CN111787283A - Construction site construction machinery monitoring system - Google Patents
Construction site construction machinery monitoring system Download PDFInfo
- Publication number
- CN111787283A CN111787283A CN202010678645.6A CN202010678645A CN111787283A CN 111787283 A CN111787283 A CN 111787283A CN 202010678645 A CN202010678645 A CN 202010678645A CN 111787283 A CN111787283 A CN 111787283A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- construction
- construction site
- site
- circuit board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M11/00—Stands or trestles as supports for apparatus or articles placed thereon Stands for scientific apparatus such as gravitational force meters
- F16M11/02—Heads
- F16M11/04—Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
- F16M11/043—Allowing translations
- F16M11/045—Allowing translations adapted to left-right translation movement
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M11/00—Stands or trestles as supports for apparatus or articles placed thereon Stands for scientific apparatus such as gravitational force meters
- F16M11/02—Heads
- F16M11/18—Heads with mechanism for moving the apparatus relatively to the stand
Abstract
The invention discloses a construction site on-site construction machinery monitoring system, which comprises a construction site, wherein two groups of cross beams are arranged below the upper top end of the construction site, an installation rod is arranged between the two groups of cross beams, a monitoring camera is arranged at the bottom end of the installation rod, and two ends of the installation rod are connected with a position adjusting device; the position adjusting device comprises a motor, a rotating gear, a movable groove and a butt joint tooth groove, and an output shaft of the motor is connected with one end of the mounting rod. According to the monitoring system for the construction site construction machinery, the monitoring range of the monitoring camera is changed, the monitoring can be clearly monitored at multiple angles, the view line shielding is avoided, the monitoring efficiency is improved, the construction site construction machinery can be monitored in real time, the workload of personnel is reduced, construction accidents are avoided, the monitoring quality is improved, the safety of a construction site is improved, when voltage is found to be abnormal, a breaker module is in short circuit, the damage of devices caused by the short circuit is prevented, the storage is carried out through the database server, and the later-stage checking is facilitated.
Description
Technical Field
The invention relates to the technical field of monitoring of construction site on-site construction machinery, in particular to a monitoring system of the construction site on-site construction machinery.
Background
Construction project supervision can be divided into design supervision and construction supervision according to supervision stages. Design supervision is the supervision performed on a design project in the design stage, and the design supervision mainly aims at ensuring that the design quality, time and other targets meet the requirements of owners; the construction supervision is the supervision carried out on construction projects in the construction stage, and the main purpose of the supervision is to ensure that the construction safety, quality, investment, construction period and the like meet the requirements of an owner, in the construction supervision process, a supervision party needs to go to a construction party to carry out engineering supervision, and during construction, the existing monitoring system can only carry out monitoring at a fixed position through monitoring the working process of the construction party, so that monitoring dead angles can occur, and the monitoring efficiency is poor.
Disclosure of Invention
The invention aims to provide a monitoring system for construction site construction machinery, which changes the monitoring range of a monitoring camera, can clearly supervise from multiple angles, avoids the appearance of sight shielding, improves the monitoring efficiency, can monitor the construction site construction machinery in real time, reduces the workload of personnel, avoids construction accidents, improves the monitoring quality, increases the safety of a construction site, and when voltage is found to be abnormal, a breaker module is short-circuited to prevent devices from being damaged due to short circuit, and is stored through a database server, so that the monitoring system is convenient to look up at in the later period, and the problems in the prior art are solved.
In order to achieve the purpose, the invention provides the following technical scheme: a monitoring system for construction machinery on a construction site comprises a construction site, wherein two groups of cross beams are arranged below the upper top end of the construction site, an installation rod is arranged between the two groups of cross beams, a monitoring camera is arranged at the bottom end of the installation rod, and two ends of the installation rod are connected with a position adjusting device;
the positioning device comprises a motor, a rotating gear, a movable groove and a butt joint tooth groove, an output shaft of the motor is connected with one end of an installation rod, the rotating gear is sleeved on the installation rod, the movable groove is formed in the cross beam, the butt joint tooth groove is formed in the inner wall of the movable groove, and the monitoring camera is wirelessly connected with the monitoring terminal;
the monitoring terminal comprises a display, a control circuit board, a transformation detection module, a master control circuit board, a breaker module and a database server, wherein the control circuit board, the transformation detection module, the master control circuit board, the breaker module and the database server are connected in series.
Preferably, the installation pole sets up two sets ofly, runs through respectively and fixes the both ends at two sets of crossbeams, and installs two surveillance cameras on a set of installation pole.
Preferably, the movable grooves and the butt joint tooth grooves are arranged in two groups and are respectively arranged on the two groups of cross beams.
Preferably, the joints of the mounting rods and the movable grooves are sleeved with rotating gears, and the rotating gears are meshed with the butt joint tooth grooves.
Preferably, the monitoring camera is wirelessly connected with the control circuit board and the database server, and the control circuit board and the database server are electrically connected with the display.
Preferably, the voltage transformation detection module is connected in series between the main control circuit board and the circuit breaker module.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the monitoring system for the construction site construction machinery, two groups of mounting rods are arranged and respectively penetrate through and are fixed at two ends of two groups of cross beams, two monitoring cameras are mounted on one group of mounting rods, a plurality of groups of monitoring cameras are arranged, multiple positions can be monitored simultaneously, rotating gears are meshed with butt joint tooth grooves, a motor drives the mounting rods to rotate, the rotating gears on the mounting rods rotate together and are meshed with the butt joint tooth grooves to drive the mounting rods to slide in the movable grooves, the monitoring range of the monitoring cameras is changed, clear multi-angle supervision can be achieved, sight shielding is avoided, monitoring efficiency is improved, the construction site construction machinery can be monitored in real time, the workload of personnel is reduced, construction accidents are avoided, supervision quality is improved, and safety of a construction site is improved.
2. According to the construction site on-site construction machinery monitoring system, the voltage transformation detection module is connected between the main control circuit board and the breaker module in series, the monitoring camera wirelessly transmits a monitored video to the database server in the monitoring terminal for storage, the database server transmits a picture to the display through the control of the main control circuit board, the voltage transformation detection module detects the internal voltage of the main control circuit board, when the voltage is abnormal, the breaker module is in short circuit, the damage of devices caused by the short circuit is prevented, the storage is performed through the database server, and the later-stage checking is facilitated.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a side cross-sectional view of the overall construction of the present invention;
FIG. 3 is an enlarged view taken at A of FIG. 1 in accordance with the present invention;
FIG. 4 is a schematic view of a connection structure between a control terminal and a monitoring camera according to the present invention;
fig. 5 is a block diagram of a control terminal structure according to the present invention.
In the figure: 1. a construction site; 11. a cross beam; 2. mounting a rod; 21. a surveillance camera; 3. a position adjusting device; 31. a motor; 32. a rotating gear; 33. a movable groove; 34. butting tooth grooves; 4. a monitoring terminal; 41. a display; 42. a control circuit board; 43. a voltage transformation detection module; 44. a main control circuit board; 45. a circuit breaker module; 46. a database server.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1, a construction site on-site construction machinery monitoring system, including construction site 1, construction site 1 top end below sets up two sets of crossbeams 11, sets up installation pole 2 between two sets of crossbeams 11, and installation pole 2 bottom installation surveillance camera 21, and installation pole 2 sets up two sets ofly, runs through respectively and fixes the both ends at two sets of crossbeams 11, and installs two surveillance cameras 21 on a set of installation pole 2, sets up multiunit surveillance camera 21, is convenient for monitor many places simultaneously.
Referring to fig. 2-3, two ends of the mounting rod 2 are connected to the positioning device 3, the positioning device 3 includes a motor 31, a rotating gear 32, a movable slot 33 and a butt-joint tooth slot 34, an output shaft of the motor 31 is connected to one end of the mounting rod 2, the mounting rod 2 is sleeved with the rotating gear 32, the movable slot 33 is disposed on the cross beam 11, the inner wall of the movable slot 33 is provided with the butt-joint tooth slot 34, the movable slot 33 and the butt-joint tooth slot 34 are disposed on two sets of the cross beam 11, the connecting portion between the mounting rod 2 and the movable slot 33 is sleeved with the rotating gear 32, the rotating gear 32 is engaged with the butt-joint tooth slot 34, the motor 31 drives the mounting rod 2 to rotate, the rotating gear 32 on the mounting rod 2 rotates together and drives the mounting rod 2 to slide in the movable slot 33 under the engagement with the butt-joint tooth slot 34, the monitoring range of the monitoring camera 21 is changed, monitoring can, the efficiency of control is improved, can monitor building site construction machinery in real time, reduce personnel's work load, avoid appearing construction accident, improve the supervision quality, increase construction site 1's security.
Referring to fig. 4-5, the monitoring camera 21 is wirelessly connected to the monitoring terminal 4, the monitoring terminal 4 includes a display 41, a control circuit board 42, a transformation detecting module 43, a main control circuit board 44, a breaker module 45 and a database server 46, the control circuit board 42, the transformation detecting module 43, the main control circuit board 44, the breaker module 45 and the database server 46 are connected in series, the monitoring camera 21 is wirelessly connected to the control circuit board 42 and the database server 46, the control circuit board 42 and the database server 46 are electrically connected to the display 41, the transformation detecting module 43 is connected in series between the main control circuit board 44 and the breaker module 45, the monitoring camera 21 wirelessly transmits a monitored video to the database server 46 in the monitoring terminal 4 for storage, the database server 46 transmits a picture to the display 41 through the main control circuit board 44, the voltage transformation detection module 43 detects the internal voltage of the main control circuit board 44, and when the voltage is found to be abnormal, the circuit breaker module 45 is short-circuited to prevent the device from being damaged due to short circuit, and the device is stored through the database server 46, so that the device can be checked in the later period.
In summary, the following steps: the invention relates to a monitoring system for construction site construction machinery, wherein two groups of mounting rods 2 are arranged and respectively penetrate through and are fixed at two ends of two groups of cross beams 11, two monitoring cameras 21 are arranged on one group of mounting rods 2, a plurality of groups of monitoring cameras 21 are arranged, so that a plurality of positions can be monitored simultaneously, rotating gears 32 are meshed with butt-joint tooth sockets 34, a motor 31 drives the mounting rods 2 to rotate, the rotating gears 32 on the mounting rods 2 rotate together and drive the mounting rods 2 to slide in movable grooves 33 under the meshing action of the butt-joint tooth sockets 34, the monitoring range of the monitoring cameras 21 is changed, clear multi-angle monitoring can be carried out, sight line obstruction is avoided, the monitoring efficiency is improved, the monitoring of the construction site construction machinery can be carried out in real time, the workload of personnel is reduced, construction accidents are avoided, the monitoring quality is improved, the safety of a construction site 1 is improved, a voltage transformation detection module 43 is connected between a main control circuit board 44, surveillance camera head 21 stores in transmitting the database server 46 in monitor terminal 4 with the video wireless of monitoring, database server 46 transmits the picture for display 41 through main control circuit board 44 control, vary voltage detection module 43 detects main control circuit board 44 internal voltage, when finding voltage anomaly, circuit breaker module 45 carries out the short circuit, prevent that the short circuit from causing the device to damage, save through database server 46, the later stage of being convenient for is looked over.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a building site construction machinery monitored control system, includes construction site (1), its characterized in that: two groups of cross beams (11) are arranged below the upper top end of the construction site (1), an installation rod (2) is arranged between the two groups of cross beams (11), a monitoring camera (21) is installed at the bottom end of the installation rod (2), and two ends of the installation rod (2) are connected with a position adjusting device (3);
the positioning device (3) comprises a motor (31), a rotating gear (32), a movable groove (33) and a butt joint tooth groove (34), an output shaft of the motor (31) is connected with one end of the installation rod (2), the rotating gear (32) is sleeved on the installation rod (2), the movable groove (33) is formed in the cross beam (11), the butt joint tooth groove (34) is formed in the inner wall of the movable groove (33), and the monitoring camera (21) is in wireless connection with the monitoring terminal (4);
the monitoring terminal (4) comprises a display (41), a control circuit board (42), a transformation detection module (43), a main control circuit board (44), a circuit breaker module (45) and a database server (46), and the control circuit board (42), the transformation detection module (43), the main control circuit board (44), the circuit breaker module (45) and the database server (46) are connected in series.
2. The monitoring system for the construction site on-site construction machine according to claim 1, wherein: the mounting rods (2) are arranged in two groups, penetrate through and are fixed at two ends of the two groups of cross beams (11) respectively, and two monitoring cameras (21) are mounted on one group of mounting rods (2).
3. The monitoring system for the construction site on-site construction machine according to claim 1, wherein: the movable grooves (33) and the butt joint tooth grooves (34) are arranged in two groups and are respectively arranged on the two groups of cross beams (11).
4. The monitoring system for the construction site on-site construction machine according to claim 1, wherein: the connecting parts of the mounting rod (2) and the movable groove (33) are sleeved with rotating gears (32), and the rotating gears (32) are meshed with the butt joint tooth grooves (34).
5. The monitoring system for the construction site on-site construction machine according to claim 1, wherein: the monitoring camera (21) is in wireless connection with the control circuit board (42) and the database server (46), and the control circuit board (42) and the database server (46) are electrically connected with the display (41).
6. The monitoring system for the construction site on-site construction machine according to claim 1, wherein: the voltage transformation detection module (43) is connected in series between the main control circuit board (44) and the breaker module (45).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010678645.6A CN111787283A (en) | 2020-07-15 | 2020-07-15 | Construction site construction machinery monitoring system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010678645.6A CN111787283A (en) | 2020-07-15 | 2020-07-15 | Construction site construction machinery monitoring system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111787283A true CN111787283A (en) | 2020-10-16 |
Family
ID=72768579
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010678645.6A Pending CN111787283A (en) | 2020-07-15 | 2020-07-15 | Construction site construction machinery monitoring system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111787283A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112728317A (en) * | 2020-12-25 | 2021-04-30 | 安徽省安泰科技股份有限公司 | Garden hazardous chemical substance monitoring system based on industrial internet and implementation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110310219A1 (en) * | 2009-05-29 | 2011-12-22 | Youngkook Electronics, Co., Ltd. | Intelligent monitoring camera apparatus and image monitoring system implementing same |
CN103442205A (en) * | 2013-08-13 | 2013-12-11 | 大庆深博电气设备有限公司 | Monitoring system commonly used for power distribution cabinet |
CN107781594A (en) * | 2017-12-20 | 2018-03-09 | 西安龙之梦网络信息有限公司 | A kind of placement supervision control engineering monitoring device for being easy to regulation |
CN208509131U (en) * | 2018-06-06 | 2019-02-15 | 平舆县工程质量监督站 | A kind of project delivery method safety long-distance monitoring device |
US20190222725A1 (en) * | 2016-09-27 | 2019-07-18 | Yuhua Wang | Camera device |
DE202019104839U1 (en) * | 2019-06-27 | 2019-09-26 | Suzhou Maichuang Information Technology Co., Ltd. | Surveillance system for safety technology |
CN210600925U (en) * | 2019-07-26 | 2020-05-22 | 广州善谦科技有限公司 | Monitoring a mobile device |
-
2020
- 2020-07-15 CN CN202010678645.6A patent/CN111787283A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110310219A1 (en) * | 2009-05-29 | 2011-12-22 | Youngkook Electronics, Co., Ltd. | Intelligent monitoring camera apparatus and image monitoring system implementing same |
CN103442205A (en) * | 2013-08-13 | 2013-12-11 | 大庆深博电气设备有限公司 | Monitoring system commonly used for power distribution cabinet |
US20190222725A1 (en) * | 2016-09-27 | 2019-07-18 | Yuhua Wang | Camera device |
CN107781594A (en) * | 2017-12-20 | 2018-03-09 | 西安龙之梦网络信息有限公司 | A kind of placement supervision control engineering monitoring device for being easy to regulation |
CN208509131U (en) * | 2018-06-06 | 2019-02-15 | 平舆县工程质量监督站 | A kind of project delivery method safety long-distance monitoring device |
DE202019104839U1 (en) * | 2019-06-27 | 2019-09-26 | Suzhou Maichuang Information Technology Co., Ltd. | Surveillance system for safety technology |
CN210600925U (en) * | 2019-07-26 | 2020-05-22 | 广州善谦科技有限公司 | Monitoring a mobile device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112728317A (en) * | 2020-12-25 | 2021-04-30 | 安徽省安泰科技股份有限公司 | Garden hazardous chemical substance monitoring system based on industrial internet and implementation method thereof |
CN112728317B (en) * | 2020-12-25 | 2023-06-30 | 安徽省安泰科技股份有限公司 | Park dangerous chemical monitoring system based on industrial Internet and implementation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104345683B (en) | A kind of valve Room intelligent inspection robot temperature monitoring system | |
CN111787283A (en) | Construction site construction machinery monitoring system | |
CN204498280U (en) | The integrated on-site monitoring equipment of architectural engineering modularization | |
CN112728317A (en) | Garden hazardous chemical substance monitoring system based on industrial internet and implementation method thereof | |
CN115126991B (en) | Intelligent substation based on modularized design's orbital patrol robot | |
CN217003877U (en) | Intelligent monitoring equipment based on adjustable | |
CN204066328U (en) | Range finding warning device | |
CN212007318U (en) | Cloud platform camera for hydropower station inspection robot | |
CN115986926A (en) | Industrial park power consumption monitoring device | |
CN109586411B (en) | Intelligent auxiliary monitoring device and monitoring method for transformer substation | |
CN113970044A (en) | Optical fiber network maintenance centralized monitoring and early warning equipment and use method thereof | |
CN212012264U (en) | Transformer substation inspection system based on BIM | |
CN211860274U (en) | Real-time information interaction engineering supervision system | |
CN116567180A (en) | Binocular stereoscopic vision-based power plant safety operation monitoring system and method | |
CN220534228U (en) | Inspection robot | |
CN215558487U (en) | Real-time monitoring and early warning device of tower crane | |
CN220706931U (en) | Building site supervisory equipment installing support | |
CN213271766U (en) | Scenic spot mobile device monitoring security protection equipment | |
CN217177952U (en) | District safety monitoring device | |
CN220487774U (en) | Sensing alarm device for detecting loosening of fan tower barrel bolt | |
CN220135020U (en) | Video monitoring recheck emergency alarm equipment | |
CN216212586U (en) | Intelligent temperature-sensing insulator | |
CN219755934U (en) | High supervisory equipment for construction of security | |
CN219712978U (en) | Monitoring equipment for industrial Internet | |
CN216087272U (en) | Explosion-proof type safety audible and visual alarm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201016 |
|
RJ01 | Rejection of invention patent application after publication |