CN111719484A - Green dust-settling environment-friendly construction structure for road and construction method thereof - Google Patents

Green dust-settling environment-friendly construction structure for road and construction method thereof Download PDF

Info

Publication number
CN111719484A
CN111719484A CN202010412487.XA CN202010412487A CN111719484A CN 111719484 A CN111719484 A CN 111719484A CN 202010412487 A CN202010412487 A CN 202010412487A CN 111719484 A CN111719484 A CN 111719484A
Authority
CN
China
Prior art keywords
carriage
water
cavity
fixed mounting
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010412487.XA
Other languages
Chinese (zh)
Other versions
CN111719484B (en
Inventor
龚伟
徐娜萍
胡光烈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longde Construction Co ltd
Original Assignee
Longde Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longde Construction Co ltd filed Critical Longde Construction Co ltd
Priority to CN202010412487.XA priority Critical patent/CN111719484B/en
Publication of CN111719484A publication Critical patent/CN111719484A/en
Application granted granted Critical
Publication of CN111719484B publication Critical patent/CN111719484B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/02Mobile apparatus, e.g. watering-vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D29/00Filters with filtering elements stationary during filtration, e.g. pressure or suction filters, not covered by groups B01D24/00 - B01D27/00; Filtering elements therefor
    • B01D29/085Funnel filters; Holders therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B11/00Arrangements or adaptations of tanks for water supply
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/02Methods or installations for obtaining or collecting drinking water or tap water from rain-water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B3/00Methods or installations for obtaining or collecting drinking water or tap water
    • E03B3/28Methods or installations for obtaining or collecting drinking water or tap water from humid air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/007Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations the wind motor being combined with means for converting solar radiation into useful energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/10Combinations of wind motors with apparatus storing energy
    • F03D9/11Combinations of wind motors with apparatus storing energy storing electrical energy
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D9/00Adaptations of wind motors for special use; Combinations of wind motors with apparatus driven thereby; Wind motors specially adapted for installation in particular locations
    • F03D9/30Wind motors specially adapted for installation in particular locations
    • F03D9/32Wind motors specially adapted for installation in particular locations on moving objects, e.g. vehicles
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02SGENERATION OF ELECTRIC POWER BY CONVERSION OF INFRARED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, e.g. USING PHOTOVOLTAIC [PV] MODULES
    • H02S20/00Supporting structures for PV modules
    • H02S20/30Supporting structures being movable or adjustable, e.g. for angle adjustment
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Power Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Development (AREA)
  • Water Supply & Treatment (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sustainable Energy (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Photovoltaic Devices (AREA)
  • Road Paving Machines (AREA)

Abstract

The invention relates to the technical field of road construction environment-friendly dust reduction, and discloses a road environment-friendly dust reduction construction structure which comprises a movable base, wherein a carriage is fixedly mounted at the top of the movable base, a cavity is formed in the carriage, two side baffles are fixedly mounted at the top of the carriage, a right baffle which is positioned at the right side of each side baffle and is fixedly connected with the two side baffles is fixedly mounted at the top of the carriage, a supporting plate is fixedly mounted in the cavity, and a first inlet and outlet hole which is communicated with the cavity and is positioned between the two side baffles is formed in the top of the carriage. The road green dust-settling environment-friendly construction structure and the construction method thereof solve the problem that dust generated in the construction process needs to be settled during road construction, but the existing dust settling device generally settles dust by filling tap water into a water tank and then spraying the tap water to the construction position, and the dust settling method causes waste of a large amount of water resources and is not environment-friendly enough.

Description

Green dust-settling environment-friendly construction structure for road and construction method thereof
Technical Field
The invention relates to the technical field of road construction environment-friendly dust fall, in particular to a road environment-friendly dust fall construction structure and a construction method thereof.
Background
The dust fall refers to air particles naturally falling on the ground, the particle size of the air particles is more than ten microns, the measurement index unit is the amount of ground surface sediment substances in a unit area within a certain time, the dust fall is the sediment of dust in the atmosphere, the sources of the dust particles in the atmosphere can be divided into a natural source and an artificial source, and the natural source and the artificial source both have primary and secondary particle sources, wherein the primary particle source in the natural source mainly comprises soil particles, the sediment on the earth surface, volcanic dust formed by volcanic eruption, smoke dust particles generated by various fires, atmospheric aerosol generated by wave breaking and bubble explosion in the ocean, cosmic dust formed by decomposing meteorite into the earth atmosphere, pollen in the biological world, spores and the like, and the secondary particle source mainly comprises tiny particles generated by photochemical reaction of hydrocarbon emitted from forests, the conversion products in the natural sulfur, nitrogen and carbon cycle, and the like, and the artificial sources mainly comprise industrial dust generated in industrial processes such as mines, open-air quarries and the like.
The dust generated in the construction process needs to be reduced in dust during highway construction, but the existing dust reducing device generally reduces dust by filling tap water into a water tank and then spraying the tap water to a construction position, and the dust reducing method causes waste of a large amount of water resources and is not environment-friendly enough, so that the green dust reducing and environment-friendly construction structure for the highway and the construction method thereof are provided to solve the problems.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a green dust-settling environment-friendly construction structure for a road and a construction method thereof, which have the advantages of reducing water resource waste and protecting the environment, and solve the problem that dust generated in the construction process needs to be settled during road construction, but the existing dust-settling device generally settles dust by filling tap water into a water tank and then spraying the tap water to the construction site, so that the dust-settling method causes the waste of a large amount of water resources and is not environment-friendly enough.
(II) technical scheme
In order to achieve the purposes of reducing water resource waste and protecting environment, the invention provides the following technical scheme: the road green dust fall environment-friendly construction structure comprises a movable base, a carriage is fixedly mounted at the top of the movable base, a cavity is formed in the carriage, two side baffles are fixedly mounted at the top of the carriage, a right baffle which is positioned at the right side of each side baffle and fixedly connected with the two side baffles is fixedly mounted at the top of the carriage, a support plate is fixedly mounted in the cavity, first inlet and outlet holes which are communicated with the cavity and positioned between the two side baffles are formed in the top of the carriage, four first electric lead screws which are positioned at the top of the support plate are fixedly mounted in the cavity, a first bottom plate which is positioned between the support plate and the first inlet and outlet holes is movably connected in the cavity, two solar power generation plates are fixedly mounted at the top of the first bottom plate, and first lead screw nuts which are fixedly connected with the first bottom plate are in threaded connection with output shafts of the four first electric lead screws, the top of the carriage is provided with second inlet and outlet holes communicated with the cavity and positioned on the right side of the first inlet and outlet hole, four second electric screw rods which are positioned on the top of the supporting plate are fixedly arranged in the cavity, a second bottom plate which is positioned between the supporting plate and the second inlet and outlet hole is movably connected in the cavity, the top of the second bottom plate is rotatably connected with a turntable, the top of the turntable is fixedly provided with a wind power generator, output shafts of the four second electric screw rods are in threaded connection with second screw nuts fixedly connected with the second bottom plate, a storage battery pack which is positioned at the bottom of the supporting plate is fixedly arranged in the cavity, a water storage tank which is positioned at the bottom of the supporting plate and positioned at the left side of the storage battery pack is fixedly arranged in the cavity, a water collection funnel which is communicated with the water storage tank is fixedly arranged at the left side of the carriage, a storage, swing joint has the delivery port fixedly connected with spray water pump's spray header in the containing box, fixed mounting has the condensation chamber that is located the backup pad bottom and is located between storage battery and the storage water tank in the cavity, the condensation chamber has been seted up in the condensation chamber, condensation intracavity fixed mounting has the condensate pipe, carriage rear side fixed mounting has the blast pipe that is linked together with the condensation chamber, condensation chamber right side fixedly connected with is located the blast pipe bottom and the intake pipe that is linked together with the condensation chamber, the one end fixedly connected with electric heater of condensation chamber is kept away from to the intake pipe, electric heater's air inlet fixedly connected with air exhauster, condensation chamber bottom fixedly connected with is linked together and runs through the storage water tank and extend to the inlet tube in the storage water.
Preferably, moving base right side fixed mounting has the trailer connecting seat, moving base left side fixed mounting has the quantity to be two connecting blocks, connecting block top threaded connection has the through connection piece and extends to the threaded rod of connecting block bottom, threaded rod bottom fixed connection is located the supporting pad of connecting block bottom, peg graft in the threaded rod left side and have the through connection threaded rod and extend to the turning handle on threaded rod right side.
Preferably, the side shield and the right shield are equal in height and larger than one centimeter in height, a first partition plate located between a right first electric screw rod and a left second electric screw rod is fixedly mounted at the top of the support plate, and a second partition plate located between the storage battery and the exhaust fan is fixedly mounted at the bottom of the support plate.
Preferably, the first business turn over hole and the downthehole sealing door that is two of second business turn over all rotate to be connected with quantity, the equal fixedly connected with joint strip of the four lateral walls of sealing door, two contained angle between the solar panel is sixty degrees, two solar panel top fixed mounting has the kicking block.
Preferably, the solar power generation panel is located at the top of the carriage when the first lead screw nut moves to the top of the first electric lead screw output shaft, the wind power generator is located at the top of the carriage when the second lead screw nut moves to the top of the second electric lead screw output shaft, a stepping motor is fixedly installed in the second bottom plate, an output shaft of the stepping motor is fixedly connected with the turntable, and a circulating water pump communicated with a condensate pipe is fixedly installed on the front side of the carriage.
Preferably, the solar power generation panel and the wind power generator are both electrically connected with a storage battery pack, a control panel is fixedly mounted on the front side of the carriage, and the first electric screw rod, the stepping motor, the second electric screw rod, the storage battery pack, the circulating water pump, the spray water pump, the electric heater and the exhaust fan are all electrically connected with the control panel.
Preferably, a water collecting tank is arranged at the top of the water collecting funnel, an activated carbon filter plate is movably connected in the water collecting tank, and a steel wire filter screen positioned at the top of the activated carbon filter plate is movably connected in the water collecting tank.
Preferably, the front side of the carriage is provided with a working hole communicated with the cavity, the working hole is connected with a working door positioned on the front side of the spray header in a rotating manner, the left side of the water storage tank is fixedly connected with an overflow pipe communicated with the water storage tank and penetrating through the carriage and extending to the left side of the carriage, and the air inlet of the exhaust fan is fixedly connected with an exhaust pipe penetrating through the carriage and extending to the front side of the carriage.
The construction method of the green dust-settling environment-friendly construction structure of the road comprises the following steps:
1) rainwater falling to the top of the carriage can only flow down from the left side through the side baffle and the right baffle and enter the water collection funnel for collection and filtration, the filtered water enters the water storage tank for collection, external mist extracted by the exhaust fan is heated by the electric heater and then enters the condensation cavity to be contacted with the condensed water pipe, so that moisture in the mist is condensed and enters the water storage tank through the water inlet pipe for collection;
2) in sunny days, the first electric screw rod output shaft rotates to drive the solar power generation panel to ascend to the top of the carriage, so that the solar power generation panel absorbs solar energy to generate power and store the power into the storage battery pack, in strong wind days, the second electric screw rod output shaft rotates to drive the wind power generator to ascend to the top of the carriage, and the stepping motor drives the rotary table to rotate so that the angle of the wind power generator rotates to a proper position, so that the wind power generator absorbs wind energy to generate power and stores the power into the storage battery pack;
3) be connected with the trailer through trailer connecting seat, make the trailer drive the carriage and remove to the place that needs the dust fall, then rotate turning handle and make the threaded rod rotatory move down, make supporting pad and ground contact, then through opening the work door, take out spray header in the follow cavity, then through the water edge spray header blowout of collecting in the spray pump extraction storage water tank to accomplish the dust fall.
(III) advantageous effects
Compared with the prior art, the invention provides a green dust-settling environment-friendly construction structure for a road and a construction method thereof, and the green dust-settling environment-friendly construction structure has the following beneficial effects:
1. the green dust-fall environment-friendly construction structure for the highway and the construction method thereof have the advantages that rainwater falling on the top of a carriage can only flow down from the left side through the side baffle and the right baffle and enter the water collection funnel for collection and filtration, the filtered water enters the water storage tank for collection, the external fog extracted by the exhaust fan is heated by the electric heater and then enters the condensation cavity to be contacted with the condensation water pipe, so that the moisture in the fog is condensed and enters the water storage tank through the water inlet pipe for collection, the trailer is connected with the trailer through the trailer connecting seat, the trailer drives the carriage to move to a place needing dust fall, then the threaded rod rotates to move downwards by rotating the rotating handle, so that the supporting pad is contacted with the ground, then the spray water pipe is extracted from the cavity by opening the working door, the collected water in the water storage tank is extracted through the spray water pump and is sprayed out along the spray water pipe, thereby completing dust fall, the waste of water resources is reduced, and meanwhile, the fog concentration around a construction site can be reduced by absorbing moisture in the fog, so that the visibility is improved.
2. According to the green dust-fall environment-friendly construction structure and the construction method for the highway, the solar power generation panel is driven to ascend to the top of the carriage through rotation of the first electric screw rod output shaft in sunny days to absorb solar energy to generate power and store the power into the storage battery pack, the wind power generator is driven to ascend to the top of the carriage through rotation of the second electric screw rod output shaft in strong wind days, the stepping motor drives the rotary table to rotate to enable the angle of the wind power generator to rotate to a proper position, the wind power generator absorbs wind energy to generate power and store the power into the storage battery pack, power is supplied through the storage battery pack, waste of electric energy is reduced, and therefore the purposes of reducing waste of water resources and being green and environment-friendly are achieved.
Drawings
FIG. 1 is a schematic structural view of a green dust-settling environment-friendly construction structure for a road and a construction method thereof provided by the invention;
FIG. 2 is a partial cross-sectional view of FIG. 1 of a green, dust-settling, and environment-friendly construction structure for a road and a construction method thereof according to the present invention;
fig. 3 is a partially enlarged schematic view of a part a shown in fig. 2 of the road green dust-fall environment-friendly construction structure and the construction method thereof provided by the invention.
In the figure: 1 movable base, 2 carriages, 3 cavities, 4 side baffles, 5 right baffles, 6 supporting plates, 7 first inlet and outlet holes, 8 first electric screw rods, 9 first base plates, 10 solar power generation plates, 11 first screw rod nuts, 12 second inlet and outlet holes, 13 second electric screw rods, 14 second base plates, 15 turnplates, 16 wind driven generators, 17 second screw rod nuts, 18 storage battery packs, 19 water storage tanks, 20 water collecting hoppers, 21 storage boxes, 22 spray water pumps, 23 spray water pipes, 24 condensation chambers, 25 condensation chambers, 26 condensation water pipes, 27 exhaust pipes, 28 air inlet pipes, 29 electric heaters, 30 exhaust fans and 31 water inlet pipes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, the construction structure for green dust fall and environmental protection for roads comprises a movable base 1, a trailer connecting seat is fixedly installed on the right side of the movable base 1, two connecting blocks are fixedly installed on the left side of the movable base 1, threaded rods which penetrate through the connecting blocks and extend to the bottoms of the connecting blocks are in threaded connection with the tops of the connecting blocks, supporting pads which are located at the bottoms of the connecting blocks are fixedly connected with the bottoms of the threaded rods, a rotating handle which penetrates through the threaded rods and extends to the right side of the threaded rods is inserted into the left side of the threaded rods, a carriage 2 is fixedly installed on the top of the movable base 1, a cavity 3 is formed in the carriage 2, two side baffles 4 are fixedly installed on the top of the carriage 2, a right baffle 5 which is located on the right side of the side baffles 4 and is fixedly connected with the two side, the top of the carriage 2 is provided with a first inlet and outlet hole 7 which is communicated with the cavity 3 and is positioned between the two side baffles 4, the cavity 3 is internally and fixedly provided with four first electric screw rods 8 which are positioned at the top of the supporting plate 6, the cavity 3 is internally and movably connected with a first bottom plate 9 which is positioned between the supporting plate 6 and the first inlet and outlet hole 7, the top of the first bottom plate 9 is fixedly provided with two solar panels 10, an included angle between the two solar panels 10 is sixty degrees, the top of the two solar panels 10 is fixedly provided with a top block, output shafts of the four first electric screw rods 8 are all in threaded connection with first screw rod nuts 11 which are fixedly connected with the first bottom plate 9, when the first screw rod nuts 11 move to the top of the output shaft of the first electric screw rod 8, the solar panels 10 are positioned at the top of the carriage 2, the top of the carriage 2 is provided with a second inlet and outlet hole 12 which is communicated with the cavity 3, two sealing doors are respectively and rotatably connected in the first inlet and outlet hole 7 and the second inlet and outlet hole 12, sealing rubber strips are respectively and fixedly connected to four side walls of each sealing door, four second electric screw rods 13 which are respectively and fixedly arranged in the cavity 3 and positioned at the top of the supporting plate 6 are fixedly arranged in the cavity 6, a first partition plate positioned between the right first electric screw rod 8 and the left second electric screw rod 13 is fixedly arranged at the top of the supporting plate 6, a second bottom plate 14 positioned between the supporting plate 6 and the second inlet and outlet hole 12 is movably connected in the cavity 3, a rotary table 15 is rotatably connected to the top of the second bottom plate 14, a stepping motor is fixedly arranged in the second bottom plate 14, an output shaft of the stepping motor is fixedly connected with the rotary table 15, a wind driven generator 16 is fixedly arranged at the top of the rotary table 15, all output shafts of the four second electric screw rods 13 are in threaded connection with second screw rod nuts 17 fixedly connected with the second bottom plate 14, and when the second screw rod nuts 17 A storage battery pack 18 positioned at the bottom of the support plate 6 is fixedly arranged in the cavity 3, the solar power generation panel 10 and the wind power generator 16 are electrically connected with the storage battery pack 18, a water storage tank 19 positioned at the bottom of the support plate 6 and positioned at the left side of the storage battery pack 18 is fixedly arranged in the cavity 3, an overflow pipe communicated with the water storage tank 19 and penetrating through the carriage 2 and extending to the left side of the carriage 2 is fixedly connected at the left side of the carriage 2, a water collection funnel 20 communicated with the water storage tank 19 is fixedly arranged at the left side of the carriage 2, a water collection tank is arranged at the top of the water collection funnel 20, an active carbon filter plate is movably connected in the water collection tank, a steel wire filter screen positioned at the top of the active carbon filter plate is movably connected in the water collection tank, a storage box 21 is fixedly arranged at the top of the water storage tank 19, a spray, a working hole communicated with the cavity 3 is formed in the front side of the carriage 2, a working door positioned in the front side of the spray pipe 23 is rotatably connected in the working hole, a condensation chamber 24 positioned at the bottom of the support plate 6 and positioned between the storage battery pack 18 and the water storage tank 19 is fixedly arranged in the cavity 3, a condensation chamber 25 is formed in the condensation chamber 24, a condensation water pipe 26 is fixedly arranged in the condensation chamber 25, a circulating water pump communicated with the condensation water pipe 26 is fixedly arranged at the front side of the carriage 2, an exhaust pipe 27 communicated with the condensation chamber 25 is fixedly arranged at the rear side of the carriage 2, an air inlet pipe 28 positioned at the bottom of the exhaust pipe 27 and communicated with the condensation chamber 25 is fixedly connected at the right side of the condensation chamber 24, an electric heater 29 is fixedly connected at one end of the air inlet pipe 28 far away from the condensation chamber 24, an exhaust fan 30 is fixedly connected at an, an air inlet of the exhaust fan 30 is fixedly connected with an exhaust pipe which penetrates through the carriage 2 and extends to the front side of the carriage 2, a control panel is fixedly mounted on the front side of the carriage 2, the first electric screw rod 8, the stepping motor, the second electric screw rod 13, the storage battery pack 18, the circulating water pump, the spray water pump 22, the electric heater 29 and the exhaust fan 30 are electrically connected with the control panel, and the bottom of the condensation chamber 24 is fixedly connected with a water inlet pipe 31 which is communicated with the condensation cavity 25, penetrates through the water storage tank 19 and extends into the water storage tank 19.
The construction method of the green dust-settling environment-friendly construction structure of the road comprises the following steps:
1) rainwater falling to the top of the carriage 2 can only flow down from the left side through the side baffle 4 and the right baffle 5 and enter the water collection funnel 20 for collection and filtration, the filtered water enters the water storage tank 19 for collection, external mist extracted by the exhaust fan 30 is heated by the electric heater 29, then enters the condensation cavity 25 to be contacted with the condensate pipe 26, so that moisture in the mist is condensed and enters the water storage tank 19 through the water inlet pipe 31 for collection;
2, in sunny days, the output shaft of the first electric screw rod 8 rotates to drive the solar power generation panel 10 to ascend to the top of the carriage 2, so that the solar power generation panel 10 absorbs solar energy to generate power and stores the power into the storage battery pack 18, in strong wind days, the output shaft of the second electric screw rod 13 rotates to drive the wind power generator 16 to ascend to the top of the carriage 2, and the stepping motor drives the rotary table 15 to rotate so that the angle of the wind power generator 16 rotates to a proper position, so that the wind power generator 16 absorbs wind energy to generate power and stores the power into the storage battery pack 18;
3 are connected with the trailer through the trailer connecting seat, make the trailer drive 2 in the carriage and remove to the place that needs the dust fall, then rotate turning handle and make the threaded rod rotatory move down, make supporting pad and ground contact, then through opening the work door, take out spray header 23 in 3 from the cavity, then through the water edge spray header 23 blowout of collecting in the 22 extraction storage water tanks 19 of spray pump to accomplish the dust fall.
The working principle is as follows: rainwater falling on the top of the carriage 2 can only flow down from the left side through the side baffle 4 and the right baffle 5 and enter the water collecting funnel 20 for collection and filtration, the filtered water enters the water storage tank 19 for collection, external fog is extracted through the exhaust fan 30, the fog is heated through the electric heater 29 and then enters the condensation cavity 25 to be contacted with the condensate pipe 26, the moisture in the fog is condensed and enters the water storage tank 19 through the water inlet pipe 31 for collection, the trailer is connected with the trailer through the trailer connecting seat, the trailer drives the carriage 2 to move to a place needing dust fall, then the threaded rod rotates to move downwards by rotating the rotating handle, the supporting pad is contacted with the ground, then the spray water pipe 23 is taken out from the cavity 3 by opening the working door, then the water collected in the water storage tank 19 is extracted through the spray water pump 22 and is sprayed out along the spray water pipe 23, thereby dust fall is completed, and the rainwater and the moisture in the fog are collected, the waste of water resources is reduced, meanwhile, the fog concentration around a construction site can be reduced by absorbing moisture in the fog, the visibility is improved, the solar power generation panel 10 is driven to ascend to the top of the carriage 2 through the rotation of the output shaft of the first electric screw 8 in sunny days, the solar power generation panel 10 absorbs solar energy to generate power and store the power into the storage battery pack 18, the wind power generator 16 is driven to ascend to the top of the carriage 2 through the rotation of the output shaft of the second electric screw 13 in strong wind days, the stepping motor drives the rotary table 15 to rotate so that the angle of the wind power generator 16 rotates to a proper position, the wind power generator 16 absorbs wind energy to generate power and store the power into the storage battery pack 18, the power is supplied through the storage battery pack 18, the waste of electric energy is reduced, and the purposes of reducing the waste of water resources and protecting the environment are.
In conclusion, the green dust-fall environment-friendly construction structure and the construction method thereof for the highway can ensure that rainwater falling on the top of a carriage 2 can only flow down from the left side through the side baffle 4 and the right baffle 5 and enter the water collection funnel 20 for collection and filtration, the filtered water enters the water storage tank 19 for collection, external fog is extracted through the exhaust fan 30, is heated through the electric heater 29, then enters the condensation cavity 25 to be contacted with the condensate pipe 26, moisture in the fog is condensed, enters the water storage tank 19 through the water inlet pipe 31 for collection, is connected with a trailer through the trailer connecting seat, the trailer drives the carriage 2 to move to a place needing dust fall, then the screw rod rotates to move downwards by rotating the rotating handle to ensure that the supporting pad is contacted with the ground, then the spray water pipe 23 is taken out of the cavity 3 through opening the working door, then the water collected in the water storage tank 19 is extracted through the spray water pump 22 and sprayed out along the spray, the dust fall is finished, the waste of water resources is reduced by collecting rainwater and moisture in fog, the concentration of the fog around a construction site can be reduced by absorbing the moisture in the fog, the visibility is improved, the solar power generation panel 10 is driven to ascend to the top of the carriage 2 through the rotation of the output shaft of the first electric screw 8 in sunny days, the solar power generation panel 10 absorbs solar energy to generate power and store the power into the storage battery pack 18, the wind power generator 16 is driven to ascend to the top of the carriage 2 through the rotation of the output shaft of the second electric screw 13 in strong wind days, the angle of the wind power generator 16 is rotated to a proper position through the rotation of the rotating disc 15 driven by the stepping motor, the wind power generator 16 absorbs wind energy to generate power and store the power into the storage battery pack 18, the power supply is carried out through the storage battery pack 18, the waste of electric energy is reduced, and the waste of water resources is reduced, the purpose of green environmental protection has been solved and need carry out the dust fall to the dust that produces in the work progress when highway construction, but current dust device generally carries out the dust fall through filling the running water then spraying to the construction department in to the water tank, and this kind of dust fall method has caused the waste of a large amount of water resources, the problem of environmental protection inadequately.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. Road green dust fall environmental protection construction structure, including removing base (1), its characterized in that: the movable type automatic feeding and discharging device is characterized in that a carriage (2) is fixedly mounted at the top of the movable base (1), a cavity (3) is formed in the carriage (2), two side baffles (4) are fixedly mounted at the top of the carriage (2), a right baffle (5) which is located on the right side of each side baffle (4) and fixedly connected with the two side baffles (4) is fixedly mounted at the top of the carriage (2), a supporting plate (6) is fixedly mounted in the cavity (3), a first feeding and discharging hole (7) which is communicated with the cavity (3) and located between the two side baffles (4) is formed in the top of the carriage (2), four first electric screw rods (8) which are located at the tops of the supporting plates (6) are fixedly mounted in the cavity (3), and a first bottom plate (9) which is located between the supporting plates (6) and the first feeding and discharging hole (7) is movably connected in, first bottom plate (9) top fixed mounting has solar panel (10) that quantity is two, four the equal threaded connection of output shaft of first electronic lead screw (8) has first screw-nut (11) with first bottom plate (9) fixed connection, second business turn over hole (12) that are linked together and are located first business turn over hole (7) right side with cavity (3) are seted up at carriage (2) top, fixed mounting has second electronic lead screw (13) that quantity is four and are located backup pad (6) top in cavity (3), swing joint has second bottom plate (14) that are located between backup pad (6) and second business turn over hole (12) in cavity (3), second bottom plate (14) top rotates and is connected with carousel (15), carousel (15) top fixed mounting has wind-driven generator (16), four the equal threaded connection of output shaft of second electronic lead screw (13) has the second screw fixedly connected with second bottom plate (14) Female (17), fixed mounting has storage battery (18) that is located backup pad (6) bottom in cavity (3), fixed mounting has storage tank (19) that is located backup pad (6) bottom and is located storage battery (18) left in cavity (3), carriage (2) left side fixed mounting has water collection funnel (20) that is linked together with storage tank (19), storage tank (19) top fixed mounting has receiver (21), storage tank (19) top fixed mounting has spray pump (22) that is linked together with storage tank (19) and is located receiver (21) right side, swing joint has spray header (23) with the delivery port fixedly connected with of spray pump (22) in receiver (21), fixed mounting has condensation chamber (24) that is located backup pad (6) bottom and is located between storage battery (18) and storage tank (19) in cavity (3), condensation chamber (25) have been seted up in condensation chamber (24), fixed mounting has condenser pipe (26) in condensation chamber (25), carriage (2) rear side fixed mounting has blast pipe (27) that are linked together with condensation chamber (25), condensation chamber (24) right side fixedly connected with is located blast pipe (27) bottom and intake pipe (28) that are linked together with condensation chamber (25), the one end fixedly connected with electric heater (29) of condensation chamber (24) are kept away from in intake pipe (28), air inlet fixedly connected with air exhauster (30) of electric heater (29), condensation chamber (24) bottom fixedly connected with is linked together and runs through inlet tube (31) in storage water tank (19) and extend to storage water tank (19) with condensation chamber (25).
2. The construction structure of claim 1, characterized in that: remove base (1) right side fixed mounting has the trailer connecting seat, it has the quantity to be two connecting blocks to remove base (1) left side fixed mounting, connecting block top threaded connection has the through connection piece and extends to the threaded rod of connecting block bottom, threaded rod bottom fixedly connected with is located the supporting pad of connecting block bottom, peg graft in the threaded rod left side and have the through connection threaded rod and extend to the turning handle on threaded rod right side.
3. The construction structure of claim 1, characterized in that: side shield (4) and right baffle (5) etc. and highly all be greater than one centimetre, backup pad (6) top fixed mounting has the first partition panel that is located between first electric lead screw in right side (8) and the electric lead screw of left side second (13), backup pad (6) bottom fixed mounting has the second partition panel that is located between storage battery (18) and air exhauster (30).
4. The construction structure of claim 1, characterized in that: all rotate in first business turn over hole (7) and the second business turn over hole (12) and be connected with quantity for two sealing door, the equal fixedly connected with joint strip of sealing door four side walls, two contained angle between solar panel (10) is sixty degrees, two solar panel (10) top fixed mounting has the kicking block.
5. The construction structure of claim 1, characterized in that: when the first lead screw nut (11) moves to the top of an output shaft of the first electric lead screw (8), the solar power generation panel (10) is located at the top of the carriage (2), when the second lead screw nut (17) moves to the top of an output shaft of the second electric lead screw (13), the wind power generator (16) is located at the top of the carriage (2), a stepping motor is fixedly installed in the second bottom plate (14), an output shaft of the stepping motor is fixedly connected with the turntable (15), and a circulating water pump communicated with a condensate pipe (26) is fixedly installed on the front side of the carriage (2).
6. The construction structure of claim 5 for green dust fall and environmental protection of road is characterized in that: the solar energy power generation panel (10) and the wind driven generator (16) are electrically connected with the storage battery set (18), a control panel is fixedly mounted on the front side of the carriage (2), and the first electric screw rod (8), the stepping motor, the second electric screw rod (13), the storage battery set (18), the circulating water pump, the spray water pump (22), the electric heater (29) and the exhaust fan (30) are electrically connected with the control panel.
7. The construction structure of claim 1, characterized in that: the water collecting funnel (20) top has been seted up the water catch bowl, swing joint has the active carbon filter plate in the water catch bowl, swing joint has the steel wire filter screen that is located the active carbon filter plate top in the water catch bowl.
8. The construction structure of claim 1, characterized in that: the utility model discloses a spray water storage device, including carriage (2), storage water tank (19), air exhauster (30), air intake fixedly connected with run through carriage (2) and extend to the exhaust tube of carriage (2) front side, the working hole that is linked together with cavity (3) is opened to carriage (2) front side, the downthehole rotation of working is connected with the work door that is located spray header (23) front side, storage water tank (19) left side fixedly connected with is linked together with storage water tank (19) and runs through carriage (2) and extend to the left overflow pipe of carriage (2), the air intake fixedly connected with of air exhauster.
9. The construction method of the road green dust-settling environment-friendly construction structure is characterized by comprising the following steps of:
1) rainwater falling to the top of the carriage (2) can only flow down from the left side through the side baffle (4) and the right baffle (5) and enter the water collection funnel (20) for collection and filtration, the filtered water enters the water storage tank (19) for collection, external fog is extracted through the exhaust fan (30), heated through the electric heater (29), then enters the condensation cavity (25) to be contacted with the condensate pipe (26), moisture in the fog is condensed, and enters the water storage tank (19) through the water inlet pipe (31) for collection;
2) in sunny days, the solar power generation panel (10) is driven to ascend to the top of the compartment (2) through the rotation of the output shaft of the first electric screw rod (8), so that the solar power generation panel (10) absorbs solar energy to generate power and store the power into the storage battery pack (18), in strong wind days, the output shaft of the second electric screw rod (13) drives the wind power generator (16) to ascend to the top of the compartment (2), and the stepping motor drives the rotary table (15) to rotate so that the angle of the wind power generator (16) rotates to a proper position, so that the wind power generator (16) absorbs wind energy to generate power and store the power into the storage battery pack (18);
3) be connected with the trailer through the trailer connecting seat, make the trailer drive carriage (2) and remove to the place that needs the dust fall, then rotate turning handle and make the threaded rod rotatory move down, make supporting pad and ground contact, then through opening the working door, take out spray header (23) in cavity (3), then through spray header (23) blowout of water edge of collecting in spray pump (22) extraction storage water tank (19), thereby accomplish the dust fall.
CN202010412487.XA 2020-05-15 2020-05-15 Green dust-settling environment-friendly construction structure for road and construction method thereof Active CN111719484B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010412487.XA CN111719484B (en) 2020-05-15 2020-05-15 Green dust-settling environment-friendly construction structure for road and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010412487.XA CN111719484B (en) 2020-05-15 2020-05-15 Green dust-settling environment-friendly construction structure for road and construction method thereof

Publications (2)

Publication Number Publication Date
CN111719484A true CN111719484A (en) 2020-09-29
CN111719484B CN111719484B (en) 2022-08-23

Family

ID=72564576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010412487.XA Active CN111719484B (en) 2020-05-15 2020-05-15 Green dust-settling environment-friendly construction structure for road and construction method thereof

Country Status (1)

Country Link
CN (1) CN111719484B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112657287A (en) * 2020-11-24 2021-04-16 安徽建筑大学 Energy-concerving and environment-protective building road dust absorbing device for civil engineering

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007182688A (en) * 2006-01-06 2007-07-19 Tsurumi Mfg Co Ltd Storage type detachable tank device
CN104895143A (en) * 2015-05-27 2015-09-09 国网山东省电力公司电力科学研究院 Efficient fog water collecting device and method
CN107724323A (en) * 2017-10-10 2018-02-23 华道林 Highway green depositing dust environmental protection construction structure and its construction method
CN107905171A (en) * 2017-10-26 2018-04-13 王晓东 A kind of multi-functional haze depositing dust sprinkling truck
CN108375156A (en) * 2018-03-20 2018-08-07 罗金山 A kind of energy conservation and environmental protection dedusting ventilation equipment
WO2018165890A1 (en) * 2017-03-15 2018-09-20 深圳市源畅通科技有限公司 High-efficiency energy-efficient smart city sprinkler vehicle
CN108729401A (en) * 2018-07-02 2018-11-02 南京海晨霞工程科技有限公司 A kind of watering heat sink that town road is easy to remove
CN108867528A (en) * 2018-06-22 2018-11-23 昆明理工大学 A kind of urban road cleaning device
KR20180135697A (en) * 2017-06-13 2018-12-21 (주)건설기술원 Mist spraying vehicle for filtering dust

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007182688A (en) * 2006-01-06 2007-07-19 Tsurumi Mfg Co Ltd Storage type detachable tank device
CN104895143A (en) * 2015-05-27 2015-09-09 国网山东省电力公司电力科学研究院 Efficient fog water collecting device and method
WO2018165890A1 (en) * 2017-03-15 2018-09-20 深圳市源畅通科技有限公司 High-efficiency energy-efficient smart city sprinkler vehicle
KR20180135697A (en) * 2017-06-13 2018-12-21 (주)건설기술원 Mist spraying vehicle for filtering dust
CN107724323A (en) * 2017-10-10 2018-02-23 华道林 Highway green depositing dust environmental protection construction structure and its construction method
CN107905171A (en) * 2017-10-26 2018-04-13 王晓东 A kind of multi-functional haze depositing dust sprinkling truck
CN108375156A (en) * 2018-03-20 2018-08-07 罗金山 A kind of energy conservation and environmental protection dedusting ventilation equipment
CN108867528A (en) * 2018-06-22 2018-11-23 昆明理工大学 A kind of urban road cleaning device
CN108729401A (en) * 2018-07-02 2018-11-02 南京海晨霞工程科技有限公司 A kind of watering heat sink that town road is easy to remove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112657287A (en) * 2020-11-24 2021-04-16 安徽建筑大学 Energy-concerving and environment-protective building road dust absorbing device for civil engineering

Also Published As

Publication number Publication date
CN111719484B (en) 2022-08-23

Similar Documents

Publication Publication Date Title
CN206625170U (en) A kind of municipal works road cleaning plant
CN111719484B (en) Green dust-settling environment-friendly construction structure for road and construction method thereof
CN106316472A (en) Household refuse recycling system
CN205839663U (en) A kind of solar power air cleaner sweeper
CN202555126U (en) Dedusting and wind power generation device
CN212188442U (en) Be used for hierarchical formula dust collector of industrial flue gas
CN212045112U (en) Robot cutting device for cutting automotive interior parts without water jet cutter
CN210495614U (en) Tail gas absorption tower that utilizes in hypophosphorous acid course of working
CN113083883A (en) Contaminated site heat-preservation in-situ remediation system and method
CN210449341U (en) Waste residue processing apparatus for mining
CN112206899A (en) Energy-concerving and environment-protective inorganic refuse treatment equipment
CN216599534U (en) Photovoltaic board deashing equipment
CN216234226U (en) Low energy consumption automatic deodorization dustbin cover
CN206971146U (en) A kind of dust for highway cleans stroller
CN214328448U (en) Municipal administration highway bituminous paving maintains device
CN112833412A (en) Environment-friendly flue gas purification equipment for waste incineration
CN113731059A (en) Building environmental protection dust collector of circulation automatic purification
CN208662067U (en) A kind of solar panels cleaning vehicle having both mechanical sweeper and electrostatic precipitation
CN207174583U (en) One kind is gone out cigarette dustbin
CN220685922U (en) Garbage collection box for municipal works
CN217678814U (en) Multifunctional leaf cleaning and falling device
CN220715345U (en) Activated carbon adsorption box
CN219002480U (en) Environment protection dust particle absorbing equipment
CN219622736U (en) Coal mine excavating and spraying device
CN218048246U (en) Lithium cell freezes electrified equipment of tearing to shreds in advance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Gong Weijiang

Inventor after: Xu Naping

Inventor after: Hu Guanglie

Inventor before: Gong Wei

Inventor before: Xu Naping

Inventor before: Hu Guanglie

GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Construction Structure and Method of Green Dust Reduction and Environmental Protection for Highway

Effective date of registration: 20230902

Granted publication date: 20220823

Pledgee: Zhejiang Shangyu Rural Commercial Bank Co.,Ltd. Fenghui Sub branch

Pledgor: LONGDE CONSTRUCTION Co.,Ltd.

Registration number: Y2023330001917