block walls and a transverse rib connecting the two longitudinal block walls. Each layer of I-shaped blocks is relatively closed with the adjacent I-shaped blocks of the layer. There is a complete cavity 1-1, and the block 1 is formed with a small column hole 1-2 at the joint point where the transverse rib connects the two longitudinal block walls, and the cavity 1-1 and the small column hole 1-2 are along the height direction of the block Through the body of the block.

每层砌块1中的空腔1-1和小柱孔1-2分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通。空腔1-1用于按设立柱钢管2、按设立柱钢筋或夹持保温片。按设有立柱钢管2或立柱钢筋的上下垒砌的多层砌块相贯通的空腔1-1内注填有混凝土而形成芯柱。 The cavities 1-1 and small post holes 1-2 in each layer of blocks 1 communicate with the cavities and small post holes in the adjacent layer of blocks built up and down. The cavity 1-1 is used for pressing the erecting column steel pipe 2, pressing the erecting column reinforcing bar or clamping the insulation sheet. The core column is formed by pouring concrete into the cavities 1-1 connected by multi-layer blocks built up and down with column steel pipes 2 or column steel bars.

上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,钢筋按插并固定在小柱孔内的高强混凝土中。 The multi-layer blocks built up and down are fixed to each other by pouring high-strength concrete in the small column holes that are partially connected. At least one steel bar for lifting and assembling the wall is provided in the wall. And fixed in the high-strength concrete in the small column hole.

如在空腔1-1内按设立柱钢管2,可以在立柱钢管2注入混凝土即成钢筋混凝土芯柱,此芯柱钢筋混搭间隔设置在大孔中作为大开间多高层住宅的抗震承重墙体,在大开间中可安装前述非承重薄型预制墙体。 If the column steel pipe 2 is set up in the cavity 1-1, concrete can be poured into the column steel pipe 2 to form a reinforced concrete core column, and the steel bars of the core column are mixed and arranged at intervals in the large holes as an earthquake-resistant load-bearing wall for a multi-story residence with large bays , the aforementioned non-load-bearing thin prefabricated walls can be installed in large bays.

如图19至图22所示,本实施例的横肋是分别连接两纵向块壁的两个相对设置的横肋,两个横肋之间形成有沿砌块高度方向贯通砌块本体的主空腔,每层砌块中的主空腔和与上下垒砌的相邻层砌块中的主空腔相贯通,主空腔用于按设立柱钢管、按设立柱钢筋或夹持保温片,按设有立柱钢管或立柱钢筋的上下垒砌的多层砌块相贯通的主空腔内注填有混凝土而形成芯柱。当然,横肋也可以是多条横肋。砌块主空腔的下口呈八字喇叭口状,砌块主空腔的上口周边对应设有一圈可与之榫合的凸圈。该片墙体吊装就位后,可以按建筑设计要求在主空腔中插入立柱钢管2或立柱钢筋,然后注填混凝土,最后设圈梁楼板后再次吊装上述墙体………。 As shown in Figures 19 to 22, the transverse ribs of this embodiment are two oppositely arranged transverse ribs respectively connecting the two longitudinal block walls, and a main body penetrating through the block body along the height direction of the block is formed between the two transverse ribs. Cavity, the main cavity in each layer of blocks is connected with the main cavity in the adjacent layer of blocks built up and down. The main cavity is used to press the erected column steel pipe, press the erected column steel bar or clamp the insulation sheet The core column is formed by pouring concrete into the main cavity connected by multi-layer blocks with upright steel pipes or upright steel bars. Of course, the transverse rib can also be a plurality of transverse ribs. The lower opening of the main cavity of the block is in the shape of a splayed bell mouth, and the upper opening of the main cavity of the block is correspondingly provided with a protruding ring which can be tenoned with it. After the wall is hoisted in place, the column steel pipe 2 or column steel bar can be inserted into the main cavity according to the architectural design requirements, then concrete is poured, and the above-mentioned wall is hoisted again after the ring beam floor is finally set.

本实施例的该片墙体内设有多道用于散热抽湿的气道孔,气道孔临近该片墙体外侧面设置并纵向贯通该片墙体。 The wall of this embodiment is provided with a plurality of air passage holes for heat dissipation and dehumidification, and the air passage holes are arranged adjacent to the outer surface of the wall and vertically penetrate the wall.

当然,本实施例的砌块1侧面上沿高度方向也可以制有竖直的半凹道,小柱孔1-2也可以由每层砌块与该层相邻的砌块之间的半凹道4对合并形成有。本实施例的砌块1上也制有凸筋和凹槽。每层砌块1与上下垒砌的相邻层砌块之间通过凸筋和凹槽一一对位榫插接合固定,为了使得墙体砌筑牢固,每层砌块1与上下垒砌的相邻层砌块之间也可以通过凸筋和凹槽错位榫插接合固定。凸筋和凹槽是分别位于砌块1的小柱孔1-2顶部和底部处的边筋和边槽。 Of course, the block 1 side of the present embodiment also can be shaped on the vertical semi-recess along the height direction, and the small post holes 1-2 can also be formed by half of each layer of blocks and the adjacent blocks of this layer. There are 4 pairs of grooves merged and formed. Ribs and grooves are also formed on the block 1 of this embodiment. Each layer of blocks 1 and the adjacent layers of blocks built up and down are fixed through the ribs and grooves one by one alignment. In order to make the wall solid, each layer of blocks 1 is connected with the upper and lower layers Adjacent layers of blocks can also be fixed by mortise-and-mortise joints between ribs and grooves. The ribs and grooves are side ribs and side grooves located at the top and bottom of the small post hole 1-2 of the block 1 respectively.

本实施例的该片墙体也制有用于与相邻墙体连接的一形、L形、T形或十字形连接柱体,一形、L形、T形或十字形连接柱体是分别由该片墙体内的工字形砌块拼接成的一形、L形、T形或十字形砌块1上下垒砌制成。该片墙体中的相邻两个砌块1之间可以通过涂覆的1-5mm厚度的水泥基胶结料进行彼此连接固定。 This piece of wall body of the present embodiment is also shaped on the one-shaped, L-shaped, T-shaped or cross-shaped connecting cylinders that are used to connect with adjacent walls, and the one-shaped, L-shaped, T-shaped or cross-shaped connecting cylinders are respectively The I-shaped, L-shaped, T-shaped or cross-shaped blocks 1 spliced by the I-shaped blocks in the wall are built up and down. Two adjacent building blocks 1 in the piece of wall can be connected and fixed to each other by applying cement-based cement with a thickness of 1-5 mm.

实施例五 Embodiment five

本实施例的保温预制墙体,是在上述实施例基础上的改进,如图23至图25所示,与上述实施例不同的是:该保温预制墙体是在现有砌墙施工前预先由砌块1自下而上垒砌而成的一片墙体,砌块1制有沿其高度方向贯通砌块本体的空腔1-1,砌块1侧面上沿高度方向制有竖直的半凹道4。 The thermal insulation prefabricated wall of this embodiment is an improvement on the basis of the above embodiments, as shown in Figure 23 to Figure 25, the difference from the above embodiment is that the thermal insulation prefabricated wall is prefabricated before the existing wall construction. A piece of wall formed by blocks 1 from bottom to top. Block 1 is formed with a cavity 1-1 that runs through the body of the block along its height direction. The side of block 1 is formed with vertical holes along the height direction Half draw 4.

每层砌块与该层相邻的砌块之间的半凹道4对合并形成有一完整的小柱孔,每层砌块1中的空腔1-1和小柱孔分别与上下垒砌的相邻层砌块中的空腔和小柱孔相贯通。 The semi-recesses 4 between each layer of blocks and the adjacent blocks of this layer merge to form a complete small post hole, and the cavity 1-1 and the small post hole in each layer of block 1 are respectively connected with the upper and lower blocks. The cavities in the adjacent layers of blocks communicate with the small column holes.

空腔1-1用于按设立柱钢管、按设立柱钢筋或夹持保温片。按设有立柱钢管或立柱钢筋的大空腔内注填有混凝土并形成芯柱,上下垒砌的多层砌块通过在部分相贯通的小柱孔内浇注高强混凝土而彼此固定成一体,该片墙体内设有用于起吊和组装该片墙体的至少一条钢筋,钢筋按插并固定在小柱孔内的高强混凝土中。 The cavity 1-1 is used for pressing the column steel pipe, pressing the column steel bar or clamping the insulation sheet. Concrete is poured into the large cavity provided with column steel pipes or column steel bars to form a core column. The multi-layer blocks built up and down are fixed into one body by pouring high-strength concrete in the small column holes that are partially connected. The wall is provided with at least one steel bar for hoisting and assembling the piece of wall, and the steel bar is inserted and fixed in the high-strength concrete in the small column hole.

本实施例的砌块1的空腔的下口呈八字喇叭口状,砌块空腔的上口周边对应设有一圈可与之榫合的凸圈。本实施例的砌块1是一形、L形、T形或十字形砌块,空腔1-1设于一形、L形、T形或十字形砌块的顶点处。 The lower opening of the cavity of the block 1 in this embodiment is in the shape of a splayed bell mouth, and the upper opening of the block cavity is correspondingly provided with a ring of protruding rings that can be tenoned with it. The block 1 of the present embodiment is a shape, L shape, T shape or cross shape block, and the cavity 1-1 is located at the apex of the shape, L shape, T shape or cross shape block.

本实用新型不局限于上述实施例。凡采用等同替换形成的技术方案,均落在本实用新型要求的保护范围。 The utility model is not limited to the above-mentioned embodiments. All technical solutions formed by equivalent replacements fall within the scope of protection required by the utility model.

Claims (13)

1. a heat insulation prefabricated body of wall, it is characterized in that: this heat insulation prefabricated body of wall is a piece of body of wall assembled from bottom to top by building block in advance before existing construction of building a wall, described building block is shaped with the cavity along the through block body of its short transverse and little post holes, cavity and little post holes in every layer of building block connect with the cavity in the adjacent layer building block assembled up and down and little post holes respectively, described cavity is for by setting up post steel pipe, by setting up post reinforcing bar or clamping insulation sheet, it is filled with concrete by note in being provided with the cavity of described column steel pipe or column reinforcing bar and is formed stem stem, the multi-layer building block assembled up and down is fixed to one another integral by pouring into a mould high-strength concrete in the little post holes that part connects, at least one reinforcing bar for lifting by crane and assemble this sheet body of wall it is provided with in this sheet body of wall, described reinforcing bar is by inserting and being fixed in the high-strength concrete in little post holes.
2. heat insulation prefabricated body of wall as claimed in claim 1, it is characterised in that: this heat insulation prefabricated body of wall is made up of two panels body of wall and the continuous insulation plate body being clamped between two panels body of wall.
3. heat insulation prefabricated body of wall as claimed in claim 1 or 2, it is characterized in that: at described block tops and bottom, be formed respectively with convex tendon and groove, close fixing by convex tendon and groove para-position tenon grafting one by one between every layer of building block and the adjacent layer building block assembled up and down or close fixing by convex tendon and groove dislocation tenon grafting;Described convex tendon and groove are to lay respectively at the limit muscle at the little post holes of described building block and limit groove.
4. heat insulation prefabricated body of wall as claimed in claim 1 or 2, it is characterized in that: being shaped with the shape for being connected with neighboring walls, L-shaped, T-shaped or cross in every body of wall and connect cylinder, it is to be assembled up and down by the shape in this sheet body of wall, L-shaped, T-shaped or cross building block respectively to make that a described shape, L-shaped, T-shaped or cross connect cylinder.
5. a heat insulation prefabricated body of wall, it is characterized in that: this heat insulation prefabricated body of wall is in advance by a piece of body of wall of sand aerated concrete block cutting before existing construction of building a wall, all it is shaped with little groove by grid-shaped cross arrangement on face inside and outside this sheet body of wall, this sheet body of wall is provided with multiple through holes in face inside and outside this sheet body of wall through, described little groove is cast with high-strength concrete, this sheet body of wall is provided with at least one reinforcing bar for lifting by crane and assemble this sheet body of wall, and described reinforcing bar is by inserting and being fixed in the high-strength concrete in little groove.
6. a heat insulation prefabricated body of wall, it is characterised in that: this heat insulation prefabricated body of wall is ready-made a piece of body of wall before existing construction of building a wall, and is longitudinally provided with at least one column steel pipe in this sheet body of wall;This sheet body of wall is made up of the slim plate body of outer concrete set gradually from outside to inside, fall sound heat-insulation layer and the slim plate body of inner concrete, being interval with light aggregate concrete in this sheet body of wall and connect post, described light aggregate concrete connects post and through fall sound heat-insulation layer and slim for inside and outside concrete plate body and fall sound heat-insulation layer is connected to each other and is integrally fixed;It is provided with outer reinforced mesh in described outer concrete the thin plate body, in described inner concrete the thin plate body, is provided with interior reinforced mesh, be provided with the joint steel pipe connecting inside and outside reinforced mesh in described connection post, the pore of described joint steel pipe has tamped light aggregate concrete.
7. heat insulation prefabricated body of wall as claimed in claim 6, it is characterized in that: the thickness >=150mm of the slim plate body of described inner concrete, described interior reinforced mesh is two road bar reinforcement network sheets, connects spacing horizontal bar, be welded and fixed between described spacing horizontal bar and joint steel pipe between two road bar reinforcement network sheets.
null8. a heat insulation prefabricated body of wall,It is characterized in that: this heat insulation prefabricated body of wall is a piece of body of wall assembled from bottom to top by building block in advance before existing construction of building a wall,Described building block is the I-shaped building block being made up of with the cross rib being connected two longitudinal block walls the two longitudinal block walls being oppositely arranged,Relative closing up between the I-shaped building block that every layer of I-shaped building block is adjacent with this layer and be formed with a complete cavity,Described building block is shaped with and is positioned at described cross rib and connects the little post holes at two longitudinal block wall junction points,Described cavity and little post holes are along the through block body in segment heights direction,Cavity and little post holes in every layer of building block connect with the cavity in the adjacent layer building block assembled up and down and little post holes respectively,Described cavity is for by setting up post steel pipe、By setting up post reinforcing bar or clamping insulation sheet,It is filled with concrete by note in the cavity that the multi-layer building block assembled up and down being provided with described column steel pipe or column reinforcing bar connects and forms stem stem,The multi-layer building block assembled up and down is fixed to one another integral by pouring into a mould high-strength concrete in the little post holes that part connects,At least one reinforcing bar for lifting by crane and assemble this sheet body of wall it is provided with in this sheet body of wall,Described reinforcing bar is by inserting and being fixed in the high-strength concrete in little post holes.
9. heat insulation prefabricated body of wall as claimed in claim 8, it is characterized in that: described cross rib is two cross ribs being oppositely arranged connecting two longitudinal block walls respectively, the main cavity along the through block body in segment heights direction it is formed with between two cross ribs, main cavity in every layer of building block and connecting with the main cavity in the adjacent layer building block assembled up and down, described main cavity is for by setting up post steel pipe, by setting up post reinforcing bar or clamping insulation sheet, being filled with concrete by note in the main cavity that the multi-layer building block assembled up and down being provided with described column steel pipe or column reinforcing bar connects and formed stem stem.
null10. a heat insulation prefabricated body of wall,It is characterized in that: this heat insulation prefabricated body of wall is a piece of body of wall assembled from bottom to top by building block in advance before existing construction of building a wall,Described building block is shaped with the cavity along the through block body of its short transverse,It is shaped with half vertical recessed channel along short transverse on described building block side,Half recessed channel between the building block that every layer of building block is adjacent with this layer is combined and is formed with a complete little post holes,Cavity and little post holes in every layer of building block connect with the cavity in the adjacent layer building block assembled up and down and little post holes respectively,Described cavity is for by setting up post steel pipe、By setting up post reinforcing bar or clamping insulation sheet,It is filled with concrete by note in being provided with the big cavity of described column steel pipe or column reinforcing bar and is formed stem stem,The multi-layer building block assembled up and down is fixed to one another integral by pouring into a mould high-strength concrete in the little post holes that part connects,At least one reinforcing bar for lifting by crane and assemble this sheet body of wall it is provided with in this sheet body of wall,Described reinforcing bar is by inserting and being fixed in the high-strength concrete in little post holes.
11. the heat insulation prefabricated body of wall as described in claim 1,2,5,6,7,8,9 or 10, it is characterised in that: being provided with the multiple tracks air flue hole for dehumidifier of dispelling the heat in this sheet body of wall, described air flue hole is closed on this sheet wall outer side face and is arranged and longitudinally through this sheet body of wall.
12. 1 kinds of prefabricated buildings, use the heat insulation prefabricated body of wall as described in claim 1,2,5,6,7,8,9 or 10, it is characterized in that: every layer of room wall is to be connected cylinder by a piece of body of wall of same layer and neighboring walls by a shape, L-shaped, T-shaped or cross to be connected to each other and formed, by being provided with column steel pipe or column reinforcing bar in the cavity connected by multi-layer building block of every body of wall of every layer of room wall, in described cavity, note is filled with concrete and column steel pipe or column reinforcing bar is fixed and form column, and every layer of room wall is provided with collar tie beam and floor.
13. prefabricated buildings as claimed in claim 12, it is characterised in that: it is positioned at that note in the little post holes of this sheet body of wall at the doorway of prefabricated buildings or window hole is real high-strength compound concrete.
CN201620439545.7U 2016-05-16 2016-05-16 Heat insulation prefabricated body of wall and prefabricated buildings Expired - Fee Related CN205776895U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620439545.7U CN205776895U (en) 2016-05-16 2016-05-16 Heat insulation prefabricated body of wall and prefabricated buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620439545.7U CN205776895U (en) 2016-05-16 2016-05-16 Heat insulation prefabricated body of wall and prefabricated buildings

Publications (1)

Publication Number Publication Date
CN205776895U true CN205776895U (en) 2016-12-07

Family

ID=57409599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620439545.7U Expired - Fee Related CN205776895U (en) 2016-05-16 2016-05-16 Heat insulation prefabricated body of wall and prefabricated buildings

Country Status (1)

Country Link
CN (1) CN205776895U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Insulated prefabricated walls and prefabricated houses
CN107989268A (en) * 2017-12-19 2018-05-04 苏州市世好建材新技术工程有限公司 A kind of building bar cylinder
CN108049529A (en) * 2017-12-20 2018-05-18 苏州市世好建材新技术工程有限公司 Building block can be monitored and reinforce precast wall body
CN108643389A (en) * 2018-04-28 2018-10-12 苏州市世好建材新技术工程有限公司 A kind of building block wall
CN108661206A (en) * 2018-05-22 2018-10-16 中国建筑第八工程局有限公司 Secondary structure masonry panel is constructed from tolerant noise-insulating warm-keeping and its construction method
CN110939281A (en) * 2019-11-01 2020-03-31 苏州市世好建材新技术工程有限公司 Automatic wall stacking machine
CN111648493A (en) * 2020-05-22 2020-09-11 浙江鼎兴建设有限公司 Movable wall body is built in room
CN113668733A (en) * 2021-09-07 2021-11-19 山东双硕环境科技有限公司 Assembled formwork-free concrete wall pouring technology and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908859A (en) * 2016-05-16 2016-08-31 苏州市世好建材新技术工程有限公司 Insulated prefabricated walls and prefabricated houses
WO2017197853A1 (en) * 2016-05-16 2017-11-23 史世英 Insulation precast wall and prefabricated building
CN108049527A (en) * 2016-05-16 2018-05-18 苏州市世好建材新技术工程有限公司 Heat insulation prefabricated wall
CN108049526A (en) * 2016-05-16 2018-05-18 苏州市世好建材新技术工程有限公司 Heat insulation prefabricated wall
CN107989268A (en) * 2017-12-19 2018-05-04 苏州市世好建材新技术工程有限公司 A kind of building bar cylinder
CN108049529A (en) * 2017-12-20 2018-05-18 苏州市世好建材新技术工程有限公司 Building block can be monitored and reinforce precast wall body
CN108643389A (en) * 2018-04-28 2018-10-12 苏州市世好建材新技术工程有限公司 A kind of building block wall
CN108661206A (en) * 2018-05-22 2018-10-16 中国建筑第八工程局有限公司 Secondary structure masonry panel is constructed from tolerant noise-insulating warm-keeping and its construction method
CN110939281A (en) * 2019-11-01 2020-03-31 苏州市世好建材新技术工程有限公司 Automatic wall stacking machine
CN111648493A (en) * 2020-05-22 2020-09-11 浙江鼎兴建设有限公司 Movable wall body is built in room
CN113668733A (en) * 2021-09-07 2021-11-19 山东双硕环境科技有限公司 Assembled formwork-free concrete wall pouring technology and construction method

Similar Documents

Publication Publication Date Title
CN105908859A (en) Insulated prefabricated walls and prefabricated houses
CN205776895U (en) Heat insulation prefabricated body of wall and prefabricated buildings
CN102691366B (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN202706258U (en) Fully-assembled detachable concrete wallboard
CN104453093B (en) Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method
CN103669905B (en) Lightweight composite prefabricated wall panel combined house and its construction method
CN206016309U (en) A kind of overall assembled building system
CN101629440A (en) Integrally prefabricated composite external wall panel and manufacturing method thereof
CN107401217A (en) A kind of beamless hollow floor chamber concrete-filled steel tube shear wall combined structure system and method
CN107035027A (en) A kind of assembled steel reinforced concrete structure light wt compound external wall panel
CN106760055B (en) Vertical connection structure of assembled shear wall and construction method thereof
CN109667376B (en) Novel superposed floor system suitable for H-shaped steel beam of steel structure and construction method thereof
CN111549812A (en) Cast-in-place prefabricated formwork-free thermal insulation integrated house
CN110656716B (en) A building structure with dense rib connections of prefabricated wall panels and its construction method
CN211622098U (en) Semi-embedded external waterproof internal heat insulation external wall panel
CN204959963U (en) Compound lightweight wall housing construction of assembled steel frame
CN204728549U (en) A kind of lightweight composite floor
CN205329970U (en) Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof
CN104878863B (en) Construction method of light composite floor
CN218933507U (en) Prefabricated light steel wire grid mortar-perlite-polystyrene shear wall with window holes
CN103015563B (en) Outer-block inner-masonry building structure system
CN116044053B (en) Concrete frame prefabricated light steel composite truss supporting steel wire mesh mortar-perlite-polystyrene composite enclosure wall and its construction method
CN100451257C (en) Steel mesh frame concrete composite building and its construction method
CN218894248U (en) Assembled light steel combined steel wire net rack mortar-perlite-polyphenyl composite shear wall
CN115977278B (en) Prefabricated light steel composite truss supporting steel wire mesh frame mortar-perlite-polystyrene composite shear wall and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

CF01 Termination of patent right due to non-payment of annual fee