CN204498280U - The integrated on-site monitoring equipment of architectural engineering modularization - Google Patents

The integrated on-site monitoring equipment of architectural engineering modularization Download PDF

Info

Publication number
CN204498280U
CN204498280U CN201520262646.7U CN201520262646U CN204498280U CN 204498280 U CN204498280 U CN 204498280U CN 201520262646 U CN201520262646 U CN 201520262646U CN 204498280 U CN204498280 U CN 204498280U
Authority
CN
China
Prior art keywords
camera
gyroaxis
solar panels
integrated
monitoring equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520262646.7U
Other languages
Chinese (zh)
Inventor
张洪明
蒋鸿
李京晏
蒋晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical Chongqing Construction Engineering Group No7 Construction Engineering Co Ltd
Priority to CN201520262646.7U priority Critical patent/CN204498280U/en
Application granted granted Critical
Publication of CN204498280U publication Critical patent/CN204498280U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Studio Devices (AREA)
  • Accessories Of Cameras (AREA)

Abstract

This patent relates to building monitoring equipment field, be specially the integrated on-site monitoring equipment of architectural engineering modularization, it comprises pedestal, camera and the revolving bed horizontally rotated for camera, described revolving bed is arranged on pedestal by turning motor, described revolving bed top is provided with two legs, the gyroaxis vertically rotated for camera is connected with between two legs, described camera is fixed in the middle part of gyroaxis, described gyroaxis two ends are connected with accelerating gear system, the output shaft of accelerating gear system connects solar panels, solar panels are supported in above camera, inner side between described revolving bed two leg is provided with the cleaning slot for placing cleaning cotton block.The beneficial effect of this patent is: this watch-dog can be competent at the video image acquisition task of comparatively complicated operating mode, and has higher self-protection.

Description

The integrated on-site monitoring equipment of architectural engineering modularization
Technical field
The utility model belongs to building monitoring equipment field, the integrated on-site monitoring equipment of particularly architectural engineering modularization.
Background technology
In recent years, be that the engineering project long-distance management system of core technology is widely used with video monitoring.Architectural engineering intelligent management system is the application at video monitoring of computer vision and mode identification technology.It automatically detects the target in video image, follow the tracks of and analyzes, and it is intelligent is that computer can by the content in analysis and understanding video pictures, thus provides monitoring and the useful key message of early warning.The application of intelligent vision monitoring technology, can realize real-time, overall process, continual security control, thus the efficiency of management of General Promotion engineering safety supervision and managerial skills.
Any abnormal conditions in architectural engineering, all can regard as in specific region and occur abnormal object in vision monitoring.Abnormal object can be undertaken by pixel detection by the mode of statistical inference.By the global de-noising based on morphological image, and obtain the region occurring exception eventually through the connectivity of region analysis, realize the object of Anomaly target detection, thus finally reach the target of safe early warning.
The mode that modern construction engineering item types presents is various and mostly have complexity, needs to arrange monitor network and monitor terminal (being mainly camera) for engineering telemanagement and monitoring specially.Be arranged on electric platform by monitoring camera now, make monitoring camera can the rotation of 360 ° in the horizontal direction, vertical direction also can the rotation of 360 °, and monitoring camera just can observe the real image situation in each region in engineering in the mode of wide viewing angle.Therefore the quality of the monitoring image data of monitor terminal is the crucial factor of follow-up data process, if the restricted observation visual angle that causes in monitor terminal installation site is bad, greatly will affect the accuracy of observation data, monitoring will embody real-time in addition, need during engineering, carry out uninterruptedly monitoring in 24 hours; Powering to monitoring camera now generally adopts wired and storage battery mode to its continued power, causes monitor terminal to need to consume more electric energy, is unfavorable for energy-saving and emission-reduction.
When camera works under fine day state, the direct projection that camera can be subject to sunlight causes surface of camera head heat higher, if there is no heat abstractor to cause to be arranged on the electronic component operation irregularity of camera inside, cause view data abnormal, waste good solar energy source simultaneously.When rainy, for being arranged on outdoor monitoring camera, because camera is exposed in rainy environment, the camera lens of camera has water droplet and amasss above, causes the fuzzy of monitored picture.
Utility model content
The purpose of this utility model is to provide one and is applied in architectural engineering and monitors, and camera can be prevented to be subject to the direct projection of sunlight at fine day, the rainy day can avoid rainwater directly to wash away, and can clean the on-site monitoring equipment of the rainwater on camera.
To achieve these goals, the integrated on-site monitoring equipment of architectural engineering modularization that the utility model provides, comprise pedestal, camera and the revolving bed horizontally rotated for camera, described revolving bed is arranged on pedestal by turning motor, described revolving bed top is provided with two legs, the gyroaxis vertically rotated for camera is connected with between two legs, described camera is fixed in the middle part of gyroaxis, described gyroaxis two ends are connected with accelerating gear system, the output shaft of accelerating gear system connects solar panels, solar panels are supported in above camera, inner side between described revolving bed two leg is provided with the cleaning slot for placing cleaning cotton block.
The utility model has the advantage of: be arranged on by the utility model in the place of broad view, camera can carry out 360 ° of omnibearing video signal collectives under the cooperation of revolving bed and gyroaxis; When camera needs to gather the higher region of physical features, camera is upwards rotated by gyroaxis, in order to not affect the collection sight line of camera in when rotating, the output shaft of solar panels with accelerating gear system is connected, make solar panels velocity of rotation faster than camera, the visual field of camera can not be subject to the impact of solar panel stop.2, also effectively prevent sunlight from shining directly into the surface of camera by solar panel, effectively prevent head shell temperature and raise and cause the chip being built in camera can not the situation of steady operation.3, in time being used in rainy operating mode, the stop of rainwater is carried out by solar panels.4, in architectural engineering, usually having the shelter such as floating dust or dew is bonded on the camera lens of camera; usually cause the fuzzy of picture; because the inner side of this programme between revolving bed two leg is provided with the cleaning slot for placing cleaning cotton block; move at Long-distance Control gyroaxis; the camera lens of camera is stroked on cleaning cotton, so just can realize the object of long-range cleaning camera lens.
Further, described solar panels both sides are connected with accelerating gear system by bracing frame, and bracing frame is connected with accelerating gear system output shaft by tightening knob.Solar panels can, when initially installing, arbitrarily be arranged on the output shaft of accelerating gear system, after installation, by tightening knob, solar panels are being adjusted to optimum position.Reduce and wait when mounted, the installation difficulty of solar panels.
Further, described accelerating gear is epicyclic train, and planetary gear ring is fixed, planet circular system is fixed by planet carrier, the output shaft of planet carrier is fixedly connected with gyroaxis, and the output shaft of sun gear is fixedly connected with solar panels, and the velocity of rotation of sun gear is greater than the velocity of rotation of planet carrier.Use the velocity of rotation of sun gear to be greater than the planet circular system of the velocity of rotation of planet carrier, can be good at realizing solar panels rotary speed slightly faster than gyroaxis, and planetary gear is relatively higher with in line gear train mechanical strength, transmission is more stable.
Further, solar panels are made outwardly arc, can be reduced the gathering of rainwater and floating dust as much as possible by the arc that described solar panels are outwardly in the middle part of being.
Further, the integrated chip that described control turning motor and gyroaxis rotate is in pedestal, and base bottom is provided with dismountable charged lithium cells.Install charged lithium cells additional to this device, sun-drenched time, carry out energy storage by the solar panels of solar panels.
Further, described cleaning slot inwall is provided with the hangnail preventing cleaning cotton block from dropping out, in order to prevent controlling camera clean time when controlling gyroaxis, the situation that cleaning cotton block may be extruded by camera, cleaning slot inwall is arranged hangnail, by hangnail, cleaning cotton block is fixed the situation preventing cleaning cotton block to be extruded.
Accompanying drawing explanation
Fig. 1 is the structural representation of the integrated on-site monitoring equipment of architectural engineering modularization mentioned in the present embodiment;
Fig. 2 is the left TV structure schematic diagram of Fig. 1.
Reference numeral is enumerated: pedestal 1, revolving bed 2, planet circular system 3, cleaning slot 4, bracing frame 5, cleaning cotton block 41, solar panels 6, camera 7, gyroaxis 8, tightening knob 9, contiguous block 10, wireless antenna 101, network cable jack 102, cable power interface 103, serial line interface 104.
Embodiment
By reference to the accompanying drawings the utility model is described in further detail below by embodiment:
The integrated on-site monitoring equipment of architectural engineering modularization as depicted in figs. 1 and 2, it comprises pedestal 1, camera 7 and the revolving bed 2 horizontally rotated for camera 7, revolving bed 2 is arranged on pedestal 1 by turning motor, revolving bed 2 top is provided with two legs, the gyroaxis 8 vertically rotated for camera 7 is connected with between two legs, leg top arranges the inner concave arc surface mated with surface of camera head, camera 7 is fixed in the middle part of gyroaxis 8, gyroaxis 8 two ends are connected with planet circular system 3, the gear ring of planet circular system 3 and the leg of revolving bed 2 are fixed, gyroaxis 8 and planet carrier coaxial rotation, the output shaft of the sun gear of planet circular system connects the bracing frame 5 fixing with solar panels 6, tightening knob is provided with between bracing frame and sun gear, solar panels can when initially installing, arbitrarily be arranged on the output shaft of sun gear, after installation, by tightening knob 9, solar panels 6 are being adjusted to optimum position.The velocity of rotation of sun gear is greater than the velocity of rotation of planet carrier, and solar panels 6 are placed in above camera 7, and the inner side between revolving bed 2 liang of legs is provided with the cleaning slot 4 for placing cleaning cotton block 41.
Be arranged in the place of broad view by this device, camera 7 can carry out 360 ° of omnibearing video signal collectives in the cooperation of revolving bed 2 and gyroaxis 8; When camera 7 needs to gather the higher region of physical features, camera 7 is upwards rotated by gyroaxis 8, in order to not affect the collection sight line of camera 7 in when rotating, solar panels 6 are connected with sun gear, make solar panels velocity of rotation faster than camera, the visual field of camera can not be subject to the impact of solar panel stop.Effectively prevent direct sunlight to the surface of camera by solar panels, avoid head shell temperature and raise and cause the chip being built in camera can not the situation of steady operation.When being used in rainy, by the stop of solar panels to rainwater.In architectural engineering, usually have the shelter such as floating dust or dew is bonded on the camera lens of camera; usually cause the fuzzy of picture; because the inner side of this programme between revolving bed two leg is provided with the cleaning slot for placing cleaning cotton block; move at Long-distance Control gyroaxis; the camera lens of camera is stroked on cleaning cotton, so just can realize the object of long-range cleaning camera lens.
The velocity of rotation of sun gear is greater than the velocity of rotation of planet carrier.Use the velocity of rotation of sun gear to be greater than the planet circular system of the velocity of rotation of planet carrier, can be good at realizing solar panels 6 rotary speed slightly faster than gyroaxis 8, when camera 7 rotates at vertical direction time, the visual field of camera 7 avoided automatically by solar panels 6.
Solar panels 7 are the outwardly arc in middle part, solar panels are made outwardly arc, can reduce the gathering of rainwater and floating dust as much as possible.The integrated chip controlling turning motor and gyroaxis rotation, in pedestal 1, is provided with dismountable charged lithium cells bottom pedestal 1.Install charged lithium cells additional to this device, sun-drenched time, carry out energy storage by the solar panels of solar panels.
Cleaning slot 4 inwall is provided with the hangnail preventing cleaning cotton block 41 from dropping out, and to be fixed by cleaning cotton block 41 to prevent cleaning cotton block 41 to be extruded by hangnail.
As shown in Figure 2, arrange contiguous block 10, contiguous block 10 offers network cable jack 102 at pedestal 1 side, serial line interface 104 for subsequent use, contiguous block 10 is also provided with wireless antenna 101; Chip in pedestal 1 is integrated with network signal processing module, serial signal processing module, wireless signal processing module.This contiguous block 10 also arranges wired power interface 103, whole device can wiredly be powered.
In reality, accelerating gear can realize by the gear train of plane transmission the speed of gyration that gyroaxis rotary speed is less than solar panels, only need this gear train larger diameter gear and gyroaxis coaxial rotation, using the output shaft that diameter rotates as driving solar panels compared with pinion, other output speeds certainly can also be used to be greater than the accelerating gear system of gear train as this programme of input speed.
Above-described is only preferred implementation of the present utility model; should be understood that; for a person skilled in the art; under the prerequisite not departing from the utility model structure; some distortion and improvement can also be made; these also should be considered as protection range of the present utility model, and these all can not affect effect and the practical applicability of the utility model enforcement.

Claims (6)

1. the integrated on-site monitoring equipment of architectural engineering modularization, it comprises pedestal, camera and the revolving bed horizontally rotated for camera, described revolving bed is arranged on pedestal by turning motor, described revolving bed top is provided with two legs, the gyroaxis vertically rotated for camera is connected with between two legs, described camera is fixed in the middle part of gyroaxis, it is characterized in that: described gyroaxis two ends are connected with accelerating gear system, the output shaft of accelerating gear system connects solar panels, solar panels are supported in above camera, inner side between described revolving bed two leg is provided with the cleaning slot for placing cleaning cotton block.
2. the integrated on-site monitoring equipment of architectural engineering modularization according to claim 1, is characterized in that: described solar panels both sides are connected with accelerating gear system by support, and support is connected with accelerating gear system output shaft by tightening knob.
3. the integrated on-site monitoring equipment of architectural engineering modularization according to claim 1, it is characterized in that: described accelerating gear is epicyclic train, planetary gear ring is fixed, planet circular system is fixed by planet carrier, the output shaft of planet carrier is fixedly connected with gyroaxis, the output shaft of sun gear is fixedly connected with solar panels, and the velocity of rotation of sun gear is greater than the velocity of rotation of planet carrier.
4. the integrated on-site monitoring equipment of architectural engineering modularization according to Claims 2 or 3, is characterized in that: the arc that described solar panels are outwardly in the middle part of being.
5. the integrated on-site monitoring equipment of architectural engineering modularization according to Claims 2 or 3, is characterized in that: the integrated chip that described control turning motor and gyroaxis rotate is in pedestal, and base bottom is provided with dismountable charged lithium cells.
6. the integrated on-site monitoring equipment of architectural engineering modularization according to claim 5, is characterized in that: described cleaning slot inwall is provided with the hangnail preventing cleaning cotton block from dropping out.
CN201520262646.7U 2015-04-28 2015-04-28 The integrated on-site monitoring equipment of architectural engineering modularization Expired - Fee Related CN204498280U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520262646.7U CN204498280U (en) 2015-04-28 2015-04-28 The integrated on-site monitoring equipment of architectural engineering modularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520262646.7U CN204498280U (en) 2015-04-28 2015-04-28 The integrated on-site monitoring equipment of architectural engineering modularization

Publications (1)

Publication Number Publication Date
CN204498280U true CN204498280U (en) 2015-07-22

Family

ID=53577554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520262646.7U Expired - Fee Related CN204498280U (en) 2015-04-28 2015-04-28 The integrated on-site monitoring equipment of architectural engineering modularization

Country Status (1)

Country Link
CN (1) CN204498280U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644047A (en) * 2016-09-09 2017-05-10 深圳市中科智诚科技有限公司 Intelligent monitoring system for oil exploration
CN108469433A (en) * 2018-03-21 2018-08-31 濮阳市华信技术服务有限公司 A kind of intelligence system and its application method for sewage on-line analysis
CN108632515A (en) * 2018-07-05 2018-10-09 安徽省兴万信息技术有限公司 A kind of monitoring camera of automatic cleaning type
CN109479506A (en) * 2018-10-26 2019-03-19 山东交通职业学院 A kind of multi-functional corn picker
CN111641766A (en) * 2020-06-03 2020-09-08 一汽解放汽车有限公司 Camera device and vehicle
CN115567681A (en) * 2022-07-20 2023-01-03 江苏若发科技发展有限公司 Solar road monitor

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644047A (en) * 2016-09-09 2017-05-10 深圳市中科智诚科技有限公司 Intelligent monitoring system for oil exploration
CN106644047B (en) * 2016-09-09 2019-04-26 深圳市中科智诚科技有限公司 A kind of intelligent monitor system for oil exploration
CN108469433A (en) * 2018-03-21 2018-08-31 濮阳市华信技术服务有限公司 A kind of intelligence system and its application method for sewage on-line analysis
CN108469433B (en) * 2018-03-21 2020-10-16 新昌县夙凡软件科技有限公司 Intelligent system for online analysis of sewage and use method thereof
CN108632515A (en) * 2018-07-05 2018-10-09 安徽省兴万信息技术有限公司 A kind of monitoring camera of automatic cleaning type
CN109479506A (en) * 2018-10-26 2019-03-19 山东交通职业学院 A kind of multi-functional corn picker
CN109479506B (en) * 2018-10-26 2022-01-18 焦作泰利机械制造股份有限公司 Multifunctional corn harvester
CN111641766A (en) * 2020-06-03 2020-09-08 一汽解放汽车有限公司 Camera device and vehicle
CN115567681A (en) * 2022-07-20 2023-01-03 江苏若发科技发展有限公司 Solar road monitor

Similar Documents

Publication Publication Date Title
CN204498280U (en) The integrated on-site monitoring equipment of architectural engineering modularization
CN210196862U (en) Be applied to energy-conserving information acquisition camera of intelligent building control
CN205945952U (en) Computer monitoring system
CN205247539U (en) Prevent external damage alarm device
CN202565380U (en) Field monitoring device utilizing solar power supply and the 3rd generation telecommunication (3G) network transmission
CN103605377B (en) Universe sky cloud cluster real-time dynamic monitoring device
CN205354545U (en) Outdoor advertising device of clean energy power supply
CN207117570U (en) A kind of photovoltaic plant automatic monitoring device
CN107613249A (en) Border supervising device, system and method
CN209041912U (en) Video monitoring apparatus with three axial truss structures
CN204334824U (en) A kind of display screen wireless supervisory control system
CN206042214U (en) Outdoor wireless camera for security
CN211649629U (en) Installation device for monitoring camera and monitoring device
CN209201229U (en) A kind of panoramic video security monitoring device
CN210075388U (en) Adjustable artificial intelligence video monitor convenient to maintenance
CN208750324U (en) Ultra-high-tension power transmission line security monitor
CN214306049U (en) Project supervision video acquisition device
CN208445640U (en) A kind of solar energy video monitoring apparatus for cell safety
CN208366380U (en) A kind of environment digital collection equipment
CN208158756U (en) A kind of monitoring device that can be achieved remotely to control
CN215453137U (en) Electronic monitoring device
CN209767725U (en) Civil security engineering monitoring device
CN212875989U (en) Power grid emergency repair remote short wave infrared night vision device
CN213333347U (en) Intelligent security video monitoring device for community
CN105897142B (en) The sunflower-shaped solar energy photovoltaic panel mounting system of automatic sun-exposing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20160428